2012 – 2013: Chongbang Mixed-Use Project, Kunshan, China, (Construction started early 2014)
I was Project Leader and Design
Director of a Mixed-use project of
160,000 m2 in Kunshan. The client
program was very precise, also giving
the shape and dimension of the
buildings. Even the podium elevations
were designed by the client. I had to
do the office towers and Soho towers
elevations. The “Jazz” scenario,
inspired by a Las Vegas Hotel, was
selected. The project is presently in
construction.
After one week elevation study, I
presented 4 different directions, with
inspiration images and fast massing
model / hand-sketch, elevation
2012 – 2013: Chongbang Mixed-Use Project, (Continuing)
2014 - 2015: Downtown Mixed-Use Center, Wuxi, China
I am presently the Project Leader and the Design Director for this big Mixed-use Center in
downtown Wuxi, facing the central plaza of the city. This is not a competition. We were
selected and I was the key factor making our firm winning the interview process. It will be
the new city center of the City Business District. The total area of the project is 180,000 m2;
residential: 70,000 m2, retail: 70,000 m2, office: 40,000 m2.
2014 - 2015: Downtown Mixed-Use Center, Wuxi, (continuing).
2014 - 2015: Downtown Mixed-Use Center, Wuxi, (continuing). One week tall tower study
2012: City Planning Exhibition Centre, Taiyuan, China
I was the Project Leader and the Design Director for this small Exhibition Center. The
project was not completed but gives us a very good reputation and allows us to have
several big urban planning mandates from the city authorities.
2015: Small Retail Center Study, Qingpu subway station, Shanghai, China
This project is a quick study competition of a small retail center at a strategic location in Shanghai. 35,00 m2 (We won Design competition).
We had only 2 weeks to prepare a document showing the business strategy, the building feasibility, the link to public transportation and the integration in the
neighborhood, according to the government strict requirements. We won the competition, the client told me that my document was “perfect”, “exactly what
we needed”. We are now waiting for government approval.
2015: Mixed-Use, Master Planning, Shanghai, China
This project is a quick study competition for a Mixed-Use
project in the suburb of Shanghai. (5 days)
Total area: 115,000 m2
Office: 7,000 m2
Retail: 10,000 m2
Residential: 98,000 m2
The client select this option for the simplicity , the clarity
and for achieving the major goals of the program and the
requirements.
Our firm was not selected for the final run.

More Related Content

What's hot (9)

Grey and white corporate architecture presentation 6
Grey and white corporate architecture presentation 6Grey and white corporate architecture presentation 6
Grey and white corporate architecture presentation 6
 
Architect
ArchitectArchitect
Architect
 
MOHAMMAD RESUME NEWwww
MOHAMMAD RESUME NEWwwwMOHAMMAD RESUME NEWwww
MOHAMMAD RESUME NEWwww
 
A+P Design Studio
A+P Design StudioA+P Design Studio
A+P Design Studio
 
Khaleel resume
Khaleel resumeKhaleel resume
Khaleel resume
 
Ici
IciIci
Ici
 
Unit7group
Unit7groupUnit7group
Unit7group
 
CV_Marketing_Patricia Wu_150626
CV_Marketing_Patricia Wu_150626CV_Marketing_Patricia Wu_150626
CV_Marketing_Patricia Wu_150626
 
Architectural renderings services
Architectural renderings servicesArchitectural renderings services
Architectural renderings services
 

Similar to AT-002- Recent Work ACO-4

CV_Project Architect_Hua Rong
CV_Project Architect_Hua RongCV_Project Architect_Hua Rong
CV_Project Architect_Hua Rong
Hua Rong
 
Thomas Stemper CV 2016
Thomas Stemper CV 2016Thomas Stemper CV 2016
Thomas Stemper CV 2016
Thomas Stemper
 
Vorrarit Anantsorrarak _Design + Planning_150416_English
Vorrarit Anantsorrarak _Design + Planning_150416_EnglishVorrarit Anantsorrarak _Design + Planning_150416_English
Vorrarit Anantsorrarak _Design + Planning_150416_English
CooLBiere A
 
DANIAL MCCAHON CV_25052016
DANIAL MCCAHON CV_25052016DANIAL MCCAHON CV_25052016
DANIAL MCCAHON CV_25052016
Danial McCahon
 
Linkdin porfolio
Linkdin porfolioLinkdin porfolio
Linkdin porfolio
Adrian Yau
 
Resume_Pooja Nandanwar_2015
Resume_Pooja Nandanwar_2015Resume_Pooja Nandanwar_2015
Resume_Pooja Nandanwar_2015
Pooja Nandanwar
 
Designing Public Services
Designing Public ServicesDesigning Public Services
Designing Public Services
Elaine
 
DANIAL MCCAHON_CV SUMMARY_PROJECTS_16082016
DANIAL MCCAHON_CV SUMMARY_PROJECTS_16082016DANIAL MCCAHON_CV SUMMARY_PROJECTS_16082016
DANIAL MCCAHON_CV SUMMARY_PROJECTS_16082016
Danial McCahon
 

Similar to AT-002- Recent Work ACO-4 (20)

CV_Project Architect_Hua Rong
CV_Project Architect_Hua RongCV_Project Architect_Hua Rong
CV_Project Architect_Hua Rong
 
Thomas Stemper CV 2016
Thomas Stemper CV 2016Thomas Stemper CV 2016
Thomas Stemper CV 2016
 
Vorrarit Anantsorrarak _Design + Planning_150416_English
Vorrarit Anantsorrarak _Design + Planning_150416_EnglishVorrarit Anantsorrarak _Design + Planning_150416_English
Vorrarit Anantsorrarak _Design + Planning_150416_English
 
DANIAL MCCAHON CV_25052016
DANIAL MCCAHON CV_25052016DANIAL MCCAHON CV_25052016
DANIAL MCCAHON CV_25052016
 
Linkdin porfolio
Linkdin porfolioLinkdin porfolio
Linkdin porfolio
 
KAUSTUBH'S RESUME
KAUSTUBH'S RESUMEKAUSTUBH'S RESUME
KAUSTUBH'S RESUME
 
FHD Group Residential Apartments porfofolio
FHD Group Residential Apartments porfofolioFHD Group Residential Apartments porfofolio
FHD Group Residential Apartments porfofolio
 
Sirin's portfolio 2013
Sirin's portfolio 2013Sirin's portfolio 2013
Sirin's portfolio 2013
 
Architectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarArchitectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj Iyengar
 
Meagan dickemann shanghai talk
Meagan dickemann shanghai talkMeagan dickemann shanghai talk
Meagan dickemann shanghai talk
 
ted's resume
ted's resumeted's resume
ted's resume
 
The tomorrow company power point by aung thu
The tomorrow company power point by aung thuThe tomorrow company power point by aung thu
The tomorrow company power point by aung thu
 
Aya samir CV
Aya samir CVAya samir CV
Aya samir CV
 
Resume_Pooja Nandanwar_2015
Resume_Pooja Nandanwar_2015Resume_Pooja Nandanwar_2015
Resume_Pooja Nandanwar_2015
 
Designing Public Services
Designing Public ServicesDesigning Public Services
Designing Public Services
 
DANIAL MCCAHON_CV SUMMARY_PROJECTS_16082016
DANIAL MCCAHON_CV SUMMARY_PROJECTS_16082016DANIAL MCCAHON_CV SUMMARY_PROJECTS_16082016
DANIAL MCCAHON_CV SUMMARY_PROJECTS_16082016
 
Designing Public Services
Designing Public ServicesDesigning Public Services
Designing Public Services
 
Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2
 
Advisor_29122016
Advisor_29122016Advisor_29122016
Advisor_29122016
 
Amritash sambodhi
Amritash sambodhiAmritash sambodhi
Amritash sambodhi
 

AT-002- Recent Work ACO-4

  • 1. 2012 – 2013: Chongbang Mixed-Use Project, Kunshan, China, (Construction started early 2014) I was Project Leader and Design Director of a Mixed-use project of 160,000 m2 in Kunshan. The client program was very precise, also giving the shape and dimension of the buildings. Even the podium elevations were designed by the client. I had to do the office towers and Soho towers elevations. The “Jazz” scenario, inspired by a Las Vegas Hotel, was selected. The project is presently in construction. After one week elevation study, I presented 4 different directions, with inspiration images and fast massing model / hand-sketch, elevation
  • 2. 2012 – 2013: Chongbang Mixed-Use Project, (Continuing)
  • 3. 2014 - 2015: Downtown Mixed-Use Center, Wuxi, China I am presently the Project Leader and the Design Director for this big Mixed-use Center in downtown Wuxi, facing the central plaza of the city. This is not a competition. We were selected and I was the key factor making our firm winning the interview process. It will be the new city center of the City Business District. The total area of the project is 180,000 m2; residential: 70,000 m2, retail: 70,000 m2, office: 40,000 m2.
  • 4. 2014 - 2015: Downtown Mixed-Use Center, Wuxi, (continuing).
  • 5. 2014 - 2015: Downtown Mixed-Use Center, Wuxi, (continuing). One week tall tower study
  • 6. 2012: City Planning Exhibition Centre, Taiyuan, China I was the Project Leader and the Design Director for this small Exhibition Center. The project was not completed but gives us a very good reputation and allows us to have several big urban planning mandates from the city authorities.
  • 7. 2015: Small Retail Center Study, Qingpu subway station, Shanghai, China This project is a quick study competition of a small retail center at a strategic location in Shanghai. 35,00 m2 (We won Design competition). We had only 2 weeks to prepare a document showing the business strategy, the building feasibility, the link to public transportation and the integration in the neighborhood, according to the government strict requirements. We won the competition, the client told me that my document was “perfect”, “exactly what we needed”. We are now waiting for government approval.
  • 8. 2015: Mixed-Use, Master Planning, Shanghai, China This project is a quick study competition for a Mixed-Use project in the suburb of Shanghai. (5 days) Total area: 115,000 m2 Office: 7,000 m2 Retail: 10,000 m2 Residential: 98,000 m2 The client select this option for the simplicity , the clarity and for achieving the major goals of the program and the requirements. Our firm was not selected for the final run.