1. CAREER OBJECTIVES
EDUCATIONS
RELEVENT COURSES
TECHNICAL SKILLS
INTERNSHIP PROGRAM
ARIF AZIZI BIN AHMAD
Bachelor of Engineering Technology (HONS) in Manufacturing
Systems
Looking forward to work in a real professional atmosphere, contributing to career development
using my academic and technical skills together with hard and discipline etiquette to be professional
in the field of Engineering. To continuously improve upon my present skills set and by being team
player, add value to the organization and society I associate myself with.
Supply Chain Management • Six Sigma Methodology • Manufacturing Technology • Thermofluids
• Production And Operation Management • Maintenance And Reliability Systems
• Lean And Agile Manufacturing • CadCam
Trainee – Engineering Department
Polymer Composite Asia Sdn Bhd 1st
February 2016 – 22nd
May 2016
Work description
Email ID : arifazizi1211@gmail.com
Tel : 018 – 313 0358
Address : D4 Blok A,
Kuaters SMK. Jelai,
73100 Johol,
Negeri Sembilan Darul Khusus.
Universiti Kuala Lumpur Institute of Product Design and
Manufacturing (IPROM)
Bachelor of Manufacturing Systems Engineering
July 2012
Graduated on October 2016
Politeknik port Dickson
Civil Engineering
July 2009
Graduated on July 2012
SolidWorks CNC Milling
CadCam (Basic) CNC Turning Machine
AutoCadd (Basic) Conventional Lathe Machine
Knowledgeable in Bill of Materials.
Successfully preparing manual installation guide for SHELL and BP project.
Supervising groups student from INTI College in researching about Thermoforming
Process.
2. WORK EXPERIENCES
STRENGTHS
Project Engineer -
Site Supervisor
Polymer Composite Asia Sdn Bhd 23rd
May 2016 – 16th
August 2016
Work Description
Electrical Technician -
Part Time
Yoon Electrical Wiring and Trading July – August 2015
Work Description
Self-motivated and able to meet deadlines, as shown by completing some of project on
time in my past experienced.
Able to make decision and take responsibility (product received from factory have
serious defect and need modification on site. All effect during and after modification are
Propose software for improvising communication between site workers and upper
department.
Assist worker and get experience in signage installation process.
Designing rack and trollies by using SolidWorks to reducing forklift movement and
increasing safety area of workers.
Play role to keeping project on schedule and minimize any additional days.
Preparing Bills of Materials (BOM) of certain project and dealing with contractors about
theirs submitted quotation.
Ensure high safety precaution to workers and customers by implement client standard
safety requirement.
Assisting engineer to monitor a group of workers on site.
Consult client and contractor about work that will be perform on site.
Travel to certain location to supervise installation and keeping project on track.
Attending kick of meeting before project started.
Control critical situation by contribute ideas to minimize factory defect during
transportation.
Successfully minimize additional service time by implement tight inspection on site.
Handle and supervise workers on site and ensure them to giving the best quality needed
by client.
Performing wiring installation to a new Pasaraya Ten Ten branch.
Giving maintenance service to the shop branch after installation work completed.
Ensure all the installations are meets the specification needs by client.
Communicate and cooperate with others contractors and ensure every work are not
trespass another contractor’s work.
Work under minimum supervision and meet tight deadlines.
3. EXTRA CURRICULAR ACTIVITIES
REFERENCES
EXPECTED SALARY
on my shoulder).
Problem solving skills (contribute ideas to crane operator due to limited space on site. It
is to prevent heavy traffic and minimize risk to customer).
Excellent telephone manner (past employment trained me to very reachable even on
holiday and after working hours).
Punctuality and extra work time (as site supervisor requirement, I need to be on site
before contractor came and be the last person to going home. It is to make sure site are
clean and safe).
Quick learner, keen to learn and improve skills (successfully learned about
Thermoforming, BOM, Factory Process, Data Entry, Safety on Site, and preparing Manual
Installation Book during internship program).
Teamwork skills (worked well as part of construction team and upper management
during BHP project).
Written and verbal communication skills (built up during college time and implement it
through replying e-mails to contractors and upper department during my office work
placement).
RM 2300.00 (negotiable)
Dr. Mohd Zaid Bin Abu Yazid
Final Year project Supervisor (September 2015 – January 2016)
Deputy Dean of Universiti Kuala Lumpur Institute of Product Design And Manufacturing (IPROM)
019 – 230 5101
Prof. Ahmad Bin Zakaria
Second Final Year Project Supervisor (September 2015 – January 2016)
Senior Lecturer of Universiti Kuala Lumpur Institute of Product Design And Manufacturing (IPROM)
019 – 281 9404
Mr. Muhammad Aqil bin Razali
Project And Facilities Engineer
Polymer Composite Asia Sdn Bhd
017 – 503 1494
Mr. Tee Kok Wong
Executive Director
Polymer Composite Asia Sdn Bhd
012 – 295 1186
2014 – 2015 IPROM Photography Club Committee
2014 – 2015 IPROM Football Team Player
1 – 2 March 2014 Oil & Gas Induction Courses Participant
2011 - 2012 Politeknik Port Dickson Rugby Team Player