Scheduling models for optimal aircraft traffic
control at busy airports: tardiness, priorities,
equity and violations considerations
Dipartimento di Ingegneria
Andrea D’Ariano, ROMA TRE University, Rome, Italy
124/11/2016
Junior ConsultingDipartimento di Ingegneria
Introduction
Modeling a Terminal Control Area
MILP formulations
Scheduling models for optimal aircraft traffic control at busy
airports: tardiness, priorities, equity and violations considerations
MILP formulations
Computational experiments
Conclusions
This work has been recently accepted for publication in the journal OMEGA :
Reference DOI: 10.1016/j.omega.2016.04.003
2
Junior ConsultingDipartimento di Ingegneria
Air Traffic Control (ATC)Air Traffic Control (ATC)
An efficient control of air traffic must ensure safe, ordered and
rapid transit of aircraft on the ground and in the air resources.
With the increase in air traffic [*],
aviation authorities are seeking
methods (i) to better use the
[*] Source: IATA 2014
methods (i) to better use the
existing airport infrastructure,
and (ii) to better manage aircraft
movements in the vicinity of
airports during operations.
3
Junior ConsultingDipartimento di Ingegneria
StatusStatus ofof thethe currentcurrent ATCATC practisepractise
• Airports are becoming a major bottleneck in ATC operations.
• The optimization of take-off/landing operations is a key factor
to improve the performance of the entire ATC system.
• ATC operations are still mainly
performed by human controllers
whose computer support is most
often limited to a graphical
representation of the current
aircraft position and speed.
• Intelligent decision support is
under investigation in order to
reduce the controller workload
(see e.g. recent ATM Seminars).
4
Junior ConsultingDipartimento di Ingegneria
Literature: Aircraft Scheduling Problem (ASP)Literature: Aircraft Scheduling Problem (ASP)
Terminal Control Area (TCA)Terminal Control Area (TCA)
Detailed
BasicExisting
Approaches Dynamic
Static
5
Junior ConsultingDipartimento di Ingegneria
Literature: Research needsLiterature: Research needs
Aircraft Scheduling Problem in Terminal Control Areas:
Most aircraft scheduling models in literature represent the
TCA as a single resource, typically the runway. These models
are not realistic since the other TCA resources are ignored.
We present a new approach that includes both accurate
modelling of traffic regulations at runways and airways.
6
This approach has already been applied to successully
control railway traffic for metro lines and railway networks.
Junior ConsultingDipartimento di Ingegneria
Our approach for TCAsOur approach for TCAs
Implementation and testing of:
• Detailed ASP-TCA models:
incorporating safety rules at
air segments, runways and holding circlesair segments, runways and holding circles
• Alternative objective functions:
maximum versus average delays, delayed aircraft (violations),
aircraft equity, throughput (completion time), priority tardiness
• Real-time traffic management instances:
Roma Fiumicino (FCO) and Milano Malpensa (MXP) airports
7
Junior ConsultingDipartimento di Ingegneria
Introduction
Modeling a Terminal Control Area
MILP formulations
Scheduling models for optimal aircraft traffic control at busy
airports: tardiness, priorities, equity and violations considerations
MILP formulations
Computational experiments
Conclusions
8
This work has been recently accepted for publication in the journal OMEGA :
Reference DOI: 10.1016/j.omega.2016.04.003
Junior ConsultingDipartimento di Ingegneria
3 HOLDING
CIRCLES
SEVERAL AIR
SEGMENTS
1 COMMON GLIDE
PATH
3 RUNWAYS3 RUNWAYS
Junior ConsultingDipartimento di Ingegneria
ASPASP ModelModel::
AlternativeAlternative
GraphGraph (AG)(AG)
Air
Segments
Common
Glide Path
RunwaysHolding Circles
8
16
17
3
SRN
1
TOR
MBR
2 6
4 10
11
12
15
7
5
13
14
RWY 16R
RWY 16L
9
A
[Pacciarelli
EJOR 2002]
RWY 25
A1
tA1
10
release date αA
(w0, A1 = αA = expected aircraft entry time)
Fixed constraints
tA1 = t0 + w0, A1
A1
0
αA
t0
Junior ConsultingDipartimento di Ingegneria
AGAG ModelModel
Air
Segments
Common
Glide Path
RunwaysHolding Circles
8
16
17
3
SRN
1
TOR
MBR
2 6
4 10
11
12
15
7
5
13
14
RWY 16R
RWY 16L
9
A
A1
RWY 25
tA1
entry due date βA
(wA1,n = βA = - αA )
A1
0 n
αA
βA
11
tn = tA1 + wA1,n
tn
Junior ConsultingDipartimento di Ingegneria
AGAG ModelModel
Air
Segments
Common
Glide Path
RunwaysHolding Circles
8
16
17
3
SRN
1
TOR
MBR
2 6
4 10
11
12
15
7
5
13
14
RWY 16R
RWY 16L
9
A
A1 A4
δ
0
-δ
RWY 25
dotted arc (A4, A1)
No holding circle
dotted arc (A1, A4)
Yes holding circle
(δ = holding time)
A1 A4
0 n
αA
βA
-δ
0
12
Alternative constraints
Junior ConsultingDipartimento di Ingegneria
AGAG ModelModel
A1 A4 A10
min
Air
Segments
Common
Glide Path
RunwaysHolding Circles
8
16
17
3
SRN
1
TOR
MBR
2 6
4 10
11
12
15
7
5
13
14
RWY 16R
RWY 16L
9
A
RWY 25
A1 A4 A10
0 n
αA
βA
- max
Time window for the travel time
in each air segment
[min travel time; max travel time]
13
Junior ConsultingDipartimento di Ingegneria
Common
Glide Path
RunwaysHolding Circles
Air
Segments
8
16
17
3
SRN
1
TOR
MBR
2 6
4 10
11
12
15
7
5
13
14
RWY 16R
RWY 16L
9
A
A
AGAG ModelModel
A1 A4 A15A10 A13 AOUTA16
RWY 25Aircraft routing:
A1-A4-A10-A13-A15-A16
A1 A4 A15A10 A13 AOUTA16
0 n
αA
βA
γA
exit due date γA
(γA = - planned landing time)
14
Junior ConsultingDipartimento di Ingegneria
Common
Glide Path
RunwaysHolding Circles
Air
Segments
8
16
17
3
SRN
1
TOR
MBR
2 6
4 10
11
12
15
7
5
13
14
RWY 16R
RWY 16L
9
A
A
B
B
AGAG ModelModel
A1 A4 A15A10 A13 AOUTA16
Potential conflict
between A and B on
the common glide path
(resource 15) !
RWY 25
A1 A4 A15A10 A13 AOUTA16
0 n
B3 B8 B15B12 B14 BOUTB17
αA
αB
βA
γA
βB
γB
Aircraft ordering problem between A and B for the common glide path
(resource 15) : longitudinal and diagonal distances must be respected
15
Junior ConsultingDipartimento di Ingegneria
Common
Glide Path
RunwaysHolding Circles
Air
Segments
8
16
17
3
SRN
1
TOR
MBR
2 6
4 10
11
12
15
7
5
13
14
RWY 16R
RWY 16L
9
A
A
B
B
CC
AGAG ModelModel
A1 A4 A15A10 A13 AOUTA16
α γ
Potential conflict between
C and B on a runway
(resource 17) !
RWY 25
0 n
B3 B8 B15B12 B14 BOUTB17
αA
αB
βA
γA
βB
γB
COUTC17
γC
αC
16
Junior ConsultingDipartimento di Ingegneria
Introduction
Modeling a Terminal Control Area
MILP formulations
Scheduling models for optimal aircraft traffic control at busy
airports: tardiness, priorities, equity and violations considerations
MILP formulations
Computational experiments
Conclusions
17
This work has been recently accepted for publication in the journal OMEGA :
Reference DOI: 10.1016/j.omega.2016.04.003
Junior ConsultingDipartimento di Ingegneria
AGAG viewedviewed asas a MILP (a MILP (MixedMixed--IntegerInteger LinearLinear ProgramProgram))





∈∀
−+≥
−−+≥
∈∀+≥
Akhji
Mxwtt
xMwtt
Fmlwtt
xtf
hkijhkhk
hkijijij
lmlm
),(),,((
)1(
),(
),(min
,
,C =
with m ≠ n
18
• Fixed constraints in F model feasible timing for each aircraft on its
specific route, plus α, β, γ constraints on the entrance and exit times.
• Alternative constraints in A represent the ordering decision between
aircraft at air segments and runways, plus holding circle decisions.



=
 −+≥
selectediskhif
selectedisjiif
x
Mxwtt
hkij
hkijhkhk
),(0
),(1
,
,
Junior ConsultingDipartimento di Ingegneria
InvestigatedInvestigated objectiveobjective functionsfunctions
Average Tardiness
Priority TardinessPriority Equity
Maximum Tardiness
19
Max Completion
Avg Completion
Tardy Jobs P
Junior ConsultingDipartimento di Ingegneria
Introduction
Modeling a Terminal Control Area
MILP formulations
PresentationPresentation outlineoutline
MILP formulations
Computational experiments
Conclusions
20
This work has been recently accepted for publication in the journal OMEGA :
Reference DOI: 10.1016/j.omega.2016.04.003
Junior ConsultingDipartimento di Ingegneria
DescriptionDescription ofof the testthe test casescases
21
Each row presents 20 disturbed scenarios (ASP instances);
Entrance delays are randomly generated with various distributions;
Unavoidable delays cannot be recovered by aircraft rescheduling;
ASP solutions are computed by means of CPLEX MIP solver 12.0.
Junior ConsultingDipartimento di Ingegneria
AA practicalpractical
schedulingscheduling rulerule
Optimizing an objective andOptimizing an objective and
looking at the other objectiveslooking at the other objectives
22
Junior ConsultingDipartimento di Ingegneria
Optimizing an objective andOptimizing an objective and
looking at the other objectiveslooking at the other objectives
23
Junior ConsultingDipartimento di Ingegneria
AA combinedcombined
approachapproach
Optimizing an objective andOptimizing an objective and
looking at the other objectiveslooking at the other objectives
24
Junior ConsultingDipartimento di Ingegneria
Introduction
Modeling a Terminal Control Area
MILP formulations
Scheduling models for optimal aircraft traffic control at busy
airports: tardiness, priorities, equity and violations considerations
MILP formulations
Computational experiments
Conclusions
25
This work has been recently accepted for publication in the journal OMEGA :
Reference DOI: 10.1016/j.omega.2016.04.003
Junior ConsultingDipartimento di Ingegneria
AchievementsAchievements
• Microscopic ASP-TCA optimization models are proposed.
• Various objective functions and approaches are investigated.
• Computational results for major Italian TCAs demonstrate the
existence of relevant gaps between the objective functions.existence of relevant gaps between the objective functions.
• Combining the various objectives
offers good trade-off solutions.
dariano@ing.uniroma3.itdariano@ing.uniroma3.it

More Related Content

What's hot

European Airport PerformanceFramework
European Airport PerformanceFrameworkEuropean Airport PerformanceFramework
European Airport PerformanceFrameworkJLGChico
 
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...irjes
 
Check interval escalation
Check interval escalationCheck interval escalation
Check interval escalationMohammed Hadi
 
A Novel Approach To The Weight and Balance Calculation for The De Haviland Ca...
A Novel Approach To The Weight and Balance Calculation for The De Haviland Ca...A Novel Approach To The Weight and Balance Calculation for The De Haviland Ca...
A Novel Approach To The Weight and Balance Calculation for The De Haviland Ca...CSCJournals
 
IRJET- Aerodynamic Analysis of Aircraft Wings using CFD
IRJET- Aerodynamic Analysis of Aircraft Wings using CFDIRJET- Aerodynamic Analysis of Aircraft Wings using CFD
IRJET- Aerodynamic Analysis of Aircraft Wings using CFDIRJET Journal
 
Airport planning
Airport planning Airport planning
Airport planning Sonali99999
 
Aircraft Design Proposal 2016
Aircraft Design Proposal 2016Aircraft Design Proposal 2016
Aircraft Design Proposal 2016Francisco Davila
 
Pid output fuzzified water level control in mimo coupled tank system
Pid output fuzzified water level control in mimo coupled tank systemPid output fuzzified water level control in mimo coupled tank system
Pid output fuzzified water level control in mimo coupled tank systemIAEME Publication
 
Delays in air traffic management a surrogate perspective
Delays in air traffic management  a surrogate perspectiveDelays in air traffic management  a surrogate perspective
Delays in air traffic management a surrogate perspectivePaula R MARK
 
М.Г.Гоман, А.В.Храмцовский (1998) - Использование методов непрерывного продол...
М.Г.Гоман, А.В.Храмцовский (1998) - Использование методов непрерывного продол...М.Г.Гоман, А.В.Храмцовский (1998) - Использование методов непрерывного продол...
М.Г.Гоман, А.В.Храмцовский (1998) - Использование методов непрерывного продол...Project KRIT
 

What's hot (15)

European Airport PerformanceFramework
European Airport PerformanceFrameworkEuropean Airport PerformanceFramework
European Airport PerformanceFramework
 
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
An Analysis of Runway Capacity at International Airport Sultan Aji Sulaiman B...
 
Check interval escalation
Check interval escalationCheck interval escalation
Check interval escalation
 
A Novel Approach To The Weight and Balance Calculation for The De Haviland Ca...
A Novel Approach To The Weight and Balance Calculation for The De Haviland Ca...A Novel Approach To The Weight and Balance Calculation for The De Haviland Ca...
A Novel Approach To The Weight and Balance Calculation for The De Haviland Ca...
 
IRJET- Aerodynamic Analysis of Aircraft Wings using CFD
IRJET- Aerodynamic Analysis of Aircraft Wings using CFDIRJET- Aerodynamic Analysis of Aircraft Wings using CFD
IRJET- Aerodynamic Analysis of Aircraft Wings using CFD
 
ATM I4D Flight Trial by Chief Pilot
ATM I4D Flight Trial by Chief PilotATM I4D Flight Trial by Chief Pilot
ATM I4D Flight Trial by Chief Pilot
 
PPT
PPTPPT
PPT
 
Airport Surface Surveillance
Airport Surface SurveillanceAirport Surface Surveillance
Airport Surface Surveillance
 
Airport planning
Airport planning Airport planning
Airport planning
 
Aircraft Design Proposal 2016
Aircraft Design Proposal 2016Aircraft Design Proposal 2016
Aircraft Design Proposal 2016
 
Pid output fuzzified water level control in mimo coupled tank system
Pid output fuzzified water level control in mimo coupled tank systemPid output fuzzified water level control in mimo coupled tank system
Pid output fuzzified water level control in mimo coupled tank system
 
M0401091096
M0401091096M0401091096
M0401091096
 
Delays in air traffic management a surrogate perspective
Delays in air traffic management  a surrogate perspectiveDelays in air traffic management  a surrogate perspective
Delays in air traffic management a surrogate perspective
 
iteapaper
iteapaperiteapaper
iteapaper
 
М.Г.Гоман, А.В.Храмцовский (1998) - Использование методов непрерывного продол...
М.Г.Гоман, А.В.Храмцовский (1998) - Использование методов непрерывного продол...М.Г.Гоман, А.В.Храмцовский (1998) - Использование методов непрерывного продол...
М.Г.Гоман, А.В.Храмцовский (1998) - Использование методов непрерывного продол...
 

Similar to D'ARIANO ATRS 2016

Erica The European Tiltrotor
Erica The European TiltrotorErica The European Tiltrotor
Erica The European Tiltrotorahmad bassiouny
 
Optimal decision making for air traffic slot allocation in a Collaborative De...
Optimal decision making for air traffic slot allocation in a Collaborative De...Optimal decision making for air traffic slot allocation in a Collaborative De...
Optimal decision making for air traffic slot allocation in a Collaborative De...Stefano Pacchiega
 
SELECTION AND ANALYSIS OF AN AIRFOIL FOR FIXED WING MICRO UNMANNED AERIAL VEH...
SELECTION AND ANALYSIS OF AN AIRFOIL FOR FIXED WING MICRO UNMANNED AERIAL VEH...SELECTION AND ANALYSIS OF AN AIRFOIL FOR FIXED WING MICRO UNMANNED AERIAL VEH...
SELECTION AND ANALYSIS OF AN AIRFOIL FOR FIXED WING MICRO UNMANNED AERIAL VEH...IRJET Journal
 
Airline Fleet Assignment And Schedule Planning
Airline Fleet Assignment And Schedule PlanningAirline Fleet Assignment And Schedule Planning
Airline Fleet Assignment And Schedule PlanningAndrew Molina
 
Simulation_Final_Project_Grp6.pptx
Simulation_Final_Project_Grp6.pptxSimulation_Final_Project_Grp6.pptx
Simulation_Final_Project_Grp6.pptxShivamPandey521834
 
Aircraft Finite Element Modelling for structure analysis using Altair Products
Aircraft Finite Element Modelling for structure analysis using Altair ProductsAircraft Finite Element Modelling for structure analysis using Altair Products
Aircraft Finite Element Modelling for structure analysis using Altair ProductsAltair
 
The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures PROuD Project
 
TAP White Paper - Sharklets (revisto)
TAP White Paper - Sharklets (revisto)TAP White Paper - Sharklets (revisto)
TAP White Paper - Sharklets (revisto)Armando Ferreira
 
10.1.1.125.6190 (2)
10.1.1.125.6190 (2)10.1.1.125.6190 (2)
10.1.1.125.6190 (2)meghraj_n
 
Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016ICSA, LLC
 
Technology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space PerspectiveTechnology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space PerspectiveICSA, LLC
 
CFD Analysis of conceptual Aircraft body
CFD Analysis of conceptual Aircraft bodyCFD Analysis of conceptual Aircraft body
CFD Analysis of conceptual Aircraft bodyIRJET Journal
 
IRJET-CFD Analysis of conceptual Aircraft body
IRJET-CFD Analysis of conceptual Aircraft bodyIRJET-CFD Analysis of conceptual Aircraft body
IRJET-CFD Analysis of conceptual Aircraft bodyIRJET Journal
 
Dissertation smaller
Dissertation smallerDissertation smaller
Dissertation smallerRonan Nicol
 
SESAR at World ATM Congress 2016 - Spectrum workshop
SESAR at World ATM Congress 2016 - Spectrum workshopSESAR at World ATM Congress 2016 - Spectrum workshop
SESAR at World ATM Congress 2016 - Spectrum workshopSESAR Joint Undertaking
 
SimScale Pedestrian Wind Comfort Capabilities
SimScale Pedestrian Wind Comfort CapabilitiesSimScale Pedestrian Wind Comfort Capabilities
SimScale Pedestrian Wind Comfort CapabilitiesSimScale
 
NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...
NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...
NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...Dr. Pankaj Dhussa
 
Aero-acoustic investigation over a 3-dimensional open sunroof using CFD
Aero-acoustic investigation over a 3-dimensional open sunroof using CFDAero-acoustic investigation over a 3-dimensional open sunroof using CFD
Aero-acoustic investigation over a 3-dimensional open sunroof using CFDIRJET Journal
 
Alenia Aermacchi in the Single European Sky ATM Research
Alenia Aermacchi in the Single European Sky ATM ResearchAlenia Aermacchi in the Single European Sky ATM Research
Alenia Aermacchi in the Single European Sky ATM ResearchLeonardo
 

Similar to D'ARIANO ATRS 2016 (20)

Erica The European Tiltrotor
Erica The European TiltrotorErica The European Tiltrotor
Erica The European Tiltrotor
 
Optimal decision making for air traffic slot allocation in a Collaborative De...
Optimal decision making for air traffic slot allocation in a Collaborative De...Optimal decision making for air traffic slot allocation in a Collaborative De...
Optimal decision making for air traffic slot allocation in a Collaborative De...
 
SELECTION AND ANALYSIS OF AN AIRFOIL FOR FIXED WING MICRO UNMANNED AERIAL VEH...
SELECTION AND ANALYSIS OF AN AIRFOIL FOR FIXED WING MICRO UNMANNED AERIAL VEH...SELECTION AND ANALYSIS OF AN AIRFOIL FOR FIXED WING MICRO UNMANNED AERIAL VEH...
SELECTION AND ANALYSIS OF AN AIRFOIL FOR FIXED WING MICRO UNMANNED AERIAL VEH...
 
Airline Fleet Assignment And Schedule Planning
Airline Fleet Assignment And Schedule PlanningAirline Fleet Assignment And Schedule Planning
Airline Fleet Assignment And Schedule Planning
 
Simulation_Final_Project_Grp6.pptx
Simulation_Final_Project_Grp6.pptxSimulation_Final_Project_Grp6.pptx
Simulation_Final_Project_Grp6.pptx
 
Aircraft Finite Element Modelling for structure analysis using Altair Products
Aircraft Finite Element Modelling for structure analysis using Altair ProductsAircraft Finite Element Modelling for structure analysis using Altair Products
Aircraft Finite Element Modelling for structure analysis using Altair Products
 
The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures
 
TAP White Paper - Sharklets (revisto)
TAP White Paper - Sharklets (revisto)TAP White Paper - Sharklets (revisto)
TAP White Paper - Sharklets (revisto)
 
N1303047887
N1303047887N1303047887
N1303047887
 
10.1.1.125.6190 (2)
10.1.1.125.6190 (2)10.1.1.125.6190 (2)
10.1.1.125.6190 (2)
 
Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016
 
Technology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space PerspectiveTechnology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space Perspective
 
CFD Analysis of conceptual Aircraft body
CFD Analysis of conceptual Aircraft bodyCFD Analysis of conceptual Aircraft body
CFD Analysis of conceptual Aircraft body
 
IRJET-CFD Analysis of conceptual Aircraft body
IRJET-CFD Analysis of conceptual Aircraft bodyIRJET-CFD Analysis of conceptual Aircraft body
IRJET-CFD Analysis of conceptual Aircraft body
 
Dissertation smaller
Dissertation smallerDissertation smaller
Dissertation smaller
 
SESAR at World ATM Congress 2016 - Spectrum workshop
SESAR at World ATM Congress 2016 - Spectrum workshopSESAR at World ATM Congress 2016 - Spectrum workshop
SESAR at World ATM Congress 2016 - Spectrum workshop
 
SimScale Pedestrian Wind Comfort Capabilities
SimScale Pedestrian Wind Comfort CapabilitiesSimScale Pedestrian Wind Comfort Capabilities
SimScale Pedestrian Wind Comfort Capabilities
 
NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...
NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...
NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...
 
Aero-acoustic investigation over a 3-dimensional open sunroof using CFD
Aero-acoustic investigation over a 3-dimensional open sunroof using CFDAero-acoustic investigation over a 3-dimensional open sunroof using CFD
Aero-acoustic investigation over a 3-dimensional open sunroof using CFD
 
Alenia Aermacchi in the Single European Sky ATM Research
Alenia Aermacchi in the Single European Sky ATM ResearchAlenia Aermacchi in the Single European Sky ATM Research
Alenia Aermacchi in the Single European Sky ATM Research
 

D'ARIANO ATRS 2016

  • 1. Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations Dipartimento di Ingegneria Andrea D’Ariano, ROMA TRE University, Rome, Italy 124/11/2016
  • 2. Junior ConsultingDipartimento di Ingegneria Introduction Modeling a Terminal Control Area MILP formulations Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations MILP formulations Computational experiments Conclusions This work has been recently accepted for publication in the journal OMEGA : Reference DOI: 10.1016/j.omega.2016.04.003 2
  • 3. Junior ConsultingDipartimento di Ingegneria Air Traffic Control (ATC)Air Traffic Control (ATC) An efficient control of air traffic must ensure safe, ordered and rapid transit of aircraft on the ground and in the air resources. With the increase in air traffic [*], aviation authorities are seeking methods (i) to better use the [*] Source: IATA 2014 methods (i) to better use the existing airport infrastructure, and (ii) to better manage aircraft movements in the vicinity of airports during operations. 3
  • 4. Junior ConsultingDipartimento di Ingegneria StatusStatus ofof thethe currentcurrent ATCATC practisepractise • Airports are becoming a major bottleneck in ATC operations. • The optimization of take-off/landing operations is a key factor to improve the performance of the entire ATC system. • ATC operations are still mainly performed by human controllers whose computer support is most often limited to a graphical representation of the current aircraft position and speed. • Intelligent decision support is under investigation in order to reduce the controller workload (see e.g. recent ATM Seminars). 4
  • 5. Junior ConsultingDipartimento di Ingegneria Literature: Aircraft Scheduling Problem (ASP)Literature: Aircraft Scheduling Problem (ASP) Terminal Control Area (TCA)Terminal Control Area (TCA) Detailed BasicExisting Approaches Dynamic Static 5
  • 6. Junior ConsultingDipartimento di Ingegneria Literature: Research needsLiterature: Research needs Aircraft Scheduling Problem in Terminal Control Areas: Most aircraft scheduling models in literature represent the TCA as a single resource, typically the runway. These models are not realistic since the other TCA resources are ignored. We present a new approach that includes both accurate modelling of traffic regulations at runways and airways. 6 This approach has already been applied to successully control railway traffic for metro lines and railway networks.
  • 7. Junior ConsultingDipartimento di Ingegneria Our approach for TCAsOur approach for TCAs Implementation and testing of: • Detailed ASP-TCA models: incorporating safety rules at air segments, runways and holding circlesair segments, runways and holding circles • Alternative objective functions: maximum versus average delays, delayed aircraft (violations), aircraft equity, throughput (completion time), priority tardiness • Real-time traffic management instances: Roma Fiumicino (FCO) and Milano Malpensa (MXP) airports 7
  • 8. Junior ConsultingDipartimento di Ingegneria Introduction Modeling a Terminal Control Area MILP formulations Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations MILP formulations Computational experiments Conclusions 8 This work has been recently accepted for publication in the journal OMEGA : Reference DOI: 10.1016/j.omega.2016.04.003
  • 9. Junior ConsultingDipartimento di Ingegneria 3 HOLDING CIRCLES SEVERAL AIR SEGMENTS 1 COMMON GLIDE PATH 3 RUNWAYS3 RUNWAYS
  • 10. Junior ConsultingDipartimento di Ingegneria ASPASP ModelModel:: AlternativeAlternative GraphGraph (AG)(AG) Air Segments Common Glide Path RunwaysHolding Circles 8 16 17 3 SRN 1 TOR MBR 2 6 4 10 11 12 15 7 5 13 14 RWY 16R RWY 16L 9 A [Pacciarelli EJOR 2002] RWY 25 A1 tA1 10 release date αA (w0, A1 = αA = expected aircraft entry time) Fixed constraints tA1 = t0 + w0, A1 A1 0 αA t0
  • 11. Junior ConsultingDipartimento di Ingegneria AGAG ModelModel Air Segments Common Glide Path RunwaysHolding Circles 8 16 17 3 SRN 1 TOR MBR 2 6 4 10 11 12 15 7 5 13 14 RWY 16R RWY 16L 9 A A1 RWY 25 tA1 entry due date βA (wA1,n = βA = - αA ) A1 0 n αA βA 11 tn = tA1 + wA1,n tn
  • 12. Junior ConsultingDipartimento di Ingegneria AGAG ModelModel Air Segments Common Glide Path RunwaysHolding Circles 8 16 17 3 SRN 1 TOR MBR 2 6 4 10 11 12 15 7 5 13 14 RWY 16R RWY 16L 9 A A1 A4 δ 0 -δ RWY 25 dotted arc (A4, A1) No holding circle dotted arc (A1, A4) Yes holding circle (δ = holding time) A1 A4 0 n αA βA -δ 0 12 Alternative constraints
  • 13. Junior ConsultingDipartimento di Ingegneria AGAG ModelModel A1 A4 A10 min Air Segments Common Glide Path RunwaysHolding Circles 8 16 17 3 SRN 1 TOR MBR 2 6 4 10 11 12 15 7 5 13 14 RWY 16R RWY 16L 9 A RWY 25 A1 A4 A10 0 n αA βA - max Time window for the travel time in each air segment [min travel time; max travel time] 13
  • 14. Junior ConsultingDipartimento di Ingegneria Common Glide Path RunwaysHolding Circles Air Segments 8 16 17 3 SRN 1 TOR MBR 2 6 4 10 11 12 15 7 5 13 14 RWY 16R RWY 16L 9 A A AGAG ModelModel A1 A4 A15A10 A13 AOUTA16 RWY 25Aircraft routing: A1-A4-A10-A13-A15-A16 A1 A4 A15A10 A13 AOUTA16 0 n αA βA γA exit due date γA (γA = - planned landing time) 14
  • 15. Junior ConsultingDipartimento di Ingegneria Common Glide Path RunwaysHolding Circles Air Segments 8 16 17 3 SRN 1 TOR MBR 2 6 4 10 11 12 15 7 5 13 14 RWY 16R RWY 16L 9 A A B B AGAG ModelModel A1 A4 A15A10 A13 AOUTA16 Potential conflict between A and B on the common glide path (resource 15) ! RWY 25 A1 A4 A15A10 A13 AOUTA16 0 n B3 B8 B15B12 B14 BOUTB17 αA αB βA γA βB γB Aircraft ordering problem between A and B for the common glide path (resource 15) : longitudinal and diagonal distances must be respected 15
  • 16. Junior ConsultingDipartimento di Ingegneria Common Glide Path RunwaysHolding Circles Air Segments 8 16 17 3 SRN 1 TOR MBR 2 6 4 10 11 12 15 7 5 13 14 RWY 16R RWY 16L 9 A A B B CC AGAG ModelModel A1 A4 A15A10 A13 AOUTA16 α γ Potential conflict between C and B on a runway (resource 17) ! RWY 25 0 n B3 B8 B15B12 B14 BOUTB17 αA αB βA γA βB γB COUTC17 γC αC 16
  • 17. Junior ConsultingDipartimento di Ingegneria Introduction Modeling a Terminal Control Area MILP formulations Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations MILP formulations Computational experiments Conclusions 17 This work has been recently accepted for publication in the journal OMEGA : Reference DOI: 10.1016/j.omega.2016.04.003
  • 18. Junior ConsultingDipartimento di Ingegneria AGAG viewedviewed asas a MILP (a MILP (MixedMixed--IntegerInteger LinearLinear ProgramProgram))      ∈∀ −+≥ −−+≥ ∈∀+≥ Akhji Mxwtt xMwtt Fmlwtt xtf hkijhkhk hkijijij lmlm ),(),,(( )1( ),( ),(min , ,C = with m ≠ n 18 • Fixed constraints in F model feasible timing for each aircraft on its specific route, plus α, β, γ constraints on the entrance and exit times. • Alternative constraints in A represent the ordering decision between aircraft at air segments and runways, plus holding circle decisions.    =  −+≥ selectediskhif selectedisjiif x Mxwtt hkij hkijhkhk ),(0 ),(1 , ,
  • 19. Junior ConsultingDipartimento di Ingegneria InvestigatedInvestigated objectiveobjective functionsfunctions Average Tardiness Priority TardinessPriority Equity Maximum Tardiness 19 Max Completion Avg Completion Tardy Jobs P
  • 20. Junior ConsultingDipartimento di Ingegneria Introduction Modeling a Terminal Control Area MILP formulations PresentationPresentation outlineoutline MILP formulations Computational experiments Conclusions 20 This work has been recently accepted for publication in the journal OMEGA : Reference DOI: 10.1016/j.omega.2016.04.003
  • 21. Junior ConsultingDipartimento di Ingegneria DescriptionDescription ofof the testthe test casescases 21 Each row presents 20 disturbed scenarios (ASP instances); Entrance delays are randomly generated with various distributions; Unavoidable delays cannot be recovered by aircraft rescheduling; ASP solutions are computed by means of CPLEX MIP solver 12.0.
  • 22. Junior ConsultingDipartimento di Ingegneria AA practicalpractical schedulingscheduling rulerule Optimizing an objective andOptimizing an objective and looking at the other objectiveslooking at the other objectives 22
  • 23. Junior ConsultingDipartimento di Ingegneria Optimizing an objective andOptimizing an objective and looking at the other objectiveslooking at the other objectives 23
  • 24. Junior ConsultingDipartimento di Ingegneria AA combinedcombined approachapproach Optimizing an objective andOptimizing an objective and looking at the other objectiveslooking at the other objectives 24
  • 25. Junior ConsultingDipartimento di Ingegneria Introduction Modeling a Terminal Control Area MILP formulations Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations MILP formulations Computational experiments Conclusions 25 This work has been recently accepted for publication in the journal OMEGA : Reference DOI: 10.1016/j.omega.2016.04.003
  • 26. Junior ConsultingDipartimento di Ingegneria AchievementsAchievements • Microscopic ASP-TCA optimization models are proposed. • Various objective functions and approaches are investigated. • Computational results for major Italian TCAs demonstrate the existence of relevant gaps between the objective functions.existence of relevant gaps between the objective functions. • Combining the various objectives offers good trade-off solutions. dariano@ing.uniroma3.itdariano@ing.uniroma3.it