2. Teekay Petrojarl
Beddingen 16
N-7014 Trondheim, Norway
+47 73 98 30 00 Rev. June 2015
Design
Contract
delivered
Contract Status
Client
Duty Holder
Status
Field Location
Country
New/Conversion
Mooring Type
Produced Water
Water Injection
Ship Shape
Time Charter
1996
Beyond 2021
BP
Teekay
Producing
Foinaven Field
United Kingdom
Conversion
Turret Mooring
120,000 bwpd
165,000 bwpd
Breadth
34.0 m
Water Depth
454 m
Length Overall
250.2 m
Petrojarl
foinaven
FPSO
Storage Capacity
202,000bbls
Oil Production
140,000BOPD
accomodation
89 PEOPLE
gas handling
114 MMSCFD
total liquids
180,00oBPD
riser slots
15