2. Teekay Petrojarl
Beddingen 16
N-7014 Trondheim, Norway
+47 73 98 30 00 Rev. June 2015
Design
Contract
delivered
Contract Status
Client
duty holder
Status
Field Location
Country
New/Conversion
Mooring Type
Produced Water
Water Injection
Ship Shape
Time Charter
2012
Q4 2021 + options (1 x 6 years)
Petrobras
Petrobras
Producing
Tiro e Sidon Field
Brazil
Conversion
Spread Mooring / 16 lines
76,000 bwpd
96,000 bwpd
Breadth
42.67 m
Water Depth
70-1000 m
Length Overall
265.7 m
FPSO Cidade
de Itajaí
FPSO
Storage Capacity
650,000 bbls
Oil Production
80,000 BOPD
accomodation
70 PEOPLE
gas handling
76 MMSCFD
total liquids
80,00o BPD
riser slots
34