Production schedule part 1 inclusive of dates until completion of coursework. Equipment list will be added here and ensure crew contacts are added to t; his.
1. Production Schedule Thriller Trailer – The Assailant A2 Media Studies
Thisproductionschedule givesdetailsof times,locations,equipment,propsandpeopleand
isusedto plana day'sshoot.
DATE (S): 10-11-17 to 24-11-17
TITLE Full Day AssailantTrailerFilming
LOCATION OF SHOOT:
HammersmithAcademyDramaStudio
TherapyRoom
Local Park
A House
DESCRIPTION OF THE VIDEO (2-3 Sentences)
We are going to do all ourThe Assailanttrailer filming acrossa week including thetherapy
scenes,the killer scenesand the acting scenes. The 2 main characters (Roseand Doctor
Casey) arerequired in every filming day.All the crew mustbe present.
SAFETY
- Makesure thatall heavy equipmentisused and held correctly
- Be careful withlighting and sound equipment
- Makesure props is used correctly and handlewith care
PRODUCTION TEAM AND THEIR CONTACT DETAILS
TITLE NAME CONTACT DETAILS
Director All Go to ADOQ Group Blog
Camera OliviaAbiwon 11oabiwon@hammersmithacademy.org
Sound QueenOmotola 11qomotola@hammersmithacademy.org
Lighting AshleyNtumba 11antumba@@hammersmithacademy.org
Costume Danielle Tama 11dtama@hammersmithacademy.org
EQUIPMENT (camera, sound,lights,props, etc)
Tripod
Camera
SoundEquipment
LightingEquipment
White Mask
Clipboard
Paper
Digital Clock
MissingPosters
Shovel
Fake Blood
Fake Gun
Fake Knife
LOCATION CONTACT DETAILS
NAME/LOCATION HammersmithAcad. Contact Info 020 8222 6000
NAME/LOCATION Local Park Contact Info Contact Crew Mem
NAME/LOCATION Household Contact Info Contact Crew Mem
NAME/LOCATION Contact Info
NAME/LOCATION Contact Info
2. Production Schedule Thriller Trailer – The Assailant A2 Media Studies
SHOOTING SCHEDULE DAY ONE - Therapy Scenesand KillerScenes
Time (include
breaks and
meals
BriefDescriptionof Activity and
Contributors
Directionsto Location (if
necessary)
4:00pm
Meetin the sixthformcenter
afterall props andequipment
have beengatheredtogether
HammersmithAcademy,1st
floor,
on the leftof staircase A
4:10pm
Gather all propsand transform
HA meetingroomtolooklike a
therapyroom
HammersmithAcademy,ground
floor,onthe leftreceptiondoor,
nearto the cafeteria
4:15pm
Start filmingthe therapy scenesin
the HA meetingroom
HammersmithAcademy,ground
floor,onthe leftreceptiondoor,
nearto the cafeteria
5:10pm
Finishfilmingthe therapyscenes
inthe HA meetingroom
HammersmithAcademy,ground
floor,onthe leftreceptiondoor,
nearto the cafeteria
5:15pm
Clearall propsand transformHA
meetingroombackto original
form
HammersmithAcademy,ground
floor,onthe leftreceptiondoor,
nearto the cafeteria
5:25pm
Movingall equipmenttothe
drama studio
HammersmithAcademy,ground
floor,onthe leftreceptiondoor,
nearto the theatre
5:30pm
Get all equipment,propsandcast
inthe drama studioandstart
filmingall killerscenes
HammersmithAcademy,ground
floor,onthe leftreceptiondoor,
nearto the theatre
6:00pm
Finishfilmingthe killerscenesin
the HA drama studio
HammersmithAcademy,ground
floor,onthe leftreceptiondoor,
nearto the theatre
6:10pm
Put all equipmentandpropsback
and go to the mediaroom
HammersmithAcademy,ground
floor,onthe leftreceptiondoor,
nearto the theatre
6:15pm
Save all workon one of the
computersinthe mediaroom
HammersmithAcademy,1st
floor,
on the rightof staircase A
6:25pm
Make sure all tasks are completed No LocationNeeded
6:30pm
Make our wayhome No LocationNeeded
Total Duration of Day’s Shoot: 2 Hours 30 Mins
3. Production Schedule Thriller Trailer – The Assailant A2 Media Studies
SHOOTING SCHEDULE DAY TWO - House Scenesand WoodsScenes
Time (include
breaks and
meals
BriefDescriptionof Activity and
Contributors
Directionsto Location (if
necessary)
2:00pm
Meetin the sixthformcenter
afterall props andequipment
have beengatheredtogether
HammersmithAcademy,1st
floor,
on the leftof staircase A
2:10pm
Start makingour wayto the
household
LocationUnknown
2:20pm
Get all equipmentatthe
householdandready
LocationUnknown
2:30pm
Start filminghouse scenes LocationUnknown
3:20pm
Finishfilminghouse scenes LocationUnknown
3:30pm
Make our wayto the local park
withall equipmentandprops
LocationUnknown
3:40pm
Start filmingwoodsscenes LocationUnknown
4:00pm
FinishFilmingwoodsscenes LocationUnknown
4:10pm
Make our wayback to school No LocationNeeded
4:30pm
Put all equipmentandpropsback
and go to the mediaroom
HammersmithAcademy,1stfloor,
on the rightof staircase A
4:35pm
Save all workon one of the
computersinthe mediaroom
HammersmithAcademy,1stfloor,
on the rightof staircase A
4:40pm
Make sure all tasks are completed
and make our wayhome
No LocationNeeded
Total Duration of Day’s Shoot: 2 Hours 40 Mins