1. OUR CITY IS
CELEBRATING
The 2020 Investment Passport
ENERHODAR
This document has been developed in order to be submitted
to prospective national and foreign investors intending
to invest into the economic and social sectors of Enerhodar
years
2. CITY’S COMPETITIVE ADVANTAGES 4
LOCATION AND TRANSPORTATION 6
GENERAL INFORMATION ON ENERHODAR 8
BRAND OF THE CITY OF ENERHODAR 10
POPULATION AND HUMAN RESOURCES 11
ECONOMIC PROFILE 12
CITY’S DEVELOPMENT STRATEGY 16
LIVING CONDITIONS, SOCIAL AND CULTURAL ATMOSPHERE AND INFRASTRUCTURE 17
BUDGET PROFILE 23
BUSINESS CLIMATE, INTERNATIONAL COOPERATION AND SUCCESSFUL INVESTMENT PROJECTS 25
INVESTMENT PROPOSALS (ANNEXES) 30
Table of contents
This year our city is celebrating 50 years. The
city is the young one where active, industrious
and creative people striving for professional
development and improvement live in.
Today, much efforts are made in order to ensure
the economic development, growth in prosperity,
competitive recovery of the economy, improved
quality of life for the citizens and implementation
of their interests. We strive to make the city of
Enerhodar the center of investments, the territory
of developed and investment-attractive business
in the foreseeable future.
We invite the representatives of small, medium
and big businesses, who are ready to invest their
intellectual property, efforts and material assets
in the development of our city.
The city of Enerhodar is open for partnership and
ready to attract investors. We welcome anyone,
who wishes to expand and increase the city’s
prosperity. The citizens of Enerhodar have always
been hospitable and today they are happy to
welcome everyone who come to us with good and
friendly intentions.
We offer you the insights into the city of Enerhodar!
WELCOMING REMARKS
The
2020
Investment
Passport
3. A high level of investment
attractiveness of Enerhodar
is supported by its strategic
meaning, high manufacturing
and labor potential, the availability
of important infrastructure
for business development as well
as favorable business environment
and a good condition of the local
finances
CITY’S
COMPETITIVE
ADVANTAGES
LEADING POSITIONS ACCORDING
TO THE SOCIAL AND ECONOMIC DEVELOPMENT
AND CONDITIONS OF LOCAL FINANCES
The city of Enerhodar takes the 1st place in Zaporizhzhia region according to the budget
revenues and key figures of the social and economic development per capita that is
supported by stable operation of two powerful energy enterprises — Zaporizhzhia Heat
Power Plant and Zaporizhzhia Nuclear Power Plant.
RECREATIONAL
AND TOURISTIC POTENTIAL
2142,3 ha — land reserves, 1231,7 ha — water reserve lands. The available recreation
areas and a high level of available water reserve lands create proper conditions for the
development of the city’s touristic potential.
FAVORABLE BUSINESS CLIMATE
AND TRANSPARENT ADMINISTRATION
Thecityhasavailabletransparentadministrativeprocedures.TheJointOffice,Administration
Service Centre of Enerhodar City Council, provides more than 130 types of administrative
services. The city’s authorities is open for cooperation with foreign and national investors as
wellasprovidessupportforbusinessactivitiesandimplementationofthecitizens’initiatives.
AVAILABLE LAND
AND MANUFACTURING
AREAS
More than 50 propositions of different
categories.
https://www.en.gov.ua/
nvesticyna-dyalynsty/
vlyn-zemelyn-dlyanki-
ta-primschennya
HIGH
RATINGS
The ratings assigned by the Credit-Rating
National Rating Agency:
a credit rating assigned to the city
of Enerhodar — uaАА, a stable outlook
The level of the city’s investment
attractiveness — uaINV4(high level).
HIGH PURCHASING POWER
OF THE POPULATION
The level of employment and salary are higher than the average ones in the country and create
proper conditions for the development of tourism, consumer services and related branches.
The
2020
Investment
Passport
http://www.credit-rating.ua/
ua/rate_history/21/134/
4. About 106 departures per day are made
from Enerhodar’s bus station,
including 46 inter-city departures.
There is a railway station in the city.
Railroad passenger services are performed
in the direction “Enerhodar-Zaporizhzhia 1” twice a day.
The closest airport is located in the north-east part of the
city of Zaporizhzhia – the Zaporizhzhia International Airport
that provides services to all types of aircrafts. Direct flights
are performed to Minsk, Antalya, Istanbul, Warsaw, Sham
El-Sheikh, Dalaman, Batumi, Burgas, and Tel Aviv. The
Zaporizhzhia International Airport sends daily flights to Kiev,
from where flights to many countries are operated.
located in the south of Ukraine,
on a left bank of the Kakhovka Reservoir
(in the Lower Dnieper region)
to the regional center (the city of Zaporizhzhia) — 124 km;
to the highway Kamianka-Dniprovska — Berdiansk — 7 km;
to the airport in the city of Zaporizhzhia — 132 km
3,6%
residential
and public
constructions
LOCATIONAND
TRANSPORTATION
RAILWAY
SERVICES
AIR
SERVICES
HIGHWAYS
SERVICES
DISTANCES LOCATION
ENERHODAR
TERRITORY
53,1%
land reserves and
water reserve lands
28,1%
industrial, transport,
communication,
energy sector lands, etc.
6 350,1 ГА
including:
The
2020
Investment
Passport
5. ENERHODARis the energy capital of Ukraine as there are two powerful
energy enterprises in its territory – a nuclear power plant and a heat power
plant, which produce 25% electric energy of Ukraine.
ENERHODARis a young Ukrainian city with a high level of social
and economic development and a significant investment potential.
Enerhodar is the city of active people, open for modern business models
and technologies. In 2020 the city is celebrating 50 years.
June 12,1970
63,5 square kilometers,the city’s density index is low – 0,84L people per 1 square kilometer
53,3K people (as at 01.01.2020)
UAH 20 638,5
DATE OF ESTABLISHMENT
AREA
POPULATION DENSITY
AVERAGE MONTHLY SALARY IN 2019
ECONOMIC STRUCTURE
CITY’S BUDGET
INTERNATIONAL COOPERATION
PARTICIPATION IN PROJECTS
OF INTERNATIONAL TECHNICAL ASSISTANCE
OFFICIAL WEBPAGE
OF ENERHODAR
CITY COUNCIL
GENERAL
INFORMATION
ON ENERHODAR
mono-functional economy, the key branch is energy sector
Enerhodar takes the first place in Zaporizhzhia region and among the majority
of cities in the country according to the local budget revenues per capita
German Development Cooperation Agency (GIZ)
International Organization for Migration (МОМ)
Polish-Ukrainian Cooperation Foundation (ПАУСІ)
Eastern Europe Fund
U-LEAD with Europe Program
the project of the Federation of Canadian Municipalities
“Partnership for urban development” (the PROMIS project)
EU project “The Mayors for Economic Growth” (M4EG)
The Agreement of Mayors — an initiative of the European Unions
concerning the climate and energy sector.
https://www.en.gov.ua/
The
2020
Investment
Passport
6. THE ELEMENTS OFTHE CITY’S
BRANDSARE USED:
as elements of festive decoration
of the city during national and local
holidays (fests, competitions,
exhibitions, etc.);
on diplomas, greeting cards;
on souvenirs;
on printed products, presentation
materials;
for advertising purposes: on posters, social
advertising;
for production of web pages
and mobile apps in the Internet;
when manufacturing the small
architectural forms.
BRAND OF THE CITY OF ENERHODAR POPULATION AND
HUMAN RESOURCES
THE CITY’S BRAND WAS DEVELOPED AND
APPROVED IN 2018 (A DECISION
OF THE CITY’S COUNCIL # 10 OF 21.12.2018).
GENDER
STRUCTURE
LABOR MARKET
male
47% female
53%
ENERHODAR is a young city and
a share of the able-bodied citizens
is higher than the national average
and is 70% when the national figure
is 67,6%.
The available labor resources
of the city together with a high level
of education and intellectual potential
create conditions for operation
of the enterprises with high
innovating features.
17 764 people
35,4% population
343 persons
6 persons
employed at the
enterprises of the
principal circle of
statistical reporting
(Q4 2019)
34777
people
Human
resources
21384
people
40-64
years
13393
people
21-39
years
8277
people
0-14
years
2604
people
15-20
years
7713
people
65 years old
and older
https://www.en.gov.ua/brend-msta
POPULATION
STRUCTURE
available
populations
53,3K
people
resident
population
53,6K
people
The
2020
Investment
Passport
the unemployed
per one vacancy
employed at the
key enterprises
7. ECONOMIC
PROFILE
ENERHODARtakes the first place
in Zaporizhzhia region according
to the key figures of social and
economic development
ENERHODARis a leader according to the volumes of sold
industrial products per capita among other cities of Zaporizhzhia
region and nationwide.
A positive dynamics of the largest local employers (Zaporizhzhia
Nuclear Power Plant and Zaporizhzhia Heat Power Plant) ensures
the stable demand for labor resources and a high level of official
employment of population. Besides, an average monthly salary is
higher than the figures of Zaporizhzhia region and the national average.
ENERHODAR
is a leader according to the
volumes of income of the
city’s citizens that creates
additional advantages for
business development, in
particular for financial sector,
consumer services, trading
and related branches.
UKRAINE
ZAPORIZHZHIA REGION
ENERHODAR
500 000 600 000 700 000
400 000
300 000
200 000
100 000
Industrial products sold
in 2019 per 1 citizen,
UAH
UKRAINE
ZAPORIZHZHIA REGION
ENERHODAR
25 30 35
20
15
10
5
A share of of registered fulltime
employees compared to the number
of the present population in 2019, %
UKRAINE
ZAPORIZHZHIA REGION
ЕНЕРГОДАР
25 000
20 000
15 000
10 000
5 000
Average monthly
salary in 2019,
UAH
UKRAINE
ZAPORIZHZHIA REGION
ЕНЕРГОДАР
25 000
20 000
15 000
10 000
5 000
Retail turnover in January-
Seprtember 2019 per
1 citizen, UAH
The
2020
Investment
Passport
8. INDUSTRY
ENERHODARis the city with mono-functional
economy – the dynamics of social and economic
development and a level of the budget revenues
depend on stable operation of two energy
enterprises – Zaporizhzhia Nuclear Power Plant
and Zaporizhzhia Heat Power Plant.
The key type of products produced and sold by
the largest employers is electric energy.
The operation of energy complex of Enerhodar
is an important conditions of energy stability not
only of the region but on a nationwide scale.
15,8%
Energy production
UAH 30,8b
43,5 billion
of kW/h
28,8%
A share of the enterprises
of Enerhodar in the total products
sales in Zaporizhzhia region
Industrial products sold
by the enterprises in 2019
Key branch
Electric energy produced by the
city’s energy enterprises in 2019
A share of the enterprises
of Enerhodar in the total volume
of electric energy produced
in Ukraine in 2019
Principal activity – electric energy production. Zaporizhzhia nuclear power
plant is the largest producer of electric energy among the Ukrainian
nuclear plants and the most powerful nuclear station in Europe.
Employment size – 11 168 persons (63,2% of the total number of fulltime
employees of the city in 2019).
The payments, made by Zaporizhzhia nuclear power plant, amount to 2/3
of revenues of the general fund of the city’s budget, excluding transfers.
Principal activity – the production of elements of the pipelines and
nonstandard equipment for nuclear and heat power plants, production
of construction metal constructions, metal doors and windows, metal
containers, reservoirs; repair and technical maintenance of vehicles
and industrial machinery.
Employment size – 783 persons.
Principal activity – the provision of services
for centralized water supply and disposal,
supply of heat energy, transportation of
heat energy through main and local heat
supply networks
Employment size – 437 persons.
Principal activity – electric energy production.
Employment size – 1 026 persons.
Zaporizhzhia heat power plant forms 5% of revenues to the general fund
of the city’s budget and, considering the negative impact of the production
on the environment, it pays an environmental tax to the municipal budget
(74,6% of revenues of the budget’s special fund).
Principal activity – the repair and maintenance of vehicles and
industrial machinery. Designing the systems and equipment for
nuclear stations, installation, adjustment, repair and technical
maintenance
Employment size – 163 persons
Principal activity – bakery products and
confectionery; production of fancy baked
goods, nondurables cakes and desserts
Employment size – 25 persons
ZAPORIZHZHIA NUCLEAR POWER
PLANT NPP OF ENERGOATOM NNEGC
ATOMENERHOMASH MANUFACTURER
OF ENERHOATOM NNEGC
TEPLOVODOKANAL, PUBLIC
UTILITY COMPANY
ZAPORIZHZHIA HEAT POWER
PLANT OF DNIPROENERGO PJSC ENHOL PRIVATE ENTERPRISE VELYCH LLC
Contact details:
https://www.npp.zp.ua/uk
Contact details:
https://aem.zp.ua/ Contact details:
https://www.en.gov.ua/vikonavchi-
organi-misyko-radi/komunalyne-
pdprimstvo-teplovodokanal
Contact details:
http://dniproenergo.com.ua/separate-units/
dtek-zaporizka-tpp/
Contact details:
http://enhol.com.ua/
Contact details:
+38 061 394 10 56
The
2020
Investment
Passport
9. THE STRATEGIC PLAN OF DEVELOPMENT OF ENERHODAR
UNTIL 2027 (APPROVED BY THE DECISION OF THE
ENERHODAR CITY COUNCIL OF 27.01.2017, NO.4)
https://www.en.gov.ua/strategya-rozvitku-msta-energodara_Vq
CITY’S
DEVELOPMENT
STRATEGY
introduction of an efficient marketing system in the city;
modern urban streets;
development of the green industry;
introduction of the energy-saving technologies;
inclusive education;
the university of the third century;
public budget of Enerhodar
establishment of new neighborhood units with relevant
infrastructures;
construction of logistics, shopping, sports and recreation centers;
construction of a waste recycling plant;
construction of a road-and-railway bridge across the Kahovka
Reservoir;
construction of hotels and dining facilities.
THE MOST SUCCESSFUL IMPLEMENTS
PROJECTS OF THE STRATEGIC PLAN
OF DEVELOPMENT OF ENERHODAR
ARE THE FOLLOWING:
STRATEGIC
DIRECTIONS
STRATEGIC
TARGETS
THE GENERAL PLAN OFTHE CITY,WAS
APPROVEDACCORDINGTOTHE DECISION OF
THE ENERHODAR CITY COUNCIL OF 03.07.2015,
NO.94AND IT PROVIDES FORTHE FOLLOWING:
THE SOCIAL INFRASTRUCTURE OF ENERHODAR
is sufficiently developed – a wide network of elementary and
secondary education establishments, medical establishments, cultural
establishments and physical culture establishments, as well as a retail
store network. The citizens consider their city comfortable for living, and
the visitors notice that it is quiet, clean and atmospheric
The city open
for investment
and business
development
Environment-
friendly city
The city
comfortable
for living
The leading city in
the national energy
industry
Development of
small and medium
businesses
Investment raising
Preservation and
development of water
resources
Reducing the man-caused
load on the environment
Increasing the
environmental liability of
the business and citizens
Attractive, modern and
safe urban environment
Resource efficient
and modern urban
environmental support
system
Qualitative social services
LIVING CONDITIONS, SOCIAL
AND CULTURAL ATMOSPHERE
AND INFRASTRUCTURE
Key strategic directions
and targets stipulated
by the Strategy of development
of the city of Enerhodar until 2027
The
2020
Investment
Passport
10. The level of medical services and the access to health
care in the city of Enerhodar is one of the factors
creating a positive investment environment.
In the healthcare, the primary
medical assistance and the quality
of medical services are being
constantly improved:
The haemodialysis center
considered the best in Ukraine
was established in 2018
In 2020, due to the private
investors; support, a compute-
rized tomograph was purcha-
sed and, at the expense of
the budget fund, 5 artificial
respiration units, digitalized
stationary and portable X-ray
units were purchased as well
as the major repair of the
premises of the in-patient
facility and dental department
were initiated.
A wide network of elementary and secondary
education establishments, located in the territory of
the city, ensure the provision of educational services
in close proximity to the place of living. Considering
a good conditions of the local finances, the city’s
authorities annually allocate funds for purchasing
required technical equipment for educational process
purposes.
The Enerhodar city branch of Zaporizhzhia region
employment center made a multilateral agreement
with Education department of the city council with
regards to complex professional orientation and
employment of the youth.
Specialized industrial
hospital, Communal
Noncommercial Enterprise
382
Number of medical
staff, people
Municipal Center
of Primary Medical
Assistance, Communal
Noncommercial Enterprise
100
Number of medical
staff, people
HEALTH CARE EDUCATION
The Enerhodar Institute of Public and Municipal
Administration named after R.H. Khenokha
“Classic Private University” (the highest education
institution of the 3rd
level of accreditation)
8 general educational institutions
11 out-of-school education facilities
2 complexes “Pre-school institution –
general educational institution”
Preschool facilities
420 students training for management,
software engineering, economics,
accounting and audit,
and social work
5 775 pupils
2 202 children
149 pre-school children
and 431 pupils
8 pre-school facilities and many
different afterschool programs
Education institutions
Healthcare
(communal)
establishments
The
2020
Investment
Passport
11. CULTURAL ESTABLISHMENTS
SPORT
INFRASTRUCTURE
The developed sports infrastructure enable every citizen to choose his own way of
sporting activities. Every year the city hosts both local and national competitions.
We are proud that our sportsmen come in top places. For example, among the citizens
of Enerhodar there are bronze medalist of the 2000 Olympic Games, Para-Powerlifting
world champion, medalists of the canoeing world championship, boxing champions of
Ukraine and Europe, medalists of the swimming championship and the freestyle wrestling
championship of Ukraine.
12K CITIZENS
OF THE CITY
visit different specialized
sports groups. The most
popular are swimming,
martial arts, boxing and
football.
250 SPORTING AND
MASS PARTICIPATION
EVENTS
are held every year
and where more than 10K
people participate in.
SPORTS INSTITUTIONS
OF THE CITY:
7 sports institutions
Municipal stadium, which
seats 4 000
12 sports halls located at
general education schools
7 fitness centers
Cultural center
Culture
and business center
Cinemas
Exhibitions
and galleries
Museums
Libraries
Leisure and
recreational
facilities
Municipal cultural center “Suchasnyk” of Enerhodar city council
Cultural and business center Zaporizhzhia nuclear power
plant of Energoatom NNEGC
The Premier cinema network
Art exhibition hall
ART BLOK Gallery
Zaporizhzhia heat power plant and Zaporizhzhia nuclear power plant
Centralized library system of Enerhodar city council consisting
of 5 libraries, including 1 children’s library
Municipal Park of Culture and Rest
Pobedy Park
Quay
Garden square at Kurchatova Street
Soniachnyi Beach
RETAIL, PUBLIC CATERING
AND SERVICES
The levels of employment and salary that are above
the national average ensure the increase in a consumer
demand of the population. It is expedient to develop
retail trade, consumer services and related branches.
This field of concern makes a stable cash flow,
and the payback period of projects is from 5 to 7 years.
Stores
Public catering
facilities
Markets
Hotels
Hair and
beauty salons
126 food stores,
210 non-food stores,
6 wholesale warehouses
2 units
3 restaurants
20 cafeterias
4 pizzerias
9 bars/clubs
21 canteens and eateries (the most of them
located within the territory of Zaporizhzhia
nuclear power plant and the city’s schools)
5 units
39 units
The
2020
Investment
Passport
12. COMMUNAL
INFRASTRUCTURE
Today there are 8 public utility
companies in the city that
provide the following services:
water supply and disposal
centralized heat supply
removal of domestic waste
and refuse
maintenance and operation
of a solid domestic waste
landfill
beautification
other specialized services.
Starting from the year 2018, the city has been imple-
menting a large-scale project of reconstruction of the
road infrastructure – almost 44% of the road has been
reconstructed within the city’s limits. The sources of
financing are the following:
municipal budget funds loanable funds
a new square was established,
about 300 trees and more than
2000 ornamental bush were
plunged,
UAH 6.5m was spent for
development of the green
infrastructure.
646 trees (of which 200 Oriental
cherries), more than 4200 roses
and 760 bushes have been
plunged
The reconstruction of the
existing irrigation system and
the construction of the new one
have been initiated
UAH 4.1m has been spent for
theses purposes.
It is expected to construct 6km of
a new irrigation pipeline and to
reconstruct 38km of the existing
one before the end of the year.
INFORMATION ON WORKING HOURS
OF THE COMPANIES,APPLICABLE
TARIFFS AND NETWORK CONNECTION
POSSIBILITY IS POSTED ON:
2019:
ІH2020: 2019:
https://www.en.gov.ua/msyk-slughbi
URBAN
BEAUTIFICATION
ROAD
INFRASTRUCTURE
UAH
970,9m
UAH
1 122,6m
UAH
94m
UAH
45m
36,71km
total length
of the urban road,
of which:
revenues
of the
municipal
budget
expenses
of the of the
municipal
budget
transferred
to the State
budget as a
reverse grant
loanable funds
raised for
reconstruction
of the road
infrastructure
19,4km
within the limits
of the residential
development.
reapirs carried
ut in 2018-2019
expected to be
repaired in 2020
expected to be
repaired in 2021
8,41km 1,76 km 1,53 km
BUDGET
PROFILE
the city’s budget revenues significantly
exceeds the relevant averages of other
local budgets per capita
high dependence on operation of the
largest employers of the city: Zaporizhzhia
heat power plant and Zaporizhzhia
nuclear power plant
Enerhodar is a donor city
as it annually transfers a
reverse grant to the state
budget
low susceptibility of the
revenue item of the city’s
budget to economic risks
INFORMATION
ON THE BUDGET:
https://www.en.gov.ua/
byudghet-msta
+15,8%
growth of the revenues
of the municipal budget
(excluding transfers)
compared to the relevant
amount in 2018
A good condition of local finance is a competitive advantage of the city as it defines
the quality of the environment, where investors operate. A high level of the fiscal
capacity enable to finance both current expenses of the budgetary institutions (in
full) and investment projects of development of the municipal infrastructure using
the funds of the municipal budget.
UKRAINE (local budgets)
ZAPORIZHZHIA REGION
ENERHODAR
12 000 14 000 16 000
10 000
8 000
6 000
4 000
2 000
Budget revenues, excluding grants,
per 1 citizen, UAH
ROAD
RECONSTRUCTION
WITHIN THE LIMITS
OF THE RESIDENTIAL
AREA, KM
The
2020
Investment
Passport
11,69 km 7,71km
reconstruction others
13. Expenditures of Enerhodar’s budget in 2017-2019, UAH millions
BUSINESS
CLIMATE
REVENUE STRUCTURE EXPENSE STRUCTURE
The tax receipts have the largest share in the budget of Enerhodar
that is evidence of a high level of its sufficiency and a good condition
of the local finances.
Using the funds of the budget, the city successfully implements
municipal development programs and, respectively, a share of capital
expenditures of the budget annually increases.
Non-tax
revenues
Excise
tax
Education
Housing
and utilities
infrastructure
Resources
conservation
Social
and cultural
sector
Payments
to the state
budget
Local
government
bodies
Land
tax
Environ-
mental tax
Single
tax
Individual
income tax
Other
revenues
66,4% 14,9% 8,3% 0,3%
2,6%
2,6%
5,0%
OWN REVENUES
OF ENERHODAR’S BUDGET
(EXCLUDING GRANTS) FOR 2019
THE 2019 ENERHODAR
BUDGET EXPENDITURES
(WITHOUT GRANTS)
Revenues of Enerhodar’s budget in 2017-2019, UAH millions
800 1000 1200
600
400
200
2017
2018
2019
800 1000 1200
600
400
200
2017
2018
2019
The development
of small and medium
businesses is one
of the top priority
development fields
of the city.
Regardless of the 2019
growth of the number of
private entrepreneurs,
the city of Enerhodar
falls behind other cities
of Zaporizhzhia region
according to the small
and medium enterprises
growth index.
The number of small and medium businesses
in Enerhodar, people
Number of small
and medium businesses
as at 01.01.2020
Total return to the budget
from small and medium
businesses
Single tax paid
1 752 private
entrepreneurs
177 small and
medium enterprises
UAH 41.6m (in 2019) – 6%
of all receipts to the general fund
of the city’s budget
(without transfers)
UAH 20.1m (in 2019) – by 14,9%
more compared to the year 2018
Small Business
2000
1500
1000
500
2017
2018
2019
Legal
entities
Individual
entrepreneurs
The number of small and medium businesses
per 10000 people of the present population
Enerhodar Tokmak Berdiansk Melitipol Zaporizhzhia
300
600
200
500
100
400
Individual
entrepreneurs
Small and
medium
enterprises
own income transfers current expenses capital expenditures
The
2020
Investment
Passport
14. BUSINESS SUPPORT
AND DEVELOPMENT
SUCCESSFUL
INVESTMENT PROJECTS
THE PROGRAM OF SUPPORT OF SMALL
AND MEDIUM BUSINESSES IN THE CITY
OF ENERHODAR FOR 2018-2022 WAS DEVELOPED
THE JOINT OFFICE,ADMINISTRATION SERVICE CENTRE
is established
«THE AGENCY OF LOCAL DEVELOPMENT OF ENERHODAR
PUBLIC ORGANIZATION AND THE ACADEMIC BUSINESS
INCUBATOR were established as a part of the Enerhodar
Institute of Public and Municipal Administration named after
R.H. Khenokha “Classic Private University”
It is expected to establish a BUSINESS CENTER and
AN INDUSTRIAL PARK for the expansion of production
and comprehensive business support in the city
https://www.en.gov.ua/pidpriemcyam/
msyka-programa-pdtrimki-ta-rozvitku-
malogo-serednyogo-pdprimnictva-v-
menergodar
From the beginning of participation in the project (from 2015) the following
have been done:
The Strategic plan of development of Enerhodar until 2027 and the
program of development of small and medium businesses developed;
Express analysis of the local business climate performed;
Projects implemented:
- “The improvement of the level of competence of active and prospective
business entities for business diversification in Enerhodar”;
- “Creation of Enerhodar’s positive image as an investment-attractive city”.
In 2H2020 the implementation of two new projects “Youth business
consulting center” and “The workshop of talents” dealing with business
development and diversification of the city’s economy are expected to be
implemented.
In 2010, the city and DTEK LLC signed a declaration of social partnership.
According to the cooperation, the equipment for the hospital, computer
equipment and furniture for the school have been purchased as well as the
measures for urban beautification and energy preservation have been taken.
In 2013, a tradition of holding a competition of mini-projects “The community
with its own hands” was established. During that time, 68 projects for
improvement of the quality of education, urban beautification and energy
preservation have been implemented.
Due to the cooperation with the Polish-
Ukrainian Cooperation Foundation (PAUC),
the city introduced the Public Budget.
Due to the implementation of the projects,
2 murals appeared in the city, sports
grounds were constructed and energy-
efficient street lighting was established.
Before the end of the year, it is expected
to construct new modern sports and art
places, to take energy saving measures
fin the buildings, as well as to introduce a
system of underground waste collection,
classification and storage.
In 2019, the Joint Office, Administration Service Centre of Enerhodar City
Council was chosen for participation in the program “U-LEAD with Europe”.
Accordingtotheprogram,itisexpectedtogetinstitutionalandmethodological
support, furniture, computer equipment and for the issuance of passport. The
project is expected to be implemented in 2H2020.
THE PROJECT OF
INTERNATIONAL
TECHNICAL ASSISTANCE
“PARTNERSHIP FOR
URBAN DEVELOPMENT”
(THE PROMIS PROJECT)
“THE COMMUNITY
WITH ITS OWN HANDS”
SPONSORED DTEK LLC
PUBLIC BUDGET
U-LEAD WITH EUROPE
https://www.en.gov.ua/
gromadsykiy-byudghet
The
2020
Investment
Passport
15. CURRENT
INVESTMENT PROJECTS
OF THE LARGEST
EMPLOYERS
NEW CONSTRUCTION
CONSTRUCTION
OF A SOLAR ELECTRIC PLANT
“SONECHKO-1”.
According to the project, it is expected to install 5K solar
panels in the territory of 37ha. The expected power capacity
is 13.2MWth; the expected volume of energy production is
16 705 MWth. In 2019 the pre-construction activities were
initiated and the expected start-up date is December 2021.
ESTABLISHMENT OF SCIENCE PARKS – SUSTAINABLE
PROCESSING CENTERS (DATA CENTERS) WITHIN THE
TERRITORY SURROUNDINGTHE NUCLEAR POWER PLANT,
that enable to raise private investments, to create new jobs and to increase the
revenues of the state and local budgets. The city will receive an impetus for
development and introduction of new technologies of the most powerful processing
complexes. At the moment the project is at the stage of planning (economic and
technological feasibility).
SHOPPING MALL OUTDOOR POOL
Our city is being constantly developed.
New recreation places are being constructed:
RESIDENTIAL COMPLEX ‘PRESTIGE”
Description: a 10-storey residential complex consisting
of 3 sections with commercial premises on the 1st
floor.
Commencement of construction works:
2019 рік
Scheduled final completion: І section – 2020;
ІІ section –2021; ІІІ section – 2022.
Investor: service company: Housing maintenance and
construction company “Enerhodar 1”, Solomon-Bud LLC
Commencement of
construction works:
2018 рік
Commencement of
construction works:
2019 рік
Project owner:
«Мале Виробничо-
комерційне підприємство»
Project owner:
Obriy LLC
Scheduled final
completion:
2021 рік
Final completion:
2020 рік
Description:
a 3-storey shopping
mall with an area of
6200 m2
Description: 2 pools:
for adults (25*10,
depth 1,4 – 1,6m)
and a wading pool
The
2020
Investment
Passport
16. INVESTMENT PROPOSALS
(ANNEXES)
RECONSTRUCTION OF THE STADIUM OF ENERHODAR AT 23A BUDIVELNYKIV STREET RECONSTRUCTION OF DECORATIVE WATER INSTALLATIONS AND DECORATIVE MONUMENTAL
AND DECORATIVE APPEARANCE OF THE CITY OF ENERHODAR
Enerhodar City Council
2021
2 months
Creation of proper conditions for health improvement and outside activities of the citizens,
for running training sessions, holding local and regional sports competitions
as well as any other public events
Reconstructed stadium with total area of 21 038 sq.m. for 400 visitors
UAH 31 569,41
Municipal budget
Design estimates developed and a positive expert report received
Enerhodar City Council
2021
13 months
Improvement of conditions for recreations of the city’s citizens
The existing water reservoir of 0.45ha cleaned and its banks fortified with stones,
Pedestrian fountain (15 х 15 м) constructed, and the surrounding territories landscaped
UAH 45 908,37
Municipal budget
Design estimates developed and a positive expert report received
Project owner
Start date
Duration
Project’s purpose
Expected benefits
project cost, UAH (000)
Sources of financing
Implementation phase
Project owner
Start date
Duration
Project’s purpose
Expected benefits
project cost, UAH (000)
Sources of financing
Implementation phase
RECONSTRUCTION OF A 5-STOREY DORMITORY LOCATED AT 5 BUDIVELNYKIV STREET,
AS A SOCIAL HOUSING ESTATE FOR SERVICEMEN
RECONSTRUCTION OF A MUNICIPAL PARK OF CULTURE AND REST
Enerhodar City Council
2021
33 months
Provision of housing to the population in need of improved housing conditions
Construction of 101 apartments, 17 of which for people with limited mobility
UAH 46 683,62
Municipal budget
Design estimates developed and a positive expert report received
Enerhodar City Council
2021
13 months
Creation of proper conditions for relaxation of the city’s citizens at a modern park
The park’s territory is fenced around the perimeter, grass lawns, sidewalks and road renewed and redesigned. 2 playgrounds
and a sports grounds established for people with limited mobility. The sprinkler system and illumination system renewed
UAH 35 569,409
Municipal budget
In 2018 design estimates was developed and a positive expert report was issued. At present, the design estimated
are being agreed and adjusted
Project owner
Start date
Duration
Project’s purpose
Expected benefits
project cost, UAH (000)
Sources of financing
Implementation phase
Project owner
Start date
Duration
Project’s purpose
Expected benefits
project cost, UAH (000)
Sources of financing
Implementation phase
ANNEX 1. A list and description of existing investment projects
The
2020
Investment
Passport
17. ANNEX 2. Information on available (communal) land plots
ANNEX 3. Information on available private manufacturing sites
ANNEX 4.
ANNEX 5. Information on premises/sites held on the balance sheet of
Zaporizhzhia Nuclear Power Plant, Production Enterprise of Enerhoatom JSC
(public ownership)
Location Object’s name
Area,
square
meters
Intended use For sale/rent
Available utility systems
(gas, water, electricity
or distances to them)
4a Yunosti Avenue
A part of the Olesya store’s building
(a basement and a part of the 1st floor)
703,3 Commercial activities For sale/rent
Electrical power supply, water
supply, sewer system
96 Promyslova Street Warehouse of heat-insulation materials No.1 592,4 Warehousing For sale No utility networks
97 Promyslova Street Warehouse of heat-insulation materials No.2 567,4 Warehousing For sale/rent No utility networks
3-г Prydniprovska
Street
Administration and amenity building 279,3 Amenity and office premises For rent
Electrical power supply,
water supply, sewer system
48 Promyslova Street A building of the oxygen station 190,3
The building is unsuitable
for continued operations.
The supporting structures
partially dismantled
For rent No utility networks
25 Budivelnykiv Street Enerhodar hotel 6672,2
To be used as a hotel or office
premises
For sale/rent
Electrical power supply, water
supply, heat supply, sewer system
Location Object’s name
Area,
square
meters
Intended use For sale/rent
Available utility systems
(gas, water, electricity
or distances to them)
157 Promyslova
Street
A building of the industrial site’s office 489,5 Amenity and office premises For sale/rent
Heat supply system; electric power
supply, water supply, sewer system;
telecommunication
129 Promyslova
Street
Mechanical unit of cable piece cutting 464,0 Production premises, garages For sale/rent supply system; electric power supply
127 Promyslova
Street
A shop of ventilation units 4291,8
Production premises, warehouses,
garages
For rent
Heat supply system; electric power
supply, water supply, sewer system;
telecommunication
A building of the transformer substation 90,0 Transformer substation For rent Electric power supply
Administrative and amenity building 789,9 Amenity and office premises For rent
Heat supply system; electric power
supply, water supply, sewer system;
telecommunication
Warehouse of supporting materials 473,0 Warehousing For sale
Heat supply system; electric power
supply
126 Promyslova
Street
Sanitaryware premise 110,8
Production premises (production of
varnish-and-paint mixtures)
For sale/rent
Heat supply system; electric power
supply, water supply connected to the
building
Premises of the central materials
warehouse
135,2 Amenity premises For rent
Centralized Heat supply system, electric
power supply, water supply, sewer
system
Concrete sites 1566,4 Unsheltered warehouse or car parking For rent No utility networks
Cold warehouse – a shed for millworks 472,6 Warehousing For rent Electric power supply
Plant of forming-and-reinforcing systems
with power-saw bench
1866,3 Carpentry shop For sale
Heat supply system; electric power
supply, sewer system
117 Promyslova
Street
Cold storage material warehouse 98,5 Warehousing For rent Temporary electric power supply
116 Promyslova
Street
Service and amenity building 1477,8 Amenity and office premises For rent
Centralized heat supply system, electric
power supply, water supply, sewer
system
Semi knocked down assembly area 4815,1 Unsheltered warehouse or car parking For rent No utility networks
Repair shops 907,4 Maintenance of equipment and vehicles For sale
Heat supply system, electric power
supply, water supply, sewer system
Location Object’s name
Area,
square
meters
Intended use For sale/rent
Available utility systems
(gas, water, electricity
or distances to them)
7 Komunalna
Street
Production facility consisting of
administration building, garage box,
covered storehouse, fence
14800 Production facility For sale
Heat supply, sewer
system, water supply,
and electricity supply
Location Object’s name
Area,
square
meters
Intended use For sale/rent
Available utility systems
(gas, water, electricity
or distances to them)
Kurchatova
Street
Lan plot (cadastral No.
2312500000:02:008:0023
9620,0
Construction and maintenance
of a multi-story residential
building
For sale/rent
Mains system nearby,
heat supply, water supply
and disposal
Information on available premises/sites held on the balance sheet of Zaporizhzhia
Heat Power Plant, Production Enterprise of Dniproenerho, JSC (private ownership)
The
2020
Investment
Passport
18. Location Object’s name
Area,
square
meters
Intended use For sale/rent
Available utility systems
(gas, water, electricity
or distances to them)
116 Promyslova
Street
A buildings of the pre-installation works
shop
2513,8
Turning shop, production of metal
constructions
For sale
Heat supply system, electric
power supply, water supply,
sewer system
Steam supply line warehouse 537,5 Warehousing For sale
Electric power supply, and some
premises have heating system
Cold storage warehouse-shelter 188,8 Warehousing For sale No utility networks
68 Promyslova
Street
Laboratory and amenity building 761,8 Amenity and office premises For rent
Heat supply system, electric
power supply, water supply,
sewer system
Steam cleaning chambers 96,6
Reinforced concrete products steam
cleaning
For sale No utility networks
warehouse space for reinforced concrete
Products
22200,0 Unsheltered warehouse For rent No utility networks
133 Promyslova
Street
Daryusha store building 119,3
social and amenity objects,
stores, trading sites
For rent
Centralized heat supply system,
electric power supply, water
supply, sewer system
Store building №26 98,3
social and amenity objects,
stores, trading sites
For rent
Centralized heat supply system,
electric power supply, water supply,
sewer system
136 Promyslova
Street
Concrete plant. Administrative and
amenity building
298,8 Amenity and office premises For sale
Centralized heat supply system,
electric power supply, water
supply, sewer system
Concrete plant. Guard desk 6,8 Amenity premises For sale No utility networks
Concrete plant. Concrete sites and roads 5100,0
Unsheltered warehouse or car
parking
For sale No utility networks
Concrete plant. Shop of brick hydro-
pressing
310,2 Sheltered warehouses For sale No utility networks
Concrete plant. Central control room 33,0
Managing the technological
operations of the concrete plant
For sale
Heat supply, electric power
supply
Concrete plant 377,4
Producing the concrete and
concrete mixture
For sale
Water supply and electric power
supply
Inert material warehouse 1560,8
Warehousing of inert materials used
for technological operations of the
concrete plant
For sale
A ground car ramp and an
underground gallery have a
temporary power supply line. No
other utility networks
Location Object’s name
Area,
square
meters
Intended use For sale/rent
Available utility systems
(gas, water, electricity
or distances to them)
136 Promyslova
Street
Concrete warehouse 221,9 Concrete warehousing For sale Power distribution system
Gas compressor station 622,9
For premises of the gas
compressor station
For sale No utility networks
115 Promyslova
Street
Administrative and amenity building 570,4
Shops, sheltered warehouse or car
parking
For rent
Heat supply, electrical power
supply, water supply, sewer system,
illumination
A shop of heat insulation works with
a warehouse of thermal insulating
materials
1450,0
Shops, sheltered warehouse
or car parking
For rent
Centralized heating, electrical power
supply
Gumming shop 430,5
For coating the metal and other
construction and spare parts
with rubber
For sale No utility networks
36 Promyslova Street
Feeder base. Building No.1 23,3 Office premises For rent No utility networks
Building No. 2 236,4 Warehousing
91 Promyslova
Street
Engineering Laboratory Building 1467,0
Office and amenity premises,
laboratory
For sale No utility networks
Amenity premises 103,5 Amenity and service premises For sale No utility networks
Materials warehouse of ПТЕМ 1001,0 Warehousing For sale Heat supply, electrical power supply
Highly inflammable materials warehouse 1553,5
Warehouse of складу inflammable
materials
For sale No utility networks
Service and amenity building 1540,0 Amenity and service premises For sale
Heat supply, electrical power supply,
water supply, sewer system
Sheltered parking for special purpose
vehicles
969,0 Сar parking For sale No utility networks
Pre-Assembly Site 25099,0
Warehousing of large reinforced
and metal constructions
For sale No utility networks
134 Promyslova
Street
Gas station with a warehouse of fuel and
lubricant materials
2332,0
Gas station and a warehouse of fuel and
lubricant materials
For sale
A building of the central control room has
heat supply and water supply systems.
And the building has an electrical wiring
12 Promyslova
Street
Workshop 517,2 Amenity and office premises For rent No utility networks
A covered shed and a car ramp 761,6 Loading-unloading operations For rent No utility networks
The
2020
Investment
Passport
19. Developed by the city’s authorities
in collaboration with Сredit-Rating,
nationally authorized rating agency.
The opinions and views have been
expressed considering the situation
as at the document’s date.
The document is for information purposes.
Credit-Rating, LLC
1 Mezhyhirska Street, Kyiv 04070
phone.: +38 (044) 490 25 50
e-mail: office@credit-rating.com.ua
www.credit-rating.com.ua
Enerhodar City Council
11 Kurchatova Street, Enerhodar,
71502, Zaporizhzhia Region
phone.: +38 (06139) 3 24 14
e-mail: adm@en.gov.ua
www.en.gov.ua
The 2020 Investment Passport
ENERHODAR