SlideShare a Scribd company logo
1 of 18
Download to read offline
Indirect Potable Reuse
Presented by
Jonathan Damora, Cy Maroofian, Dane Kim,
Alex Bakken, and Kevin Gibson
CE 485
Date 2/9/2015
Agenda
1. Processes
2. Site Layout
3. Regulations
4. Costs
5. Evaluation
Process Flow Diagram
WWTP
Discharge
to WWTP
To the
Reservoir
Microfiltration
● The reverse osmosis
technology requires a
constant input at constant
pressure to perform at max
efficiency
● To account for the variable
flows, the plant can run at a
constant rate all day, by
filling up equalization
basins from the WTP
effluent
Water Treatment Vs.
Wastewater Treatment
Site Layout
Site Layout
Advanced Water Treatment
Layout
Based on GWRS Advanced Treatment Facility
Regulation - CA Title 17
Article 1
§7584. Responsibility and scope of program
The water supplier's cross-connection control program shall for the purpose of addressing the
requirements of Sections 7585 through 7605 include, but not be limited to, the following elements:
(a) The adoption of operating rules or ordinances to implement the cross-connection program.
(b) The conducting of surveys to identify water user premises where cross connections are likely to
occur,
(c) The provisions of backflow protection by the water user at the user's connection or within the user's
premises or both,
(d) The provision of at least one person trained in cross-connection control to carry out the cross-
connection program,
(e) The establishment of a procedure or system for testing backflow preventers, and
(f) The maintenance of records of locations, tests, and repairs of backflow preventers.
Article 2. Protection of Water System
§7604. Type of Protection Required
(c) Recycled water
(1) Premises where the public water system is used to supplement the recycled water supply use Air-
Gap Separation device (AG).
§7602. Construction of backflow preventers.
(a) Air-gap Separation. An Air-gap separation (AG) shall be at least double the diameter of the supply
pipe, measured vertically from the flood rim of the receiving vessel to the supply pipe; however, in
no case shall this separation be less than one inch.
§7603. Location of backflow preventers.
(a) Air-gap Separation. An air-gap separation shall be located as close as practical to the user's
connection and all piping between the user's connection and the receiving tank shall be entirely
visible unless otherwise approved in writing by the water supplier and the health agency.
Regulation CA Title 22
Article
§60305. Use of recycled water for impoundments.
(a) Except as provided in subsection (b), recycled water used as a source of water supply for nonrestricted recreational
impoundments shall be disinfected tertiary recycled water that has been subjected to conventional treatment.
Article 1.
§60301.230 Disinfected tertiary recycled water
By definition, "Disinfected tertiary recycled water" means a filtered and subsequently disinfected wastewater that meets
the following criteria:
(a) The filtered wastewater has been disinfected by either:
(1) A chlorine disinfection process following filtration that provides a CT (the product of total chlorine residual and
modal contact time measured at the same point) value of not less than 450 milligram-minutes per liter at all
times with a modal contact time of at least 90 minutes, based on peak dry weather design flow; or
(2) A disinfection process that, when combined with the filtration process, has been demonstrated to inactivate
and/or remove 99.999 percent of the plaque forming units of F-specific bacteriophage MS2, or polio virus in
the wastewater. A virus that is at least as resistant to disinfection as polio virus may be used for purposes
of the demonstration.
(b) The median concentration of total coliform bacteria measured in the disinfected effluent does not exceed an MPN of
2.2 per 100 milliliters utilizing the bacteriological results of the last seven days for which analyses have been completed
and the number of total coliform bacteria does not exceed an MPN of 23 per 100 milliliters in more than one sample in
any 30 day period. No sample shall exceed an MPN of 240 total coliform bacteria per 100 milliliters.
Article 4. Use Area Requirements.
§60310. Use area requirements.
(b) No impoundment of disinfected tertiary recycled water shall occur within 100 feet of any domestic water supply well.
Facilities:
Reservoir : 6 Acres
AOP: 3 Acres
Evaporation Pond: 90 Acres
Channel/Pipes:
WTP → AOP (Pipes): 2 Acres
AOP → Reservoir (Open Channel): 1 Acre
Reservoir → WTP (Pressured Pipes): 2.5 Acres
Land Cost Estimations
Totals
Total Land Size = 105 Acres
Total Land Cost ($25,000 per Acre)= $2,625,000
- 2040 - 2060: ~1,300 acre-ft / year or $1.3 M / year
- After 2060: ~1,800 acre-ft / year or $1.8 M / year
Water Savings
http://www.psdgraphics.com/file/water-droplet-icon.jpg
- Advanced Water Treatment: $30M
- Land: $2.7M
- Excavation: 7.5M
- Equalization Tank: $2.2M
- Concrete: $5M
- Pipe: $790,000
- Pump: $10,000
- Total: $48.2M
(All values rounded up)
CAPEX
- 2040 - 2060: - $650,000 / year
- After 2060: - $950,000 / year
( + Cost) / ( - Savings)
(Savings: compared to river discharge)
(All values rounded up)
OPEX
Environmental Impact Report
- construction is Northwest of the town in a relatively remote location,
construction will not affect any residential, commercial, or industrial areas.
- construction will also not affect any roadways or cause traffic issues.
- noise during construction and operation will not be a concern due to the
remote location
- sludge will be disposed of in a
variety of methods, primary
methods include lagoon
disposal, landfill disposal,
while a small % can be used
to fertilize soil for agricultural
use or sent to WWTP to be
treated (won’t be using
deep-well injection due to risk
of GW contamination)
- reservoir will act as a bird refuge, along with other fauna
- will act as a backup supply of water for potential drought
- evaporation pond will help replenish groundwater supply as well
- our design will be able to
handle the projected
2060 population
- the construction will create
plenty of jobs(projected to
take ~6 years), and once
finished, we will have 4 full-
time operators
- potential downside is the risk
of corrosive water in the
concrete-lined open channels
Environmental Impact Report
Alternative Evaluation
7
9
10
9
10
9
9
9
7
7
7
6
10
9
110

More Related Content

What's hot

Evaluation of a hybrid forward osmosis system
Evaluation of a hybrid forward osmosis systemEvaluation of a hybrid forward osmosis system
Evaluation of a hybrid forward osmosis systemacciona
 
Oilfield Produced water management
Oilfield Produced water managementOilfield Produced water management
Oilfield Produced water managementCharles Chindove
 
Water supply system
Water supply systemWater supply system
Water supply systemaishah
 
Introduction sanitary engineering by Prof. Dhaval. S. Shah
Introduction  sanitary engineering by Prof. Dhaval. S. ShahIntroduction  sanitary engineering by Prof. Dhaval. S. Shah
Introduction sanitary engineering by Prof. Dhaval. S. Shahdhavalsshah
 
IRJET - Application of Water Conservation Technique to Low Income Group H...
IRJET -  	  Application of Water Conservation Technique to Low Income Group H...IRJET -  	  Application of Water Conservation Technique to Low Income Group H...
IRJET - Application of Water Conservation Technique to Low Income Group H...IRJET Journal
 
akshi jain_suruchi shah
akshi jain_suruchi shahakshi jain_suruchi shah
akshi jain_suruchi shahguestf0d083
 
Smart Water Solution Using Internet of Things (IoT)
Smart Water Solution Using Internet of Things (IoT)Smart Water Solution Using Internet of Things (IoT)
Smart Water Solution Using Internet of Things (IoT)Vinay Gor
 
Making Waves: Water Recycling Investment and Fracking in the Permian Basin
Making Waves: Water Recycling Investment and Fracking in the Permian BasinMaking Waves: Water Recycling Investment and Fracking in the Permian Basin
Making Waves: Water Recycling Investment and Fracking in the Permian BasinWilson Perumal and Company
 
Phytorid Wastewater Treatment Technology- Decentralised & Ecosystem Based ...
Phytorid Wastewater Treatment Technology- Decentralised  &  Ecosystem  Based ...Phytorid Wastewater Treatment Technology- Decentralised  &  Ecosystem  Based ...
Phytorid Wastewater Treatment Technology- Decentralised & Ecosystem Based ...Nitin Kumar
 
Instant Sewage Treatment Plant e-STP Presentation
Instant Sewage Treatment Plant e-STP PresentationInstant Sewage Treatment Plant e-STP Presentation
Instant Sewage Treatment Plant e-STP PresentationSuresh Kumar
 
Wasa new services plumbing inspectorate process
Wasa new services   plumbing inspectorate processWasa new services   plumbing inspectorate process
Wasa new services plumbing inspectorate processJeffrey James
 
Design of sewage treatment plant
Design of sewage treatment plantDesign of sewage treatment plant
Design of sewage treatment plantGARRE RAVI KUMAR
 
Macro Sustainability Methodologies project
Macro Sustainability Methodologies projectMacro Sustainability Methodologies project
Macro Sustainability Methodologies projectShironika Farrior
 
Rainwater harvesting in a megacity presentation for BWSSB
Rainwater harvesting in a megacity  presentation for BWSSBRainwater harvesting in a megacity  presentation for BWSSB
Rainwater harvesting in a megacity presentation for BWSSBzenrain man
 
Landscape architecture & water management_ Mohan Subramaniam_2013
Landscape architecture & water management_ Mohan Subramaniam_2013Landscape architecture & water management_ Mohan Subramaniam_2013
Landscape architecture & water management_ Mohan Subramaniam_2013India Water Portal
 
Perth Seawater Desalination Plant - serving 2 mln of people with drinking water
Perth Seawater Desalination Plant - serving 2 mln of people with drinking waterPerth Seawater Desalination Plant - serving 2 mln of people with drinking water
Perth Seawater Desalination Plant - serving 2 mln of people with drinking waterSUEZ Australia & New Zealand
 
Sewage Treatment Plant
Sewage Treatment PlantSewage Treatment Plant
Sewage Treatment PlantDeepak Samal
 
=Rain water harvesting =-
 =Rain water harvesting =- =Rain water harvesting =-
=Rain water harvesting =-omg
 

What's hot (19)

Evaluation of a hybrid forward osmosis system
Evaluation of a hybrid forward osmosis systemEvaluation of a hybrid forward osmosis system
Evaluation of a hybrid forward osmosis system
 
Oilfield Produced water management
Oilfield Produced water managementOilfield Produced water management
Oilfield Produced water management
 
Water supply system
Water supply systemWater supply system
Water supply system
 
Introduction sanitary engineering by Prof. Dhaval. S. Shah
Introduction  sanitary engineering by Prof. Dhaval. S. ShahIntroduction  sanitary engineering by Prof. Dhaval. S. Shah
Introduction sanitary engineering by Prof. Dhaval. S. Shah
 
IRJET - Application of Water Conservation Technique to Low Income Group H...
IRJET -  	  Application of Water Conservation Technique to Low Income Group H...IRJET -  	  Application of Water Conservation Technique to Low Income Group H...
IRJET - Application of Water Conservation Technique to Low Income Group H...
 
akshi jain_suruchi shah
akshi jain_suruchi shahakshi jain_suruchi shah
akshi jain_suruchi shah
 
Smart Water Solution Using Internet of Things (IoT)
Smart Water Solution Using Internet of Things (IoT)Smart Water Solution Using Internet of Things (IoT)
Smart Water Solution Using Internet of Things (IoT)
 
Water Reuse & Wastewater Management
Water Reuse & Wastewater ManagementWater Reuse & Wastewater Management
Water Reuse & Wastewater Management
 
Making Waves: Water Recycling Investment and Fracking in the Permian Basin
Making Waves: Water Recycling Investment and Fracking in the Permian BasinMaking Waves: Water Recycling Investment and Fracking in the Permian Basin
Making Waves: Water Recycling Investment and Fracking in the Permian Basin
 
Phytorid Wastewater Treatment Technology- Decentralised & Ecosystem Based ...
Phytorid Wastewater Treatment Technology- Decentralised  &  Ecosystem  Based ...Phytorid Wastewater Treatment Technology- Decentralised  &  Ecosystem  Based ...
Phytorid Wastewater Treatment Technology- Decentralised & Ecosystem Based ...
 
Instant Sewage Treatment Plant e-STP Presentation
Instant Sewage Treatment Plant e-STP PresentationInstant Sewage Treatment Plant e-STP Presentation
Instant Sewage Treatment Plant e-STP Presentation
 
Wasa new services plumbing inspectorate process
Wasa new services   plumbing inspectorate processWasa new services   plumbing inspectorate process
Wasa new services plumbing inspectorate process
 
Design of sewage treatment plant
Design of sewage treatment plantDesign of sewage treatment plant
Design of sewage treatment plant
 
Macro Sustainability Methodologies project
Macro Sustainability Methodologies projectMacro Sustainability Methodologies project
Macro Sustainability Methodologies project
 
Rainwater harvesting in a megacity presentation for BWSSB
Rainwater harvesting in a megacity  presentation for BWSSBRainwater harvesting in a megacity  presentation for BWSSB
Rainwater harvesting in a megacity presentation for BWSSB
 
Landscape architecture & water management_ Mohan Subramaniam_2013
Landscape architecture & water management_ Mohan Subramaniam_2013Landscape architecture & water management_ Mohan Subramaniam_2013
Landscape architecture & water management_ Mohan Subramaniam_2013
 
Perth Seawater Desalination Plant - serving 2 mln of people with drinking water
Perth Seawater Desalination Plant - serving 2 mln of people with drinking waterPerth Seawater Desalination Plant - serving 2 mln of people with drinking water
Perth Seawater Desalination Plant - serving 2 mln of people with drinking water
 
Sewage Treatment Plant
Sewage Treatment PlantSewage Treatment Plant
Sewage Treatment Plant
 
=Rain water harvesting =-
 =Rain water harvesting =- =Rain water harvesting =-
=Rain water harvesting =-
 

Similar to Bakken_IPR_Slides

California; Guidelines for Rainwater Harvesting - City of Berkeley
California;  Guidelines for Rainwater Harvesting - City of Berkeley  California;  Guidelines for Rainwater Harvesting - City of Berkeley
California; Guidelines for Rainwater Harvesting - City of Berkeley D7Z
 
Center for Sustainable Shale Development Comparison to State/Federal Regulations
Center for Sustainable Shale Development Comparison to State/Federal RegulationsCenter for Sustainable Shale Development Comparison to State/Federal Regulations
Center for Sustainable Shale Development Comparison to State/Federal RegulationsMarcellus Drilling News
 
Permitting potable water from rainwater- AIA Houston- September 2014
Permitting potable water from rainwater- AIA Houston- September 2014Permitting potable water from rainwater- AIA Houston- September 2014
Permitting potable water from rainwater- AIA Houston- September 2014GreeNexus Consulting, LLC
 
Marina and Village Surface Water Runoff and Waste Water Management plan
 Marina and Village Surface Water Runoff and Waste Water Management plan Marina and Village Surface Water Runoff and Waste Water Management plan
Marina and Village Surface Water Runoff and Waste Water Management planFrank Costanzo Connelly
 
Rainwater Harvesting: DCR Stormwater Design Specification - Virgina
Rainwater Harvesting:  DCR Stormwater Design Specification - VirginaRainwater Harvesting:  DCR Stormwater Design Specification - Virgina
Rainwater Harvesting: DCR Stormwater Design Specification - VirginaK9T
 
Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...San Diego County Water Authority
 
New Central Ground Water Authority (CGWA) guidelines 24 Sept 2020
New Central Ground Water Authority (CGWA) guidelines 24 Sept 2020New Central Ground Water Authority (CGWA) guidelines 24 Sept 2020
New Central Ground Water Authority (CGWA) guidelines 24 Sept 2020Nikesh Banwade
 
r-170910123730.pdf
r-170910123730.pdfr-170910123730.pdf
r-170910123730.pdflnhipulan
 
R.A. 9275 Philippine Clean Water Act of 2004
R.A. 9275 Philippine Clean Water Act of 2004R.A. 9275 Philippine Clean Water Act of 2004
R.A. 9275 Philippine Clean Water Act of 2004Rochelle Mendez
 
Law / NOC on Ground Water Utilization
Law / NOC on Ground Water UtilizationLaw / NOC on Ground Water Utilization
Law / NOC on Ground Water UtilizationIAAPI HQ
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeRick Nabett
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternativeRick Nabett
 
2 c 9detentionstoragedesign
2 c 9detentionstoragedesign2 c 9detentionstoragedesign
2 c 9detentionstoragedesignSiam Kak
 
05 Water and Energy
05 Water and Energy05 Water and Energy
05 Water and EnergyJill Watkins
 
Storm Water manual
Storm Water manualStorm Water manual
Storm Water manualgscplanning
 
Virginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design SpecVirginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design SpecFu Michael Justin
 
design of common hazardous waste treatment, storage and 2
design of common hazardous waste treatment, storage and 2design of common hazardous waste treatment, storage and 2
design of common hazardous waste treatment, storage and 2Arvind Kumar
 

Similar to Bakken_IPR_Slides (20)

California; Guidelines for Rainwater Harvesting - City of Berkeley
California;  Guidelines for Rainwater Harvesting - City of Berkeley  California;  Guidelines for Rainwater Harvesting - City of Berkeley
California; Guidelines for Rainwater Harvesting - City of Berkeley
 
Center for Sustainable Shale Development Comparison to State/Federal Regulations
Center for Sustainable Shale Development Comparison to State/Federal RegulationsCenter for Sustainable Shale Development Comparison to State/Federal Regulations
Center for Sustainable Shale Development Comparison to State/Federal Regulations
 
IRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 ExpansionIRWD Michelson Water Recycling Plant Phase 2 Expansion
IRWD Michelson Water Recycling Plant Phase 2 Expansion
 
Permitting potable water from rainwater- AIA Houston- September 2014
Permitting potable water from rainwater- AIA Houston- September 2014Permitting potable water from rainwater- AIA Houston- September 2014
Permitting potable water from rainwater- AIA Houston- September 2014
 
Marina and Village Surface Water Runoff and Waste Water Management plan
 Marina and Village Surface Water Runoff and Waste Water Management plan Marina and Village Surface Water Runoff and Waste Water Management plan
Marina and Village Surface Water Runoff and Waste Water Management plan
 
Rainwater Harvesting: DCR Stormwater Design Specification - Virgina
Rainwater Harvesting:  DCR Stormwater Design Specification - VirginaRainwater Harvesting:  DCR Stormwater Design Specification - Virgina
Rainwater Harvesting: DCR Stormwater Design Specification - Virgina
 
Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...
 
New Central Ground Water Authority (CGWA) guidelines 24 Sept 2020
New Central Ground Water Authority (CGWA) guidelines 24 Sept 2020New Central Ground Water Authority (CGWA) guidelines 24 Sept 2020
New Central Ground Water Authority (CGWA) guidelines 24 Sept 2020
 
r-170910123730.pdf
r-170910123730.pdfr-170910123730.pdf
r-170910123730.pdf
 
R.A. 9275 Philippine Clean Water Act of 2004
R.A. 9275 Philippine Clean Water Act of 2004R.A. 9275 Philippine Clean Water Act of 2004
R.A. 9275 Philippine Clean Water Act of 2004
 
Law / NOC on Ground Water Utilization
Law / NOC on Ground Water UtilizationLaw / NOC on Ground Water Utilization
Law / NOC on Ground Water Utilization
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable Alternative
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternative
 
2 c 9detentionstoragedesign
2 c 9detentionstoragedesign2 c 9detentionstoragedesign
2 c 9detentionstoragedesign
 
Design manual chapter7_revjan_2013
Design manual chapter7_revjan_2013Design manual chapter7_revjan_2013
Design manual chapter7_revjan_2013
 
Desalination
DesalinationDesalination
Desalination
 
05 Water and Energy
05 Water and Energy05 Water and Energy
05 Water and Energy
 
Storm Water manual
Storm Water manualStorm Water manual
Storm Water manual
 
Virginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design SpecVirginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design Spec
 
design of common hazardous waste treatment, storage and 2
design of common hazardous waste treatment, storage and 2design of common hazardous waste treatment, storage and 2
design of common hazardous waste treatment, storage and 2
 

Bakken_IPR_Slides

  • 1. Indirect Potable Reuse Presented by Jonathan Damora, Cy Maroofian, Dane Kim, Alex Bakken, and Kevin Gibson CE 485 Date 2/9/2015
  • 2. Agenda 1. Processes 2. Site Layout 3. Regulations 4. Costs 5. Evaluation
  • 5. ● The reverse osmosis technology requires a constant input at constant pressure to perform at max efficiency ● To account for the variable flows, the plant can run at a constant rate all day, by filling up equalization basins from the WTP effluent Water Treatment Vs. Wastewater Treatment
  • 8. Advanced Water Treatment Layout Based on GWRS Advanced Treatment Facility
  • 9. Regulation - CA Title 17 Article 1 §7584. Responsibility and scope of program The water supplier's cross-connection control program shall for the purpose of addressing the requirements of Sections 7585 through 7605 include, but not be limited to, the following elements: (a) The adoption of operating rules or ordinances to implement the cross-connection program. (b) The conducting of surveys to identify water user premises where cross connections are likely to occur, (c) The provisions of backflow protection by the water user at the user's connection or within the user's premises or both, (d) The provision of at least one person trained in cross-connection control to carry out the cross- connection program, (e) The establishment of a procedure or system for testing backflow preventers, and (f) The maintenance of records of locations, tests, and repairs of backflow preventers.
  • 10. Article 2. Protection of Water System §7604. Type of Protection Required (c) Recycled water (1) Premises where the public water system is used to supplement the recycled water supply use Air- Gap Separation device (AG). §7602. Construction of backflow preventers. (a) Air-gap Separation. An Air-gap separation (AG) shall be at least double the diameter of the supply pipe, measured vertically from the flood rim of the receiving vessel to the supply pipe; however, in no case shall this separation be less than one inch. §7603. Location of backflow preventers. (a) Air-gap Separation. An air-gap separation shall be located as close as practical to the user's connection and all piping between the user's connection and the receiving tank shall be entirely visible unless otherwise approved in writing by the water supplier and the health agency.
  • 11. Regulation CA Title 22 Article §60305. Use of recycled water for impoundments. (a) Except as provided in subsection (b), recycled water used as a source of water supply for nonrestricted recreational impoundments shall be disinfected tertiary recycled water that has been subjected to conventional treatment. Article 1. §60301.230 Disinfected tertiary recycled water By definition, "Disinfected tertiary recycled water" means a filtered and subsequently disinfected wastewater that meets the following criteria: (a) The filtered wastewater has been disinfected by either: (1) A chlorine disinfection process following filtration that provides a CT (the product of total chlorine residual and modal contact time measured at the same point) value of not less than 450 milligram-minutes per liter at all times with a modal contact time of at least 90 minutes, based on peak dry weather design flow; or (2) A disinfection process that, when combined with the filtration process, has been demonstrated to inactivate and/or remove 99.999 percent of the plaque forming units of F-specific bacteriophage MS2, or polio virus in the wastewater. A virus that is at least as resistant to disinfection as polio virus may be used for purposes of the demonstration. (b) The median concentration of total coliform bacteria measured in the disinfected effluent does not exceed an MPN of 2.2 per 100 milliliters utilizing the bacteriological results of the last seven days for which analyses have been completed and the number of total coliform bacteria does not exceed an MPN of 23 per 100 milliliters in more than one sample in any 30 day period. No sample shall exceed an MPN of 240 total coliform bacteria per 100 milliliters. Article 4. Use Area Requirements. §60310. Use area requirements. (b) No impoundment of disinfected tertiary recycled water shall occur within 100 feet of any domestic water supply well.
  • 12. Facilities: Reservoir : 6 Acres AOP: 3 Acres Evaporation Pond: 90 Acres Channel/Pipes: WTP → AOP (Pipes): 2 Acres AOP → Reservoir (Open Channel): 1 Acre Reservoir → WTP (Pressured Pipes): 2.5 Acres Land Cost Estimations Totals Total Land Size = 105 Acres Total Land Cost ($25,000 per Acre)= $2,625,000
  • 13. - 2040 - 2060: ~1,300 acre-ft / year or $1.3 M / year - After 2060: ~1,800 acre-ft / year or $1.8 M / year Water Savings http://www.psdgraphics.com/file/water-droplet-icon.jpg
  • 14. - Advanced Water Treatment: $30M - Land: $2.7M - Excavation: 7.5M - Equalization Tank: $2.2M - Concrete: $5M - Pipe: $790,000 - Pump: $10,000 - Total: $48.2M (All values rounded up) CAPEX
  • 15. - 2040 - 2060: - $650,000 / year - After 2060: - $950,000 / year ( + Cost) / ( - Savings) (Savings: compared to river discharge) (All values rounded up) OPEX
  • 16. Environmental Impact Report - construction is Northwest of the town in a relatively remote location, construction will not affect any residential, commercial, or industrial areas. - construction will also not affect any roadways or cause traffic issues. - noise during construction and operation will not be a concern due to the remote location - sludge will be disposed of in a variety of methods, primary methods include lagoon disposal, landfill disposal, while a small % can be used to fertilize soil for agricultural use or sent to WWTP to be treated (won’t be using deep-well injection due to risk of GW contamination)
  • 17. - reservoir will act as a bird refuge, along with other fauna - will act as a backup supply of water for potential drought - evaporation pond will help replenish groundwater supply as well - our design will be able to handle the projected 2060 population - the construction will create plenty of jobs(projected to take ~6 years), and once finished, we will have 4 full- time operators - potential downside is the risk of corrosive water in the concrete-lined open channels Environmental Impact Report