Kirkuk Technical Institute……Civil Department
Engineering Drawing…………………..Second Year
2017---2018
Structural Drawing
The Foundation
(R A J A A J A M E E L) (5)
Foundation ‫األسس‬
.‫المنشآت‬ ‫عليه‬ ‫ترتكز‬ ‫الذي‬ ‫المهم‬ ‫الجزء‬ ‫ذلك‬ ‫هو‬ ‫األساس‬
‫من‬ ‫تمكنها‬ ‫مختلفة‬ ‫بنائية‬ ‫وبمواد‬ ‫معين‬ ‫عمق‬ ‫على‬ ‫األرض‬ ‫مستوى‬ ‫تحت‬ ‫عادة‬ ‫ويشيد‬
.‫البناية‬ ‫لتحمل‬ ‫الكافية‬ ‫األرض‬ ‫مساحة‬ ‫الى‬ ‫المنشأ‬ ‫أحمال‬ ‫نقل‬
‫مالئمته‬ ‫حسب‬ ‫كل‬ ‫األسس‬ ‫من‬ ‫عديدة‬ ‫أنواع‬ ‫المباني‬ ‫أعمال‬ ‫في‬ ‫تستعمل‬
‫للمنشأ‬
‫ما‬ ‫المباني‬ ‫في‬ ‫المستخدمة‬ ‫األسس‬ ‫أنواع‬ ‫وأهم‬ .‫التربة‬ ‫وطبيعة‬
:‫يأتي‬
-
:‫أوآل‬
-
‫الجداري‬ ‫األساس‬
(
Wall-footing
)
:‫ثانيآ‬
-
‫المنفرد‬ ‫األساس‬
(
Isolated Footing
)
:‫ثالثآ‬
-
‫المتصل‬ ‫األساس‬
(
Combined Footing
)
:‫رابعآ‬
-
)‫(الشريطي‬ ‫المستمر‬ ‫األساس‬
(
Continuous Footing
)
‫خامس‬
:‫آ‬
-
)‫(الحصيري‬ ‫الرمثي‬ ‫األساس‬
(
Raft-Foundation
)
:‫سادسآ‬
-
‫الركائز‬ ‫أسس‬
(
Piles-Footing
)
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
:‫أوآل‬
-
‫الجداري‬ ‫األساس‬
(
Wall-footing
)
‫مةواد‬ ‫بأسةتعمال‬ ‫أو‬ ‫المسةلحة‬ ‫الخرسةانة‬ ‫أو‬ ‫األعتياديةة‬ ‫الخرسانة‬ ‫من‬ ‫ويعمل‬ ‫لألثقال‬ ‫الحاملة‬ ‫الجدران‬ ‫مع‬ ‫األساس‬ ‫من‬ ‫النوع‬ ‫هذا‬ ‫يستعمل‬
‫الفوالذية‬ ‫المقاطع‬ ‫مثل‬ ‫أخرى‬ ‫بنائية‬
‫المدلفن‬
‫ة‬
‫تكةون‬ ‫األسةاس‬ ‫أسةفل‬ ‫فةي‬ ‫توفةع‬ ‫كةبكة‬ ‫كةكل‬ ‫علةى‬ ‫عمةا‬ ‫التسةليا‬ ‫يكةون‬ ‫مسةلحة‬ ‫األسةس‬ ‫كون‬ ‫حالة‬ ‫في‬.
‫الرئيس‬ ‫قضبانها‬
‫األطول‬ ‫(البعد‬ ‫األساس‬ ‫لطول‬ ‫موازية‬ ‫تكون‬ ‫والتي‬ ‫الثانوية‬ ‫القضبان‬ ‫فوقها‬ ‫تربط‬ ,)‫األساس‬ ‫من‬ ‫األصغر‬ ‫(البعد‬ ‫مستعرض‬ ‫بشكل‬ ‫ة‬
‫متسةاوية‬ ‫بمسةافات‬ ‫توفةع‬ ‫حلقيةة‬ ‫رباطةات‬ ‫مةع‬ ‫واألسةفل‬ ‫ألعلةى‬ ‫فةي‬ ‫طوليةآ‬ ‫توفع‬ ‫الرئيسة‬ ‫قضبانه‬ ‫صندوقي‬ ‫بشكل‬ ‫تكون‬ ‫أو‬.)‫األساس‬ ‫من‬
‫لتحةز‬
(R A J A A J A M E E L) (5)
‘(
‫الرئيسةة‬ ‫التسةةليا‬ ‫حديةةد‬ ) ‫تكتةة‬
( ‫مةةابين‬ ‫يتةةراو‬ ‫بمقةةدار‬ ‫الخرسةةاني‬ ‫الغطةةاء‬ ‫تةةرا‬ ‫مراعةةاة‬ ‫مةةع‬ ‫ي‬
07
-
07
‫مةةن‬ ‫التسةةليا‬ ‫قضةةبان‬ ‫لحمايةةة‬ ‫ملةةم‬ )
.‫التربة‬
.‫المسلحة‬ ‫وغير‬ ‫المسلحة‬ ‫الخرسانة‬ ‫من‬ ‫جداري‬ ‫ألساس‬ ‫نموذجية‬ ‫مقاطع‬ ‫توفا‬ ‫التالية‬ ‫األككال‬
(R A J A A J A M E E L) (5)
PLAIN WALL FOOTING
)‫اعتيادي‬ ‫جداري‬ ‫(اساس‬
(R A J A A J A M E E L) (5)
REINFORCED CONCRETE WALL FOOTING
‫ا‬
‫األولى‬ ‫للوحة‬
‫الجدارية‬ ‫األسس‬ ‫موضحآ‬ ‫سكني‬ ‫دار‬ ‫من‬ ‫لجزء‬ ‫األفقي‬ ‫المخطط‬ ‫أرسم‬
,‫التحمل‬ ‫ضعيفة‬ ‫والتربة‬ ‫القوية‬ ‫التربة‬ ‫حالة‬ ‫في‬
‫مقاطع‬ ‫رسم‬ ‫مع‬
(‫عرضية‬
A-A
(‫و‬ )
B-B
)
.
( ‫الجدران‬ ‫سمك‬
02
(‫األساس‬ ‫عرض‬.)‫سم‬
022
)‫سم‬
‫أختار‬
. ‫مناسب‬ ‫رسم‬ ‫مقياس‬
(R A J A A J A M E E L) (5)
3.5
6
3.5
4
PLAN OF WALLS
kitchen
living Bedroom
(R A J A A J A M E E L) (5)
4
3.5
6 3.5
1
PLAN OF FOUNDATIONS
Dim. in m.
A A
B
1
(R A J A A J A M E E L) (5)
FOUNDATION WITHOUT RENFORCEMENT
G.L
.5
.1
1
.2
.4
.3
.1
‫جدآ‬ ‫قوية‬ ‫التربة‬ ‫تكون‬ ‫عندما‬ ‫الجدار‬ ‫أساس‬ ‫في‬ ‫عرفي‬ ‫مقطع‬
.
(R A J A A J A M E E L) (5)
WALL FOUNDATION WITH REINFORCEMENT
7 16
.2
.5
.1
1
G.L
.2
16@150
‫التحمل‬ ‫قليلة‬ ‫التربة‬ ‫تكون‬ ‫عندما‬ ‫جدار‬ ‫ألساس‬ ‫عرفي‬ ‫مقطع‬
‫لألثقال‬
.
(R A J A A J A M E E L) (5)
Strr. 16 @250
6 16
0.6
0.5
0.1
0.8
G.L
WALL FOUNDATION WITH REINFORCEMENT
0.2
6 16
‫جداري‬ ‫أساس‬ ‫في‬ ‫مقطع‬
‫تكون‬ ‫عندما‬
‫جدآ‬ ‫فعيفة‬ ‫التربة‬
.
(R A J A A J A M E E L) (5)
:‫ثانيآ‬
-
‫المنفرد‬ ‫األساس‬
(
Isolated Footing
)
‫دعامة‬ ‫أو‬ ‫عمود‬ ‫حمل‬ ‫لنقل‬ ‫األساس‬ ‫من‬ ‫النوع‬ ‫هذا‬ ‫يستعمل‬
‫األعتيادية‬ ‫الخرسانة‬ ‫من‬ ‫عادة‬ ‫وتعمل‬ ,‫التربة‬ ‫الى‬ ‫منفردة‬ ‫قاعدة‬ ‫بواسطة‬ ‫واحدة‬
‫األنحناء‬ ‫وقوى‬ ‫العمودية‬ ‫القوى‬ ‫األعتبار‬ ‫بنظر‬ ‫يؤخذ‬ ‫المنفرد‬ ‫األساس‬ ‫تصميم‬ ‫عند‬.‫دائرة‬ ‫أو‬ ‫مستطيل‬ ‫أو‬ ‫مربع‬ ‫ككل‬ ‫على‬ ‫وتكون‬ ‫المسلحة‬ ‫أو‬
‫و‬ ‫والقص‬
‫بسبب‬ ‫الفشل‬
‫األنبعاج‬
(
Punching shear
.)
‫صبة‬ ‫سمك‬ ‫يكون‬
.‫نسبيآ‬ ‫واسعة‬ ‫األساس‬ ‫مساحة‬ ‫تكون‬ ‫عندما‬ ‫متغيرآ‬ ‫أو‬ ‫ثابتآ‬ ‫األساس‬
‫و‬
‫أو‬ ‫ثابت‬ ‫بسمك‬ ‫المنفرد‬ ‫األساس‬ ‫من‬ ‫أنواع‬ ‫تبين‬ ‫التالية‬ ‫األككال‬
‫م‬
.‫تغير‬
(R A J A A J A M E E L) (5)
‫فةي‬ ‫أمةا‬ .‫الشةكل‬ ‫دائريةة‬ ‫أو‬ ‫مربعةة‬ ‫تكةون‬ ‫عنةدما‬ ‫باألتجةاهين‬ ‫متسةاوية‬ ‫تكةونن‬ ‫األسةاس‬ ‫أسةفل‬ ‫فةي‬ ‫التسليا‬ ‫قضبان‬ ‫من‬ ‫بشبكة‬ ‫المنفردة‬ ‫األسس‬ ‫تسلا‬
‫مراعةاة‬ ‫يجةب‬ , ‫الطويةل‬ ‫األتجةا‬ ‫فةي‬ ‫مةؤثر‬ ‫عمةق‬ ‫أكبةر‬ ‫ألعطةاء‬ ‫الطوليةة‬ ‫القضةبان‬ ‫فوق‬ ‫المستعرفة‬ ‫القضبان‬ ‫وفع‬ ‫يتم‬ ‫المستطيلة‬ ‫األسس‬
‫ربةط‬
‫األعمدة‬ ‫تسليا‬
,‫ثابةت‬ ‫وبسةمك‬ ‫مسةتطيل‬ ‫وآخةر‬ ‫القاعةدة‬ ‫مربةع‬ ‫منفةرد‬ ‫ألسةاس‬ ‫األنشةائية‬ ‫التفاصيل‬ ‫توفا‬ ‫التالية‬ ‫األككال‬.‫األسس‬ ‫تسليا‬ ‫مع‬ ‫عنشائيآ‬
.‫السمك‬ ‫متغير‬ ‫دائري‬ ‫منفرد‬ ‫أساس‬ ‫يمثل‬ ‫ككل‬ ‫كذلك‬
(R A J A A J A M E E L) (5)
‫الثانية‬ ‫اللوحة‬
‫بمقياس‬ ‫التالية‬ ‫المنفردة‬ ‫لألسس‬ ‫والعرضية‬ ‫الرأسية‬ ‫المقاطع‬ ‫مع‬ ‫التالية‬ ‫المخططات‬ ‫أرسم‬
‫لكل‬ ‫التسليح‬ ‫حديد‬ ‫تفاصيل‬ ‫توضيح‬ ‫مع‬ ‫مناسب‬ ‫رسم‬
.‫منها‬
(A) SEQUARE FOOTING
(R A J A A J A M E E L) (5)
(R A J A A J A M E E L) (5)
(B) RECTANGULAR FOOTING
(R A J A A J A M E E L) (5)
(C) ISOLATED FOOTING (TRAPEZOIDAL FOOTING)
14 20/m
14
20
/m
0.8
1.8
2.6
0.8
1.8
8 16
‫باللوحة‬ ‫ملحق‬
:‫الثانية‬
-
‫المخطط‬ ‫ارسم‬
‫والمقطع‬ ‫األفقي‬
‫العمودي‬
‫والمقطع‬
‫للعمود‬ ‫العرضي‬
‫مع‬ ‫التالية‬ ‫لألشكال‬
‫حديد‬ ‫توضيح‬
. ‫التسليح‬
(R A J A A J A M E E L) (5)
(C) ISOLATED FOOTING (TRAPEZOIDAL FOOTING)
14 20
SECTION
2.5
.4
.2
1
G.L
.4
1.7
.7
14 20
(R A J A A J A M E E L) (5)
‫قاعدته‬ ‫مع‬ ‫دائري‬ ‫لعمود‬ ‫رأسي‬ ‫مقطع‬
(D)
(R A J A A J A M E E L) (5)
‫أفقي‬ ‫مخطط‬
‫دائري‬ ‫عمود‬ ‫لقاعدة‬
(R A J A A J A M E E L) (5)
(Combined Footing) :‫ثالثآ‬
-
‫الم‬ ‫األساس‬
‫ركب‬
,‫العمودين‬ ‫ثقلي‬ ‫مقدار‬ ‫تساوي‬ ‫عند‬ ‫متناظر‬ ‫مستطيل‬ ‫ككل‬ ‫ذو‬ ‫بعض‬ ‫من‬ ‫بعضهما‬ ‫متقاربين‬ ‫عموديين‬ ‫ثقل‬ ‫يحمل‬ ‫منفرد‬ ‫أساس‬ ‫هو‬
‫يكون‬ ‫وقد‬
‫مجاورة‬ ‫قطعة‬ ‫لحدود‬ ‫مالصقآ‬ ‫األعمدة‬ ‫أحد‬ ‫يكون‬ ‫عندما‬ ‫أو‬ ,‫الثقلين‬ ‫تباين‬ ‫عند‬ ‫متناظر‬ ‫غير‬ ‫مستطيل‬ ‫أو‬ ‫منحرف‬ ‫كبه‬ ‫بشكل‬
‫بروز‬ ‫يتعذر‬ ‫بحيث‬
‫التالي‬ ‫الشكل‬ ‫في‬ ‫كما‬ ‫القطعة‬ ‫حدود‬ ‫خارج‬ ‫األساس‬
.
A
A
A
B
D Marjonal edge----
D
D
Combined footing plans
(R A J A A J A M E E L) (5)
‫الط‬ ‫قضبانه‬ ‫عتب‬ ‫بشكل‬ ‫المتصل‬ ‫األساس‬ ‫تسليا‬ ‫يتم‬
‫و‬
‫لية‬
‫الواصل‬ ‫للخط‬ ‫موازية‬
‫أعلةى‬ ‫فةي‬ ‫وتكةون‬ ,‫األنحنةاء‬ ‫قةوى‬ ‫لمعالجةة‬ ‫العمودين‬ ‫مركزي‬ ‫بين‬
‫األعمدة‬ ‫تحت‬ ‫األسفل‬ ‫وفي‬ ‫الوسط‬ ‫عند‬ ‫األساس‬
‫أكثةر‬ ‫بمسةافات‬ ‫القةص‬ ‫قةوى‬ ‫لمعالجةة‬ )‫ومزدوجةة‬ ‫منفةردة‬ ‫(حلقةات‬ ‫ركابية‬ ‫بقضبان‬ )‫(تربط‬ ‫تحز‬ ,
‫م‬ ‫تربط‬ ‫مستعرفة‬ ‫قضبان‬ ‫كبكة‬ ‫أفافة‬ ‫مراعاة‬ ‫مع‬ ,‫األعمدة‬ ‫عند‬ ‫تقاربآ‬
.‫األنحناء‬ ‫قوى‬ ‫تحمل‬ ‫لزيادة‬ ‫األعمدة‬ ‫تحت‬ ‫الطولية‬ ‫القضبان‬ ‫ع‬
‫الثالثة‬ ‫اللوحة‬
) ‫الشكل‬ ‫(مستطيل‬ ‫متصل‬ ‫أساس‬ ‫لقاعدة‬ ‫األنشائية‬ ‫التفاصيل‬ ‫أرسم‬
]
‫رأسي‬ ‫مقطع‬ ‫مع‬ ‫أفقي‬ ‫مخطط‬
[
(R A J A A J A M E E L) (5)
2.5
10
2 2
.7
.5
PLAN (TOP RINFORCEMENT)
20 - 24
10 - 24 16 @400
.7
.5
‫مستطيل‬ ‫ككل‬ ‫ذو‬ )‫(المركب‬ ‫المتصل‬ ‫لألساس‬ ‫العليا‬ ‫التسليا‬ ‫كبكة‬ ‫يوفا‬ ‫أفقي‬ ‫مخطط‬
(R A J A A J A M E E L) (5)
2.2 2.2
1.3 1.3
LONGITUDINAL SECTION
20 - 24
9 - 20
16 @300
10 - 24
10 - 24
16 @400
16 - 16
.5
.7
16 - 16
.8
1
‫المتصل‬ ‫األساس‬ ‫في‬ ‫طولي‬ ‫مقطع‬
‫التسليا‬ ‫حديد‬ ‫تكثي‬ ‫أماكن‬ ‫يبين‬
*
)‫السفلى‬ ‫(الشبكة‬ ‫باألساس‬ ‫األعمدة‬ ‫اتصال‬ ‫منطقة‬ ‫أسفل‬
‫انحناء‬ ‫عز‬ ‫لوجود‬
.‫سالب‬
*
)‫العليا‬ ‫(الشبكة‬ ‫العمودين‬ ‫مابين‬ ‫منطقة‬
.‫موجب‬ ‫انحناء‬ ‫عز‬ ‫لوجود‬
(R A J A A J A M E E L) (5)
PLAN( BOTTOM RINFORCEMENT)
10
2 2
2.5
2.2 16- 16
16 @300
9 - 20
‫مستطيل‬ ‫ككل‬ ‫ذو‬ )‫(المركب‬ ‫المتصل‬ ‫لألساس‬ ‫السفلى‬ ‫التسليا‬ ‫كبكة‬ ‫يوفا‬ ‫أفقي‬ ‫مخطط‬
(R A J A A J A M E E L) (5)
‫لقاعدة‬ ‫األنشائية‬ ‫التفاصيل‬ ‫توفا‬ ‫التالية‬ ‫األككال‬
.‫وعرفية‬ ‫طولية‬ ‫مقاطع‬ ‫مع‬ ‫منحرف‬ ‫كبه‬ ‫بشكل‬ ‫متصل‬ ‫أساس‬
(R A J A A J A M E E L) (5)
Longitudinal Section
(R A J A A J A M E E L) (5)
Cross section
(R A J A A J A M E E L) (5)
‫اللوحة‬
‫الرابعة‬
:‫أدناه‬ ‫في‬ ‫المبين‬ )‫(المتصل‬ ‫المركب‬ ‫لألساس‬ ‫والعرضية‬ ‫الطولية‬ ‫الرأسية‬ ‫والمقاطع‬ ‫األفقي‬ ‫المخطط‬ ‫أرسم‬
-
‫بعد‬ ‫على‬ ‫العرضي‬ ‫المقطع‬ ‫(ارسم‬ ‫مالحظة‬
0
)‫األساس‬ ‫من‬ ‫الرفيع‬ ‫الجزء‬ ‫من‬ ‫متر‬
.
.5
.7
1.5
.5
3
.4
.7
7
5 2
.4
PLAN
(R A J A A J A M E E L) (5)
REINFORCEMENT IN TOP
16-@400 20@150
A A
A A
REINFORCEMENT IN BOTTOM
8- 18 16@300
8- 20
4- 20
(R A J A A J A M E E L) (5)
SECTION A-A
1.2
16@300
8- 20
16-@400
20@150
8-@18
4- 20
16@300
2
.8
(R A J A A J A M E E L) (5)
:‫رابعآ‬
-
)‫(الشريطي‬ ‫المستمر‬ ‫األساس‬
Continuous Footing
‫على‬ ‫واقعة‬ ‫األعمدة‬ ‫من‬ ‫عدد‬ ‫هناا‬ ‫يكون‬ ‫عندما‬ ‫األسس‬ ‫من‬ ‫النوع‬ ‫هذا‬ ‫يعمل‬
‫استقامة‬
‫رخةوة‬ ‫تربةة‬ ‫علةى‬ ‫وترتكةز‬ ‫بعضةها‬ ‫مع‬ ‫تتقارب‬ ‫واحدة‬
‫ةآ‬‫ة‬‫مع‬ ‫ةداخل‬‫ة‬‫تت‬ ‫ةردة‬‫ة‬‫المنف‬ ‫ةس‬‫ة‬‫األس‬ ‫ةد‬‫ة‬‫قواع‬ ‫ةل‬‫ة‬‫يجع‬ ‫ةا‬‫ة‬‫مم‬
‫ل‬
,‫ةد‬‫ة‬‫موح‬ ‫ةرض‬‫ة‬‫بع‬ ‫ةاس‬‫ة‬‫األس‬ ‫ةذا‬‫ة‬‫ه‬ ‫ةون‬‫ة‬‫يك‬ ,‫ةدة‬‫ة‬‫أعم‬ ‫ةة‬‫ة‬‫لمجموع‬ ‫ةتمر‬‫ة‬‫مس‬ ‫ةاس‬‫ة‬‫األس‬ ‫ةن‬‫ة‬‫م‬ ‫ةريطآ‬‫ة‬‫ك‬ ‫ةون‬‫ة‬‫تك‬
‫الخةارجيين‬ ‫العمةودين‬ ‫نهةايتي‬ ‫عنةد‬ ‫مناسب‬ ‫بمقدار‬ ‫المستمر‬ ‫ويبرزاألساس‬
‫التر‬ ‫علةى‬ ‫الضةغط‬ ‫توزيةع‬ ‫لجعةل‬ ‫ذلةك‬ ‫أمكةن‬ ‫عذا‬
.‫تجانسةآ‬ ‫أكثةر‬ ‫بةة‬
‫و‬
‫يكون‬
‫ممةا‬ ‫األعمةدة‬ ‫تحةت‬ ‫السةالبة‬ ‫العزو‬ ‫معالجة‬ ‫مراعاة‬ ‫مع‬ ‫المركب‬ ‫األساس‬ ‫لتسليا‬ ‫مشابهآ‬ ‫األسس‬ ‫من‬ ‫النوع‬ ‫هذا‬ ‫تسليا‬
‫التسةليا‬ ‫حديةد‬ ‫تةداخل‬ ‫يتطلةب‬
.‫المتجاورة‬ ‫الفضاءات‬ ‫بين‬
‫و‬
‫واح‬ ‫أستقامة‬ ‫على‬ ‫تقع‬ ‫أعمدة‬ ‫لمجموعة‬ ‫مستمر‬ ‫ألساس‬ ‫األنشائية‬ ‫التفاصيل‬ ‫توفا‬ ‫التالية‬ ‫األككال‬
.‫دة‬
(R A J A A J A M E E L) (5)
PLAN
(R A J A A J A M E E L) (5)
ELEVATION
(R A J A A J A M E E L) (5)
Section (A-A)
C.L
11-25mm 11-25mm
8-16mm@20cm 8-16mm@20cm
8-16mm@20cm
3@30 5@15 5@15 5@15
2@30 5@15 5@15
3@30 5@15
8-25mm
10mm@30cm
50
50
(R A J A A J A M E E L) (5)
Section (B-B) 75
200
50
8-25mm
10mm@30cm
6-22mm
11-25mm
12mm-4Legged
(R A J A A J A M E E L) (5)
:‫خامسآ‬
-
)‫(الحصيري‬ ‫الرمثي‬ ‫األساس‬
Raft-Foundation
‫جدآ‬ ‫كبيرة‬ ‫المنشأ‬ ‫أعمدة‬ ‫على‬ ‫األحمال‬ ‫تكون‬ ‫عندما‬ ‫األساس‬ ‫هذا‬ ‫يستعمل‬
‫تزيةد‬ ‫مسافة‬ ‫الى‬ ‫تحتاج‬ ‫األسس‬ ‫يجعل‬ ‫مما‬ ‫فعي‬ ‫التربة‬ ‫وتحمل‬
.‫المنشأ‬ ‫مساحة‬ ‫نص‬ ‫على‬
‫و‬
‫الفركة‬ ‫هذ‬ ‫تسليا‬ ‫يفضل‬ ,‫أوأعتاب‬ ‫روافد‬ ‫بدون‬ ‫واحد‬ ‫بسمك‬ ‫مسلحة‬ ‫خرسانية‬ ‫فركة‬ ‫بشكل‬ ‫الحصيري‬ ‫األساس‬ ‫يكون‬
‫جعل‬ ‫مراعاة‬ ‫مع‬ .)‫األسفل‬ ‫في‬ ‫تسليا‬ ‫وطبقة‬ ‫األعلى‬ ‫في‬ ‫تسليا‬ ‫(طبقة‬ ‫الحديد‬ ‫قضبان‬ ‫من‬ ‫بشبكتين‬
‫الطويةل‬ ‫األتجةا‬ ‫في‬ ‫يكون‬ ‫ما‬ ‫أكبر‬ ‫المؤثر‬ ‫العمق‬
‫األعتةاب‬ ‫تكةون‬ ‫وقةد‬ .‫الرمثةي‬ ‫األسةاس‬ ‫مسةاحة‬ ‫علةى‬ ‫األعمةدة‬ ‫ثقةل‬ ‫لتوزيةع‬ ‫وروافةد‬ ‫أعتةاب‬ ‫مةع‬ ‫مسةلحة‬ ‫خرسةانية‬ ‫صبة‬ ‫بشكل‬ ‫األساس‬ ‫يكون‬ ‫أوأن‬.
‫ظه‬ ‫عند‬ ‫او‬ ‫التنفيذ‬ ‫لسهولة‬ ‫األعلى‬ ‫الى‬ ‫مقلوبة‬
‫األسس‬ ‫موقع‬ ‫في‬ ‫الجوفية‬ ‫الميا‬ ‫ور‬
.
(R A J A A J A M E E L) (5)
‫افقية‬ ‫مخططات‬
)‫مقلوبة‬ ‫جسور‬ ‫مع‬ , ‫جسور‬ ‫(بدون‬ ‫الحصيرية‬ ‫االسس‬ ‫من‬ ‫لنوعين‬
(R A J A A J A M E E L) (5)
‫و‬
‫الرمثي‬ ‫االساس‬ ‫رسم‬ ‫طريقة‬ ‫توفا‬ ‫التالية‬ ‫االفقية‬ ‫المخططات‬
)‫جسور‬ ‫دون‬ ‫(من‬
.
4000 4250 3500 3250
4500
4000
4500
:‫األولى‬ ‫الخطوة‬
-
‫المركزية‬ ‫الخطوط‬ ‫رسم‬
‫المطلوبة‬ ‫األبعاد‬ ‫حسب‬ ‫األعمدة‬ ‫وتحديد‬ )‫(المحاور‬
.
(R A J A A J A M E E L) (5)
4000 4250 3500 3250
4500
4000
4500
:‫الثانية‬ ‫الخطوة‬
-
‫باألتجا‬ ‫السفلي‬ ‫التسليا‬ ‫كبكة‬ ‫تثبيت‬
‫الطويل‬
‫قضبان‬
‫قطر‬
07
‫كل‬ ‫ملم‬
077
‫ملةم‬
‫قطةر‬ ‫بقضةبان‬ ‫القصيريسةلا‬ ‫األتجةا‬ ‫أمةا‬
01
‫ملةم‬
‫كل‬
077
‫ملم‬
( ‫الجهات‬ ‫كل‬ ‫من‬ ‫الخرساني‬ ‫الغطاء‬ ‫مسافة‬ ‫ترا‬ ‫مع‬
07
.)‫ملم‬
(R A J A A J A M E E L) (5)
1020
1360
1200
1200
1367
1025
4100
3600
3900
850 1134 1284 1284 1034 1034 950 713
3400 3850 3100 2850
3250
3500
4250
4000
4500
4000
4500
13000
:‫الثالثة‬ ‫الخطوة‬
-
‫مسافة‬ ‫تحديد‬
(
1/4L
)
‫من‬
‫المحور‬ ‫طول‬
‫العمودين‬ ‫بين‬
‫األتجاهين‬ ‫ومن‬
‫األفاف‬ ‫الحديد‬ ‫تثبيت‬ ‫ليتم‬
‫اسةفل‬ ‫ي‬
‫العمةود‬ ‫منطقةة‬
‫فةي‬
( ‫مسافة‬ ‫تؤخذ‬ ‫الوسطية‬ ‫الصبات‬ ‫في‬ ‫أما‬ ‫أساس‬ ‫صبة‬ ‫وأخير‬ ‫أول‬ ‫حالتي‬
1/3L
)
.
)
‫كما‬
‫التالي‬ ‫بالشكل‬ ‫موفا‬
.)
(R A J A A J A M E E L) (5)
1020
1360
1200
1200
1367
1025
4100
3600
3900
850 1134 1284 1284 1034 1034 950 713
3400 3850 3100 2850
4500
4000
4500
‫قطر‬ ‫السفلى‬ ‫للطبقة‬ ‫األفافي‬ ‫التسليا‬ ‫حديد‬
00
‫كل‬ ‫ملم‬
077
‫ملم‬
‫باالتجا‬
‫الطويل‬
‫و‬
‫التسليا‬ ‫حديد‬
‫اإلفافي‬
‫قطر‬ ‫السفلى‬ ‫للطبقة‬
07
‫كل‬ ‫ملم‬
077
‫ملم‬
‫القصير‬ ‫باألتجا‬
( ‫الخرساني‬ ‫الغطاء‬ ‫مسافة‬ ‫ترا‬ ‫مع‬
07
.)‫ملم‬
(R A J A A J A M E E L) (5)
‫السفلي‬ ‫التسليا‬ ‫كبكة‬ ‫يوفا‬ ‫التالي‬ ‫األفقي‬ ‫المخطط‬
‫فقط‬
.
1020
1360
1200
1200
1367
1025
4100
3600
3900
850 1134 1284 1284 1034 1034 950 713
3400 3850 3100 2850
3250
3500
4250
4000
4500
4000
4500
13000
15000
Bottom Reinforcement
Mat
Addetional Bottem
Reinforcement
(R A J A A J A M E E L) (5)
)‫باتجاهين‬ ‫مستمر‬ ‫هما(تسليا‬ ‫نوعين‬ ‫على‬ ‫ايضا‬ ‫تكون‬ ‫العلوي‬ ‫التسليا‬ ‫لطبقة‬ ‫بالنسبة‬
‫وتسليا‬
‫مقطوع‬
.‫األعمدة‬ ‫مابين‬ ‫المسافة‬ ‫في‬ ‫وفعه‬ ‫يتم‬
:‫الرابعة‬ ‫الخطوة‬
-
‫مسافة‬ ‫تحديد‬
0.875L)
(
‫طول‬ ‫من‬
‫عمودين‬ ‫كل‬ ‫المحوربين‬
‫أل‬
( ‫ومسافة‬ ‫أساس‬ ‫وأخيرصبة‬ ‫ول‬
0.75L
‫طول‬ ‫من‬ )
‫كةل‬
‫صةبة‬
‫ةةةةةةةطية‬‫ة‬‫وس‬
‫ةةةةةةةين‬‫ة‬‫ب‬
‫ةةةةةةةدة‬‫ة‬‫األعم‬
‫ةةةةةةةة‬‫ة‬‫المقطوع‬ ‫ةةةةةةةليا‬‫ة‬‫التس‬ ‫ةةةةةةةبان‬‫ة‬‫قض‬ ‫ةةةةةةةع‬‫ة‬‫لوف‬
‫ةةةةةةةي‬‫ة‬‫ف‬
.‫ةةةةةةةالي‬‫ة‬‫الت‬ ‫ةةةةةةةكل‬‫ة‬‫بالش‬ ‫ةةةةةةةا‬‫ة‬‫موف‬ ‫ةةةةةةةا‬‫ة‬‫وكم‬ ‫ةةةةةةةاس‬‫ة‬‫األس‬ ‫ةةةةةةةبة‬‫ة‬‫ص‬
3413
2700
3588
0.875
L
0.875
L
0.75
L
4100
4500
3600
4000
3900
4500
4000 4250 3500 3250
2720
3400
2894
3850
2325
3100
2494
2850
0.875 L 0.875 L
0.75 L 0.75 L
(R A J A A J A M E E L) (5)
‫العليا‬ ‫الطبقة‬ ‫تسليا‬ ‫يوفا‬ ‫أفقي‬ ‫مخطط‬
‫لألساس‬
‫بقضبان‬
‫مستمرة‬
‫قطر‬
01
‫كل‬ ‫ملم‬
077
‫وباالتجاهين‬ ‫ملم‬
.
(R A J A A J A M E E L) (5)
‫التسليا‬ ‫يوفا‬ ‫التالي‬ ‫الشكل‬
‫اإلفافي‬
‫األعمدة‬ ‫مابين‬ ‫يقع‬ ‫والذي‬ ‫األساس‬ ‫من‬ ‫العليا‬ ‫للطبقة‬
‫قطر‬ ‫بقضبان‬
07
‫كل‬ ‫ملم‬
077
‫و‬ ‫ملم‬
‫باالتجاهين‬
.
(R A J A A J A M E E L) (5)
‫بنوعيه‬ ‫العليا‬ ‫الطبقة‬ ‫تسليا‬ ‫يوفا‬ ‫التالي‬ ‫المخطط‬
.
(R A J A A J A M E E L) (5)
.‫الحصيري‬ ‫األساس‬ ‫في‬ ‫عرضي‬ ‫مقطع‬ ‫يوضح‬ ‫التالي‬ ‫الشكل‬
20@150 18@150 Add. 22@150 Add. 20@150
18@150 20@150 Add. 20@150 Add. 22@150
Cross Section
(R A J A A J A M E E L) (5)
:‫سادسآ‬
-
‫أ‬
‫الركائز‬ ‫سس‬
(Piles-Footing)
‫يمكن‬ ‫ال‬ ‫بحيث‬ ‫فعيفة‬ ‫أو‬ ,‫األسس‬ ‫ألعمال‬ ‫صالحة‬ ‫غير‬ ‫السطا‬ ‫من‬ ‫القريبة‬ ‫التربة‬ ‫تكون‬ ‫عندما‬ ‫الركائز‬ ‫أسس‬ ‫تستعمل‬
‫استعمال‬
‫أنواع‬
‫الركائز‬ ‫من‬ ‫مجموعة‬ ‫على‬ ‫يستند‬ ‫العمود‬ ‫بجعل‬ ‫وتصمم‬ .‫الموانئ‬ ‫في‬ ‫كما‬ ‫الماء‬ ‫سطا‬ ‫فوق‬ ‫المنشأ‬ ‫كون‬ ‫حالة‬ ‫في‬ ‫تستعمل‬ ‫كذلك‬ .‫األسس‬ ‫من‬ ‫أخرى‬
‫تربط‬ )‫أكثر‬ ‫أو‬ ‫(ثالثة‬
‫قبعة‬ ‫هما‬
‫نية‬ ‫خرسا‬
‫مسلحة‬
(
Cap of piles
.‫الركائز‬ ‫مجموعة‬ ‫الى‬ ‫المركزي‬ ‫العمود‬ ‫ثقل‬ ‫نقل‬ ‫على‬ ‫القدرة‬ ‫لها‬ )
‫القبعة‬ ‫وحافة‬ ‫الركيزة‬ ‫مركز‬ ‫بين‬ ‫مسافة‬ ‫أقل‬
( ‫هو‬
0.07
-
0.7
‫بقدر‬ ‫)مرة‬
‫الركيزة‬ ‫قطر‬
‫مجموعاتها‬ ‫في‬ ‫الركائز‬ ‫مراكز‬ ‫بين‬ ‫بها‬ ‫المسمو‬ ‫والمسافة‬ ,
( ‫هو‬
0.7
-
3
‫قطر‬ ‫بقدر‬ ‫مرة‬ )
.‫الركيزة‬
.‫التنفيذ‬ ‫عند‬ ‫الركيزة‬ ‫كاقولية‬ ‫في‬ ‫حصوله‬ ‫يمكن‬ ‫الذي‬ ‫الخطأ‬ ‫مالحظة‬ ‫مع‬
‫فغط‬ ‫كقوة‬ ‫المركزي‬ ‫العمود‬ ‫ثقل‬ ‫ينتقل‬ ‫أن‬ ‫بشرط‬ ‫الركيزة‬ ‫قبعة‬ ‫سمك‬ ‫يحدد‬
‫على‬
‫عن‬ ‫تقل‬ ‫ال‬ ‫بزاوية‬ ‫الركائز‬ ‫مركز‬
°(
57
)
‫الى‬ ‫مقاس‬ ‫السمك‬ ‫وهذا‬
‫ال‬ ‫أعلى‬ ‫مستوى‬
‫ر‬
‫بشبك‬ ‫الركائز‬ ‫قبعة‬ ‫تسلا‬ .‫مستوية‬ ‫جعلها‬ ‫بعد‬ ‫كائز‬
‫فوق‬ ‫القاعدة‬ ‫بأسفل‬ ‫تكون‬ )‫(ثقيلة‬ ‫الرئيسية‬ ‫الشبكة‬ .‫الحديدية‬ ‫القضبان‬ ‫من‬ ‫تين‬
‫ل‬ ‫الركائز‬
‫م‬
‫قوى‬ ‫عالجة‬
‫االنحناء‬
.‫الركائز‬ ‫مع‬ ‫لألعمدة‬ ‫التسليا‬ ‫حديد‬ ‫ربط‬ ‫لزيادة‬ ‫األعلى‬ ‫في‬ )‫(خفيفة‬ ‫ثانوية‬ ‫وكبكة‬ ,
‫األعمدة‬ ‫تسليا‬ ‫وحديد‬ ‫العليا‬ ‫بالشبكة‬ ‫ليربط‬ ‫الركائز‬ ‫تسليا‬ ‫حديد‬ ‫يستمر‬ ‫أن‬ ‫يجب‬
‫ال‬ ‫خرساني‬ ‫غطاء‬ ‫ترا‬ ‫ويراعى‬ .‫السفلى‬ ‫بالشبكة‬ ‫ليربط‬
‫عن‬ ‫يقل‬
(
07
.‫والماء‬ ‫التربة‬ ‫من‬ ‫التسليا‬ ‫حديد‬ ‫لحماية‬ ‫ملم‬ )
‫بينهما‬ ‫والربط‬ ‫والقبعة‬ ‫الركائز‬ ‫تسليا‬ ‫مع‬ ‫الركائز‬ ‫مجاميع‬ ‫رسم‬
.
‫خ‬, ‫رباعية‬ , ‫(ثالثية‬ ‫تكون‬ ‫قد‬ ‫والتي‬ ‫الخرسانية‬ ‫القبعات‬ ‫في‬ ‫الركائز‬ ‫توزيع‬ ‫طريقة‬ ‫توفا‬ ‫التالية‬ ‫المخططات‬
(‫ويعتبر‬ .‫الركائز‬ )...., ‫ماسية‬
D
)
,‫الركيزة‬ ‫قطر‬ ‫هو‬
( ‫ركيزة‬ ‫أول‬ ‫لمركز‬ ‫الحافة‬ ‫من‬ ‫البينية‬ ‫المسافات‬ ‫توفيا‬ ‫تم‬
1.25D
( ‫وأخرى‬ ‫ركيزة‬ ‫مركز‬ ‫بين‬ ‫والمسافة‬ )
2.5D
.)
‫ميل‬ ‫مقدار‬ ‫تثبيت‬ ‫تم‬ ‫كذلك‬
‫تتراو‬ ‫حيث‬ ‫الركائز‬ ‫لقبعة‬ ‫الحوافي‬
°(
57
–
°
07
–
°
007
.)
(R A J A A J A M E E L) (5)
(R A J A A J A M E E L) (5)
1.25D 2.5D 1.25D
D
D D
1.25D 2.5D 1.25D
1.25D
2.5D
1.25D
D
D
D D
1.25D 2.5D 2.5D 1.25D
1.25D
2.5D
2.5D
1.25D
D
D
D
D D
D
D
D D
D
D
1.25D 2.5D 1.25D
1.25D
2.5D
2.5D
1.25D
(R A J A A J A M E E L) (5)
= ‫الركيزة‬ ‫قطر‬..‫الخرسانية‬ ‫القبعة‬ ‫في‬ ‫الركائز‬ ‫توزيع‬
02
‫سم‬
1.25D
2.5D
2.5D
2.5D
1.25D
1.25D
1.25D 2.5D 2.5D 1.25D
1.25D
2.5D
2.5D
2.5D
1.25D
1.25D
1.25D 2.5D 2.5D 1.25D
D D D
D
D
D
D D D
D
D
D
D D D
1.25D 2.5D 2.5D 1.25D
1.25D
2.5D
2.5D
1.25D
D
D
D
D D D
D
D
D
.‫الخرسانية‬ ‫القبعة‬ ‫في‬ ‫الركائز‬ ‫توزيع‬
.
= ‫الركيزة‬ ‫قطر‬.
02
‫سم‬
(R A J A A J A M E E L) (5)
.‫الخرسانية‬ ‫القبعة‬ ‫في‬ ‫الركائز‬ ‫توزيع‬
.
= ‫الركيزة‬ ‫قطر‬.
52
‫سم‬
1.25D 2.5D 1.25D 1.25D 2.5D 2.5D 1.25D
60°
D
D
D
D
D
D
D
D
D
D
D
D
D D
D
D D D
D
D
D
D
D
D
D
D D
D
120°
45°
1.25D
2.5D
2.5D
2.5D
2.5D
1.25D
(R A J A A J A M E E L) (5)
‫مع‬ ‫الركائز‬ ‫لقبعة‬ ‫الرأسية‬ ‫والمقاطع‬ ‫األفقية‬ ‫المخططات‬ ‫توضح‬ ‫التالية‬ ‫األشكال‬
‫تفاصيل‬
.‫التسليح‬ ‫قضبان‬
1600
500
500
2600
20mm@200mmC/C
both
way
Reinforcement for cap of piles Plan
D=400
D
D
D
D
500
800
(R A J A A J A M E E L) (5)
40 db
500
25 @250
Both way
6 25
Ties 10@300
75
1000
150
500
1500
1600
1.25*D
= ‫الركيزة‬ ‫قطر‬
044
‫ملم‬
(R A J A A J A M E E L) (5)
.‫التسليا‬ ‫حديد‬ ‫تفاصيل‬ ‫فيه‬ ‫يبين‬ ‫المقطع‬ ‫دائرية‬ ‫ركيزة‬ ‫في‬ ‫وعرفي‬ ‫طولي‬ ‫مقطع‬
0.4
0.4
0.8
8-25mm 10mm@70mm
10mm@150mm
Longitudinal Section & Cross Section in Pile
8-25mm
(R A J A A J A M E E L) (5)
‫الركيزة‬ ‫في‬ ‫عرفي‬ ‫ومقطع‬ ‫طولي‬ ‫مقطع‬ ‫يوفا‬ ‫التالي‬ ‫الشكل‬
‫المضلعة‬
‫التسليا‬ ‫حديد‬ ‫تفاصيل‬ ‫مع‬
400
400
800
(10-20-30)m. or more than
Stirr. 12mm@100mm 12mm@50mm
10- O 25mm
50
Cross Section
400
400
(R A J A A J A M E E L) (5)
‫التفاصيل‬ ‫ارسم‬ :‫تمرين‬
‫اإلنشائية‬
‫ذات‬ ‫لبناية‬ ‫الكاملة‬
‫أسس‬
‫(مخططات‬ ‫متنوعة‬
‫أفقية‬
‫لكل‬ ‫مقاطع‬ ‫و‬
‫أساس‬
)
.
6 2.5 4 4 4 4 4 4 4
6
2.5
6
5.5
36.5
20
A B C D E F G H I J
1
2
3
5
FOUNDATION PLAN
F1 F1
F1
F1
F2
F2
F2
F2
F2 F2 F2 F2
F3
F3
F3
F3
SCHEDULE OF FOOTING
(R A J A A J A M E E L) (5)
NO. OF
COLUMNS
DIMENSIONS
(m)
NO. OF
FOOTING
DIMENSIONS
(m)
REMARK
-------- F1 1*0.3 WALL FOOTING
C2 0.4*0.5 F2 1.5*2*0.5 SEPARATED FOOTING
(RECTANGULAR)
C3 0.3*0.4 F3 0.5*4*0.5 COMBINED FOOTING
(RECTANGULAR)
BARS – SCHEDULE
NO. OF FOOTING SHORT BARS LONG BARS REMARK
F1 Ø10mm@200mm 8-Ø12mm TOP + BOTTOM
F2 07-Ø00mm 07-Ø00mm BOTTOM, TWO-WAY
F3 14-Ø00mm 0-Ø00mm TOP MAT
Add. Bars 14-Ø00mm
Ø00mm@150mm 5-Ø00mm BOTTOM MAT
Add. Bars 10-Ø00mm 10-Ø00mm
(R A J A A J A M E E L) (5)
0.3
0.9
0.8
0.6
0.4
1
0.1
8-12mm
10mm200mm
(30*30*3)cm Mosaic tiles
(5)cm Cemente mortar 1:4
(10)cm Plian concrete 1:3:6
(5)cm Crushed stone
Earth filling
Wall Foundation
(F1)
(R A J A A J A M E E L) (5)
0.3
0.4
2
A
A
PLAN
30mm mosaic tiles
50mm 1:4 cement mortar
100mm 1:3:6 plain concrete
50mm crushed stone
earth filling
0.4
1.5
0.3
10 - 12mm
both way
Section A-A Separated Footing (F2)
G.L
(R A J A A J A M E E L) (5)
2.5
4
1.5
0.75
0.4
0.3
C C
B
Plan for Combined Footing
(F3)
(R A J A A J A M E E L) (5)
: ‫واجب‬
-
( ‫المقطعين‬ ‫أرسم‬
B-B
( , )
C-C
‫بالتفاصيل‬ )
.‫أعاله‬ ‫بالجدول‬ ‫الموضح‬ ‫التسليح‬ ‫معطيات‬ ‫وحسب‬ ‫الكاملة‬
.‫مناسب‬ ‫رسم‬ ‫مقياس‬ ‫استعمل‬
****************
*******************************
****
‫هللا‬ ‫بحمد‬ ‫تم‬

More Related Content

What's hot

Base isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structuresBase isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structures
vaignan
 
Project 3 - Building design for seismic effects
Project 3 - Building design for seismic effectsProject 3 - Building design for seismic effects
Project 3 - Building design for seismic effects
Dinesha Kuruppuarachchi
 
Microsoft Word - BASE ISOLATION
Microsoft Word - BASE ISOLATIONMicrosoft Word - BASE ISOLATION
Microsoft Word - BASE ISOLATION
Sumit Srivastav
 

What's hot (20)

The History_Evolution of Roof Trusses
The History_Evolution of Roof TrussesThe History_Evolution of Roof Trusses
The History_Evolution of Roof Trusses
 
2911 1 4
2911 1 42911 1 4
2911 1 4
 
Shallow foundation tos
Shallow foundation  tosShallow foundation  tos
Shallow foundation tos
 
SEISMIC EVALUATION
SEISMIC EVALUATIONSEISMIC EVALUATION
SEISMIC EVALUATION
 
Rectangular and Circular underground water tank
Rectangular and Circular underground water tank Rectangular and Circular underground water tank
Rectangular and Circular underground water tank
 
Theory of structures 002
Theory of structures 002Theory of structures 002
Theory of structures 002
 
Module 1_Spring 2020.pdf
Module 1_Spring 2020.pdfModule 1_Spring 2020.pdf
Module 1_Spring 2020.pdf
 
Base isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structuresBase isolation topic as per jntu syllabus for m.tech 1st year structures
Base isolation topic as per jntu syllabus for m.tech 1st year structures
 
Beam
BeamBeam
Beam
 
Torsion in beam
Torsion in beamTorsion in beam
Torsion in beam
 
Shallow foundation
Shallow foundationShallow foundation
Shallow foundation
 
Deep beams
Deep beamsDeep beams
Deep beams
 
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
 
Special moment frames aci 318 - اطارات مقاومة للعزوم
Special moment frames aci   318 - اطارات مقاومة للعزوم Special moment frames aci   318 - اطارات مقاومة للعزوم
Special moment frames aci 318 - اطارات مقاومة للعزوم
 
Presentation sii
Presentation siiPresentation sii
Presentation sii
 
Project 3 - Building design for seismic effects
Project 3 - Building design for seismic effectsProject 3 - Building design for seismic effects
Project 3 - Building design for seismic effects
 
Is 1893-part2-2014
Is 1893-part2-2014Is 1893-part2-2014
Is 1893-part2-2014
 
Response spectrum method
Response spectrum methodResponse spectrum method
Response spectrum method
 
Microsoft Word - BASE ISOLATION
Microsoft Word - BASE ISOLATIONMicrosoft Word - BASE ISOLATION
Microsoft Word - BASE ISOLATION
 
Shear walls
Shear wallsShear walls
Shear walls
 

الاسس-foundation.pdf

  • 1. 1 Kirkuk Technical Institute……Civil Department Engineering Drawing…………………..Second Year 2017---2018 Structural Drawing The Foundation
  • 2. (R A J A A J A M E E L) (5) Foundation ‫األسس‬ .‫المنشآت‬ ‫عليه‬ ‫ترتكز‬ ‫الذي‬ ‫المهم‬ ‫الجزء‬ ‫ذلك‬ ‫هو‬ ‫األساس‬ ‫من‬ ‫تمكنها‬ ‫مختلفة‬ ‫بنائية‬ ‫وبمواد‬ ‫معين‬ ‫عمق‬ ‫على‬ ‫األرض‬ ‫مستوى‬ ‫تحت‬ ‫عادة‬ ‫ويشيد‬ .‫البناية‬ ‫لتحمل‬ ‫الكافية‬ ‫األرض‬ ‫مساحة‬ ‫الى‬ ‫المنشأ‬ ‫أحمال‬ ‫نقل‬ ‫مالئمته‬ ‫حسب‬ ‫كل‬ ‫األسس‬ ‫من‬ ‫عديدة‬ ‫أنواع‬ ‫المباني‬ ‫أعمال‬ ‫في‬ ‫تستعمل‬ ‫للمنشأ‬ ‫ما‬ ‫المباني‬ ‫في‬ ‫المستخدمة‬ ‫األسس‬ ‫أنواع‬ ‫وأهم‬ .‫التربة‬ ‫وطبيعة‬ :‫يأتي‬ - :‫أوآل‬ - ‫الجداري‬ ‫األساس‬ ( Wall-footing ) :‫ثانيآ‬ - ‫المنفرد‬ ‫األساس‬ ( Isolated Footing ) :‫ثالثآ‬ - ‫المتصل‬ ‫األساس‬ ( Combined Footing ) :‫رابعآ‬ - )‫(الشريطي‬ ‫المستمر‬ ‫األساس‬ ( Continuous Footing ) ‫خامس‬ :‫آ‬ - )‫(الحصيري‬ ‫الرمثي‬ ‫األساس‬ ( Raft-Foundation ) :‫سادسآ‬ - ‫الركائز‬ ‫أسس‬ ( Piles-Footing ) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ :‫أوآل‬ - ‫الجداري‬ ‫األساس‬ ( Wall-footing ) ‫مةواد‬ ‫بأسةتعمال‬ ‫أو‬ ‫المسةلحة‬ ‫الخرسةانة‬ ‫أو‬ ‫األعتياديةة‬ ‫الخرسانة‬ ‫من‬ ‫ويعمل‬ ‫لألثقال‬ ‫الحاملة‬ ‫الجدران‬ ‫مع‬ ‫األساس‬ ‫من‬ ‫النوع‬ ‫هذا‬ ‫يستعمل‬ ‫الفوالذية‬ ‫المقاطع‬ ‫مثل‬ ‫أخرى‬ ‫بنائية‬ ‫المدلفن‬ ‫ة‬ ‫تكةون‬ ‫األسةاس‬ ‫أسةفل‬ ‫فةي‬ ‫توفةع‬ ‫كةبكة‬ ‫كةكل‬ ‫علةى‬ ‫عمةا‬ ‫التسةليا‬ ‫يكةون‬ ‫مسةلحة‬ ‫األسةس‬ ‫كون‬ ‫حالة‬ ‫في‬. ‫الرئيس‬ ‫قضبانها‬ ‫األطول‬ ‫(البعد‬ ‫األساس‬ ‫لطول‬ ‫موازية‬ ‫تكون‬ ‫والتي‬ ‫الثانوية‬ ‫القضبان‬ ‫فوقها‬ ‫تربط‬ ,)‫األساس‬ ‫من‬ ‫األصغر‬ ‫(البعد‬ ‫مستعرض‬ ‫بشكل‬ ‫ة‬ ‫متسةاوية‬ ‫بمسةافات‬ ‫توفةع‬ ‫حلقيةة‬ ‫رباطةات‬ ‫مةع‬ ‫واألسةفل‬ ‫ألعلةى‬ ‫فةي‬ ‫طوليةآ‬ ‫توفع‬ ‫الرئيسة‬ ‫قضبانه‬ ‫صندوقي‬ ‫بشكل‬ ‫تكون‬ ‫أو‬.)‫األساس‬ ‫من‬ ‫لتحةز‬
  • 3. (R A J A A J A M E E L) (5) ‘( ‫الرئيسةة‬ ‫التسةةليا‬ ‫حديةةد‬ ) ‫تكتةة‬ ( ‫مةةابين‬ ‫يتةةراو‬ ‫بمقةةدار‬ ‫الخرسةةاني‬ ‫الغطةةاء‬ ‫تةةرا‬ ‫مراعةةاة‬ ‫مةةع‬ ‫ي‬ 07 - 07 ‫مةةن‬ ‫التسةةليا‬ ‫قضةةبان‬ ‫لحمايةةة‬ ‫ملةةم‬ ) .‫التربة‬ .‫المسلحة‬ ‫وغير‬ ‫المسلحة‬ ‫الخرسانة‬ ‫من‬ ‫جداري‬ ‫ألساس‬ ‫نموذجية‬ ‫مقاطع‬ ‫توفا‬ ‫التالية‬ ‫األككال‬
  • 4. (R A J A A J A M E E L) (5) PLAIN WALL FOOTING )‫اعتيادي‬ ‫جداري‬ ‫(اساس‬
  • 5. (R A J A A J A M E E L) (5) REINFORCED CONCRETE WALL FOOTING ‫ا‬ ‫األولى‬ ‫للوحة‬ ‫الجدارية‬ ‫األسس‬ ‫موضحآ‬ ‫سكني‬ ‫دار‬ ‫من‬ ‫لجزء‬ ‫األفقي‬ ‫المخطط‬ ‫أرسم‬ ,‫التحمل‬ ‫ضعيفة‬ ‫والتربة‬ ‫القوية‬ ‫التربة‬ ‫حالة‬ ‫في‬ ‫مقاطع‬ ‫رسم‬ ‫مع‬ (‫عرضية‬ A-A (‫و‬ ) B-B ) . ( ‫الجدران‬ ‫سمك‬ 02 (‫األساس‬ ‫عرض‬.)‫سم‬ 022 )‫سم‬ ‫أختار‬ . ‫مناسب‬ ‫رسم‬ ‫مقياس‬
  • 6. (R A J A A J A M E E L) (5) 3.5 6 3.5 4 PLAN OF WALLS kitchen living Bedroom
  • 7. (R A J A A J A M E E L) (5) 4 3.5 6 3.5 1 PLAN OF FOUNDATIONS Dim. in m. A A B 1
  • 8. (R A J A A J A M E E L) (5) FOUNDATION WITHOUT RENFORCEMENT G.L .5 .1 1 .2 .4 .3 .1 ‫جدآ‬ ‫قوية‬ ‫التربة‬ ‫تكون‬ ‫عندما‬ ‫الجدار‬ ‫أساس‬ ‫في‬ ‫عرفي‬ ‫مقطع‬ .
  • 9. (R A J A A J A M E E L) (5) WALL FOUNDATION WITH REINFORCEMENT 7 16 .2 .5 .1 1 G.L .2 16@150 ‫التحمل‬ ‫قليلة‬ ‫التربة‬ ‫تكون‬ ‫عندما‬ ‫جدار‬ ‫ألساس‬ ‫عرفي‬ ‫مقطع‬ ‫لألثقال‬ .
  • 10. (R A J A A J A M E E L) (5) Strr. 16 @250 6 16 0.6 0.5 0.1 0.8 G.L WALL FOUNDATION WITH REINFORCEMENT 0.2 6 16 ‫جداري‬ ‫أساس‬ ‫في‬ ‫مقطع‬ ‫تكون‬ ‫عندما‬ ‫جدآ‬ ‫فعيفة‬ ‫التربة‬ .
  • 11. (R A J A A J A M E E L) (5) :‫ثانيآ‬ - ‫المنفرد‬ ‫األساس‬ ( Isolated Footing ) ‫دعامة‬ ‫أو‬ ‫عمود‬ ‫حمل‬ ‫لنقل‬ ‫األساس‬ ‫من‬ ‫النوع‬ ‫هذا‬ ‫يستعمل‬ ‫األعتيادية‬ ‫الخرسانة‬ ‫من‬ ‫عادة‬ ‫وتعمل‬ ,‫التربة‬ ‫الى‬ ‫منفردة‬ ‫قاعدة‬ ‫بواسطة‬ ‫واحدة‬ ‫األنحناء‬ ‫وقوى‬ ‫العمودية‬ ‫القوى‬ ‫األعتبار‬ ‫بنظر‬ ‫يؤخذ‬ ‫المنفرد‬ ‫األساس‬ ‫تصميم‬ ‫عند‬.‫دائرة‬ ‫أو‬ ‫مستطيل‬ ‫أو‬ ‫مربع‬ ‫ككل‬ ‫على‬ ‫وتكون‬ ‫المسلحة‬ ‫أو‬ ‫و‬ ‫والقص‬ ‫بسبب‬ ‫الفشل‬ ‫األنبعاج‬ ( Punching shear .) ‫صبة‬ ‫سمك‬ ‫يكون‬ .‫نسبيآ‬ ‫واسعة‬ ‫األساس‬ ‫مساحة‬ ‫تكون‬ ‫عندما‬ ‫متغيرآ‬ ‫أو‬ ‫ثابتآ‬ ‫األساس‬ ‫و‬ ‫أو‬ ‫ثابت‬ ‫بسمك‬ ‫المنفرد‬ ‫األساس‬ ‫من‬ ‫أنواع‬ ‫تبين‬ ‫التالية‬ ‫األككال‬ ‫م‬ .‫تغير‬
  • 12. (R A J A A J A M E E L) (5) ‫فةي‬ ‫أمةا‬ .‫الشةكل‬ ‫دائريةة‬ ‫أو‬ ‫مربعةة‬ ‫تكةون‬ ‫عنةدما‬ ‫باألتجةاهين‬ ‫متسةاوية‬ ‫تكةونن‬ ‫األسةاس‬ ‫أسةفل‬ ‫فةي‬ ‫التسليا‬ ‫قضبان‬ ‫من‬ ‫بشبكة‬ ‫المنفردة‬ ‫األسس‬ ‫تسلا‬ ‫مراعةاة‬ ‫يجةب‬ , ‫الطويةل‬ ‫األتجةا‬ ‫فةي‬ ‫مةؤثر‬ ‫عمةق‬ ‫أكبةر‬ ‫ألعطةاء‬ ‫الطوليةة‬ ‫القضةبان‬ ‫فوق‬ ‫المستعرفة‬ ‫القضبان‬ ‫وفع‬ ‫يتم‬ ‫المستطيلة‬ ‫األسس‬ ‫ربةط‬ ‫األعمدة‬ ‫تسليا‬ ,‫ثابةت‬ ‫وبسةمك‬ ‫مسةتطيل‬ ‫وآخةر‬ ‫القاعةدة‬ ‫مربةع‬ ‫منفةرد‬ ‫ألسةاس‬ ‫األنشةائية‬ ‫التفاصيل‬ ‫توفا‬ ‫التالية‬ ‫األككال‬.‫األسس‬ ‫تسليا‬ ‫مع‬ ‫عنشائيآ‬ .‫السمك‬ ‫متغير‬ ‫دائري‬ ‫منفرد‬ ‫أساس‬ ‫يمثل‬ ‫ككل‬ ‫كذلك‬
  • 13. (R A J A A J A M E E L) (5) ‫الثانية‬ ‫اللوحة‬ ‫بمقياس‬ ‫التالية‬ ‫المنفردة‬ ‫لألسس‬ ‫والعرضية‬ ‫الرأسية‬ ‫المقاطع‬ ‫مع‬ ‫التالية‬ ‫المخططات‬ ‫أرسم‬ ‫لكل‬ ‫التسليح‬ ‫حديد‬ ‫تفاصيل‬ ‫توضيح‬ ‫مع‬ ‫مناسب‬ ‫رسم‬ .‫منها‬ (A) SEQUARE FOOTING
  • 14. (R A J A A J A M E E L) (5)
  • 15. (R A J A A J A M E E L) (5) (B) RECTANGULAR FOOTING
  • 16. (R A J A A J A M E E L) (5) (C) ISOLATED FOOTING (TRAPEZOIDAL FOOTING) 14 20/m 14 20 /m 0.8 1.8 2.6 0.8 1.8 8 16 ‫باللوحة‬ ‫ملحق‬ :‫الثانية‬ - ‫المخطط‬ ‫ارسم‬ ‫والمقطع‬ ‫األفقي‬ ‫العمودي‬ ‫والمقطع‬ ‫للعمود‬ ‫العرضي‬ ‫مع‬ ‫التالية‬ ‫لألشكال‬ ‫حديد‬ ‫توضيح‬ . ‫التسليح‬
  • 17. (R A J A A J A M E E L) (5) (C) ISOLATED FOOTING (TRAPEZOIDAL FOOTING) 14 20 SECTION 2.5 .4 .2 1 G.L .4 1.7 .7 14 20
  • 18. (R A J A A J A M E E L) (5) ‫قاعدته‬ ‫مع‬ ‫دائري‬ ‫لعمود‬ ‫رأسي‬ ‫مقطع‬ (D)
  • 19. (R A J A A J A M E E L) (5) ‫أفقي‬ ‫مخطط‬ ‫دائري‬ ‫عمود‬ ‫لقاعدة‬
  • 20. (R A J A A J A M E E L) (5) (Combined Footing) :‫ثالثآ‬ - ‫الم‬ ‫األساس‬ ‫ركب‬ ,‫العمودين‬ ‫ثقلي‬ ‫مقدار‬ ‫تساوي‬ ‫عند‬ ‫متناظر‬ ‫مستطيل‬ ‫ككل‬ ‫ذو‬ ‫بعض‬ ‫من‬ ‫بعضهما‬ ‫متقاربين‬ ‫عموديين‬ ‫ثقل‬ ‫يحمل‬ ‫منفرد‬ ‫أساس‬ ‫هو‬ ‫يكون‬ ‫وقد‬ ‫مجاورة‬ ‫قطعة‬ ‫لحدود‬ ‫مالصقآ‬ ‫األعمدة‬ ‫أحد‬ ‫يكون‬ ‫عندما‬ ‫أو‬ ,‫الثقلين‬ ‫تباين‬ ‫عند‬ ‫متناظر‬ ‫غير‬ ‫مستطيل‬ ‫أو‬ ‫منحرف‬ ‫كبه‬ ‫بشكل‬ ‫بروز‬ ‫يتعذر‬ ‫بحيث‬ ‫التالي‬ ‫الشكل‬ ‫في‬ ‫كما‬ ‫القطعة‬ ‫حدود‬ ‫خارج‬ ‫األساس‬ . A A A B D Marjonal edge---- D D Combined footing plans
  • 21. (R A J A A J A M E E L) (5) ‫الط‬ ‫قضبانه‬ ‫عتب‬ ‫بشكل‬ ‫المتصل‬ ‫األساس‬ ‫تسليا‬ ‫يتم‬ ‫و‬ ‫لية‬ ‫الواصل‬ ‫للخط‬ ‫موازية‬ ‫أعلةى‬ ‫فةي‬ ‫وتكةون‬ ,‫األنحنةاء‬ ‫قةوى‬ ‫لمعالجةة‬ ‫العمودين‬ ‫مركزي‬ ‫بين‬ ‫األعمدة‬ ‫تحت‬ ‫األسفل‬ ‫وفي‬ ‫الوسط‬ ‫عند‬ ‫األساس‬ ‫أكثةر‬ ‫بمسةافات‬ ‫القةص‬ ‫قةوى‬ ‫لمعالجةة‬ )‫ومزدوجةة‬ ‫منفةردة‬ ‫(حلقةات‬ ‫ركابية‬ ‫بقضبان‬ )‫(تربط‬ ‫تحز‬ , ‫م‬ ‫تربط‬ ‫مستعرفة‬ ‫قضبان‬ ‫كبكة‬ ‫أفافة‬ ‫مراعاة‬ ‫مع‬ ,‫األعمدة‬ ‫عند‬ ‫تقاربآ‬ .‫األنحناء‬ ‫قوى‬ ‫تحمل‬ ‫لزيادة‬ ‫األعمدة‬ ‫تحت‬ ‫الطولية‬ ‫القضبان‬ ‫ع‬ ‫الثالثة‬ ‫اللوحة‬ ) ‫الشكل‬ ‫(مستطيل‬ ‫متصل‬ ‫أساس‬ ‫لقاعدة‬ ‫األنشائية‬ ‫التفاصيل‬ ‫أرسم‬ ] ‫رأسي‬ ‫مقطع‬ ‫مع‬ ‫أفقي‬ ‫مخطط‬ [
  • 22. (R A J A A J A M E E L) (5) 2.5 10 2 2 .7 .5 PLAN (TOP RINFORCEMENT) 20 - 24 10 - 24 16 @400 .7 .5 ‫مستطيل‬ ‫ككل‬ ‫ذو‬ )‫(المركب‬ ‫المتصل‬ ‫لألساس‬ ‫العليا‬ ‫التسليا‬ ‫كبكة‬ ‫يوفا‬ ‫أفقي‬ ‫مخطط‬
  • 23. (R A J A A J A M E E L) (5) 2.2 2.2 1.3 1.3 LONGITUDINAL SECTION 20 - 24 9 - 20 16 @300 10 - 24 10 - 24 16 @400 16 - 16 .5 .7 16 - 16 .8 1 ‫المتصل‬ ‫األساس‬ ‫في‬ ‫طولي‬ ‫مقطع‬ ‫التسليا‬ ‫حديد‬ ‫تكثي‬ ‫أماكن‬ ‫يبين‬ * )‫السفلى‬ ‫(الشبكة‬ ‫باألساس‬ ‫األعمدة‬ ‫اتصال‬ ‫منطقة‬ ‫أسفل‬ ‫انحناء‬ ‫عز‬ ‫لوجود‬ .‫سالب‬ * )‫العليا‬ ‫(الشبكة‬ ‫العمودين‬ ‫مابين‬ ‫منطقة‬ .‫موجب‬ ‫انحناء‬ ‫عز‬ ‫لوجود‬
  • 24. (R A J A A J A M E E L) (5) PLAN( BOTTOM RINFORCEMENT) 10 2 2 2.5 2.2 16- 16 16 @300 9 - 20 ‫مستطيل‬ ‫ككل‬ ‫ذو‬ )‫(المركب‬ ‫المتصل‬ ‫لألساس‬ ‫السفلى‬ ‫التسليا‬ ‫كبكة‬ ‫يوفا‬ ‫أفقي‬ ‫مخطط‬
  • 25. (R A J A A J A M E E L) (5) ‫لقاعدة‬ ‫األنشائية‬ ‫التفاصيل‬ ‫توفا‬ ‫التالية‬ ‫األككال‬ .‫وعرفية‬ ‫طولية‬ ‫مقاطع‬ ‫مع‬ ‫منحرف‬ ‫كبه‬ ‫بشكل‬ ‫متصل‬ ‫أساس‬
  • 26. (R A J A A J A M E E L) (5) Longitudinal Section
  • 27. (R A J A A J A M E E L) (5) Cross section
  • 28. (R A J A A J A M E E L) (5) ‫اللوحة‬ ‫الرابعة‬ :‫أدناه‬ ‫في‬ ‫المبين‬ )‫(المتصل‬ ‫المركب‬ ‫لألساس‬ ‫والعرضية‬ ‫الطولية‬ ‫الرأسية‬ ‫والمقاطع‬ ‫األفقي‬ ‫المخطط‬ ‫أرسم‬ - ‫بعد‬ ‫على‬ ‫العرضي‬ ‫المقطع‬ ‫(ارسم‬ ‫مالحظة‬ 0 )‫األساس‬ ‫من‬ ‫الرفيع‬ ‫الجزء‬ ‫من‬ ‫متر‬ . .5 .7 1.5 .5 3 .4 .7 7 5 2 .4 PLAN
  • 29. (R A J A A J A M E E L) (5) REINFORCEMENT IN TOP 16-@400 20@150 A A A A REINFORCEMENT IN BOTTOM 8- 18 16@300 8- 20 4- 20
  • 30. (R A J A A J A M E E L) (5) SECTION A-A 1.2 16@300 8- 20 16-@400 20@150 8-@18 4- 20 16@300 2 .8
  • 31. (R A J A A J A M E E L) (5) :‫رابعآ‬ - )‫(الشريطي‬ ‫المستمر‬ ‫األساس‬ Continuous Footing ‫على‬ ‫واقعة‬ ‫األعمدة‬ ‫من‬ ‫عدد‬ ‫هناا‬ ‫يكون‬ ‫عندما‬ ‫األسس‬ ‫من‬ ‫النوع‬ ‫هذا‬ ‫يعمل‬ ‫استقامة‬ ‫رخةوة‬ ‫تربةة‬ ‫علةى‬ ‫وترتكةز‬ ‫بعضةها‬ ‫مع‬ ‫تتقارب‬ ‫واحدة‬ ‫ةآ‬‫ة‬‫مع‬ ‫ةداخل‬‫ة‬‫تت‬ ‫ةردة‬‫ة‬‫المنف‬ ‫ةس‬‫ة‬‫األس‬ ‫ةد‬‫ة‬‫قواع‬ ‫ةل‬‫ة‬‫يجع‬ ‫ةا‬‫ة‬‫مم‬ ‫ل‬ ,‫ةد‬‫ة‬‫موح‬ ‫ةرض‬‫ة‬‫بع‬ ‫ةاس‬‫ة‬‫األس‬ ‫ةذا‬‫ة‬‫ه‬ ‫ةون‬‫ة‬‫يك‬ ,‫ةدة‬‫ة‬‫أعم‬ ‫ةة‬‫ة‬‫لمجموع‬ ‫ةتمر‬‫ة‬‫مس‬ ‫ةاس‬‫ة‬‫األس‬ ‫ةن‬‫ة‬‫م‬ ‫ةريطآ‬‫ة‬‫ك‬ ‫ةون‬‫ة‬‫تك‬ ‫الخةارجيين‬ ‫العمةودين‬ ‫نهةايتي‬ ‫عنةد‬ ‫مناسب‬ ‫بمقدار‬ ‫المستمر‬ ‫ويبرزاألساس‬ ‫التر‬ ‫علةى‬ ‫الضةغط‬ ‫توزيةع‬ ‫لجعةل‬ ‫ذلةك‬ ‫أمكةن‬ ‫عذا‬ .‫تجانسةآ‬ ‫أكثةر‬ ‫بةة‬ ‫و‬ ‫يكون‬ ‫ممةا‬ ‫األعمةدة‬ ‫تحةت‬ ‫السةالبة‬ ‫العزو‬ ‫معالجة‬ ‫مراعاة‬ ‫مع‬ ‫المركب‬ ‫األساس‬ ‫لتسليا‬ ‫مشابهآ‬ ‫األسس‬ ‫من‬ ‫النوع‬ ‫هذا‬ ‫تسليا‬ ‫التسةليا‬ ‫حديةد‬ ‫تةداخل‬ ‫يتطلةب‬ .‫المتجاورة‬ ‫الفضاءات‬ ‫بين‬ ‫و‬ ‫واح‬ ‫أستقامة‬ ‫على‬ ‫تقع‬ ‫أعمدة‬ ‫لمجموعة‬ ‫مستمر‬ ‫ألساس‬ ‫األنشائية‬ ‫التفاصيل‬ ‫توفا‬ ‫التالية‬ ‫األككال‬ .‫دة‬
  • 32. (R A J A A J A M E E L) (5) PLAN
  • 33. (R A J A A J A M E E L) (5) ELEVATION
  • 34. (R A J A A J A M E E L) (5) Section (A-A) C.L 11-25mm 11-25mm 8-16mm@20cm 8-16mm@20cm 8-16mm@20cm 3@30 5@15 5@15 5@15 2@30 5@15 5@15 3@30 5@15 8-25mm 10mm@30cm 50 50
  • 35. (R A J A A J A M E E L) (5) Section (B-B) 75 200 50 8-25mm 10mm@30cm 6-22mm 11-25mm 12mm-4Legged
  • 36. (R A J A A J A M E E L) (5) :‫خامسآ‬ - )‫(الحصيري‬ ‫الرمثي‬ ‫األساس‬ Raft-Foundation ‫جدآ‬ ‫كبيرة‬ ‫المنشأ‬ ‫أعمدة‬ ‫على‬ ‫األحمال‬ ‫تكون‬ ‫عندما‬ ‫األساس‬ ‫هذا‬ ‫يستعمل‬ ‫تزيةد‬ ‫مسافة‬ ‫الى‬ ‫تحتاج‬ ‫األسس‬ ‫يجعل‬ ‫مما‬ ‫فعي‬ ‫التربة‬ ‫وتحمل‬ .‫المنشأ‬ ‫مساحة‬ ‫نص‬ ‫على‬ ‫و‬ ‫الفركة‬ ‫هذ‬ ‫تسليا‬ ‫يفضل‬ ,‫أوأعتاب‬ ‫روافد‬ ‫بدون‬ ‫واحد‬ ‫بسمك‬ ‫مسلحة‬ ‫خرسانية‬ ‫فركة‬ ‫بشكل‬ ‫الحصيري‬ ‫األساس‬ ‫يكون‬ ‫جعل‬ ‫مراعاة‬ ‫مع‬ .)‫األسفل‬ ‫في‬ ‫تسليا‬ ‫وطبقة‬ ‫األعلى‬ ‫في‬ ‫تسليا‬ ‫(طبقة‬ ‫الحديد‬ ‫قضبان‬ ‫من‬ ‫بشبكتين‬ ‫الطويةل‬ ‫األتجةا‬ ‫في‬ ‫يكون‬ ‫ما‬ ‫أكبر‬ ‫المؤثر‬ ‫العمق‬ ‫األعتةاب‬ ‫تكةون‬ ‫وقةد‬ .‫الرمثةي‬ ‫األسةاس‬ ‫مسةاحة‬ ‫علةى‬ ‫األعمةدة‬ ‫ثقةل‬ ‫لتوزيةع‬ ‫وروافةد‬ ‫أعتةاب‬ ‫مةع‬ ‫مسةلحة‬ ‫خرسةانية‬ ‫صبة‬ ‫بشكل‬ ‫األساس‬ ‫يكون‬ ‫أوأن‬. ‫ظه‬ ‫عند‬ ‫او‬ ‫التنفيذ‬ ‫لسهولة‬ ‫األعلى‬ ‫الى‬ ‫مقلوبة‬ ‫األسس‬ ‫موقع‬ ‫في‬ ‫الجوفية‬ ‫الميا‬ ‫ور‬ .
  • 37. (R A J A A J A M E E L) (5) ‫افقية‬ ‫مخططات‬ )‫مقلوبة‬ ‫جسور‬ ‫مع‬ , ‫جسور‬ ‫(بدون‬ ‫الحصيرية‬ ‫االسس‬ ‫من‬ ‫لنوعين‬
  • 38. (R A J A A J A M E E L) (5) ‫و‬ ‫الرمثي‬ ‫االساس‬ ‫رسم‬ ‫طريقة‬ ‫توفا‬ ‫التالية‬ ‫االفقية‬ ‫المخططات‬ )‫جسور‬ ‫دون‬ ‫(من‬ . 4000 4250 3500 3250 4500 4000 4500 :‫األولى‬ ‫الخطوة‬ - ‫المركزية‬ ‫الخطوط‬ ‫رسم‬ ‫المطلوبة‬ ‫األبعاد‬ ‫حسب‬ ‫األعمدة‬ ‫وتحديد‬ )‫(المحاور‬ .
  • 39. (R A J A A J A M E E L) (5) 4000 4250 3500 3250 4500 4000 4500 :‫الثانية‬ ‫الخطوة‬ - ‫باألتجا‬ ‫السفلي‬ ‫التسليا‬ ‫كبكة‬ ‫تثبيت‬ ‫الطويل‬ ‫قضبان‬ ‫قطر‬ 07 ‫كل‬ ‫ملم‬ 077 ‫ملةم‬ ‫قطةر‬ ‫بقضةبان‬ ‫القصيريسةلا‬ ‫األتجةا‬ ‫أمةا‬ 01 ‫ملةم‬ ‫كل‬ 077 ‫ملم‬ ( ‫الجهات‬ ‫كل‬ ‫من‬ ‫الخرساني‬ ‫الغطاء‬ ‫مسافة‬ ‫ترا‬ ‫مع‬ 07 .)‫ملم‬
  • 40. (R A J A A J A M E E L) (5) 1020 1360 1200 1200 1367 1025 4100 3600 3900 850 1134 1284 1284 1034 1034 950 713 3400 3850 3100 2850 3250 3500 4250 4000 4500 4000 4500 13000 :‫الثالثة‬ ‫الخطوة‬ - ‫مسافة‬ ‫تحديد‬ ( 1/4L ) ‫من‬ ‫المحور‬ ‫طول‬ ‫العمودين‬ ‫بين‬ ‫األتجاهين‬ ‫ومن‬ ‫األفاف‬ ‫الحديد‬ ‫تثبيت‬ ‫ليتم‬ ‫اسةفل‬ ‫ي‬ ‫العمةود‬ ‫منطقةة‬ ‫فةي‬ ( ‫مسافة‬ ‫تؤخذ‬ ‫الوسطية‬ ‫الصبات‬ ‫في‬ ‫أما‬ ‫أساس‬ ‫صبة‬ ‫وأخير‬ ‫أول‬ ‫حالتي‬ 1/3L ) . ) ‫كما‬ ‫التالي‬ ‫بالشكل‬ ‫موفا‬ .)
  • 41. (R A J A A J A M E E L) (5) 1020 1360 1200 1200 1367 1025 4100 3600 3900 850 1134 1284 1284 1034 1034 950 713 3400 3850 3100 2850 4500 4000 4500 ‫قطر‬ ‫السفلى‬ ‫للطبقة‬ ‫األفافي‬ ‫التسليا‬ ‫حديد‬ 00 ‫كل‬ ‫ملم‬ 077 ‫ملم‬ ‫باالتجا‬ ‫الطويل‬ ‫و‬ ‫التسليا‬ ‫حديد‬ ‫اإلفافي‬ ‫قطر‬ ‫السفلى‬ ‫للطبقة‬ 07 ‫كل‬ ‫ملم‬ 077 ‫ملم‬ ‫القصير‬ ‫باألتجا‬ ( ‫الخرساني‬ ‫الغطاء‬ ‫مسافة‬ ‫ترا‬ ‫مع‬ 07 .)‫ملم‬
  • 42. (R A J A A J A M E E L) (5) ‫السفلي‬ ‫التسليا‬ ‫كبكة‬ ‫يوفا‬ ‫التالي‬ ‫األفقي‬ ‫المخطط‬ ‫فقط‬ . 1020 1360 1200 1200 1367 1025 4100 3600 3900 850 1134 1284 1284 1034 1034 950 713 3400 3850 3100 2850 3250 3500 4250 4000 4500 4000 4500 13000 15000 Bottom Reinforcement Mat Addetional Bottem Reinforcement
  • 43. (R A J A A J A M E E L) (5) )‫باتجاهين‬ ‫مستمر‬ ‫هما(تسليا‬ ‫نوعين‬ ‫على‬ ‫ايضا‬ ‫تكون‬ ‫العلوي‬ ‫التسليا‬ ‫لطبقة‬ ‫بالنسبة‬ ‫وتسليا‬ ‫مقطوع‬ .‫األعمدة‬ ‫مابين‬ ‫المسافة‬ ‫في‬ ‫وفعه‬ ‫يتم‬ :‫الرابعة‬ ‫الخطوة‬ - ‫مسافة‬ ‫تحديد‬ 0.875L) ( ‫طول‬ ‫من‬ ‫عمودين‬ ‫كل‬ ‫المحوربين‬ ‫أل‬ ( ‫ومسافة‬ ‫أساس‬ ‫وأخيرصبة‬ ‫ول‬ 0.75L ‫طول‬ ‫من‬ ) ‫كةل‬ ‫صةبة‬ ‫ةةةةةةةطية‬‫ة‬‫وس‬ ‫ةةةةةةةين‬‫ة‬‫ب‬ ‫ةةةةةةةدة‬‫ة‬‫األعم‬ ‫ةةةةةةةة‬‫ة‬‫المقطوع‬ ‫ةةةةةةةليا‬‫ة‬‫التس‬ ‫ةةةةةةةبان‬‫ة‬‫قض‬ ‫ةةةةةةةع‬‫ة‬‫لوف‬ ‫ةةةةةةةي‬‫ة‬‫ف‬ .‫ةةةةةةةالي‬‫ة‬‫الت‬ ‫ةةةةةةةكل‬‫ة‬‫بالش‬ ‫ةةةةةةةا‬‫ة‬‫موف‬ ‫ةةةةةةةا‬‫ة‬‫وكم‬ ‫ةةةةةةةاس‬‫ة‬‫األس‬ ‫ةةةةةةةبة‬‫ة‬‫ص‬ 3413 2700 3588 0.875 L 0.875 L 0.75 L 4100 4500 3600 4000 3900 4500 4000 4250 3500 3250 2720 3400 2894 3850 2325 3100 2494 2850 0.875 L 0.875 L 0.75 L 0.75 L
  • 44. (R A J A A J A M E E L) (5) ‫العليا‬ ‫الطبقة‬ ‫تسليا‬ ‫يوفا‬ ‫أفقي‬ ‫مخطط‬ ‫لألساس‬ ‫بقضبان‬ ‫مستمرة‬ ‫قطر‬ 01 ‫كل‬ ‫ملم‬ 077 ‫وباالتجاهين‬ ‫ملم‬ .
  • 45. (R A J A A J A M E E L) (5) ‫التسليا‬ ‫يوفا‬ ‫التالي‬ ‫الشكل‬ ‫اإلفافي‬ ‫األعمدة‬ ‫مابين‬ ‫يقع‬ ‫والذي‬ ‫األساس‬ ‫من‬ ‫العليا‬ ‫للطبقة‬ ‫قطر‬ ‫بقضبان‬ 07 ‫كل‬ ‫ملم‬ 077 ‫و‬ ‫ملم‬ ‫باالتجاهين‬ .
  • 46. (R A J A A J A M E E L) (5) ‫بنوعيه‬ ‫العليا‬ ‫الطبقة‬ ‫تسليا‬ ‫يوفا‬ ‫التالي‬ ‫المخطط‬ .
  • 47. (R A J A A J A M E E L) (5) .‫الحصيري‬ ‫األساس‬ ‫في‬ ‫عرضي‬ ‫مقطع‬ ‫يوضح‬ ‫التالي‬ ‫الشكل‬ 20@150 18@150 Add. 22@150 Add. 20@150 18@150 20@150 Add. 20@150 Add. 22@150 Cross Section
  • 48. (R A J A A J A M E E L) (5) :‫سادسآ‬ - ‫أ‬ ‫الركائز‬ ‫سس‬ (Piles-Footing) ‫يمكن‬ ‫ال‬ ‫بحيث‬ ‫فعيفة‬ ‫أو‬ ,‫األسس‬ ‫ألعمال‬ ‫صالحة‬ ‫غير‬ ‫السطا‬ ‫من‬ ‫القريبة‬ ‫التربة‬ ‫تكون‬ ‫عندما‬ ‫الركائز‬ ‫أسس‬ ‫تستعمل‬ ‫استعمال‬ ‫أنواع‬ ‫الركائز‬ ‫من‬ ‫مجموعة‬ ‫على‬ ‫يستند‬ ‫العمود‬ ‫بجعل‬ ‫وتصمم‬ .‫الموانئ‬ ‫في‬ ‫كما‬ ‫الماء‬ ‫سطا‬ ‫فوق‬ ‫المنشأ‬ ‫كون‬ ‫حالة‬ ‫في‬ ‫تستعمل‬ ‫كذلك‬ .‫األسس‬ ‫من‬ ‫أخرى‬ ‫تربط‬ )‫أكثر‬ ‫أو‬ ‫(ثالثة‬ ‫قبعة‬ ‫هما‬ ‫نية‬ ‫خرسا‬ ‫مسلحة‬ ( Cap of piles .‫الركائز‬ ‫مجموعة‬ ‫الى‬ ‫المركزي‬ ‫العمود‬ ‫ثقل‬ ‫نقل‬ ‫على‬ ‫القدرة‬ ‫لها‬ ) ‫القبعة‬ ‫وحافة‬ ‫الركيزة‬ ‫مركز‬ ‫بين‬ ‫مسافة‬ ‫أقل‬ ( ‫هو‬ 0.07 - 0.7 ‫بقدر‬ ‫)مرة‬ ‫الركيزة‬ ‫قطر‬ ‫مجموعاتها‬ ‫في‬ ‫الركائز‬ ‫مراكز‬ ‫بين‬ ‫بها‬ ‫المسمو‬ ‫والمسافة‬ , ( ‫هو‬ 0.7 - 3 ‫قطر‬ ‫بقدر‬ ‫مرة‬ ) .‫الركيزة‬ .‫التنفيذ‬ ‫عند‬ ‫الركيزة‬ ‫كاقولية‬ ‫في‬ ‫حصوله‬ ‫يمكن‬ ‫الذي‬ ‫الخطأ‬ ‫مالحظة‬ ‫مع‬ ‫فغط‬ ‫كقوة‬ ‫المركزي‬ ‫العمود‬ ‫ثقل‬ ‫ينتقل‬ ‫أن‬ ‫بشرط‬ ‫الركيزة‬ ‫قبعة‬ ‫سمك‬ ‫يحدد‬ ‫على‬ ‫عن‬ ‫تقل‬ ‫ال‬ ‫بزاوية‬ ‫الركائز‬ ‫مركز‬ °( 57 ) ‫الى‬ ‫مقاس‬ ‫السمك‬ ‫وهذا‬ ‫ال‬ ‫أعلى‬ ‫مستوى‬ ‫ر‬ ‫بشبك‬ ‫الركائز‬ ‫قبعة‬ ‫تسلا‬ .‫مستوية‬ ‫جعلها‬ ‫بعد‬ ‫كائز‬ ‫فوق‬ ‫القاعدة‬ ‫بأسفل‬ ‫تكون‬ )‫(ثقيلة‬ ‫الرئيسية‬ ‫الشبكة‬ .‫الحديدية‬ ‫القضبان‬ ‫من‬ ‫تين‬ ‫ل‬ ‫الركائز‬ ‫م‬ ‫قوى‬ ‫عالجة‬ ‫االنحناء‬ .‫الركائز‬ ‫مع‬ ‫لألعمدة‬ ‫التسليا‬ ‫حديد‬ ‫ربط‬ ‫لزيادة‬ ‫األعلى‬ ‫في‬ )‫(خفيفة‬ ‫ثانوية‬ ‫وكبكة‬ , ‫األعمدة‬ ‫تسليا‬ ‫وحديد‬ ‫العليا‬ ‫بالشبكة‬ ‫ليربط‬ ‫الركائز‬ ‫تسليا‬ ‫حديد‬ ‫يستمر‬ ‫أن‬ ‫يجب‬ ‫ال‬ ‫خرساني‬ ‫غطاء‬ ‫ترا‬ ‫ويراعى‬ .‫السفلى‬ ‫بالشبكة‬ ‫ليربط‬ ‫عن‬ ‫يقل‬ ( 07 .‫والماء‬ ‫التربة‬ ‫من‬ ‫التسليا‬ ‫حديد‬ ‫لحماية‬ ‫ملم‬ ) ‫بينهما‬ ‫والربط‬ ‫والقبعة‬ ‫الركائز‬ ‫تسليا‬ ‫مع‬ ‫الركائز‬ ‫مجاميع‬ ‫رسم‬ . ‫خ‬, ‫رباعية‬ , ‫(ثالثية‬ ‫تكون‬ ‫قد‬ ‫والتي‬ ‫الخرسانية‬ ‫القبعات‬ ‫في‬ ‫الركائز‬ ‫توزيع‬ ‫طريقة‬ ‫توفا‬ ‫التالية‬ ‫المخططات‬ (‫ويعتبر‬ .‫الركائز‬ )...., ‫ماسية‬ D ) ,‫الركيزة‬ ‫قطر‬ ‫هو‬ ( ‫ركيزة‬ ‫أول‬ ‫لمركز‬ ‫الحافة‬ ‫من‬ ‫البينية‬ ‫المسافات‬ ‫توفيا‬ ‫تم‬ 1.25D ( ‫وأخرى‬ ‫ركيزة‬ ‫مركز‬ ‫بين‬ ‫والمسافة‬ ) 2.5D .) ‫ميل‬ ‫مقدار‬ ‫تثبيت‬ ‫تم‬ ‫كذلك‬ ‫تتراو‬ ‫حيث‬ ‫الركائز‬ ‫لقبعة‬ ‫الحوافي‬ °( 57 – ° 07 – ° 007 .)
  • 49. (R A J A A J A M E E L) (5)
  • 50. (R A J A A J A M E E L) (5) 1.25D 2.5D 1.25D D D D 1.25D 2.5D 1.25D 1.25D 2.5D 1.25D D D D D 1.25D 2.5D 2.5D 1.25D 1.25D 2.5D 2.5D 1.25D D D D D D D D D D D D 1.25D 2.5D 1.25D 1.25D 2.5D 2.5D 1.25D
  • 51. (R A J A A J A M E E L) (5) = ‫الركيزة‬ ‫قطر‬..‫الخرسانية‬ ‫القبعة‬ ‫في‬ ‫الركائز‬ ‫توزيع‬ 02 ‫سم‬ 1.25D 2.5D 2.5D 2.5D 1.25D 1.25D 1.25D 2.5D 2.5D 1.25D 1.25D 2.5D 2.5D 2.5D 1.25D 1.25D 1.25D 2.5D 2.5D 1.25D D D D D D D D D D D D D D D D 1.25D 2.5D 2.5D 1.25D 1.25D 2.5D 2.5D 1.25D D D D D D D D D D .‫الخرسانية‬ ‫القبعة‬ ‫في‬ ‫الركائز‬ ‫توزيع‬ . = ‫الركيزة‬ ‫قطر‬. 02 ‫سم‬
  • 52. (R A J A A J A M E E L) (5) .‫الخرسانية‬ ‫القبعة‬ ‫في‬ ‫الركائز‬ ‫توزيع‬ . = ‫الركيزة‬ ‫قطر‬. 52 ‫سم‬ 1.25D 2.5D 1.25D 1.25D 2.5D 2.5D 1.25D 60° D D D D D D D D D D D D D D D D D D D D D D D D D D D D 120° 45° 1.25D 2.5D 2.5D 2.5D 2.5D 1.25D
  • 53. (R A J A A J A M E E L) (5) ‫مع‬ ‫الركائز‬ ‫لقبعة‬ ‫الرأسية‬ ‫والمقاطع‬ ‫األفقية‬ ‫المخططات‬ ‫توضح‬ ‫التالية‬ ‫األشكال‬ ‫تفاصيل‬ .‫التسليح‬ ‫قضبان‬ 1600 500 500 2600 20mm@200mmC/C both way Reinforcement for cap of piles Plan D=400 D D D D 500 800
  • 54. (R A J A A J A M E E L) (5) 40 db 500 25 @250 Both way 6 25 Ties 10@300 75 1000 150 500 1500 1600 1.25*D = ‫الركيزة‬ ‫قطر‬ 044 ‫ملم‬
  • 55. (R A J A A J A M E E L) (5) .‫التسليا‬ ‫حديد‬ ‫تفاصيل‬ ‫فيه‬ ‫يبين‬ ‫المقطع‬ ‫دائرية‬ ‫ركيزة‬ ‫في‬ ‫وعرفي‬ ‫طولي‬ ‫مقطع‬ 0.4 0.4 0.8 8-25mm 10mm@70mm 10mm@150mm Longitudinal Section & Cross Section in Pile 8-25mm
  • 56. (R A J A A J A M E E L) (5) ‫الركيزة‬ ‫في‬ ‫عرفي‬ ‫ومقطع‬ ‫طولي‬ ‫مقطع‬ ‫يوفا‬ ‫التالي‬ ‫الشكل‬ ‫المضلعة‬ ‫التسليا‬ ‫حديد‬ ‫تفاصيل‬ ‫مع‬ 400 400 800 (10-20-30)m. or more than Stirr. 12mm@100mm 12mm@50mm 10- O 25mm 50 Cross Section 400 400
  • 57. (R A J A A J A M E E L) (5) ‫التفاصيل‬ ‫ارسم‬ :‫تمرين‬ ‫اإلنشائية‬ ‫ذات‬ ‫لبناية‬ ‫الكاملة‬ ‫أسس‬ ‫(مخططات‬ ‫متنوعة‬ ‫أفقية‬ ‫لكل‬ ‫مقاطع‬ ‫و‬ ‫أساس‬ ) . 6 2.5 4 4 4 4 4 4 4 6 2.5 6 5.5 36.5 20 A B C D E F G H I J 1 2 3 5 FOUNDATION PLAN F1 F1 F1 F1 F2 F2 F2 F2 F2 F2 F2 F2 F3 F3 F3 F3 SCHEDULE OF FOOTING
  • 58. (R A J A A J A M E E L) (5) NO. OF COLUMNS DIMENSIONS (m) NO. OF FOOTING DIMENSIONS (m) REMARK -------- F1 1*0.3 WALL FOOTING C2 0.4*0.5 F2 1.5*2*0.5 SEPARATED FOOTING (RECTANGULAR) C3 0.3*0.4 F3 0.5*4*0.5 COMBINED FOOTING (RECTANGULAR) BARS – SCHEDULE NO. OF FOOTING SHORT BARS LONG BARS REMARK F1 Ø10mm@200mm 8-Ø12mm TOP + BOTTOM F2 07-Ø00mm 07-Ø00mm BOTTOM, TWO-WAY F3 14-Ø00mm 0-Ø00mm TOP MAT Add. Bars 14-Ø00mm Ø00mm@150mm 5-Ø00mm BOTTOM MAT Add. Bars 10-Ø00mm 10-Ø00mm
  • 59. (R A J A A J A M E E L) (5) 0.3 0.9 0.8 0.6 0.4 1 0.1 8-12mm 10mm200mm (30*30*3)cm Mosaic tiles (5)cm Cemente mortar 1:4 (10)cm Plian concrete 1:3:6 (5)cm Crushed stone Earth filling Wall Foundation (F1)
  • 60. (R A J A A J A M E E L) (5) 0.3 0.4 2 A A PLAN 30mm mosaic tiles 50mm 1:4 cement mortar 100mm 1:3:6 plain concrete 50mm crushed stone earth filling 0.4 1.5 0.3 10 - 12mm both way Section A-A Separated Footing (F2) G.L
  • 61. (R A J A A J A M E E L) (5) 2.5 4 1.5 0.75 0.4 0.3 C C B Plan for Combined Footing (F3)
  • 62. (R A J A A J A M E E L) (5) : ‫واجب‬ - ( ‫المقطعين‬ ‫أرسم‬ B-B ( , ) C-C ‫بالتفاصيل‬ ) .‫أعاله‬ ‫بالجدول‬ ‫الموضح‬ ‫التسليح‬ ‫معطيات‬ ‫وحسب‬ ‫الكاملة‬ .‫مناسب‬ ‫رسم‬ ‫مقياس‬ ‫استعمل‬ **************** ******************************* **** ‫هللا‬ ‫بحمد‬ ‫تم‬