OLD CUTLER ROAD CHARETTE
Background:
Forged by the citizens of Cutler Bay in June 2002
Studied challenges and proposed solutions
Plan adopted by the Board of County Commissioners in 2004
Charette Plan Vision for Roadway:
Reinstate historical character
Resolution of physical appearance and traffic congestion
problems
Transformation from a motorist-oriented to a pedestrian and
bicycle oriented environment
Key Charette Goals:
This Project:
Limited to public rights-of-way within Charette Master Plan
Community’s needs / thoughts into consideration
Rebalance movement along Old Cutler Road
Increase safety through modifications: reduce motorist
speed and increase pedestrian and bicycle visibility
Preserve and enhance the historical and community
ambiance along the roadway
>
>
>
>
>
>
>
>
>
>
>
MDC Public Works Design Objectives
> Drainage
> Curb & Gutter and Sidewalk Improvements
> Intersection & Signalization Improvements
> Landscaping & Lighting
> Bicycle & Bus Facilities
Additional Town of Cutler Bay Design
Objectives
> Public Outreach
> Improved Public Safety
> Easing of Traffic Congestion
> Traffic Calming
> Pedestrianization
> Streetscape Improvements
PROJECT OBJECTIVES
END PROJECT
SW 87th Avenue
N
BEGIN PROJECT
SW 97th Avenue
PROJECT CORRIDOR MAP
Narrowed lanes (11 ft wide)
10 ft wide shared-use path on south side
6 ft wide sidewalk on north side
Center median or divider islands
Curb and gutter
SIGNAL SYSTEMS: URBAN
Illuminated Street Sign
LED Traffic Lights
Camera Vehicle Detector in Lieu of Loops
Pedestrian Countdown Timer
SIGNAL SYSTEMS: RESIDENTIAL
ROUNDABOUT: SW 97th AVENUE
> Serve as “bookends”
> Provide smooth and safe transition from higher to low speed
> Aesthetic enhancement to the area
Charette Roundabout Objectives:
ROUNDABOUT: SW 87th AVENUE
> Serve as “bookends”
> Provide smooth and safe transition from higher to low speed
> Aesthetic enhancement to the area
> Improve traffic operations
Charette Roundabout Objectives:
ROADWAY HISTORIC CHARACTER
Landscaping
Roadway / Sidewalk Materials
Streetscape Furniture
Lighting
Architectural Enhancements
Landscape Design Objectives
> Maintain as much of the existing tree canopy as possible
> Use species with lower maintenance requirements and drought tolerance
> Work with stakeholders to ensure views of existing signage isn’t blocked
> Provide significant shade for walk and path to create a comfortable experience
> Utilize Crime Prevention Through Environmental Design (CPTED) principles to ensure
safety
LANDSCAPING
CHARETTE IMAGES
PINE ROCKLAND CORRIDOR
> The Town of Cutler Bay consulted with Fairchild Tropical Botanical Gardens
to enhance the landscaping theme put forth in the “Connect to Protect”
plan for the Pine Rockland Corridor Project.
> Pine rocklands have shrunk dramatically over the years
and now occur as isolated remnants in Miami-Dade
County.
PINE ROCKLAND CORRIDOR
> Old Cutler Road follows historic
limestone ridge bordering once vast
Pine Rockland Corridor, and the
vegetation was predominantly Pine
Rockland with some Hardwood
Hammocks.
> Integral colored concrete sidewalk with
decorative finish
> Crosswalks in same colored concrete so
that they are perceived as extensions of
the sidewalk
PAVER MATERIALS
> Bus Bays
> Signalized Intersections
> Roundabouts
STREET FURNITURE
LIGHTING OPTION
manufactured by
Architecture Area Lighting
> Energy Efficient
> Dark Sky Friendly
> Pedestrian Safety
> Traditional Acorn Luminaire as Depicted in Charette
> Aesthetic enhancement
> Opportunity for signage / banner arms, etc.
ARCHITECTURAL ELEMENTS
> Traditional and Historic
> Low Horizontal in Nature
> Limerock Material to Evoke Coral Walls
along Historic Old Cutler Road
> Landscaping to Create Identity
BUS SHELTER OPTIONS
PRE-FAB BUS SHELTER
PUBLIC OUTREACH
PUBLIC OUTREACH
Biggest Challenge of the Project:
> To build a road on time and on budget, while keeping the
corridor open to minimize the impact to the business and
residential community.
Strategy:
> Strong Public Outreach Program from the start.
OVERVIEW
PUBLIC OUTREACH
Public Outreach Meetings:
First public input meeting, May 24, 2010 (Get the public involved)
Second public input meeting, June 28, 2010 (Get the public involved)
Additional Public Meetings: (Update the public on project status)
Homeowners Association
Concerned Citizens of Cutler Bay
Cutler Bay Business Association
Cutler Ridge Women’s Council
>
MEETINGS
>
>
PUBLIC OUTREACH
PUBLIC INPUT MEETING #1
PUBLIC OUTREACH
PUBLIC INPUT MEETING #1
PUBLIC OUTREACH
PUBLIC INPUT MEETING #2
PUBLIC OUTREACH
PUBLIC INPUT MEETING #2
PUBLIC OUTREACH
HOA MEETINGS
PUBLIC OUTREACH
CONCERNED CITIZENS MEETINGS
PUBLIC OUTREACH
CBBA & CUTLER RIDGE WOMEN’S COUNCIL
PUBLIC OUTREACH
Public Outreach at Public Events:
(Update the public on project status)
> Chili Cook-Off
> Rib Ticklers Ball
> Taste of the Bay
> Movie Nights
> Health South Fair Expo
PUBLIC EVENTS
PUBLIC OUTREACH
PUBLIC EVENTS
PUBLIC OUTREACH
PUBLIC EVENTS
PUBLIC OUTREACH
Full Time Public Information Officer:
> Available by phone and e-mail any time of the day.
> Door to Door face time with the public (residents and business owners).
> Field office at town center open to the public.
> Blast emails to town residents and business owners on project progress.
(Project Board and Project Detour Flyers)
> All phone calls and email inquires answered in a timely manner.
> Monthly project update at Town Council Meetings.
> Invited FIU student to participate as intern in project.
PUBLIC INFORMATION OFFICER
PUBLIC OUTREACH
PIO PROJECT DETOUR FLYERS
PUBLIC OUTREACH
PIO MONTHLY PROJECT BOARD UPDATES
PUBLIC OUTREACH
PIO DOOR-TO-DOOR FACETIME
PUBLIC OUTREACH
FIU STUDENT INTERN
PUBLIC OUTREACH
Town Staff:
Town Mayor, Town Manager and Public Works Director
available by phone, email or in person to address constituent
concerns.
Maintained promise to keep Old Cutler Road open through
construction phase, for residents and businesses.
Town Staff available at all public events.
>
>
>
TOWN STAFF
PUBLIC OUTREACH
TOWN STAFF
CONSTRUCTION
CONSTRUCTION
Full Time CEI Inspector on Site (Marlin Engineering)
Weekly Progress and Field Meetings by the Project Team: Stantec, Marlin Engineering,
Acosta Tractors Inc., and Town Public Works Staff.
> Excellent relationship among project team. Positive attitude, positive outcome.
> Allowed project team to solve all issues in a timely manner.
> Maintain project goals: A milestone indicator of contractors progress.
> Coordinate with Miami Dade County, shop drawings, revisions, and inspections.
> Maintain a quality product during construction, reducing/eliminating rework and final
punch list item checklist.
> Coordination with utility companies (WASD, FPL, COMCAST, AT&T, FLORIDA CITY GAS).
> Identify utility conflicts to avoid delays during construction.
> Perform all utility relocations early, to avoid delays during construction.
> Tracking construction schedule on a weekly basis.
CONSTRUCTION ENGINEERING & INSPECTIONS
CONSTRUCTION
WEEKLY PROJECT TEAM MEETINGS
CONSTRUCTION PHASING SCHEDULE
PHASES
(SW 97TH AVENUE TO SW 92ND AVENUE)
1 NORTHBOUND LANE – JANUARY 2012 TO JULY 2012
4 SOUTHBOUND LANE – MARCH 2013 TO AUGUST 2013
PHASES
(SW 92ND AVENUE TO SW 87TH AVENUE)
2 NORTHBOUND LANE – JULY 2012 TO DECEMBER 2012
3 SOUTHBOUND LANE – JANUARY 2013 TO MARCH 2013
CONSTRUCTION
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
CONSTRUCTION
PROJECT AERIALS
RESULTS
THANK YOU

More Related Content

What's hot

WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities us2unionsquare
 
Fort lincoln park community mtg presentation 2019 09 24 final
Fort lincoln park  community mtg presentation 2019 09 24 finalFort lincoln park  community mtg presentation 2019 09 24 final
Fort lincoln park community mtg presentation 2019 09 24 finalRamaChilamkurthy
 
CHA Redevelopment Plan April 2015
CHA Redevelopment Plan April 2015CHA Redevelopment Plan April 2015
CHA Redevelopment Plan April 2015Yo Harvesto
 
Union Square Open Space Plan
Union Square Open Space PlanUnion Square Open Space Plan
Union Square Open Space PlanRob May
 
D:\Patrick Depa Planner Portfolio
D:\Patrick Depa Planner Portfolio D:\Patrick Depa Planner Portfolio
D:\Patrick Depa Planner Portfolio Home
 
Wf May2208 Support Committee
Wf May2208 Support CommitteeWf May2208 Support Committee
Wf May2208 Support Committeeguestb99391
 
Ny ave. playground cm 2019.04.24
Ny ave. playground cm 2019.04.24Ny ave. playground cm 2019.04.24
Ny ave. playground cm 2019.04.24RamaChilamkurthy
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pmRamaChilamkurthy
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsJohnny Browaeys - 庄博闻
 
Rita bright community meeting 07 11_2018
Rita bright community meeting 07 11_2018Rita bright community meeting 07 11_2018
Rita bright community meeting 07 11_2018RamaChilamkurthy
 
Comments on the Draft Plan and Sewers
Comments on the Draft Plan and SewersComments on the Draft Plan and Sewers
Comments on the Draft Plan and SewersGabrielleDondero
 
Friday Forum - Indy Full Circle Master Plan
Friday Forum - Indy Full Circle Master PlanFriday Forum - Indy Full Circle Master Plan
Friday Forum - Indy Full Circle Master PlanPlan 2020
 
Planning Board Presentation
Planning Board PresentationPlanning Board Presentation
Planning Board Presentationus2unionsquare
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardinerEast
 

What's hot (20)

WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities
 
Fort lincoln park community mtg presentation 2019 09 24 final
Fort lincoln park  community mtg presentation 2019 09 24 finalFort lincoln park  community mtg presentation 2019 09 24 final
Fort lincoln park community mtg presentation 2019 09 24 final
 
CHA Redevelopment Plan April 2015
CHA Redevelopment Plan April 2015CHA Redevelopment Plan April 2015
CHA Redevelopment Plan April 2015
 
Union Square Open Space Plan
Union Square Open Space PlanUnion Square Open Space Plan
Union Square Open Space Plan
 
D:\Patrick Depa Planner Portfolio
D:\Patrick Depa Planner Portfolio D:\Patrick Depa Planner Portfolio
D:\Patrick Depa Planner Portfolio
 
Wf May2208 Support Committee
Wf May2208 Support CommitteeWf May2208 Support Committee
Wf May2208 Support Committee
 
Wf May2208 Support Committee
Wf May2208 Support CommitteeWf May2208 Support Committee
Wf May2208 Support Committee
 
Ny ave. playground cm 2019.04.24
Ny ave. playground cm 2019.04.24Ny ave. playground cm 2019.04.24
Ny ave. playground cm 2019.04.24
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
 
Affordable Housing Development Request
Affordable Housing Development RequestAffordable Housing Development Request
Affordable Housing Development Request
 
Dph architect llc resume
Dph architect llc resumeDph architect llc resume
Dph architect llc resume
 
Urban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case DescriptionsUrban Brownfield Redevelopment - Case Descriptions
Urban Brownfield Redevelopment - Case Descriptions
 
NE_Broch
NE_BrochNE_Broch
NE_Broch
 
Rita bright community meeting 07 11_2018
Rita bright community meeting 07 11_2018Rita bright community meeting 07 11_2018
Rita bright community meeting 07 11_2018
 
Comments on the Draft Plan and Sewers
Comments on the Draft Plan and SewersComments on the Draft Plan and Sewers
Comments on the Draft Plan and Sewers
 
Friday Forum - Indy Full Circle Master Plan
Friday Forum - Indy Full Circle Master PlanFriday Forum - Indy Full Circle Master Plan
Friday Forum - Indy Full Circle Master Plan
 
Civic master plan overview presentation - March 20, 2013
Civic master plan overview presentation - March 20, 2013Civic master plan overview presentation - March 20, 2013
Civic master plan overview presentation - March 20, 2013
 
Planning Board Presentation
Planning Board PresentationPlanning Board Presentation
Planning Board Presentation
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
 
Local Area Plan : Vancouver
Local Area Plan : VancouverLocal Area Plan : Vancouver
Local Area Plan : Vancouver
 

Viewers also liked (16)

Aplicacion de la Norma COVENIN 3049-93
Aplicacion de la Norma COVENIN 3049-93Aplicacion de la Norma COVENIN 3049-93
Aplicacion de la Norma COVENIN 3049-93
 
Third Grade E-Book
Third Grade E-BookThird Grade E-Book
Third Grade E-Book
 
Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12
 
Wausau Paper Presentation
Wausau Paper PresentationWausau Paper Presentation
Wausau Paper Presentation
 
Does Size Matter?
Does Size Matter?Does Size Matter?
Does Size Matter?
 
Public Works Advocacy - The Australian Way
Public Works Advocacy - The Australian WayPublic Works Advocacy - The Australian Way
Public Works Advocacy - The Australian Way
 
PaulinaWolskaZadanieZTI
PaulinaWolskaZadanieZTIPaulinaWolskaZadanieZTI
PaulinaWolskaZadanieZTI
 
Presentación4
Presentación4Presentación4
Presentación4
 
What Every City Manager wants in a Public Works Director
What Every City Manager wants in a Public Works Director What Every City Manager wants in a Public Works Director
What Every City Manager wants in a Public Works Director
 
Utility Work within Public Right of Way
Utility Work within Public Right of WayUtility Work within Public Right of Way
Utility Work within Public Right of Way
 
Tools for Pavement Preservation
Tools for Pavement PreservationTools for Pavement Preservation
Tools for Pavement Preservation
 
APWA Cool Roofing Made Simple
APWA Cool Roofing Made SimpleAPWA Cool Roofing Made Simple
APWA Cool Roofing Made Simple
 
City of Edgewater CNG Presentation
City of Edgewater CNG PresentationCity of Edgewater CNG Presentation
City of Edgewater CNG Presentation
 
Permanent Backup Lift Station Pumps
Permanent Backup Lift Station PumpsPermanent Backup Lift Station Pumps
Permanent Backup Lift Station Pumps
 
Pathway to Sustainable Waste Management
Pathway to Sustainable Waste ManagementPathway to Sustainable Waste Management
Pathway to Sustainable Waste Management
 
Outlining the essay
Outlining the essayOutlining the essay
Outlining the essay
 

Similar to Old Cutler Road Improvements

Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardinerEast
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display BoardsGardinerEast
 
PPS Managing Great Public Spaces
PPS Managing Great Public SpacesPPS Managing Great Public Spaces
PPS Managing Great Public Spacessfgreatstreets
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Daniel X. O'Neil
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010Daniel X. O'Neil
 
Fairgrounds Roadway Widening Public Meeting (Sept. 23, 2014)
Fairgrounds Roadway Widening Public Meeting (Sept. 23, 2014)Fairgrounds Roadway Widening Public Meeting (Sept. 23, 2014)
Fairgrounds Roadway Widening Public Meeting (Sept. 23, 2014)City of Midland
 
Scott's Addition Boulevard Association June Public Meeting
Scott's Addition Boulevard Association June Public MeetingScott's Addition Boulevard Association June Public Meeting
Scott's Addition Boulevard Association June Public MeetingTrevor Dickerson
 
9/9 FRI 11:00 | Getting It Done: Partnerships Now and for the Future 2
9/9 FRI 11:00 | Getting It Done: Partnerships Now and for the Future 29/9 FRI 11:00 | Getting It Done: Partnerships Now and for the Future 2
9/9 FRI 11:00 | Getting It Done: Partnerships Now and for the Future 2APA Florida
 
Imagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North CarolinaImagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North CarolinaRPO America
 
Eastwood Village Public Private partnership
Eastwood Village Public Private partnershipEastwood Village Public Private partnership
Eastwood Village Public Private partnershipDennisChurch
 
January 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue UpdateJanuary 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue UpdatePlanetCommunities
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Samantha Coren
 
Njf redevelopment forum 2018 driver
Njf redevelopment forum 2018 driverNjf redevelopment forum 2018 driver
Njf redevelopment forum 2018 driverNew Jersey Future
 

Similar to Old Cutler Road Improvements (20)

Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 Panels
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display Boards
 
PPS Managing Great Public Spaces
PPS Managing Great Public SpacesPPS Managing Great Public Spaces
PPS Managing Great Public Spaces
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
 
Creating the Box: Recognizing the Need for Regulatory Change and Creating a S...
Creating the Box: Recognizing the Need for Regulatory Change and Creating a S...Creating the Box: Recognizing the Need for Regulatory Change and Creating a S...
Creating the Box: Recognizing the Need for Regulatory Change and Creating a S...
 
MAPD 2010 - Creating the box
MAPD 2010 - Creating the boxMAPD 2010 - Creating the box
MAPD 2010 - Creating the box
 
Fairgrounds Roadway Widening Public Meeting (Sept. 23, 2014)
Fairgrounds Roadway Widening Public Meeting (Sept. 23, 2014)Fairgrounds Roadway Widening Public Meeting (Sept. 23, 2014)
Fairgrounds Roadway Widening Public Meeting (Sept. 23, 2014)
 
Rocky River Master Plan presentation
Rocky River Master Plan presentationRocky River Master Plan presentation
Rocky River Master Plan presentation
 
Scott's Addition Boulevard Association June Public Meeting
Scott's Addition Boulevard Association June Public MeetingScott's Addition Boulevard Association June Public Meeting
Scott's Addition Boulevard Association June Public Meeting
 
9/9 FRI 11:00 | Getting It Done: Partnerships Now and for the Future 2
9/9 FRI 11:00 | Getting It Done: Partnerships Now and for the Future 29/9 FRI 11:00 | Getting It Done: Partnerships Now and for the Future 2
9/9 FRI 11:00 | Getting It Done: Partnerships Now and for the Future 2
 
D3 Overcoming Provincialism
D3 Overcoming ProvincialismD3 Overcoming Provincialism
D3 Overcoming Provincialism
 
Corpus Christi, TX R/UDAT Project: The Harbor Bridge
Corpus Christi, TX R/UDAT Project: The Harbor BridgeCorpus Christi, TX R/UDAT Project: The Harbor Bridge
Corpus Christi, TX R/UDAT Project: The Harbor Bridge
 
TO Blvd Outreach City Info Mtg PPT Final
TO Blvd Outreach City Info Mtg PPT FinalTO Blvd Outreach City Info Mtg PPT Final
TO Blvd Outreach City Info Mtg PPT Final
 
Bath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) ProjectBath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) Project
 
Imagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North CarolinaImagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North Carolina
 
Eastwood Village Public Private partnership
Eastwood Village Public Private partnershipEastwood Village Public Private partnership
Eastwood Village Public Private partnership
 
January 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue UpdateJanuary 28, 2022 Greening Lower Grand Avenue Update
January 28, 2022 Greening Lower Grand Avenue Update
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12
 
Njf redevelopment forum 2018 driver
Njf redevelopment forum 2018 driverNjf redevelopment forum 2018 driver
Njf redevelopment forum 2018 driver
 

More from 2014 Florida Public Works Expo (7)

Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714Community redevelopment areas and public infrastructure 070714
Community redevelopment areas and public infrastructure 070714
 
Closing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building OperationsClosing the Gap - Technology Impact on Building Operations
Closing the Gap - Technology Impact on Building Operations
 
Pipe Bursting
Pipe BurstingPipe Bursting
Pipe Bursting
 
The Pompano Canal Story
The Pompano Canal StoryThe Pompano Canal Story
The Pompano Canal Story
 
Sustainability
SustainabilitySustainability
Sustainability
 
Emergency Watershed Protection Program
Emergency Watershed Protection ProgramEmergency Watershed Protection Program
Emergency Watershed Protection Program
 
Networking for Introverts
Networking for IntrovertsNetworking for Introverts
Networking for Introverts
 

Recently uploaded

Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...tanu pandey
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfSamirsinh Parmar
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlEdouardHusson
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30JSchaus & Associates
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentationgememarket11
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...SUHANI PANDEY
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterChristina Parmionova
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
 

Recently uploaded (20)

Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentation
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 

Old Cutler Road Improvements

  • 1.
  • 2. OLD CUTLER ROAD CHARETTE Background: Forged by the citizens of Cutler Bay in June 2002 Studied challenges and proposed solutions Plan adopted by the Board of County Commissioners in 2004 Charette Plan Vision for Roadway: Reinstate historical character Resolution of physical appearance and traffic congestion problems Transformation from a motorist-oriented to a pedestrian and bicycle oriented environment Key Charette Goals: This Project: Limited to public rights-of-way within Charette Master Plan Community’s needs / thoughts into consideration Rebalance movement along Old Cutler Road Increase safety through modifications: reduce motorist speed and increase pedestrian and bicycle visibility Preserve and enhance the historical and community ambiance along the roadway > > > > > > > > > > >
  • 3. MDC Public Works Design Objectives > Drainage > Curb & Gutter and Sidewalk Improvements > Intersection & Signalization Improvements > Landscaping & Lighting > Bicycle & Bus Facilities Additional Town of Cutler Bay Design Objectives > Public Outreach > Improved Public Safety > Easing of Traffic Congestion > Traffic Calming > Pedestrianization > Streetscape Improvements PROJECT OBJECTIVES
  • 4. END PROJECT SW 87th Avenue N BEGIN PROJECT SW 97th Avenue PROJECT CORRIDOR MAP
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15. Narrowed lanes (11 ft wide) 10 ft wide shared-use path on south side 6 ft wide sidewalk on north side Center median or divider islands Curb and gutter
  • 16. SIGNAL SYSTEMS: URBAN Illuminated Street Sign LED Traffic Lights Camera Vehicle Detector in Lieu of Loops Pedestrian Countdown Timer
  • 18. ROUNDABOUT: SW 97th AVENUE > Serve as “bookends” > Provide smooth and safe transition from higher to low speed > Aesthetic enhancement to the area Charette Roundabout Objectives:
  • 19. ROUNDABOUT: SW 87th AVENUE > Serve as “bookends” > Provide smooth and safe transition from higher to low speed > Aesthetic enhancement to the area > Improve traffic operations Charette Roundabout Objectives:
  • 20. ROADWAY HISTORIC CHARACTER Landscaping Roadway / Sidewalk Materials Streetscape Furniture Lighting Architectural Enhancements
  • 21. Landscape Design Objectives > Maintain as much of the existing tree canopy as possible > Use species with lower maintenance requirements and drought tolerance > Work with stakeholders to ensure views of existing signage isn’t blocked > Provide significant shade for walk and path to create a comfortable experience > Utilize Crime Prevention Through Environmental Design (CPTED) principles to ensure safety LANDSCAPING CHARETTE IMAGES
  • 22. PINE ROCKLAND CORRIDOR > The Town of Cutler Bay consulted with Fairchild Tropical Botanical Gardens to enhance the landscaping theme put forth in the “Connect to Protect” plan for the Pine Rockland Corridor Project. > Pine rocklands have shrunk dramatically over the years and now occur as isolated remnants in Miami-Dade County. PINE ROCKLAND CORRIDOR > Old Cutler Road follows historic limestone ridge bordering once vast Pine Rockland Corridor, and the vegetation was predominantly Pine Rockland with some Hardwood Hammocks.
  • 23. > Integral colored concrete sidewalk with decorative finish > Crosswalks in same colored concrete so that they are perceived as extensions of the sidewalk
  • 24. PAVER MATERIALS > Bus Bays > Signalized Intersections > Roundabouts
  • 26. LIGHTING OPTION manufactured by Architecture Area Lighting > Energy Efficient > Dark Sky Friendly > Pedestrian Safety > Traditional Acorn Luminaire as Depicted in Charette > Aesthetic enhancement > Opportunity for signage / banner arms, etc.
  • 27. ARCHITECTURAL ELEMENTS > Traditional and Historic > Low Horizontal in Nature > Limerock Material to Evoke Coral Walls along Historic Old Cutler Road > Landscaping to Create Identity
  • 30. PUBLIC OUTREACH Biggest Challenge of the Project: > To build a road on time and on budget, while keeping the corridor open to minimize the impact to the business and residential community. Strategy: > Strong Public Outreach Program from the start. OVERVIEW
  • 31. PUBLIC OUTREACH Public Outreach Meetings: First public input meeting, May 24, 2010 (Get the public involved) Second public input meeting, June 28, 2010 (Get the public involved) Additional Public Meetings: (Update the public on project status) Homeowners Association Concerned Citizens of Cutler Bay Cutler Bay Business Association Cutler Ridge Women’s Council > MEETINGS > >
  • 38. PUBLIC OUTREACH CBBA & CUTLER RIDGE WOMEN’S COUNCIL
  • 39. PUBLIC OUTREACH Public Outreach at Public Events: (Update the public on project status) > Chili Cook-Off > Rib Ticklers Ball > Taste of the Bay > Movie Nights > Health South Fair Expo PUBLIC EVENTS
  • 42. PUBLIC OUTREACH Full Time Public Information Officer: > Available by phone and e-mail any time of the day. > Door to Door face time with the public (residents and business owners). > Field office at town center open to the public. > Blast emails to town residents and business owners on project progress. (Project Board and Project Detour Flyers) > All phone calls and email inquires answered in a timely manner. > Monthly project update at Town Council Meetings. > Invited FIU student to participate as intern in project. PUBLIC INFORMATION OFFICER
  • 44. PUBLIC OUTREACH PIO MONTHLY PROJECT BOARD UPDATES
  • 47. PUBLIC OUTREACH Town Staff: Town Mayor, Town Manager and Public Works Director available by phone, email or in person to address constituent concerns. Maintained promise to keep Old Cutler Road open through construction phase, for residents and businesses. Town Staff available at all public events. > > > TOWN STAFF
  • 50. CONSTRUCTION Full Time CEI Inspector on Site (Marlin Engineering) Weekly Progress and Field Meetings by the Project Team: Stantec, Marlin Engineering, Acosta Tractors Inc., and Town Public Works Staff. > Excellent relationship among project team. Positive attitude, positive outcome. > Allowed project team to solve all issues in a timely manner. > Maintain project goals: A milestone indicator of contractors progress. > Coordinate with Miami Dade County, shop drawings, revisions, and inspections. > Maintain a quality product during construction, reducing/eliminating rework and final punch list item checklist. > Coordination with utility companies (WASD, FPL, COMCAST, AT&T, FLORIDA CITY GAS). > Identify utility conflicts to avoid delays during construction. > Perform all utility relocations early, to avoid delays during construction. > Tracking construction schedule on a weekly basis. CONSTRUCTION ENGINEERING & INSPECTIONS
  • 52. CONSTRUCTION PHASING SCHEDULE PHASES (SW 97TH AVENUE TO SW 92ND AVENUE) 1 NORTHBOUND LANE – JANUARY 2012 TO JULY 2012 4 SOUTHBOUND LANE – MARCH 2013 TO AUGUST 2013 PHASES (SW 92ND AVENUE TO SW 87TH AVENUE) 2 NORTHBOUND LANE – JULY 2012 TO DECEMBER 2012 3 SOUTHBOUND LANE – JANUARY 2013 TO MARCH 2013 CONSTRUCTION
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78.
  • 79.
  • 80.
  • 81.
  • 82.
  • 83.
  • 84.
  • 85.
  • 86.
  • 87.
  • 88.
  • 89.
  • 90.
  • 91.
  • 92.
  • 93.
  • 94.
  • 95.
  • 96.
  • 97.
  • 98.
  • 99.
  • 100.
  • 101.
  • 102.
  • 103.
  • 104.
  • 105.
  • 106.
  • 107.
  • 108.
  • 109.
  • 110.
  • 111.
  • 112.
  • 113.