SlideShare a Scribd company logo
1 of 1
Download to read offline
A5252
3/30/20152:52:22PM
BUILDING 5
ENLARGED COMMON
AREA PLANS
LEVEL 2
01COMMON AREA LEVEL 2 - MATERIAL BASE EXTENTS PLAN 1/4" = 1'-0"13COMMON AREA LEVEL 2 - FLOOR FINISH PLAN 1/4" = 1'-0"
1600 WATER STREET
LAREDO TX 78040
Drawn By :
Project No. :
Date :
3042.00
Contact : J NICHOLS
Drawn By :
Project No. :
Date :
Contact :
SM/RM/FA/BW/AS
KEY PLANKEY PLAN
N
B1a B2 B3
A2
B4 A3
A4
PH II
PH II
RETAIL LEVEL 1
RETAIL LEVEL 2
PARKING LEVEL
TOA
THOMAS / O'CONNOR ASSOCIATES LLC
ARCHITECTURE / URBAN DESIGN
1120 GRANT STEET
EVANSTON, ILLINOIS 60201
312-519-9624
03-30-2015
THE OUTLET
SHOPPES AT
LAREDO
AT
TS
XETE FO
SA
REGIS
TERED ARC
H
ITECT
RO
SSG.ADA
MS
14 8 4 9
03-30-2015
BID PACKAGE SET
B1b B1c
B5a B5b
A1a A1b A1c
A5a A5b
5002
2
TYP.
5002
2
TYP.
5002
2
TYP.
5002
2
TYP.
WALLFINISH2
WALL FINISH 2
WALLFINISH2
WALL FINISH 2
WALL FINISH 1
WALL FINISH 2
WALL FINISH 2
WALL FINISH 2
WALL FINISH 2
WALL FINISH 3
(BUILD-OUTS)
WALLFINISH2
WALLFINISH5
WALLFINISH5
PWT-2 @
SINK RECESS
TYP.
PWT-2 @
SINK RECESS
TYP.
WALL FINISH TYPES -
- SEE ELEVATIONS FOR MATERIAL HEIGHTS & COLOR
LOCATIONS
- SEE A5002 SHEET FOR WALL FINISH TYPICALS
WALL FINISH 1:
- PROFILE RUBBER BASE (RPB-1)
- PAINT (P/IE-3) BELOW CHAIR RAIL
- CHAIR RAIL (CR-1)
- WALLCOVERING (WC-1) ABOVE CHAIR RAIL
WALL FINISH 2:
- PORCELAIN WALL TILE (PWT-1)
- PORCELAIN BULLNOSE (PBN-2) TO CAP WALL TILE
- GLASS ACCENT WALL TILE (SEE TYP. ON A5002)
- PAINT (P/IE-2) ABOVE TILE
WALL FINISH 3: TILE BUILD OUT AT SINK
- FLOOR TO CEILING GLASS TILE MOSAICS (MT-2).
TYPICAL ON ALL 3 SIDES AND BOTTOM OF
BUILD-OUT.
- SCHLUTER STRIP (SLTS-1) FOR OUTSIDE
CORNERS ONLY
WALL 4: RESTROOM ENTRIES
- PROFILE RUBBER BASE (RPB-1)
- FLOOR TO CEILING PAINT (P/IE-10)
WALL FINISH 5: WOMEN'S LOUNGE
- PROCELAIN BULLNOSE (PBN-2) AS WALL BASE
- WALLCOVERING (WC-1) FLOOR TO CEILING ON
(3 WALLS TYPICAL).
WALL FINISH 6: VENDING
- RUBBER PROFILE BASE (RPB-1)
- FLOOR TO CEILING PAINT (P/IE-3)
WALL
FINISH2
WALL
FINISH 4
WALL
FINISH 4
REVEAL
(SEE ELEVATIONS)
REVEAL
(SEE ELEVATIONS)
WALL
FINISH 4
WALLFINISH1
WALL
FINISH 4
WALL
FINISH2
WALLFINISH1
WALLFINISH2
WALLFINISH2
WALL FINISH 2
WALL FINISH 3
(BUILD-OUTS)
WALL FINISH 5
WALLFINISH6
WALLFINISH2
WALLFINISH2
WALLFINISH2
CORNER
GUARDS
(SEE
ELEVATIONS)
CORNER
GUARDS
(SEE
ELEVATIONS)
2'-0"
2'-0"
WALLFINISH1
WALLFINISH1
5002
2
2PFT
2PFT
2PFT
2PFT
2" MARBLE
TRANSITION
THRESHOLD
2" MARBLE
TRANSITION
THRESHOLD
SEE A5002 FOR ENLARGED FLOOR
PATTERN REPEAT. ACCENT VCT FOR
THIS CORRIDOR SHALL BE VCT- 4
(COLOR: GRANNY SMITH)
1PFT
2MT
1PFT
3MT
2PFT
3MT
1PFT
FLOOR NOTE AT WALL REVEALS:
VCT FLOOR AND/OR 2" MARBLE FLOOR
TRANSITION SHALL EXTEND INTO
REVEAL AT WALL. SEE ELEVATIONS.
3" 2'-4" 3"
ALIGN TILE BUILD-OUT WITH
FLOOR PATTERN INSET
3"1'-101
2" 3"
TILE BUILD-OUT DOES NOT
ALIGN WITH FLOOR PATTERN INSET
2'-10" 2'-10" 2'-10" 2'-10"
5'-1"
EQ. 5'-7" 3" EQ.
4'-2"EQ.EQ.
4'-111
2"
2'-41
2" 2'-41
2" 2'-41
2" 2'-41
2"
7VCT
7VCT
7VCT
7VCT
7VCT
7VCT
7VCT
7VCT
7VCT
7VCT
RTS-1
RTS-1
RTS-1
RTS-1
51
2" 51
2" 51
2"31
2"
10" 10" 10" 5"5"5"
3" TYP.
(3) 1X1
TILES WIDE
3" TYP.
(3) 1X1
TILES WIDE
2'-0"
2'-0"
RTS-1

More Related Content

What's hot

Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
Martin Pauly
 
Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603
Shin Kameyama
 
office door submission model
 office door submission model office door submission model
office door submission model
dezyneecole
 
Latest Portfolio.compressed
Latest Portfolio.compressedLatest Portfolio.compressed
Latest Portfolio.compressed
Reuben Moruri
 

What's hot (12)

Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
 
502 north market
502 north market502 north market
502 north market
 
Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603
 
Masliansky_Project_2
Masliansky_Project_2Masliansky_Project_2
Masliansky_Project_2
 
24491-00
24491-0024491-00
24491-00
 
2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization
 
Lombard House
Lombard HouseLombard House
Lombard House
 
Farmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CAFarmers Executive Fitness Wilshire Blvd LA CA
Farmers Executive Fitness Wilshire Blvd LA CA
 
BC_Three-StoreyHouse
BC_Three-StoreyHouseBC_Three-StoreyHouse
BC_Three-StoreyHouse
 
office door submission model
 office door submission model office door submission model
office door submission model
 
Woodsville
WoodsvilleWoodsville
Woodsville
 
Latest Portfolio.compressed
Latest Portfolio.compressedLatest Portfolio.compressed
Latest Portfolio.compressed
 

Similar to A5252

KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLIS
Sean Roper
 
21dj0036 plan.pdf
21dj0036 plan.pdf21dj0036 plan.pdf
21dj0036 plan.pdf
Quote5
 
Building Information Modeling - Residential Fall 2014
Building Information Modeling -  Residential Fall 2014Building Information Modeling -  Residential Fall 2014
Building Information Modeling - Residential Fall 2014
Martin Pauly
 
lore_wine_&_spirits_wtc_retail
lore_wine_&_spirits_wtc_retaillore_wine_&_spirits_wtc_retail
lore_wine_&_spirits_wtc_retail
Gerald E. Marquez
 
03B-MASTER SITE PLAN 03-MASTER SITE (1)
03B-MASTER SITE PLAN 03-MASTER SITE (1)03B-MASTER SITE PLAN 03-MASTER SITE (1)
03B-MASTER SITE PLAN 03-MASTER SITE (1)
Sergio Penton
 

Similar to A5252 (20)

Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setar
 
Measured drawings
Measured drawingsMeasured drawings
Measured drawings
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLIS
 
Lot 280 Bogdanich way
Lot 280 Bogdanich wayLot 280 Bogdanich way
Lot 280 Bogdanich way
 
Elsegundopor tbinder008
Elsegundopor tbinder008Elsegundopor tbinder008
Elsegundopor tbinder008
 
elsegundoporTBINDER008
elsegundoporTBINDER008elsegundoporTBINDER008
elsegundoporTBINDER008
 
21dj0036 plan.pdf
21dj0036 plan.pdf21dj0036 plan.pdf
21dj0036 plan.pdf
 
MA_Thomas_Portfolio
MA_Thomas_PortfolioMA_Thomas_Portfolio
MA_Thomas_Portfolio
 
Building Information Modeling - Residential Fall 2014
Building Information Modeling -  Residential Fall 2014Building Information Modeling -  Residential Fall 2014
Building Information Modeling - Residential Fall 2014
 
Greville king draft concept plans
Greville king draft concept plansGreville king draft concept plans
Greville king draft concept plans
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
 
lore_wine_&_spirits_wtc_retail
lore_wine_&_spirits_wtc_retaillore_wine_&_spirits_wtc_retail
lore_wine_&_spirits_wtc_retail
 
KASSIN GYM
KASSIN GYMKASSIN GYM
KASSIN GYM
 
Gem residences
Gem residencesGem residences
Gem residences
 
Gem residences
Gem residencesGem residences
Gem residences
 
Gem residences
Gem residencesGem residences
Gem residences
 
La Cumbre Nextel Santa Barbara CA
La Cumbre Nextel Santa Barbara CALa Cumbre Nextel Santa Barbara CA
La Cumbre Nextel Santa Barbara CA
 
A-1.pdf
A-1.pdfA-1.pdf
A-1.pdf
 
03B-MASTER SITE PLAN 03-MASTER SITE (1)
03B-MASTER SITE PLAN 03-MASTER SITE (1)03B-MASTER SITE PLAN 03-MASTER SITE (1)
03B-MASTER SITE PLAN 03-MASTER SITE (1)
 
City Place Dania - Linear Interior walls (inside units only).pdf
City Place Dania - Linear Interior walls (inside units only).pdfCity Place Dania - Linear Interior walls (inside units only).pdf
City Place Dania - Linear Interior walls (inside units only).pdf
 

More from Antoinette Pope

More from Antoinette Pope (7)

A4502
A4502A4502
A4502
 
P26532B-FORREP
P26532B-FORREPP26532B-FORREP
P26532B-FORREP
 
P26834-FOR REP
P26834-FOR REPP26834-FOR REP
P26834-FOR REP
 
P24050BD-FORREP
P24050BD-FORREPP24050BD-FORREP
P24050BD-FORREP
 
J24263-page1
J24263-page1J24263-page1
J24263-page1
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15
 
Exterior - Material Board
Exterior - Material BoardExterior - Material Board
Exterior - Material Board
 

A5252

  • 1. A5252 3/30/20152:52:22PM BUILDING 5 ENLARGED COMMON AREA PLANS LEVEL 2 01COMMON AREA LEVEL 2 - MATERIAL BASE EXTENTS PLAN 1/4" = 1'-0"13COMMON AREA LEVEL 2 - FLOOR FINISH PLAN 1/4" = 1'-0" 1600 WATER STREET LAREDO TX 78040 Drawn By : Project No. : Date : 3042.00 Contact : J NICHOLS Drawn By : Project No. : Date : Contact : SM/RM/FA/BW/AS KEY PLANKEY PLAN N B1a B2 B3 A2 B4 A3 A4 PH II PH II RETAIL LEVEL 1 RETAIL LEVEL 2 PARKING LEVEL TOA THOMAS / O'CONNOR ASSOCIATES LLC ARCHITECTURE / URBAN DESIGN 1120 GRANT STEET EVANSTON, ILLINOIS 60201 312-519-9624 03-30-2015 THE OUTLET SHOPPES AT LAREDO AT TS XETE FO SA REGIS TERED ARC H ITECT RO SSG.ADA MS 14 8 4 9 03-30-2015 BID PACKAGE SET B1b B1c B5a B5b A1a A1b A1c A5a A5b 5002 2 TYP. 5002 2 TYP. 5002 2 TYP. 5002 2 TYP. WALLFINISH2 WALL FINISH 2 WALLFINISH2 WALL FINISH 2 WALL FINISH 1 WALL FINISH 2 WALL FINISH 2 WALL FINISH 2 WALL FINISH 2 WALL FINISH 3 (BUILD-OUTS) WALLFINISH2 WALLFINISH5 WALLFINISH5 PWT-2 @ SINK RECESS TYP. PWT-2 @ SINK RECESS TYP. WALL FINISH TYPES - - SEE ELEVATIONS FOR MATERIAL HEIGHTS & COLOR LOCATIONS - SEE A5002 SHEET FOR WALL FINISH TYPICALS WALL FINISH 1: - PROFILE RUBBER BASE (RPB-1) - PAINT (P/IE-3) BELOW CHAIR RAIL - CHAIR RAIL (CR-1) - WALLCOVERING (WC-1) ABOVE CHAIR RAIL WALL FINISH 2: - PORCELAIN WALL TILE (PWT-1) - PORCELAIN BULLNOSE (PBN-2) TO CAP WALL TILE - GLASS ACCENT WALL TILE (SEE TYP. ON A5002) - PAINT (P/IE-2) ABOVE TILE WALL FINISH 3: TILE BUILD OUT AT SINK - FLOOR TO CEILING GLASS TILE MOSAICS (MT-2). TYPICAL ON ALL 3 SIDES AND BOTTOM OF BUILD-OUT. - SCHLUTER STRIP (SLTS-1) FOR OUTSIDE CORNERS ONLY WALL 4: RESTROOM ENTRIES - PROFILE RUBBER BASE (RPB-1) - FLOOR TO CEILING PAINT (P/IE-10) WALL FINISH 5: WOMEN'S LOUNGE - PROCELAIN BULLNOSE (PBN-2) AS WALL BASE - WALLCOVERING (WC-1) FLOOR TO CEILING ON (3 WALLS TYPICAL). WALL FINISH 6: VENDING - RUBBER PROFILE BASE (RPB-1) - FLOOR TO CEILING PAINT (P/IE-3) WALL FINISH2 WALL FINISH 4 WALL FINISH 4 REVEAL (SEE ELEVATIONS) REVEAL (SEE ELEVATIONS) WALL FINISH 4 WALLFINISH1 WALL FINISH 4 WALL FINISH2 WALLFINISH1 WALLFINISH2 WALLFINISH2 WALL FINISH 2 WALL FINISH 3 (BUILD-OUTS) WALL FINISH 5 WALLFINISH6 WALLFINISH2 WALLFINISH2 WALLFINISH2 CORNER GUARDS (SEE ELEVATIONS) CORNER GUARDS (SEE ELEVATIONS) 2'-0" 2'-0" WALLFINISH1 WALLFINISH1 5002 2 2PFT 2PFT 2PFT 2PFT 2" MARBLE TRANSITION THRESHOLD 2" MARBLE TRANSITION THRESHOLD SEE A5002 FOR ENLARGED FLOOR PATTERN REPEAT. ACCENT VCT FOR THIS CORRIDOR SHALL BE VCT- 4 (COLOR: GRANNY SMITH) 1PFT 2MT 1PFT 3MT 2PFT 3MT 1PFT FLOOR NOTE AT WALL REVEALS: VCT FLOOR AND/OR 2" MARBLE FLOOR TRANSITION SHALL EXTEND INTO REVEAL AT WALL. SEE ELEVATIONS. 3" 2'-4" 3" ALIGN TILE BUILD-OUT WITH FLOOR PATTERN INSET 3"1'-101 2" 3" TILE BUILD-OUT DOES NOT ALIGN WITH FLOOR PATTERN INSET 2'-10" 2'-10" 2'-10" 2'-10" 5'-1" EQ. 5'-7" 3" EQ. 4'-2"EQ.EQ. 4'-111 2" 2'-41 2" 2'-41 2" 2'-41 2" 2'-41 2" 7VCT 7VCT 7VCT 7VCT 7VCT 7VCT 7VCT 7VCT 7VCT 7VCT RTS-1 RTS-1 RTS-1 RTS-1 51 2" 51 2" 51 2"31 2" 10" 10" 10" 5"5"5" 3" TYP. (3) 1X1 TILES WIDE 3" TYP. (3) 1X1 TILES WIDE 2'-0" 2'-0" RTS-1