Today’s presentation
• Welcome and Introduction to Andy Smith
• Introduction to Rodgers Leask Ltd
• Introduction to the EPA project
• Define phase of the DMAIC methodology
• Measure phase of the DMAIC methodology
• Analyse phase of the DMAIC methodology
• Improve phase of the DMAIC methodology
• Control phase of the DMAIC methodology
• Project Summary
• Our Sectors for you to peruse at your leisure
• Our Clients for you to peruse at your leisure
Andy Smith EPA project presentation 4/16/2019 2
Introduction to Rodgers Leask Ltd
• Established over 30 years – founded 1984 in Derby
• Offices in Derby, Birmingham & South West
• Over 60 engineering and technical staff
• £7.5m turnover (2017)
• 80% repeat business
• Longstanding clients
• ISO certification: 9001, 14001, 18001, 27001
• Recently undergone a Management Buy Out
• There is more information about our clients and business at the end of
the presentation
Andy Smith EPA project presentation 4/16/2019 3
Introduction to Andy Smith
• Andy Smith – General Manager
• Finance Management
• Information Technology
• Human Resources
• Reception and Administration
• Conformance Management
• Fleet Management
• Facilities Management
• Basically if something needs to be done then you will be
able to blame me if it goes wrong!
Andy Smith EPA project presentation 4/16/2019 4
Introduction to EPA project
• Agreed project – Improve engineering departmental efficiencies
• Process adopted – DMAIC (Six Sigma methodology)
• D – Define phase of the
• In this phase I needed to identify the customers needs and the process or products to be improved.
• Management team were identified as the key stakeholders
• Processes were reviewed and inconsistencies identified
• SIPOC was used as a visualisation aid for process reviews
• Key performance measures were identified
• In the Define phase of a project it is critical that you seek and gain buy in from all stakeholder otherwise
you run a significant risk of resources not being made available later in the project
• Problem Statement: Structures are not consistently applying all relevant Health & Safety procedures to their
engineering projects and are not storing the significant project documentation into Workspace inline with the
companies Quality manual – ISO9001.
• These practices need to be measurably improved.
Andy Smith EPA project presentation 4/16/2019 5
• M – Measure
• In this phase I needed to map out the “as is” process and this was visualised using
process mapping.
• I collected data from existing internal audits to allow us to set a baseline to measure
improvements from.
• I also collected anecdotal data from the Structure's team as to what they saw the
problems were in their department.
• Following a project review we were able to revise our problem statement.
• Revised Problem Statement: Structures are not consistently applying all relevant Health &
Safety procedures to their engineering projects and are not storing the significant project
documentation into Workspace inline with the companies Quality manual – ISO9001.
• A training plan needs to be implemented to ensure consistent use of Workspace and Health
& Safety application to all Structures projects.
Andy Smith EPA project presentation 4/16/2019 6
Andy Smith EPA project presentation 4/16/2019 7
 A - Analyse
 I analysed data from previous audits which suggested poor adherence to
procedures, inconsistence application of Health and Safety protocols and an erratic
use of Workspace
 Drawing numbering systems were being ignored and basic document controls
were not in place
 It also became apparent that there was an “age” difference in what procedures
were adopted by whom? And also that any training that had previously delivered
was out of date
 We identified the critical documentation which needed to be output from the
engineering process with Structures and this was used to generate a secondary
audit
 Following the secondary audit is became even clearer that process and policies
were not being adhered to and that we were not following legal guidance on some
Health and Safety practices
Andy Smith EPA project presentation 4/16/2019 8
 I – Improve:
• Introduce a review of the Designers Risk Assessment documentation.
• Ensure all engineers were trained in the use of the developed template
• Dynamic Risk Assessment training was to be delivered to the whole of
the Structures department
• Specific Safety Media course were identified as critical training
requirements
• Develop “Introduction to Workspace” training
• Deliver “Introduction to Workspace” training to all of the Structures
department
• Implementation of process for storage and naming of project critical
documentation
• Implement a process to measure all new projects for their adherence
to the new standard
• Implement project auditing as part of the Quality management process
Andy Smith EPA project presentation 4/16/2019 9
 C - Control
• A Safety Media Dashboard was created to Monitor the uptake of
identified critical training.
• All training was recorded in the Training Matrix
• All Safety Media training is now a deliverable objective in everyone's
appraisal
• The Designer Risk Assessment template is now stored in Workspace (as
a template)
• Monthly project audits are in place with a weighted scoring system
• Engineers now have an improvement objective as an appraisal
deliverable
• All this is now reviewed at the Management meetings as well as the
Conformance meetings
• Identifies failures or potential improvements are fed back into the
regular departmental improvement meetings
Project Summary
• Rodgers Leask Ltd identified that they wanted to make a significant
business change to the way the engineering departments operated and
for this to have a Quality and Financial benefit to the business
• Andy Smith undertook a project to identify and deliver this change, this
project became his apprenticeship project which has been presented as
part of the EPA process today
• The engineering departments have already changed their processes and
identified best practice is being shared across departments
• Health and Safety have been significantly improved, the risk of future
claims have been significantly mitigated, Workspace is now a tool we can
be proud of and we are in a better position to enter into negotiations to
reduce our PI insurance even further
• The goals of the project have more than been delivered and
expectations for my next project have been raised significantly.
Andy Smith EPA project presentation 4/16/2019 10
Our sectors
Industrial
Manufacturing
facilities – from
automotive to food
and drink
Leisure & Hotels
New build
refurbishment and
extension
Commercial
Retail parks, offices,
town centres, hotels
and multi-storey car
parks
Residential
Low rise, multi-storey
apartments and
student
accommodation
Education
Universities,
colleges
and schools
Healthcare
Medical units,
health centres and
care homes
Nuclear
New build,
decommissioning
and defence
Town Centre
Development
Masterplanning
Distribution
High bay
warehouses and
marshalling
4/16/2019 Andy Smith EPA project presentation 11
Our clients
4/16/2019 Andy Smith EPA project presentation 12

More Related Content

What's hot

Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
Kartikeya Pandey
 
Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015
Aconex
 
O'Neill Jamie Resume 2016
O'Neill Jamie Resume 2016O'Neill Jamie Resume 2016
O'Neill Jamie Resume 2016
Jamie O'Neill
 
Innovations in program controls integrating primavera and cost systems
Innovations in program controls   integrating primavera and cost systemsInnovations in program controls   integrating primavera and cost systems
Innovations in program controls integrating primavera and cost systems
p6academy
 
Time After Time: Creating Reliable Administrative Methods Process (RAMP)
Time After Time: Creating Reliable Administrative Methods Process (RAMP)Time After Time: Creating Reliable Administrative Methods Process (RAMP)
Time After Time: Creating Reliable Administrative Methods Process (RAMP)
Beckie Layton
 

What's hot (20)

Session T2 - Best Practice Project Controls with EcoSys
Session T2 - Best Practice Project Controls with EcoSysSession T2 - Best Practice Project Controls with EcoSys
Session T2 - Best Practice Project Controls with EcoSys
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
 
Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015Deliver Reliable Power Projects - Webinar June 16 2015
Deliver Reliable Power Projects - Webinar June 16 2015
 
Controlling Project Performance using PDM - PSQT2005 - Ben Linders
Controlling Project Performance using PDM - PSQT2005 - Ben LindersControlling Project Performance using PDM - PSQT2005 - Ben Linders
Controlling Project Performance using PDM - PSQT2005 - Ben Linders
 
Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Benefits of a Company-wide Project Management Platform - Webinar, July 2016Benefits of a Company-wide Project Management Platform - Webinar, July 2016
Benefits of a Company-wide Project Management Platform - Webinar, July 2016
 
O'Neill Jamie Resume 2016
O'Neill Jamie Resume 2016O'Neill Jamie Resume 2016
O'Neill Jamie Resume 2016
 
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
FIATECH 2011 - Reducing Costs and Increasing ROI: Project Management in the C...
 
Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...
Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...
Conquer Interface Management, Deliver Successful Projects - Webinar March 18,...
 
Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...
 
How Strategic Alliances and Alternative Delivery Models Drive Project Success...
How Strategic Alliances and Alternative Delivery Models Drive Project Success...How Strategic Alliances and Alternative Delivery Models Drive Project Success...
How Strategic Alliances and Alternative Delivery Models Drive Project Success...
 
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...
AACE Keynote Presentation: Three Steps Toward Program-wide Control - Aconex, ...
 
Avoid the risk and streamline your project controls
Avoid the risk and streamline your project controlsAvoid the risk and streamline your project controls
Avoid the risk and streamline your project controls
 
Keeping your project on track - Webinar, September 2016
Keeping your project on track - Webinar, September 2016Keeping your project on track - Webinar, September 2016
Keeping your project on track - Webinar, September 2016
 
Innovations in program controls integrating primavera and cost systems
Innovations in program controls   integrating primavera and cost systemsInnovations in program controls   integrating primavera and cost systems
Innovations in program controls integrating primavera and cost systems
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
 
Maintaining Business Continuity During Your Lab Relocation
Maintaining Business Continuity During Your Lab RelocationMaintaining Business Continuity During Your Lab Relocation
Maintaining Business Continuity During Your Lab Relocation
 
Modernize project controls to ensure project success aecom
Modernize project controls to ensure project success   aecomModernize project controls to ensure project success   aecom
Modernize project controls to ensure project success aecom
 
Session T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic OpportunitySession T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic Opportunity
 
Time After Time: Creating Reliable Administrative Methods Process (RAMP)
Time After Time: Creating Reliable Administrative Methods Process (RAMP)Time After Time: Creating Reliable Administrative Methods Process (RAMP)
Time After Time: Creating Reliable Administrative Methods Process (RAMP)
 

Similar to EPA Presentation - Andy Smith

CDM_2015_no_speaker_notes.pptx
CDM_2015_no_speaker_notes.pptxCDM_2015_no_speaker_notes.pptx
CDM_2015_no_speaker_notes.pptx
ssuserb5044d
 
The path to a single project controls system with a primavera core ppt
The path to a single project controls system with a primavera core pptThe path to a single project controls system with a primavera core ppt
The path to a single project controls system with a primavera core ppt
p6academy
 

Similar to EPA Presentation - Andy Smith (20)

EPA Project - Andy Smith
EPA Project - Andy SmithEPA Project - Andy Smith
EPA Project - Andy Smith
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
CDM_2015_no_speaker_notes.pptx
CDM_2015_no_speaker_notes.pptxCDM_2015_no_speaker_notes.pptx
CDM_2015_no_speaker_notes.pptx
 
Practical experiences of portfolio management
Practical experiences of portfolio managementPractical experiences of portfolio management
Practical experiences of portfolio management
 
What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
Your project selected_for_audit_sip18_project_auditors
Your project selected_for_audit_sip18_project_auditorsYour project selected_for_audit_sip18_project_auditors
Your project selected_for_audit_sip18_project_auditors
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
Strategies and Process Improvement with Enterprise SPICE®
Strategies and Process Improvement with Enterprise SPICE®Strategies and Process Improvement with Enterprise SPICE®
Strategies and Process Improvement with Enterprise SPICE®
 
PMINYC Lean
PMINYC LeanPMINYC Lean
PMINYC Lean
 
BCS-Presentations.pptx
BCS-Presentations.pptxBCS-Presentations.pptx
BCS-Presentations.pptx
 
Introduction to Agile Software Development
Introduction to Agile Software DevelopmentIntroduction to Agile Software Development
Introduction to Agile Software Development
 
Making of Stakeholders Delight
Making of Stakeholders DelightMaking of Stakeholders Delight
Making of Stakeholders Delight
 
Making of Stakeholders Delight
Making of Stakeholders Delight Making of Stakeholders Delight
Making of Stakeholders Delight
 
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
 
Managing the Unknown v2
Managing the Unknown v2Managing the Unknown v2
Managing the Unknown v2
 
The path to a single project controls system with a primavera core ppt
The path to a single project controls system with a primavera core pptThe path to a single project controls system with a primavera core ppt
The path to a single project controls system with a primavera core ppt
 
Pm audit and assessment approach final
Pm audit and assessment approach   finalPm audit and assessment approach   final
Pm audit and assessment approach final
 
Iiba cbap
Iiba cbapIiba cbap
Iiba cbap
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education Program
 

Recently uploaded

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 

Recently uploaded (17)

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 

EPA Presentation - Andy Smith

  • 1. Presentation to: EPA - CTskills Rodgers Leask April 2019 4/16/2019 1
  • 2. Today’s presentation • Welcome and Introduction to Andy Smith • Introduction to Rodgers Leask Ltd • Introduction to the EPA project • Define phase of the DMAIC methodology • Measure phase of the DMAIC methodology • Analyse phase of the DMAIC methodology • Improve phase of the DMAIC methodology • Control phase of the DMAIC methodology • Project Summary • Our Sectors for you to peruse at your leisure • Our Clients for you to peruse at your leisure Andy Smith EPA project presentation 4/16/2019 2
  • 3. Introduction to Rodgers Leask Ltd • Established over 30 years – founded 1984 in Derby • Offices in Derby, Birmingham & South West • Over 60 engineering and technical staff • £7.5m turnover (2017) • 80% repeat business • Longstanding clients • ISO certification: 9001, 14001, 18001, 27001 • Recently undergone a Management Buy Out • There is more information about our clients and business at the end of the presentation Andy Smith EPA project presentation 4/16/2019 3
  • 4. Introduction to Andy Smith • Andy Smith – General Manager • Finance Management • Information Technology • Human Resources • Reception and Administration • Conformance Management • Fleet Management • Facilities Management • Basically if something needs to be done then you will be able to blame me if it goes wrong! Andy Smith EPA project presentation 4/16/2019 4
  • 5. Introduction to EPA project • Agreed project – Improve engineering departmental efficiencies • Process adopted – DMAIC (Six Sigma methodology) • D – Define phase of the • In this phase I needed to identify the customers needs and the process or products to be improved. • Management team were identified as the key stakeholders • Processes were reviewed and inconsistencies identified • SIPOC was used as a visualisation aid for process reviews • Key performance measures were identified • In the Define phase of a project it is critical that you seek and gain buy in from all stakeholder otherwise you run a significant risk of resources not being made available later in the project • Problem Statement: Structures are not consistently applying all relevant Health & Safety procedures to their engineering projects and are not storing the significant project documentation into Workspace inline with the companies Quality manual – ISO9001. • These practices need to be measurably improved. Andy Smith EPA project presentation 4/16/2019 5
  • 6. • M – Measure • In this phase I needed to map out the “as is” process and this was visualised using process mapping. • I collected data from existing internal audits to allow us to set a baseline to measure improvements from. • I also collected anecdotal data from the Structure's team as to what they saw the problems were in their department. • Following a project review we were able to revise our problem statement. • Revised Problem Statement: Structures are not consistently applying all relevant Health & Safety procedures to their engineering projects and are not storing the significant project documentation into Workspace inline with the companies Quality manual – ISO9001. • A training plan needs to be implemented to ensure consistent use of Workspace and Health & Safety application to all Structures projects. Andy Smith EPA project presentation 4/16/2019 6
  • 7. Andy Smith EPA project presentation 4/16/2019 7  A - Analyse  I analysed data from previous audits which suggested poor adherence to procedures, inconsistence application of Health and Safety protocols and an erratic use of Workspace  Drawing numbering systems were being ignored and basic document controls were not in place  It also became apparent that there was an “age” difference in what procedures were adopted by whom? And also that any training that had previously delivered was out of date  We identified the critical documentation which needed to be output from the engineering process with Structures and this was used to generate a secondary audit  Following the secondary audit is became even clearer that process and policies were not being adhered to and that we were not following legal guidance on some Health and Safety practices
  • 8. Andy Smith EPA project presentation 4/16/2019 8  I – Improve: • Introduce a review of the Designers Risk Assessment documentation. • Ensure all engineers were trained in the use of the developed template • Dynamic Risk Assessment training was to be delivered to the whole of the Structures department • Specific Safety Media course were identified as critical training requirements • Develop “Introduction to Workspace” training • Deliver “Introduction to Workspace” training to all of the Structures department • Implementation of process for storage and naming of project critical documentation • Implement a process to measure all new projects for their adherence to the new standard • Implement project auditing as part of the Quality management process
  • 9. Andy Smith EPA project presentation 4/16/2019 9  C - Control • A Safety Media Dashboard was created to Monitor the uptake of identified critical training. • All training was recorded in the Training Matrix • All Safety Media training is now a deliverable objective in everyone's appraisal • The Designer Risk Assessment template is now stored in Workspace (as a template) • Monthly project audits are in place with a weighted scoring system • Engineers now have an improvement objective as an appraisal deliverable • All this is now reviewed at the Management meetings as well as the Conformance meetings • Identifies failures or potential improvements are fed back into the regular departmental improvement meetings
  • 10. Project Summary • Rodgers Leask Ltd identified that they wanted to make a significant business change to the way the engineering departments operated and for this to have a Quality and Financial benefit to the business • Andy Smith undertook a project to identify and deliver this change, this project became his apprenticeship project which has been presented as part of the EPA process today • The engineering departments have already changed their processes and identified best practice is being shared across departments • Health and Safety have been significantly improved, the risk of future claims have been significantly mitigated, Workspace is now a tool we can be proud of and we are in a better position to enter into negotiations to reduce our PI insurance even further • The goals of the project have more than been delivered and expectations for my next project have been raised significantly. Andy Smith EPA project presentation 4/16/2019 10
  • 11. Our sectors Industrial Manufacturing facilities – from automotive to food and drink Leisure & Hotels New build refurbishment and extension Commercial Retail parks, offices, town centres, hotels and multi-storey car parks Residential Low rise, multi-storey apartments and student accommodation Education Universities, colleges and schools Healthcare Medical units, health centres and care homes Nuclear New build, decommissioning and defence Town Centre Development Masterplanning Distribution High bay warehouses and marshalling 4/16/2019 Andy Smith EPA project presentation 11
  • 12. Our clients 4/16/2019 Andy Smith EPA project presentation 12

Editor's Notes

  1. Hi everyone, this is the agenda for today’s presentation. The presentation should only take 15 mins so if you could please save any questions until the end it would be appreciated.
  2. Rodgers Least Ltd is an Engineering Consultancy that has a proud history and uses a “three r” policy at the basis of it’s business: Reputation Repeat business Recommendations We do have a website and an online presence but we do not actively “advertise” our services. At this point I would like to thank Rodgers Leask for funding this course and giving me the time to train.
  3. Hi my name is Andy Smith and I am General Manager of Rodgers Leask Ltd. I would like to welcome you to this now 13 min presentation on my EPA project, again I would appreciate it if you could save any questions until the end. I am responsible for the “non engineering” functions within our business and I always say that “if you need someone to blame then it will usually end up with me”. I have worked here for just over 3 ½ years and I have spent most of that time introducing “change” to Rodgers Leask Ltd, including the introduction of CTskills apprenticeships.
  4. Why DMAIC? I have been involved in many change projects over the last 30 years and have adopted a process that I feel best supports my customers but that I also feel I can utilise without confusing them with any “management jargon”. I use the Six Sigma methodology called DMAIC which I will take you through over the next few slides. I did not tell the project team that I was following this methodology but I did ask them to give me their input and I applied the methodology in the back ground. Over the years I have found that talking “jargon” to people really switches them off. So step one of the methodology is Define: We used the Define phase to get an agreed Problem Statement for the project. The identified problem statement will have an impact on project Quality, speed of access to project data and introduces an opportunity to further reduce the companies Public Indemnity Insurance; Quality improvements over the last 2 years have already been a key factor in reducing our PI insurance by over £80k.
  5. Measure: The key part to the Measure phase of a project is to collect data and the “as is” state within the business. I have used a SIPOC for many years now to help visualise the inputs and outputs from a process, these tend to lead you in the right direction and to what needs to be measured. In our project meetings we visualised the process and confirmed that there were no “project” audits in existence. It is important to collect as much data as possible during the measure phase of a project, but always remember that if you collect data you will need to analyse that data at some point during the project cycle. We also carried out an FMEA to see what factors would prevent us from being successful, these were minimal as the MD had given his authority to improve whatever wee felt necessary, any escalation was to be through him directly.
  6. Analyse: The key purpose of the analyse phase of a project is not review all data collected during the project, including process maps and procedures. The analysis phase provided quite damning information to suggest that things were actually worse than originally thought. It became apparent that basic Health and Safety was not understood and that basic legal requirements were being omitted.
  7. Improve: The improve phase is used to identify what changes we are going to implement during this project. This was our plan: Introduce a review of the Designers Risk Assessment documentation. Ensure all engineers were trained in the use of the developed template Dynamic Risk Assessment training was to be delivered to the whole of the Structures department Specific Safety Media course were identified as critical training requirements Develop “Introduction to Workspace” training Deliver “Introduction to Workspace” training to all of the Structures department Implementation of process for storage and naming of project critical documentation Implement a process to measure all new projects for their adherence to the new standard
  8. Control: The Control phase is used to identify how you are going to monitor the improvements that were implemented during this project. A Safety Media Dashboard was created to Monitor the uptake of identified critical training. All training was recorded in the Training Matrix All Safety Media training is now a deliverable objective in everyone's appraisal The Designer Risk Assessment template is now stored in Workspace (as a template) Monthly project audits are in place with a weighted scoring system Engineers now have an improvement objective as an appraisal deliverable All this is now reviewed at the Management meetings as well as the Conformance meetings Identifies failures or potential improvements are fed back into the regular departmental improvement meetings
  9. Read the summary as is. Thank you all for taking the time to listen to me today and I hope you found the presentation informative. That is the end of todays presentation so its thank you and goodbye from me.