SlideShare a Scribd company logo
1 of 1
Download to read offline
Page 1 of 1
Printed: 19/09/2016 11:13 a.m.
File: D:PersonalBusiness Analysis_IIBABABOKBABOK2 (Released 2010-04-01)MyAnalysisBABOKv2 Process Associations_v0_03.xlsx
IIBA BABOK v2 Business Analysis Process Associations
Key
These matrices summarise information from v2 of the IIBA BABOK.
For further details on the documents, processes, techniques and other information included in the matrices, please refer to the IIBA BABOK v2 document.
This part of the matrix below is a master list of all BABOK documents showing which tasks (in columns) have them as Inputs (e.g. Read) or Outputs (e.g. Created)
Where an 'r' appears in a matrix cell, that indicates the document (in the row) is an INPUT to the task (in the column)
Where a "C' appears in a matrix cell, that indicates the document (in the row) is an OUTPUT created by the task (in the column)
By showing which specific tasks Creates a particular document as an output and showing which other tasks read it as an input, it helps show the dependency and sequence of documents and tasks
Note: The documents are currently listed in ascending alphabetical order of document name. A useful variation that may be available later, is a version that shows documents in sequence of creation and use, but that may be after BABOK v3 is released.
2 This part of the matrix is a master list of all general and specific techniques mentioned in the v2 BABOK, and show which Process uses them.
V2 BABOK Chapters and Activities >
ID Document / Technique Name
Output
(+1 in
matrix)
Input
(-1 in
matrix)
PlanBusinessAnalysisApproach
ConductStakeholderAnalysis
PlanBAActivities
PlanBACommunication
PlanRequirementsManagementProcess
ManageBAPerformance
PrepareforElicitation
ConductElicitationActivity
DocumentElicitationResults
ConfirmElicitationResults
ManageSolutionScope
ManageRequirementsTraceability
MaintainRequirementsforRe-use
PrepareRequirementsPackage
CommunicateRequirements
DefineBusinessNeed
AssessCapabilityGaps
DetermineSolutionsApproach
DefineSolutionScope
DefineBusinessCase
PrioritiseRequirements
OrganiseRequirements
SpecifyandModelRequirements
DefineAssumptionsandConstraints
VerifyQualityofRequirements
ValidateRequirementsMeetStakeholderNeeds
AssessProposedSolution
AllocateRequirements
AssessOrganisationalReadiness
DefineTransitionRequirements
ValidateSolution
EvaluateSolutionPerformance
2.1 2.2 2.3 2.4 2.5 2.6 3.1 3.2 3.3 3.4 4.1 4.2 4.3 4.4 4.5 5.1 5.2 5.3 5.4 5.5 6.1 6.2 6.3 6.4 6.5 6.6 7.1 7.2 7.3 7.4 7.5 7.6
Number of Input Documents (with 'r' in matrix) 38 3 3 4 4 3 4 4 7 1 2 7 2 2 13 5 2 3 3 4 4 5 3 2 1 4 2 3 4 4 3 3 4
Number of External Input Documents Required 9 2 2 1 1 1 2 1 1 1 1 1 1 1 1 1 2 1 1 2
Number of Output Documents (with 'C' in matrix) 1 1 1 1 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 1
6. Requirements Analysis
7. Solution Assessment &
Validation
1
1
2. BA Planning & Monitoring 3. Elicitation
4. Requirements
Management &
Communication 5. Enterprise Analysis
1 Assessment of Proposed Solution 1 C
2 Assumptions and Constraints 1 3 r r C r
3 Business Analysis Approach 1 3 C r r r
4 Business Analysis Communications Plan 1 2 C r r
5 Business Analysis Performance Assessment 1 1 r C
6 Business Analysis Performance Metrics 1 r
7 Business Analysis Plans 1 3 C r r r
8 Business Analysis Process Assets 1 C
9 Business Case 1 4 r r C r r
10 Business Goals and Objectives 1 r
11 Business Need 1 9 r r r r C r r r r r
12 Elicitation Results 1 1 C r
13 Enterprise Architecture 3 r r r
14 Expert Judgement 1 r
15 Identified Defects 1 1 C r
16 Mitigating Actions 1 C
17 Organisational Performance Standards 1 r
18 Organisational Process Assets (Checklists, templates etc) 10 r r r r r r r r r r
19 Organisational Readiness Assessment 1 1 C r
20 Required Capabilities 1 2 C r r
21 Requirements [Stated, Unconfirmed] 1 4 C r r r r
22 Requirements [Stated, Confirmed] 1 6 C r r r r r r
23 Requirements [Traced] 1 4 r C r r r
24 Requirements [Communicated] 1 3 r r C r
25 Requirements [Approved] 1 5 C r r r r r
26 Requirements [Prioritised] 1 5 r C r r r r
27 Requirements [Verified Quality of Models] 1 2 r C r
28 Requirements [Validated by Stakeholder] 1 2 r C r
29 Requirements [Allocated] 1 2 r r C
30 Requirements [Maintained & Resuable] 1 1 C r
31 Requirements Management Plan 1 5 C r r r r r
32 Requirements Package 1 1 C r
33 Requirements Structure 1 2 r C r
34 Scheduled Resources 1 1 C r
35 Solution [Constructed, deployed or designed] 5 r r r r r
36 Solution Approach 1 1 C r
37 Solution Options 1 r
38 Solution Performance Assessment 1 1 r C
39 Solution Performance Metrics 1 r
40 Solution Scope 1 7 r r r C r r r r
41 Solution Validation Assessment 1 C
42 Stakeholder Concerns [Unconfirmed] 1 4 C r r r r
43 Stakeholder Concerns [Confirmed] 1 C
44 Stakeholder list, roles & responsibilities 1 5 C r r r r r
45 Stakeholder or Solution Requirements 1 1 r C
46 Supporting Materials 1 1 C r
47 Transition Requirements 1 1 r C
Key: C=Document is CREATED by the task (e.g. an Output) r=Document is READ by the task (e.g. an Input)
2
Techniques
(1=use of technique in the task) 3 13 3 1 3 8 9 10 10 2 3 1 2 2 6 2 6 5 6 5 9 16 2 4 5 3 6 11 5 3 4
General Techniques
9.01 Acceptance and Evaluation Criteria Definition 8 1 1 1 1 1 1 1 1
9.02 Benchmarking 2 1 1
9.03 Brainstorming 6 1 1 1 1 1 1
9.04 Business Rules Analysis 5 1 1 1 1 1
9.05 Data Dictionary and Glossary (3-2 + 6-3) 2 1 1
9.06 Data Flow Diagrams (6-2,3 + 7-3,4) 4 1 1 1 1
9.07 Data Modelling (6-2,3 + 7-4) 3 1 1 1
9.08 Decision Analysis (2-1,5 + 5-3,5 + 6-1 + 7-1,2,6) 8 1 1 1 1 1 1 1 1
9.09 Document Analysis (3-1,2,3 + 5-2) 4 1 1 1 1
9.1 Estimation (2-3 + 5-3,5) 3 1 1 1
9.11 Focus Groups (3-1,2,3 + 5-1 + 7-3,6) 6 1 1 1 1 1 1
9.12 Functional Decomposition (2-3 + 5-1,4 + 6-2,3 + 7-2) 6 1 1 1 1 1 1
9.13 Interface Analysis (3-1,2,3 + 5-4 + 6-3) 5 1 1 1 1 1
9.14 Interviews (2-2,6 + 3-1,2,3,4 + 7-3) 7 1 1 1 1 1 1 1
9.15 Lessons Learned Process (2-6) 1 1
9.16 Metrics and Key Performance Indicators (2-6 + 5-5 + 6-3,6) 4 1 1 1 1
9.17 Non-functional Requirements Analysis (6-3) 1 1
9.18 Observation (3-1,2,3,4 + 7-6) 5 1 1 1 1 1
9.19 Organization Modelling (2-2 + 6-2,3 + 7-3,4) 5 1 1 1 1 1
9.2 Problem Tracking (2-5,6 + 3-3 + 4-1 + 6-4,5 + 7-3,5) 8 1 1 1 1 1 1 1 1
9.21 Process Modelling (2-1,2,6 + 6-2,3 + 7-2,3,4) 8 1 1 1 1 1 1 1 1
9.22 Prototyping (3-1,2,3 + 6-3,6) 5 1 1 1 1 1
9.23 Requirements Workshops (2-2 + 3-1,2,3 + 4-5 + 5-3) 6 1 1 1 1 1 1
9.24 Risk Analysis (2-2,3,5 + 4-5 + 5-5 + 6-1,4,6 + 7-3) 8 1 1 1 1 1 1 1 1
9.25 Root Cause Analysis (2-6 + 5-1 + 7-5) 3 1 1 1
9.26 Scenarios and Use Cases (2-2 + 6-2,3 + 7-2) 4 1 1 1 1
9.27 Scope Modelling (2-2 + 5-4 + 6-2) 3 1 1 1
9.28 Sequence Diagrams (6-3) 1 1
9.29 State Diagrams (6-3) 1 1
9.3 Structured Walkthrough (2-1,4 + 6-5,6) 5 1 1 1 1 1
9.31 Survey/Questionnaire (2-2,6 + 3-1,2,3 + 7-3,6) 7 1 1 1 1 1 1 1
9.32 SWOT Analysis (5-2,5 + 7-3) 3 1 1 1
9.33 User Stories (2-2 + 5-4 + 6-2,3) 4 1 1 1 1
9.34 Vendor Assessment (5-5 + 7-1) 2 1 1
Specific Techniques
9.35 Baselining (s4-1-5-2) 1 1
9.36 Checklists (s6-5-5-2) 1 1
9.37 Coverage Matrix (s4-2-5-1) 1 1
9.38 Feasibility Analysis (s5-3-5-2) 1 1
9.39 Force Field Analysis (s7-3-5-2) 1 1
9.4 MoSCoW Analysis (s6-1-5-2) 1 1
9.41 Problem or Vision Statement (s5-4-5-2) 1 1
9.42 RACI Matrix (s2-2-5-2) 1 1
9.43 Requirements Documentation (s4-4-5-1) 1 1
9.44 Requirements for Vendor Selection RFI, RFQ, RFP (s4-4-5-2) 1 1
9.45 Signoff (s4-1-5-3) 1 1
9.46 Stakeholder Map (s2-2-5-3) 1 1
9.47 Timeboxing/Budgeting (s6-1-5-3) 1 1
9.48 Variance Analysis (s2-6-5-2) 1 1
9.49 Voting (s6-1-5-4) 1 1
By Alan Maxwell, Christchurch, New Zealand

More Related Content

What's hot

Babok v3 chp 10 techniques
Babok v3 chp 10 techniquesBabok v3 chp 10 techniques
Babok v3 chp 10 techniquesjongminshi
 
BABOK Study Group - meeting 1
BABOK Study Group - meeting 1BABOK Study Group - meeting 1
BABOK Study Group - meeting 1Paweł Zubkiewicz
 
BABOK v3 讀書會 CH8 20150618
BABOK v3 讀書會 CH8 20150618BABOK v3 讀書會 CH8 20150618
BABOK v3 讀書會 CH8 20150618moris lee
 
Requirements Analysis And Design Ddefinition
Requirements Analysis And Design DdefinitionRequirements Analysis And Design Ddefinition
Requirements Analysis And Design DdefinitionOD Ali
 
BABOK v3 讀書會 CH7 20150611
BABOK v3 讀書會 CH7 20150611BABOK v3 讀書會 CH7 20150611
BABOK v3 讀書會 CH7 20150611moris lee
 
BABOK v3 讀書會 CH1 20150507
BABOK v3 讀書會 CH1 20150507BABOK v3 讀書會 CH1 20150507
BABOK v3 讀書會 CH1 20150507moris lee
 
BABOK Study Group - meeting 2
BABOK Study Group - meeting 2BABOK Study Group - meeting 2
BABOK Study Group - meeting 2Paweł Zubkiewicz
 
Alisa Plaksina, "Process Improvement using the ARIS Methodology"
Alisa Plaksina, "Process Improvement using the ARIS Methodology"Alisa Plaksina, "Process Improvement using the ARIS Methodology"
Alisa Plaksina, "Process Improvement using the ARIS Methodology"Mikhail Vink
 
Business analysis planning and monitoring
Business analysis planning and monitoringBusiness analysis planning and monitoring
Business analysis planning and monitoringnyasha charumbira
 
BABOK v3 讀書會 CH3 20150514
BABOK v3 讀書會 CH3 20150514BABOK v3 讀書會 CH3 20150514
BABOK v3 讀書會 CH3 20150514moris lee
 
IIBA BABOK version 3 - What's inside
IIBA BABOK version 3 - What's insideIIBA BABOK version 3 - What's inside
IIBA BABOK version 3 - What's insideTechcanvass
 
BABOK Study Group - meeting 3
BABOK Study Group - meeting 3BABOK Study Group - meeting 3
BABOK Study Group - meeting 3Paweł Zubkiewicz
 
BABOK v3 讀書會 CH5 20150528
BABOK v3 讀書會 CH5 20150528BABOK v3 讀書會 CH5 20150528
BABOK v3 讀書會 CH5 20150528moris lee
 
iiBA Enterprise Analysis on a Page
iiBA Enterprise Analysis on a PageiiBA Enterprise Analysis on a Page
iiBA Enterprise Analysis on a Pagedesigner DATA
 

What's hot (20)

Babok v3 chp 10 techniques
Babok v3 chp 10 techniquesBabok v3 chp 10 techniques
Babok v3 chp 10 techniques
 
CBAP BABOK v3 notes
CBAP BABOK v3 notes CBAP BABOK v3 notes
CBAP BABOK v3 notes
 
BABOK Study Group - meeting 1
BABOK Study Group - meeting 1BABOK Study Group - meeting 1
BABOK Study Group - meeting 1
 
BABOK v3 讀書會 CH8 20150618
BABOK v3 讀書會 CH8 20150618BABOK v3 讀書會 CH8 20150618
BABOK v3 讀書會 CH8 20150618
 
Requirements Analysis And Design Ddefinition
Requirements Analysis And Design DdefinitionRequirements Analysis And Design Ddefinition
Requirements Analysis And Design Ddefinition
 
BABOK v3 讀書會 CH7 20150611
BABOK v3 讀書會 CH7 20150611BABOK v3 讀書會 CH7 20150611
BABOK v3 讀書會 CH7 20150611
 
BAs IIBA and the BABOK
BAs IIBA and the BABOKBAs IIBA and the BABOK
BAs IIBA and the BABOK
 
BABOK v3 讀書會 CH1 20150507
BABOK v3 讀書會 CH1 20150507BABOK v3 讀書會 CH1 20150507
BABOK v3 讀書會 CH1 20150507
 
BABOK Study Group - meeting 2
BABOK Study Group - meeting 2BABOK Study Group - meeting 2
BABOK Study Group - meeting 2
 
iiBA babok onapage
iiBA babok onapageiiBA babok onapage
iiBA babok onapage
 
Alisa Plaksina, "Process Improvement using the ARIS Methodology"
Alisa Plaksina, "Process Improvement using the ARIS Methodology"Alisa Plaksina, "Process Improvement using the ARIS Methodology"
Alisa Plaksina, "Process Improvement using the ARIS Methodology"
 
Business analysis planning and monitoring
Business analysis planning and monitoringBusiness analysis planning and monitoring
Business analysis planning and monitoring
 
BABOK v3 讀書會 CH3 20150514
BABOK v3 讀書會 CH3 20150514BABOK v3 讀書會 CH3 20150514
BABOK v3 讀書會 CH3 20150514
 
Business analysis compass mapping to the iiba babok v2
Business analysis compass mapping to the iiba babok v2Business analysis compass mapping to the iiba babok v2
Business analysis compass mapping to the iiba babok v2
 
IIBA BABOK version 3 - What's inside
IIBA BABOK version 3 - What's insideIIBA BABOK version 3 - What's inside
IIBA BABOK version 3 - What's inside
 
Analysis Phase
Analysis PhaseAnalysis Phase
Analysis Phase
 
Babok2 chapter5 final
Babok2 chapter5 finalBabok2 chapter5 final
Babok2 chapter5 final
 
BABOK Study Group - meeting 3
BABOK Study Group - meeting 3BABOK Study Group - meeting 3
BABOK Study Group - meeting 3
 
BABOK v3 讀書會 CH5 20150528
BABOK v3 讀書會 CH5 20150528BABOK v3 讀書會 CH5 20150528
BABOK v3 讀書會 CH5 20150528
 
iiBA Enterprise Analysis on a Page
iiBA Enterprise Analysis on a PageiiBA Enterprise Analysis on a Page
iiBA Enterprise Analysis on a Page
 

Similar to BABOKv2_SummaryTaskAssociationMatrix_v0_03

Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate templateSteven Bonacorsi
 
Measuring quality of developments in a large industrial software factory with...
Measuring quality of developments in a large industrial software factory with...Measuring quality of developments in a large industrial software factory with...
Measuring quality of developments in a large industrial software factory with...SpagoWorld
 
Learn How to Get Success in ASQ Six Sigma Green Belt (CSSGB) Certification Exam
Learn How to Get Success in ASQ Six Sigma Green Belt (CSSGB) Certification ExamLearn How to Get Success in ASQ Six Sigma Green Belt (CSSGB) Certification Exam
Learn How to Get Success in ASQ Six Sigma Green Belt (CSSGB) Certification ExamMeghna Arora
 
Nandyal_20150513_1145_1230.original.1431384030
Nandyal_20150513_1145_1230.original.1431384030Nandyal_20150513_1145_1230.original.1431384030
Nandyal_20150513_1145_1230.original.1431384030Raghav Nandyal
 
Tool Kit: Requirements management plan (babok on a page)
Tool Kit: Requirements management plan (babok on a page)Tool Kit: Requirements management plan (babok on a page)
Tool Kit: Requirements management plan (babok on a page)designer DATA
 
Bussiness analyst training in india
Bussiness analyst training in indiaBussiness analyst training in india
Bussiness analyst training in indiaunited global soft
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
BABoK V2 Requirements Analysis (RA)
BABoK V2 Requirements Analysis (RA)BABoK V2 Requirements Analysis (RA)
BABoK V2 Requirements Analysis (RA)AMJAD SHAIKH
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesSteven Bonacorsi
 
OIA administration
OIA administrationOIA administration
OIA administrationtechmeonline
 
First Time IT Project Management Review
First Time IT Project Management ReviewFirst Time IT Project Management Review
First Time IT Project Management Reviewdavidzisu
 
Assessment checklist
Assessment checklistAssessment checklist
Assessment checklistKASC
 
EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptyashchotaliyael21
 
D03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapD03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapLeanleaders.org
 
D03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapD03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapLeanleaders.org
 
DQ Product Usage Methodology Highlights_v6_ltd
DQ Product Usage Methodology Highlights_v6_ltdDQ Product Usage Methodology Highlights_v6_ltd
DQ Product Usage Methodology Highlights_v6_ltdDigendra Vir Singh (DV)
 

Similar to BABOKv2_SummaryTaskAssociationMatrix_v0_03 (20)

Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
 
Measuring quality of developments in a large industrial software factory with...
Measuring quality of developments in a large industrial software factory with...Measuring quality of developments in a large industrial software factory with...
Measuring quality of developments in a large industrial software factory with...
 
Learn How to Get Success in ASQ Six Sigma Green Belt (CSSGB) Certification Exam
Learn How to Get Success in ASQ Six Sigma Green Belt (CSSGB) Certification ExamLearn How to Get Success in ASQ Six Sigma Green Belt (CSSGB) Certification Exam
Learn How to Get Success in ASQ Six Sigma Green Belt (CSSGB) Certification Exam
 
Nandyal_20150513_1145_1230.original.1431384030
Nandyal_20150513_1145_1230.original.1431384030Nandyal_20150513_1145_1230.original.1431384030
Nandyal_20150513_1145_1230.original.1431384030
 
Tool Kit: Requirements management plan (babok on a page)
Tool Kit: Requirements management plan (babok on a page)Tool Kit: Requirements management plan (babok on a page)
Tool Kit: Requirements management plan (babok on a page)
 
Bussiness analyst training in india
Bussiness analyst training in indiaBussiness analyst training in india
Bussiness analyst training in india
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
BABoK V2 Requirements Analysis (RA)
BABoK V2 Requirements Analysis (RA)BABoK V2 Requirements Analysis (RA)
BABoK V2 Requirements Analysis (RA)
 
Six Sigma For Managers
Six Sigma For Managers   Six Sigma For Managers
Six Sigma For Managers
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Analyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate TemplatesAnalyze Phase Lean Six Sigma Tollgate Templates
Analyze Phase Lean Six Sigma Tollgate Templates
 
OIA administration
OIA administrationOIA administration
OIA administration
 
Lean six-sigma-project-charter-template
Lean six-sigma-project-charter-templateLean six-sigma-project-charter-template
Lean six-sigma-project-charter-template
 
First Time IT Project Management Review
First Time IT Project Management ReviewFirst Time IT Project Management Review
First Time IT Project Management Review
 
Assessment checklist
Assessment checklistAssessment checklist
Assessment checklist
 
EO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.pptEO notes Lecture 27 Project Management 2.ppt
EO notes Lecture 27 Project Management 2.ppt
 
D03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapD03 15 Deliverable Roadmap
D03 15 Deliverable Roadmap
 
D03 15 Deliverable Roadmap
D03 15 Deliverable RoadmapD03 15 Deliverable Roadmap
D03 15 Deliverable Roadmap
 
DQ Product Usage Methodology Highlights_v6_ltd
DQ Product Usage Methodology Highlights_v6_ltdDQ Product Usage Methodology Highlights_v6_ltd
DQ Product Usage Methodology Highlights_v6_ltd
 

BABOKv2_SummaryTaskAssociationMatrix_v0_03

  • 1. Page 1 of 1 Printed: 19/09/2016 11:13 a.m. File: D:PersonalBusiness Analysis_IIBABABOKBABOK2 (Released 2010-04-01)MyAnalysisBABOKv2 Process Associations_v0_03.xlsx IIBA BABOK v2 Business Analysis Process Associations Key These matrices summarise information from v2 of the IIBA BABOK. For further details on the documents, processes, techniques and other information included in the matrices, please refer to the IIBA BABOK v2 document. This part of the matrix below is a master list of all BABOK documents showing which tasks (in columns) have them as Inputs (e.g. Read) or Outputs (e.g. Created) Where an 'r' appears in a matrix cell, that indicates the document (in the row) is an INPUT to the task (in the column) Where a "C' appears in a matrix cell, that indicates the document (in the row) is an OUTPUT created by the task (in the column) By showing which specific tasks Creates a particular document as an output and showing which other tasks read it as an input, it helps show the dependency and sequence of documents and tasks Note: The documents are currently listed in ascending alphabetical order of document name. A useful variation that may be available later, is a version that shows documents in sequence of creation and use, but that may be after BABOK v3 is released. 2 This part of the matrix is a master list of all general and specific techniques mentioned in the v2 BABOK, and show which Process uses them. V2 BABOK Chapters and Activities > ID Document / Technique Name Output (+1 in matrix) Input (-1 in matrix) PlanBusinessAnalysisApproach ConductStakeholderAnalysis PlanBAActivities PlanBACommunication PlanRequirementsManagementProcess ManageBAPerformance PrepareforElicitation ConductElicitationActivity DocumentElicitationResults ConfirmElicitationResults ManageSolutionScope ManageRequirementsTraceability MaintainRequirementsforRe-use PrepareRequirementsPackage CommunicateRequirements DefineBusinessNeed AssessCapabilityGaps DetermineSolutionsApproach DefineSolutionScope DefineBusinessCase PrioritiseRequirements OrganiseRequirements SpecifyandModelRequirements DefineAssumptionsandConstraints VerifyQualityofRequirements ValidateRequirementsMeetStakeholderNeeds AssessProposedSolution AllocateRequirements AssessOrganisationalReadiness DefineTransitionRequirements ValidateSolution EvaluateSolutionPerformance 2.1 2.2 2.3 2.4 2.5 2.6 3.1 3.2 3.3 3.4 4.1 4.2 4.3 4.4 4.5 5.1 5.2 5.3 5.4 5.5 6.1 6.2 6.3 6.4 6.5 6.6 7.1 7.2 7.3 7.4 7.5 7.6 Number of Input Documents (with 'r' in matrix) 38 3 3 4 4 3 4 4 7 1 2 7 2 2 13 5 2 3 3 4 4 5 3 2 1 4 2 3 4 4 3 3 4 Number of External Input Documents Required 9 2 2 1 1 1 2 1 1 1 1 1 1 1 1 1 2 1 1 2 Number of Output Documents (with 'C' in matrix) 1 1 1 1 1 2 2 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 1 6. Requirements Analysis 7. Solution Assessment & Validation 1 1 2. BA Planning & Monitoring 3. Elicitation 4. Requirements Management & Communication 5. Enterprise Analysis 1 Assessment of Proposed Solution 1 C 2 Assumptions and Constraints 1 3 r r C r 3 Business Analysis Approach 1 3 C r r r 4 Business Analysis Communications Plan 1 2 C r r 5 Business Analysis Performance Assessment 1 1 r C 6 Business Analysis Performance Metrics 1 r 7 Business Analysis Plans 1 3 C r r r 8 Business Analysis Process Assets 1 C 9 Business Case 1 4 r r C r r 10 Business Goals and Objectives 1 r 11 Business Need 1 9 r r r r C r r r r r 12 Elicitation Results 1 1 C r 13 Enterprise Architecture 3 r r r 14 Expert Judgement 1 r 15 Identified Defects 1 1 C r 16 Mitigating Actions 1 C 17 Organisational Performance Standards 1 r 18 Organisational Process Assets (Checklists, templates etc) 10 r r r r r r r r r r 19 Organisational Readiness Assessment 1 1 C r 20 Required Capabilities 1 2 C r r 21 Requirements [Stated, Unconfirmed] 1 4 C r r r r 22 Requirements [Stated, Confirmed] 1 6 C r r r r r r 23 Requirements [Traced] 1 4 r C r r r 24 Requirements [Communicated] 1 3 r r C r 25 Requirements [Approved] 1 5 C r r r r r 26 Requirements [Prioritised] 1 5 r C r r r r 27 Requirements [Verified Quality of Models] 1 2 r C r 28 Requirements [Validated by Stakeholder] 1 2 r C r 29 Requirements [Allocated] 1 2 r r C 30 Requirements [Maintained & Resuable] 1 1 C r 31 Requirements Management Plan 1 5 C r r r r r 32 Requirements Package 1 1 C r 33 Requirements Structure 1 2 r C r 34 Scheduled Resources 1 1 C r 35 Solution [Constructed, deployed or designed] 5 r r r r r 36 Solution Approach 1 1 C r 37 Solution Options 1 r 38 Solution Performance Assessment 1 1 r C 39 Solution Performance Metrics 1 r 40 Solution Scope 1 7 r r r C r r r r 41 Solution Validation Assessment 1 C 42 Stakeholder Concerns [Unconfirmed] 1 4 C r r r r 43 Stakeholder Concerns [Confirmed] 1 C 44 Stakeholder list, roles & responsibilities 1 5 C r r r r r 45 Stakeholder or Solution Requirements 1 1 r C 46 Supporting Materials 1 1 C r 47 Transition Requirements 1 1 r C Key: C=Document is CREATED by the task (e.g. an Output) r=Document is READ by the task (e.g. an Input) 2 Techniques (1=use of technique in the task) 3 13 3 1 3 8 9 10 10 2 3 1 2 2 6 2 6 5 6 5 9 16 2 4 5 3 6 11 5 3 4 General Techniques 9.01 Acceptance and Evaluation Criteria Definition 8 1 1 1 1 1 1 1 1 9.02 Benchmarking 2 1 1 9.03 Brainstorming 6 1 1 1 1 1 1 9.04 Business Rules Analysis 5 1 1 1 1 1 9.05 Data Dictionary and Glossary (3-2 + 6-3) 2 1 1 9.06 Data Flow Diagrams (6-2,3 + 7-3,4) 4 1 1 1 1 9.07 Data Modelling (6-2,3 + 7-4) 3 1 1 1 9.08 Decision Analysis (2-1,5 + 5-3,5 + 6-1 + 7-1,2,6) 8 1 1 1 1 1 1 1 1 9.09 Document Analysis (3-1,2,3 + 5-2) 4 1 1 1 1 9.1 Estimation (2-3 + 5-3,5) 3 1 1 1 9.11 Focus Groups (3-1,2,3 + 5-1 + 7-3,6) 6 1 1 1 1 1 1 9.12 Functional Decomposition (2-3 + 5-1,4 + 6-2,3 + 7-2) 6 1 1 1 1 1 1 9.13 Interface Analysis (3-1,2,3 + 5-4 + 6-3) 5 1 1 1 1 1 9.14 Interviews (2-2,6 + 3-1,2,3,4 + 7-3) 7 1 1 1 1 1 1 1 9.15 Lessons Learned Process (2-6) 1 1 9.16 Metrics and Key Performance Indicators (2-6 + 5-5 + 6-3,6) 4 1 1 1 1 9.17 Non-functional Requirements Analysis (6-3) 1 1 9.18 Observation (3-1,2,3,4 + 7-6) 5 1 1 1 1 1 9.19 Organization Modelling (2-2 + 6-2,3 + 7-3,4) 5 1 1 1 1 1 9.2 Problem Tracking (2-5,6 + 3-3 + 4-1 + 6-4,5 + 7-3,5) 8 1 1 1 1 1 1 1 1 9.21 Process Modelling (2-1,2,6 + 6-2,3 + 7-2,3,4) 8 1 1 1 1 1 1 1 1 9.22 Prototyping (3-1,2,3 + 6-3,6) 5 1 1 1 1 1 9.23 Requirements Workshops (2-2 + 3-1,2,3 + 4-5 + 5-3) 6 1 1 1 1 1 1 9.24 Risk Analysis (2-2,3,5 + 4-5 + 5-5 + 6-1,4,6 + 7-3) 8 1 1 1 1 1 1 1 1 9.25 Root Cause Analysis (2-6 + 5-1 + 7-5) 3 1 1 1 9.26 Scenarios and Use Cases (2-2 + 6-2,3 + 7-2) 4 1 1 1 1 9.27 Scope Modelling (2-2 + 5-4 + 6-2) 3 1 1 1 9.28 Sequence Diagrams (6-3) 1 1 9.29 State Diagrams (6-3) 1 1 9.3 Structured Walkthrough (2-1,4 + 6-5,6) 5 1 1 1 1 1 9.31 Survey/Questionnaire (2-2,6 + 3-1,2,3 + 7-3,6) 7 1 1 1 1 1 1 1 9.32 SWOT Analysis (5-2,5 + 7-3) 3 1 1 1 9.33 User Stories (2-2 + 5-4 + 6-2,3) 4 1 1 1 1 9.34 Vendor Assessment (5-5 + 7-1) 2 1 1 Specific Techniques 9.35 Baselining (s4-1-5-2) 1 1 9.36 Checklists (s6-5-5-2) 1 1 9.37 Coverage Matrix (s4-2-5-1) 1 1 9.38 Feasibility Analysis (s5-3-5-2) 1 1 9.39 Force Field Analysis (s7-3-5-2) 1 1 9.4 MoSCoW Analysis (s6-1-5-2) 1 1 9.41 Problem or Vision Statement (s5-4-5-2) 1 1 9.42 RACI Matrix (s2-2-5-2) 1 1 9.43 Requirements Documentation (s4-4-5-1) 1 1 9.44 Requirements for Vendor Selection RFI, RFQ, RFP (s4-4-5-2) 1 1 9.45 Signoff (s4-1-5-3) 1 1 9.46 Stakeholder Map (s2-2-5-3) 1 1 9.47 Timeboxing/Budgeting (s6-1-5-3) 1 1 9.48 Variance Analysis (s2-6-5-2) 1 1 9.49 Voting (s6-1-5-4) 1 1 By Alan Maxwell, Christchurch, New Zealand