            44 days to Olympic Games Opening Ceremony




   Olympic Park delivered on time and within budget
   Construction virtually complete
   £476m of uncommitted contingency remaining
   Successful test events
   A great Jubilee weekend
   Country embracing Torch Relay
                                  UNCLASSIFIED
   In a strong position but no complacency as challenges remain
THE CHALLENGE – 2005




        UNCLASSIFIED
UNCLASSIFIED
The contaminated site was filled with disused tyres and industrial waste
UNCLASSIFIED
The site was limited by old infrastructure and poor transport links
UNCLASSIFIED
Draining of debris-filled Pudding Mill river that ran through Olympic Park site
UNCLASSIFIED
The site was criss-crossed by electricity pylons that had to be dismantled
UNCLASSIFIED
The UK’s largest and greenest clean up operation
OLYMPIC PARK




    UNCLASSIFIED
NEW WORLD-CLASS SPORTS VENUES




            UNCLASSIFIED
NEW WORLD-CLASS SPORTS VENUES




            UNCLASSIFIED
CUTTING-EDGE DESIGN – PERMANENT ALONGSIDE TEMPORARY




                       UNCLASSIFIED
A NEW COMMUNITY – FOR GAMES & LEGACY




 Olympic & Paralympic Village
      – Home to 23,000 athletes and officials during Games
      – Converted into more than 2,800 homes in legacy
 A new school (Chobham Academy) and new health centre
                           UNCLASSIFIED
NEW INFRASTRUCTURE
     FOR EAST LONDON




  New utilities networks to provide
 power, water and sanitation built for
 Games and in legacy (energy centre,
 primary substation, pumping station)
   30 bridges and connections built for
  Games and in legacy
UNCLASSIFIED
TRANSPORT




 Making East London one of the
most connected parts of the capital
 £6.5bn investment into transport
system ahead of London 2012,
including £400m investment by ODA
 Capacity at Stratford station trebled
with over 200 trains per hour in 2012
                                 UNCLASSIFIED
SUSTAINABILITY
 Built into venues, e.g. Velodrome built with
100% sustainably sourced timber
 98% of materials generated from demolition
works reused or recycled
 ~60% reduction achieved in Olympic Park’s
carbon footprint
 Renewed waterways, wildlife relocated, new
                                     UNCLASSIFIED
habitats created
JOBS & BUSINESS
        More than 46,000 worked on
       Olympic Park during
       construction, 1/5th from local
       communities
        Promoting employment &
       improving skills
        Exemplary health and safety
       record
        Olympic Park is a showcase
       for best of British business and
       global design skills
             £7.5bn worth of contracts
UNCLASSIFIED(ODA & LOCOG)
PUBLIC SECTOR FUNDING PACKAGE: FUNDERS

   2007 Baseline Budget                  31 May 2012




                          UNCLASSIFIED
PUBLIC SECTOR FUNDING PACKAGE: BREAKDOWN
                 (£9,298m)




                  UNCLASSIFIED
LESSONS FOR THE
                   FUTURE

           Learning Legacy website

           Working with Rio

           Delivering major projects




UNCLASSIFIED
JUNE 2012
    44 days to Olympic Games
    Opening Ceremony

     Olympic Park delivered on
    time and within budget
     £476m of uncommitted
    contingency remaining
     World class performance by
    UK PLC
     No complacency as the UK is
        getting ready to welcome the
        world
UNCLASSIFIED
Q&A




UNCLASSIFIED

More Related Content

What's hot

River Clyde 2007 Part 2a
River Clyde 2007 Part 2aRiver Clyde 2007 Part 2a
River Clyde 2007 Part 2a
socialsubjects
 
River Clyde 2007 Part 2b
River Clyde 2007 Part 2bRiver Clyde 2007 Part 2b
River Clyde 2007 Part 2b
socialsubjects
 
Copenhagen City, Denmark
Copenhagen City, DenmarkCopenhagen City, Denmark
Copenhagen City, Denmark
Andhra University
 

What's hot (13)

London 2012 olympic games
London 2012 olympic gamesLondon 2012 olympic games
London 2012 olympic games
 
2012 London olympics
2012 London olympics2012 London olympics
2012 London olympics
 
Cardiff
CardiffCardiff
Cardiff
 
190922_Allies and Morrison_Artur Carulla_Shougang Forum
190922_Allies and Morrison_Artur Carulla_Shougang Forum190922_Allies and Morrison_Artur Carulla_Shougang Forum
190922_Allies and Morrison_Artur Carulla_Shougang Forum
 
Lessons learnt from projects
Lessons learnt from projectsLessons learnt from projects
Lessons learnt from projects
 
ZAL PORT r4
ZAL PORT r4ZAL PORT r4
ZAL PORT r4
 
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
 
Joe Montgomery. ULI
Joe Montgomery. ULIJoe Montgomery. ULI
Joe Montgomery. ULI
 
River Clyde 2007 Part 2a
River Clyde 2007 Part 2aRiver Clyde 2007 Part 2a
River Clyde 2007 Part 2a
 
Waterfront for All Summit Workshop #3: The waterfront as a unique development...
Waterfront for All Summit Workshop #3: The waterfront as a unique development...Waterfront for All Summit Workshop #3: The waterfront as a unique development...
Waterfront for All Summit Workshop #3: The waterfront as a unique development...
 
River Clyde 2007 Part 2b
River Clyde 2007 Part 2bRiver Clyde 2007 Part 2b
River Clyde 2007 Part 2b
 
London eye
London eyeLondon eye
London eye
 
Copenhagen City, Denmark
Copenhagen City, DenmarkCopenhagen City, Denmark
Copenhagen City, Denmark
 

Viewers also liked (8)

CEIP MARISMAS DE HINOJOS Asamblea padres 2015 16
CEIP MARISMAS DE HINOJOS Asamblea padres 2015 16CEIP MARISMAS DE HINOJOS Asamblea padres 2015 16
CEIP MARISMAS DE HINOJOS Asamblea padres 2015 16
 
Marco presentacion de los ecosistemas
Marco presentacion de los  ecosistemasMarco presentacion de los  ecosistemas
Marco presentacion de los ecosistemas
 
Design Now
Design NowDesign Now
Design Now
 
Marta, isabel y ursula. Productos químicos y Contaminación.
Marta, isabel y ursula. Productos químicos y Contaminación.Marta, isabel y ursula. Productos químicos y Contaminación.
Marta, isabel y ursula. Productos químicos y Contaminación.
 
Presentation games complete
Presentation games completePresentation games complete
Presentation games complete
 
Pomellato case Study
Pomellato case StudyPomellato case Study
Pomellato case Study
 
Aeromexico's case study
Aeromexico's case studyAeromexico's case study
Aeromexico's case study
 
Lexie Perez & Julia Weeks Price Chopper Case Study
Lexie Perez & Julia Weeks Price Chopper Case StudyLexie Perez & Julia Weeks Price Chopper Case Study
Lexie Perez & Julia Weeks Price Chopper Case Study
 

Similar to Olympics update and quarterly economic report (international journalists) - June 2012

The London 2012 Games - on time, on budget
The London 2012 Games - on time, on budgetThe London 2012 Games - on time, on budget
The London 2012 Games - on time, on budget
2012govuk
 
IN_DELHI PUBLIC SCHOOL_XII A
IN_DELHI PUBLIC SCHOOL_XII AIN_DELHI PUBLIC SCHOOL_XII A
IN_DELHI PUBLIC SCHOOL_XII A
British Council
 
Was the Olympics Worth it for the Environment?
Was the Olympics Worth it for the Environment?Was the Olympics Worth it for the Environment?
Was the Olympics Worth it for the Environment?
Mr Hutchinson
 
Olympics affects on east london
Olympics   affects on  east londonOlympics   affects on  east london
Olympics affects on east london
miccoro
 
Creating the World’s Most Liveable City by 2040: Transition to Transformation...
Creating the World’s Most Liveable City by 2040: Transition to Transformation...Creating the World’s Most Liveable City by 2040: Transition to Transformation...
Creating the World’s Most Liveable City by 2040: Transition to Transformation...
ICLEI
 
Lesson 4
Lesson 4Lesson 4
Lesson 4
total
 

Similar to Olympics update and quarterly economic report (international journalists) - June 2012 (20)

Sustainability Briefing - facts and figures
Sustainability Briefing - facts and figuresSustainability Briefing - facts and figures
Sustainability Briefing - facts and figures
 
The London 2012 Games - on time, on budget
The London 2012 Games - on time, on budgetThe London 2012 Games - on time, on budget
The London 2012 Games - on time, on budget
 
IN_DELHI PUBLIC SCHOOL_XII A
IN_DELHI PUBLIC SCHOOL_XII AIN_DELHI PUBLIC SCHOOL_XII A
IN_DELHI PUBLIC SCHOOL_XII A
 
London olympics
London olympicsLondon olympics
London olympics
 
London olympics
London olympicsLondon olympics
London olympics
 
London olympics
London olympicsLondon olympics
London olympics
 
Was the Olympics Worth it for the Environment?
Was the Olympics Worth it for the Environment?Was the Olympics Worth it for the Environment?
Was the Olympics Worth it for the Environment?
 
Delivering Transformation - Place Making in North Lincolnshire
Delivering Transformation - Place Making in North LincolnshireDelivering Transformation - Place Making in North Lincolnshire
Delivering Transformation - Place Making in North Lincolnshire
 
Geovation Water Challenge: United Utilities
Geovation Water Challenge: United UtilitiesGeovation Water Challenge: United Utilities
Geovation Water Challenge: United Utilities
 
Olympics affects on east london
Olympics   affects on  east londonOlympics   affects on  east london
Olympics affects on east london
 
Reflections on lessons learnt from projects
Reflections on lessons learnt from projectsReflections on lessons learnt from projects
Reflections on lessons learnt from projects
 
London Olympics
London OlympicsLondon Olympics
London Olympics
 
Swansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkinsSwansea lagoon presentation by ioan jenkins
Swansea lagoon presentation by ioan jenkins
 
Quarterly economic report (UK journalists) - June 2012
Quarterly economic report (UK journalists) - June 2012Quarterly economic report (UK journalists) - June 2012
Quarterly economic report (UK journalists) - June 2012
 
Eco2 - A Sector Perspective
Eco2 - A Sector PerspectiveEco2 - A Sector Perspective
Eco2 - A Sector Perspective
 
Creating the World’s Most Liveable City by 2040: Transition to Transformation...
Creating the World’s Most Liveable City by 2040: Transition to Transformation...Creating the World’s Most Liveable City by 2040: Transition to Transformation...
Creating the World’s Most Liveable City by 2040: Transition to Transformation...
 
Env2010 Presentation- Vancouver 2010
Env2010 Presentation- Vancouver 2010Env2010 Presentation- Vancouver 2010
Env2010 Presentation- Vancouver 2010
 
Winning for the natural environment - Natural England 2012 project
Winning for the natural environment - Natural England 2012 projectWinning for the natural environment - Natural England 2012 project
Winning for the natural environment - Natural England 2012 project
 
Lesson 4
Lesson 4Lesson 4
Lesson 4
 
The project of a generation: The Plan Nord
The project of a generation: The Plan NordThe project of a generation: The Plan Nord
The project of a generation: The Plan Nord
 

Recently uploaded

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 

Recently uploaded (20)

04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Table
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt
 

Olympics update and quarterly economic report (international journalists) - June 2012

  • 1. GOE QUARTERLY REPORT – June 2012 Hugh Robertson MP Minister for Sport & Olympics Dennis Hone Chief Executive, Olympic Delivery Authority David Goldstone Director of Finance, Government Olympic Executive 13 June 2012 UNCLASSIFIED
  • 2. JUNE 2012 44 days to Olympic Games Opening Ceremony  Olympic Park delivered on time and within budget  Construction virtually complete  £476m of uncommitted contingency remaining  Successful test events  A great Jubilee weekend  Country embracing Torch Relay UNCLASSIFIED  In a strong position but no complacency as challenges remain
  • 3. THE CHALLENGE – 2005 UNCLASSIFIED
  • 4. UNCLASSIFIED The contaminated site was filled with disused tyres and industrial waste
  • 5. UNCLASSIFIED The site was limited by old infrastructure and poor transport links
  • 6. UNCLASSIFIED Draining of debris-filled Pudding Mill river that ran through Olympic Park site
  • 7. UNCLASSIFIED The site was criss-crossed by electricity pylons that had to be dismantled
  • 8. UNCLASSIFIED The UK’s largest and greenest clean up operation
  • 9. OLYMPIC PARK UNCLASSIFIED
  • 10. NEW WORLD-CLASS SPORTS VENUES UNCLASSIFIED
  • 11. NEW WORLD-CLASS SPORTS VENUES UNCLASSIFIED
  • 12. CUTTING-EDGE DESIGN – PERMANENT ALONGSIDE TEMPORARY UNCLASSIFIED
  • 13. A NEW COMMUNITY – FOR GAMES & LEGACY  Olympic & Paralympic Village – Home to 23,000 athletes and officials during Games – Converted into more than 2,800 homes in legacy  A new school (Chobham Academy) and new health centre UNCLASSIFIED
  • 14. NEW INFRASTRUCTURE FOR EAST LONDON  New utilities networks to provide power, water and sanitation built for Games and in legacy (energy centre, primary substation, pumping station)  30 bridges and connections built for Games and in legacy UNCLASSIFIED
  • 15. TRANSPORT  Making East London one of the most connected parts of the capital  £6.5bn investment into transport system ahead of London 2012, including £400m investment by ODA  Capacity at Stratford station trebled with over 200 trains per hour in 2012 UNCLASSIFIED
  • 16. SUSTAINABILITY  Built into venues, e.g. Velodrome built with 100% sustainably sourced timber  98% of materials generated from demolition works reused or recycled  ~60% reduction achieved in Olympic Park’s carbon footprint  Renewed waterways, wildlife relocated, new UNCLASSIFIED habitats created
  • 17. JOBS & BUSINESS  More than 46,000 worked on Olympic Park during construction, 1/5th from local communities  Promoting employment & improving skills  Exemplary health and safety record  Olympic Park is a showcase for best of British business and global design skills  £7.5bn worth of contracts UNCLASSIFIED(ODA & LOCOG)
  • 18. PUBLIC SECTOR FUNDING PACKAGE: FUNDERS 2007 Baseline Budget 31 May 2012 UNCLASSIFIED
  • 19. PUBLIC SECTOR FUNDING PACKAGE: BREAKDOWN (£9,298m) UNCLASSIFIED
  • 20. LESSONS FOR THE FUTURE  Learning Legacy website  Working with Rio  Delivering major projects UNCLASSIFIED
  • 21. JUNE 2012 44 days to Olympic Games Opening Ceremony  Olympic Park delivered on time and within budget  £476m of uncommitted contingency remaining  World class performance by UK PLC  No complacency as the UK is getting ready to welcome the world UNCLASSIFIED

Editor's Notes

  1. UNCLASSIFIED
  2. UNCLASSIFIED
  3. UNCLASSIFIED
  4. UNCLASSIFIED
  5. UNCLASSIFIED
  6. UNCLASSIFIED
  7. UNCLASSIFIED
  8. UNCLASSIFIED
  9. UNCLASSIFIED
  10. UNCLASSIFIED
  11. UNCLASSIFIED
  12. UNCLASSIFIED
  13. UNCLASSIFIED
  14. UNCLASSIFIED
  15. UNCLASSIFIED
  16. UNCLASSIFIED
  17. UNCLASSIFIED
  18. UNCLASSIFIED
  19. UNCLASSIFIED
  20. UNCLASSIFIED