5. 8th floor Hallway Door and Frames
-Paint Staircase doors and frames -North/South (Rado)
-Paint Elevator door/frames and HVAC door/Frame
6. 7TH Floor Men’s.
- Paint washroom stalls (Rado)
-Paint Main door and frame (Rado)
-Repair Wall tiles (Dave)
7. 7TH Floor Women’s.
- Replace cabinet and vanity (Cabinet Co.)
Close up of cabinet door
8. 7th floor Women’s Washroom
-Paint Stall Doors (Rado)
- Paint main door and frame
9. 7th floor Hallway Faux Door
-Build faux door over damaged wall paper (remove fountain)
(Complete Solutions Inc.) (647)293-7697
Photo of 4th floor panels
for reference
Photo of 8th floor faux door as reference
22. 3rd floor Hallway Door and Frames
-Paint Staircase doors and frames -North/South (Rado)
-Paint all utility room door/frames and washroom doors/frames
23. 2nd floor Men’s Washroom
-Remove Wallpaper/ Plaster / Paint (Rado)
-Paint Main Door and Frames (Rado)
-Paint Stalls and Doors (Rado)
Rusting Stall Wall
2nd Floor Men’s
26. 2nd floor Hallway Door and Frames
-Paint Staircase doors and frames -North/South (Rado)
-Paint all utility room door/frames and washroom doors/frames