If you buy, sell or implement energy projects in industrial setting, in this presentation you will find how to pick a proper GEAR - Goal-oriented Energy Analysis and Reporting tools.
Presentation explains how to set up energy project to avoid painful disappointments of non-recognition. We also show what not and how not to waste your time, nerves and resources.
With proper GEAR your will do your job faster, with less stress, and secure recognition with executives.
3. Take away message
Proper analysis of energy use will help me
Buy/sell energy projects faster and
Gain praise, professional satisfaction and good night sleep
4. Plan
What is the right tool and why?
What’s in it for me?
How to calculate savings by IPMVP?
How to find new projects?
How not to do analysis?
5. When looking at projects, CFO …
Core
business
Energy
projects
Knows how it works? Yes Nope
Has done it before? Yes You wish
Has reliable numbers to
prove results?
Yes ?
Acceptable return 10% 50%
6. When looking at projects, CFO …
Core
business
Energy
projects
Knows how it works? Yes Nope
Has done it before? Yes You wish
Has reliable numbers to
prove results?
Yes ?
Acceptable return 10% 50%
7. Proper tool …
1. Is as simple as possible, but not simpler
2. Links results to business
3. Delivers much more value than it costs
Goal-oriented Energy Analysis and Reporting -
GEAR
8. EMs: GEAR assures good night sleep
Common approaches to measuring results:
“It’s obvious, just look at the Amps”
“Accountants will calculate”
“Vendor will calculate”
Proper GEAR:
Pre-agreed
result assessment procedure
based on data and
linked to key business indicators
9. Vendors: GEAR helps build business
Win projects on value
Make results count in the Boardroom
Make client happy
Satisfied clients send cheques
Happy clients also send referrals
10. EMs and Vendors:
risks and pains with no right GEAR
Frustratingly long sales cycle
Unconvincing Boardroom presentations
At risk: Satisfaction, recognition, career, job
11. Determine reduction by IPMVP
Before implementation:
Identify and measure key consumption drivers and
consumption through the same period
Build a statistically valid baseline
Record all non-measured factors that affect consumption
After:
Measure drivers and calculate Expected consumption
Measure Actual consumption
Check if factors are still the same, else adjust baseline
Reduction = Expected – Actual ±adjustments
12. Watch for pitfalls
• Understand accuracy and certainty of statistics-
based baseline; agree on them with decision-maker
• Monitor data for human error
• Check dates: production is often recorded later
• Use engineering common sense to validate model
13. Demand profile shows possible waste
<1% of time
demand
exceeded 450kW
25% of the time
demand was
under 50kW
40% of the time
demand was over
almost 300kW
22. Take away message
For a copy of this presentation
with notes and hidden slides
please contact Anatoli Naoumov
anaoumov@greenq.ca
Visit us at www.greenq.ca or call 416-728-7239
Subscribe to our blog at www.greenq.ca/blog
Proper GEAR => more business and less hassle
Thank you
Editor's Notes
W
Did coffee work its magic? Let’s see.
Who likes to deliver energy projects?
Who likes to implement energy projects?
Who likes to buy or sell energy projects?
Who has to sell or buy energy projects regularly?
Today I’ll share with you a couple of ideas on how to make your buy/sell experience less stressful and more engineer-ish.
Transition
Energy Managers and Vendors stand to benefit
Which brings us to the objective
I am here today to convince both groups that proper analysis of energy consumption helps find, procure or sell, implement and report energy projects.
And by doing so it helps turn battle ground between vendors and energy managers into common ground.
Transition
I shall consider my mission accomplished if tomorrow you will remember that
How?
Avoid risk of perceived non-performance
Shorten sales cycle, increase closure rate, generate repeat orders and referrals
What helps clients succeed with more projects, helps us deliver more projects.
Transition
Here is my plan for the next 35 min or so
Please postpone questions until the end, unless absolutely necessary
Transition - W
What is one hurdle that stops you from selling and buying more energy projects?
Will I go to far to say to call this hurdle “CFO” in a general sense?
I
Guess the digit game.
What’s the max you will bet on odd/even of the 2nd digit on a $20? 50/50
What if the 2nd and the 3rd digits stand for the month the bill was printed – 01 to 12? (not true) 75/25
Knowing how it works cuts risk and allows to profitably increase investment.
Whose responsibility is to provide proper numbers? – Ours: EMs and Vendors
What tools are available? – lots
W
Discussing details of each tool falls outside the scope of this presentation.
Which tool to choose? What is an adequate tool?
Answer is simple, but not easy: Match tool to goal
Transition
It’s easier said than done and I will help with criteria
Rephrasing Einstein.
CFMs, PSIs, degrees, Amps and m3 have little meaning in the Boardroom, that’s where projects are funded
Transition -W
First, let’s briefly discuss what constitutes value of energy project
In which other system service provider determines their own marks? – Public schools. Sometimes it works, other times it does not.
What happens when validation tool is not independent from the vendor? - VW
Without GEAR all you have is an opinion. It may not get you far enough in the Boardroom.
Unless effects of your project are reported in terms understood and valued by decision-makers, your funding application will fall into “Other”.
Transition W
What’s the value of measuring and analysis? Measure it or not it will be the same effect on business, the same amount of reduction, right?
What’s more important: returns or risks?
Who thinks returns? Why aren’t we at a casino yet?
Ask your client’s CFO: what’s more important risk or return?
Lower risk leads to higher approval rate, bigger projects, more projects.
Transition
Let’s take a closer look at personal risks
I do not even know for which side – for vendors or for ems – this question is more important. Let’s start with EMs
This slide needs example of lighting retrofit in freezer
Vendors, this is your chance to showcase value of your projects and make them noticed by your client’s boss: Make your projects count in the Boardroom and price will never be an issue again.
EMs, project investment decision is binary: go or no-go. Since value assessment is not an exact science, you only need to find a way to assess part of value sufficient to justify the required investment.
Read more about this approach at Mark Jewel’s book and blog.
Transition
Now, let’s look at the value GEAR from the other side of the virtual barricade – vendors.
Picture your counterpart empowered to talk to CFO and be understood.
Result relevant to business is understood at higher level more and bigger orders
Transition
What if we do not use proper GEAR?
Long: because C-level does not get it
The only person who is not at risk of being busted is the owner, who is granted the right of graciously going out of business.
Transition -W
Enough of doom and gloom, how to do it right?
Determining value of energy projects is a vast topic. Let’s take a closer look at direct utility cost
Take 30 sec to read, then I’ll comment
Only direct utility cost
Based on best practices accumulated from engineers like you.
Accuracy and certainly come at a cost. Aim to collect just enough data to produce model of desired accuracy
The shortest version of IPMVP ever published. 100 p
Transition
Watch for pitfalls!
Breaking any these rules will affect validity of the whole calculation
Production time: I worked with a client who run a 2-shift production from 8am to midnight. Unless they could not fill the order, in which case they worked past midnight, while production was allocated to yesterday.
Exact numbers do not exist in life
Higher accuracy = lower certainty
R2 alone can mislead
Baseline formula must reflect physics
Transition
We have discussed Why’s, risks and value to existing projects. What GEAR can be used to find projects?
Data covers a whole year
25% is weekends + holidays
58h of 0
Must have interval data
Transition
This was a fun warm up. Let’s tackle a more serious situation with a more serious tool - CUSUM
Transition
Last but not least – How not to do analysis