On the Leading Edge




                  For over 30 years TEAM GROUP has been entrusted      30
                  by bot...
Message
                  from the Chairman
                        In this ever-changing world, consultancies are require...
…our capacity to offer integrated
                    solutions delivered by a professional
                        workfo...
Contents
              06 07 08
                  A VALUE-BASED
                  ORGANIZATION
                           ...
36
                                 WATER RESOURCES




                       44                                       EN...
Founded in 1978, TEAM GROUP is a conglomerate of Thai-
                                                                   ...
Integrated Expertise                                                       ENERGY
                                        ...
Board of Directors
                  Dr. Prasert Patramai               Chairman of the Board
                    .
      ...
1 2 3 4
                                                                                                                  ...
1 2 3 4
                              5 6 7 8
                                 9 10 11 12
                                ...
1 2 3 4 5 6
                                                                                                              ...
Another Challenging
                   yet Successful Year
                           Due to our dedication to realizing o...
Credentials
                       Our growth in 2009 is attributable to our clients’ trust, which has enabled us
        ...
14

Team1-64.indd 14   4/2/10 7:23:21 PM
Building
                   and Infrastructure


                       Function,
                             aesthetics,...
PTT Central Workshop in Rayong                                    Laboratory Design
                                      ...
Administered by: SQ Architects and Planners Co., Ltd.
                    2552                                            ...
18

Team1-64.indd 18   4/2/10 7:23:29 PM
Transportation
                   and Logistics


                     To promote sustainable transport for the people of ...
Revision of the Mass Transit Master Plan in the Bangkok
               Metropolitan Region (M-MAP)
                       ...
Integrated Mass Transit                             M-MAP
                                   Master Plan

            The ...
Bangkok Mass Transit System: Green Line Extension
              (Saphan Mai-Lam Lukka)
                                   ...
The Capital Market Center Project


             Clients: The Stock Exchange of Thailand (SET)
                      Archi...
Traffic simulation of Sri Nagarindra-Sukhumvit 103 Intersection
                                                          ...
National Road No. 67 (Anlong Veng-Siem Reap), Cambodia
                                 67 (                 –            ...
26

Team1-64.indd 26   4/2/10 7:25:26 PM
Environment

                   With over 30 years of experience in this field, TEAM GROUP
                   offers the c...
Environmental Monitoring for the Natural Gas Pipeline Project
                                                            ...
HIA is an effective way
                                                               to promote wellbeing,
             ...
EIA for the Chana Power Plant Project                                                                      2,485.58


    ...
EMP, RAP and Raw Water System Design for Hongsa Coal-Fired
        Power Plant, Lao PDR
                                  ...
EIA for Coal-Fired Power Plant in Stueng Hav, Sihanoukville, Cambodia

                   Client: Cambodian Energy Limited...
Master Plan for Wastewater Management in River Basins
                        Client: Wastewater Management Authority (WMA...
Metropolitan Water Productivity Enhancement

                   Client: Metropolitan Waterworks Authority (MWA)
          ...
.                300                 /                     3
                                                             ...
36
 36

Team1-64.indd 36   4/2/10 7:25:42 PM
Water Resources


                    Drawing on our 30 years of accumulated knowledge
                    and experience ...
Drainage Tunnel from Saen Saep and Lat Phrao Canals
               to the Chao Phraya River


                   Client: I...
TEAM GROUP provided quality control services
           for the construction of the drainage tunnel from
           Saen S...
Nam Ngum 2 Hydroelectric Power Project
                                                    2       .
                   Cl...
Nam Ngum 2 Hydroelectric Power Project is located 90 kilometers
       north of Vientiane Province. The powerhouse will co...
Xayabouri Hydroelectric Power Project
                                                                  .
                ...
Xayabouri Hydroelectric Power Project is part of
       the Mekong cascade development plan, which
       comprises nine r...
44
 44

Team1-64.indd 44   4/2/10 7:26:03 PM
Energy


                    TEAM GROUP is not only committed to service
                    excellence in the development...
Chit Lom Electricity Terminal Station and
                   Transmission Line Tunnel
                       Client: Metro...
FIRST AND
                                                                           FOREMOST

                           ...
Tank Farm Terminal in Phetchaburi Province

                    Client: Bangchak Petroleum Public Company Limited
        ...
Client: Bangchak Biofuel Company Limited
               Administered by: TEAM Consulting
               Engineering and Ma...
50
 50

Team1-64.indd 50   4/2/10 7:26:13 PM
Message
                  from the Chairman
                        In this ever-changing world, consultancies are require...
Management
                   and Training


                                         project and
                     Off...
Economic Value Management (EVM)

                   Clients: The Airports of Thailand Public Company Limited (AOT)
       ...
Today, most international organizations
                                                                 have adopted the ...
Project Management of the New Tobacco Factory at Rojana
           Industrial Park, Phra Nakhon Si Ayutthaya
             ...
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
TEAMGROUP-Consulting Engineering & Management _Global  Recruitment
Upcoming SlideShare
Loading in...5
×

TEAMGROUP-Consulting Engineering & Management _Global Recruitment

2,521

Published on

TEAM Group of Companies is a group of lead largest group of companies of this line in Thailand formed by the amalgamation of 13 firms, we are prompt to meet the customer’s demands in various fields. We always embrace team work as a value in a bid to deliver quality services and ensure the optimal satisfaction of our customers.

Today, in the context of globalization, the Southeast Asian countries are all striving to encourage self-development in order to keep abreast of rapid global changes. Attracted by favourable investment atmosphere and government’s policy, we have incorporated the business on the creation, design and production of all kinds of media for public relations, alternative energy development and environmental management, and logistics services. Our unrivalled team is formed by a workforce of approximately 1,000 at present.

Published in: Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
2,521
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
29
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Transcript of "TEAMGROUP-Consulting Engineering & Management _Global Recruitment"

  1. 1. On the Leading Edge For over 30 years TEAM GROUP has been entrusted 30 by both the public and private sectors with a wide range of development projects, both domestic and international. With the high caliber workforce and the enhanced comprehensive services required to respond to new global needs, the Group has maintained its position at the frontline of consulting and related businesses in Thailand and is further committed to creating new service bases in the region and beyond. 1 Team1-64.indd 1 4/2/10 7:22:04 PM
  2. 2. Message from the Chairman In this ever-changing world, consultancies are required to find prompt and effective solutions to the new and critical challenges which are constantly emerging. Through their expertise, accrued experience and state-of-the-art technology, the staff of TEAM GROUP are able to meet these requirements and in the process develop their specializations. This has led to the Group’s becoming the top-ranked Thai consultant in its areas. To give one example of our success, faced with the world’s ongoing energy problems and the need to develop alternative energy, we have played a vital role in many projects involving clean energy and energy conservation and, helping to alleviate the problem of climate change, TEAM GROUP has devised a multitude of innovative outcomes. TEAM GROUP is foremost among consulting service providers which assist the public and private sectors in developing such measures. Our other works include services in environmentally-friendly buildings, planning and development of pollution-free transit systems, environmental management, solid waste and wastewater management, and waste-to-energy. In 2009, TEAM GROUP was entrusted with a number of important projects in both Thailand and neighboring countries. The year thus represented an important phase in TEAM GROUP’s growth. In addition to our ability to address new challenges, another key to this success is our capacity to offer integrated solutions delivered by a professional workforce, focused solely on the optimal satisfaction of the client. Effective and timely solutions within budget are always assured. Decades-long experience and the trust we have obtained build our confidence in directing the organization toward international expansion, especially in the Southeast Asian region. I strongly believe that our highly professional staff will be able to prove the potential of Thai consultants in the international arena and, as they have already done in Thailand, steer TEAM GROUP to the position of leading consultancy in this region. (D Prasert Patramai) (Dr. P t P t i) Chairman of the Board 2 Team1-64.indd 2 4/2/10 7:22:06 PM
  3. 3. …our capacity to offer integrated solutions delivered by a professional workforce, focused solely on the optimal satisfaction of the client… ... ... 2552 ( . ) 3 Team1-64.indd 3 4/2/10 7:22:11 PM
  4. 4. Contents 06 07 08 A VALUE-BASED ORGANIZATION I N T E G R AT E D EXPERTISE EXECUTIVES 12 13 A N O T H E R CHALLENGING CREDENTIALS BUILDING AND INFRASTRUCTURE 14 YET SUCCESSFUL YEAR 18 TRANSPORTATION AND LOGISTICS ENVIRONMENT 4 26 Team1-64.indd 4 4/2/10 7:22:15 PM
  5. 5. 36 WATER RESOURCES 44 ENERGY COMMUNICATIONS AND PUBLIC PARTICIPATION 50 56 MANAGEMENT AND TRAINING 62 63 64 CORPORATE S O C I A L RESPONSIBILITY CARE FOR THE ENVIRONMENT, SAV E T HE E A R T H STRIVING TO GO BEYOND THE LEADING EDGE . . . 5 Team1-64.indd 5 4/2/10 7:22:21 PM
  6. 6. Founded in 1978, TEAM GROUP is a conglomerate of Thai- based consulting firms. Our business started with the provision Vision: TO BE THE of services in the fields of water resources development and environment. From there, we expanded to provide sustainable solutions in the areas of transportation and logistics, infrastructure, energy, building, management, and communications and public participation. Integrated services are viewed as a critical business strategy in our quest to improve our competitiveness and our ability to respond to THAI LEADER IN customer demand. Embracing the values of service, quality and teamwork, our professional workforce provides clients with time-bound, cost- THE INTEGRATED effective, and innovative multidisciplinary solutions, all focused on clients’ needs. CONSULTING A Value-Based AND RELATED Organization BUSINESSES 2521 DOMESTICALLY AND INTERNATIONALLY Operating Performance and Workforce Operating Revenue Workforce 2000 1400 1.6 Workforce (person) 1.4 1,150 1,168 1.4 1.4 (MB) 1,572 1200 1.3 1.3 1,466 1,461 1,082 1,099 ( ) 1500 1,392 1.2 1.2 1000 914 1,213 / 1 800 1000 0.8 Million baht Revenue per capita 600 0.6 500 400 0.4 200 0.2 0 0 0 yr 2005 2006 2007 2008 2009 yr 2005 2006 2007 2008 2009 Revenue Workforce Revenue per capita 6 Team1-64.indd 6 4/2/10 7:22:36 PM
  7. 7. Integrated Expertise ENERGY ATT Consultants Co., Ltd. (ATT) Energy, oil and gas, power plant, petrochemical-related projects, berth, building, pipeline system and utilities. Through the tight amalgamation of 13 affiliates, specialists in a diverse range of fields, TEAM GROUP is able to offer integrated solutions to their clients. TEAM Energy Management Co., Ltd. (TEM) Integrated consulting services in energy conservation, energy auditing and energy efficiency. 13 Energy & Environmental Management Co., Ltd. (EEM) Alternative energy development and environmental management. INFRASTRUCTURE & ENVIRONMENT TEAM Consulting Engineering and Management Co., Ltd. (TEAM) MANAGEMENT & TRAINING Engineering, environment, and management consultancy services. Management Solutions International Ltd. (MSI) Integrated consultancy services in corporate strategic management, finance and investment, accounting, marketing, project management Geotechnical & Foundation Engineering Co., Ltd. (GFE) and project development. Geotechnical engineering consultancy services. SQ Architects and Planners Co., Ltd. (SQ) Planning and design of building architecture, interior design, Modern Management and Technology Co., Ltd. (MMT) landscape architecture, and design for urban development. Human resource development, optimizing academic and administrative competence. TEAM Logistics and Transport Co., Ltd. (TLT) Transportation planning, traffic management, and traffic impact COMMUNICATIONS & PUBLIC PARTICIPATION management, logistics, and supply chain management. Daoreuk Communications Co., Ltd. (DR) Integrated services in communications and public participation in strategic planning; action planning and implementation, ranging from TEAM Consulting and Management (Cambodia) Co., Ltd. publication and multimedia production to event management and Based in Phnom Penh, capable local professionals community relations. provide regional consulting services. TEAM Consulting and Management (Cambodia) Co., Ltd. TEAM LAO Co., Ltd. A full range of consulting services for the public and private sectors as well as international agencies in Lao PDR and the TCG Printing Co., Ltd. (PRT) Greater Mekong subregion. One-stop service in digital printing as well as design and related TEAM LAO Co., Ltd. services. 7 Team1-64.indd 7 4/2/10 7:22:37 PM
  8. 8. Board of Directors Dr. Prasert Patramai Chairman of the Board . Mr. Peerawat Premchun Director Dr. Thanasarn Khuayjarernpanishk Director . Mr. Amnat Prommasutra Director Mr. Wera Sutesopon Director Mr. Suksavasdi Srisuphonvanij Director 8 Team1-64.indd 8 4/2/10 7:22:41 PM
  9. 9. 1 2 3 4 5 6 7 8 9 10 11 12 13 1 Dr. Prasert Patramai 5 Mr. Chawalit Chantararat 8 Dr. Sirinimit Wungsoontorn 11 Dr. Pradit Nopmongcol . . . Chairman of the Board Executive Director Executive Director Executive Director 2 Mr. Peerawat Premchun - - 12 Mr. Chawan Theungsang - Senior Executive Director 6 Mr. Kittipol Bunnim 9 Mr. Thongchai Montapaneewat - 3 Dr. Thanasarn Khuayjarernpanishk Executive Director Executive Director 13 Dr. Samran Chooduangngern . . Senior Executive Director - - Deputy Managing Director - - (TEAM Cambodia) - EEM TEAM Cambodia 4 Mr. Amnat Prommasutra 7 Mr. Prasong Wangrattanapranee 10 Mr. Issarin Patramai Senior Executive Director Executive Director Executive Director - - MSI MMT 9 Team1-64.indd 9 4/2/10 7:22:43 PM
  10. 10. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Mr. Srid Aphaiphuminart 5 Ms. Lertluksna Yodavudh 8 Dr. Surasak Taweesilp 12 Mr. Rachapon Silavisesrith . Chairman of the Board (ATT) Managing Director (DR) Executive Director (SQ) ATT DR SQ - Managing Director (TLT) 2 Dr. Werapol Thonguthai 6 Mr. Preecha Vongvitavat TLT 13 Mr. Teeravit Jomsueb . 9 Mr. Kaiwut Simtarakaew Managing Director (ATT) Executive Director (DR) Deputy Managing Director (SQ) ATT DR Deputy Managing Director (TLT) SQ TLT 3 Mr. Wirat Ongprasert 7 Dr. Aphichat Sramoon 14 Mr. Tanin Pongsilamanee . 10 Mr. Wijit Silavisesrith Executive Director (ATT) Executive Director (SQ) ATT - Managing Director (SQ) SQ Managing Director (GFE) SQ 4 Mr. Arnon Kulruedeerittha GFE 15 Ms. Sopapan Chintaganont 11 Mr. Wichian Wachirachowpong Executive Director (ATT) Executive Director (SQ) ATT Director (SQ) SQ SQ 10 Team1-64.indd 10 4/2/10 7:22:53 PM
  11. 11. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Mr. Choosak Losagulpong 7 Mr. Sathit Malaitham 13 Ms. Vimol Ongsakul Assistant Managing Director Assistant Managing Director - Transportation and Logistics Division Head - Accounting and Finance Construction Supervision Consulting 2 Mr. Wattana Limdaengsa-nguan 8 Mr. Phisol Chansri 14 Mr. Srijaroung Bandhaya Assistant Managing Director Assistant Managing Director - Water Resources Department Head - Human Resources Construction Supervision Consulting 3 Ms. Budsaba Isrankura Na Ayudhaya 9 Mr. Somkiat Manirudj 15 Ms. Roongtip Koungyuttamongkol Assistant Managing Director - Environmental Science Assistant Managing Director - Water Resources Department Head - Business Promotion and Communications 4 Ms. Pramwanee Predapun 10 Mr. Grisada Anoosittagool Assistant Managing Director - Environmental Science Assistant Managing Director (TEAM LAO) 5 Ms. Yaowapa Chuwong 11 Mr. Cherd-matee Pinittanon Assistant Managing Director - Environmental Science Assistant Managing Director (TEAM LAO) 6 Mr. Charnchai Gowgirdwiboon 12 Ms. Sawanmon Awaiwanont Assistant Managing Director - Transportation and Logistics Assistant Executive Director (DR) 11 Team1-64.indd 11 4/2/10 7:23:05 PM
  12. 12. Another Challenging yet Successful Year Due to our dedication to realizing our vision and values, in 2009 we not only successfully completed previously established projects, but were also newly engaged in far-reaching projects initiated by the public and private sectors, both in Thailand and in neighboring countries. In particular, two affiliates – TEAM Consulting and Management (Cambodia) Co., Ltd. and TEAM LAO Co., Ltd. – had wider opportunities to become involved in local projects, which added to their experience and enhanced their potential to be stepping stones into the wider region. Some of the projects we were entrusted with in 2009 are presented in this annual report, categorized into the areas of building and infrastructure, transportation and logistics, environment, water resources, energy, management and training, and communications and public participation. 2552 TEAM Consulting and Management (Cambodia) Co., Ltd. TEAM LAO Co., Ltd. . 2552 12 Team1-64.indd 12 4/2/10 7:23:16 PM
  13. 13. Credentials Our growth in 2009 is attributable to our clients’ trust, which has enabled us to expand and diversify our expertise and the range of services we offer; the opportunities our clients have offered us have strengthened our confidence that we can successfully meet the challenges of the future. Our great appreciation therefore goes to: 2552 ... Private Enterprises & International Organizations Government & State Enterprises Central Pattana Public Company Limited Office of the National Economic and Social Development Board ( ) Bangchak Biofuel Company Limited Department of Scientific Service Thai Oil Public Company Limited Metropolitan Electricity Authority ( ) CH. Karnchang Public Company Limited Electricity Generating Authority of Thailand . ( ) Banpu Public Company Limited Metropolitan Waterworks Authority ( ) SEAFCO Public Company Limited The Stock Exchange of Thailand ( ) Map Ta Phut Tank Terminal Company Limited Office of Transport and Traffic Policy and Planning Wat Traimit Wittayaram Thailand Institute of Scientific and Technological Research Electricity Generating Public Company Limited National Institute of Metrology (Thailand) ( ) Advance Agro Public Company Limited Bangkok Metropolitan Administration ( ) Bangkok Mass Transit System Public Company Limited King Mongkut’s University of Technology Thonburi ( ) Land and Houses Public Company Limited Wastewater Management Authority ( ) Ek-Chai Distribution System Company Limited The Liquor Distillery Organization, Excise Department - Integrated Refinery & Petrochemical Complex (IRPC) Thailand Tobacco Monopoly Public Company Limited ( ) Ministry of Public Works and Transport, Kingdom of Cambodia Asian Development Bank Airports of Thailand Public Company Limited Japan Bank for International Cooperation ( ) PTT Public Company Limited . ( ) 13 Team1-64.indd 13 4/2/10 7:23:17 PM
  14. 14. 14 Team1-64.indd 14 4/2/10 7:23:21 PM
  15. 15. Building and Infrastructure Function, aesthetics, energy-efficiency and environmentally-friendly design are our prime considerations when combining our expertise in engineering, architecture, landscape architecture, interior design, and mechanical, electrical and communication systems. The result is the delivery of fully integrated services in building and infrastructure development. 15 Team1-64.indd 15 4/2/10 7:23:24 PM
  16. 16. PTT Central Workshop in Rayong Laboratory Design . In 2009, we were entrusted with the detailed design of ( ) laboratories by several organizations. Design of these laboratories focused on enhancing research development and promotion as well as achieving greater operational Client: PTT Public Company Limited efficiency for our clients. Blending function with a modern Administered by: ATT Consultants Co., Ltd. and attractive design, these facilities also embraced the : . ( ) concept of green building to ensure wise use of energy and : resources. We also introduced Building Information Modeling, or BIM technology, to support the design process. Owing to our success in the detailed technical design of the Southeast Asian laboratory for the diagnosis of avian influenza in 2005, we set our goal of becoming the nation’s leading consultancy in laboratory design and construction. Bioprocess Research and Innovation Facility Client: King Mongkut’s University of Technology Thonburi (KMUTT) : Seven-storey building equipped with comprehensive TEAM GROUP was entrusted with the design and interior and exterior utilities on a par with international construction supervision of a new large centralized, fully- standards. equipped workshop for the maintenance of machinery 7 and equipment for the five PTT gas extraction plants in Map Ta Phut Industrial Estate, Rayong. The 3,150 m2 building comprises office and storage areas, maintenance equipment, including 20-ton, 5-ton and 3-ton overhead cranes, and internal roads. 5 . 3,150 20 5 3 Building Information Modeling (BIM) 16 Team1-64.indd 16 4/2/10 7:23:26 PM
  17. 17. Administered by: SQ Architects and Planners Co., Ltd. 2552 : 2548 (Building Information Modeling - BIM) Model Center for the Production of Biomass Synthetic Fuel Client: The Thailand Institute of Scientific and Technological Research : Model center, serving as an information storehouse and host for research and development in the field of biomass fuel development. Chemical Metrology Laboratory The Test Center for Exports Client: National Institute of Metrology (Thailand) Client: Department of Science Service : : An automation system-based reference Environmentally-friendly laboratory for chemical laboratory and specialization center for testing and experimentation. Thailand. Using solar-cell electricity to reduce power drawn from distribution lines. Building Automation System SQ Architects and Planners Co., Ltd. is one of two companies in Thailand that currently introduce the Building Information Modeling (BIM) (BIM) * to their work* BIM BIM is the process of generating and managing building data during its life cycle. Typically it uses three-dimensional, real-time, dynamic building modeling software to increase productivity in building design and construction. The model represents the whole building components, construction procedure, as well as properties and quantity of materials, thus enhancing the accuracy of cost estimation, building structure design as well as construction management and facility management planning. *From Construction and Property magazine. Issue 18 November-December 2009. * Construction and Property 18 - 2552 17 Team1-64.indd 17 4/2/10 7:23:28 PM
  18. 18. 18 Team1-64.indd 18 4/2/10 7:23:29 PM
  19. 19. Transportation and Logistics To promote sustainable transport for the people of the Bangkok region, TEAM GROUP has provided assistance in all stages of the development of Bangkok’s mass transit system. This has ranged from master planning to design and construction supervision. We have also been entrusted with traffic management projects and have improved traffic flow in business areas and around construction sites in Bangkok. The construction supervision of roads and highways in Thailand also paved our way to roadwork projects in neighboring countries. 19 Team1-64.indd 19 4/2/10 7:23:32 PM
  20. 20. Revision of the Mass Transit Master Plan in the Bangkok Metropolitan Region (M-MAP) (M-MAP) Client: Office of Transport and Traffic Policy and Planning : Administered by: : TEAM Consulting Engineering and Management Co., Ltd. TEAM Logistics and Transport Co., Ltd. Daoreuk Communications Co., Ltd. 20 Team1-64.indd 20 4/2/10 7:23:33 PM
  21. 21. Integrated Mass Transit M-MAP Master Plan The Mass Transit Master Plan in the Bangkok 20 ( 2553- Metropolitan Region (M-MAP) requires a comprehensive 2572) study covering all aspects of the rail transit system, its 8 4 environmental impacts and public participation in the capital’s mass transit network. The study will lead to the formulation of a 20-year mass transit system action plan (2010-2029) for Bangkok and its environs. Featuring a radial and circumferential pattern, the network is initially divided into 12 inter-connecting lines. In the interests of the public, the master plan specifies the creation of an integrated mass transport network with the use of a common ticket and fare rate structure. The plan will also act as a master plan for all agencies concerned. TEAM GROUP assisted with feasibility studies investigating alternative routes, new feeder routes, prioritization of alternative routes, financial and implementation planning, and environmental impact assessment. 21 Team1-64.indd 21 4/2/10 7:25:22 PM
  22. 22. Bangkok Mass Transit System: Green Line Extension (Saphan Mai-Lam Lukka) - 4 Client: Office of Transport and Traffic Policy and Planning Administered by: TEAM Consulting Engineering and Management Co., Ltd. Geotechnical and Foundation Engineering Co., Ltd. Daoreuk Communications Co., Ltd. : 4 : TEAM GROUP acted as the consultant in master planning, generating detailed designs for the project. We also supervised the construction of the BTS Green Line Extension, consisting of - the Dark Green Line (Mo Chit-Lam Lukka Khlong 4) and the Light Green Line (Bearing-Samut Prakan). 2 - Following the successful operation planning, feasibility 13.5 studies, environmental impact assessment, detailed design, preparation of tender documents and management of public participation activities for the first phase at Mo Chit-Saphan Mai, we were further entrusted with management of the second phase. This covered the 13.5-kilometer long line from Saphan Mai to Lam Lukka. The project also features a new design for the frontage road running in parallel with the track structure and connecting Phahon Yothin Road with Lam Lukka Road. 22 Team1-64.indd 22 4/2/10 7:25:23 PM
  23. 23. The Capital Market Center Project Clients: The Stock Exchange of Thailand (SET) Architects 49 Limited Administered by: TEAM Logistics and Transport Co., Ltd. : 49 : The Stock Exchange of Thailand is developing the first center for innovative financial products and integrated investment in Thailand. Located on an area of 2.384 hectares on Ratchadaphisek Paramics Road, the project features the SET office building and a 1.546- hectare space open to interested parties to implement a land M i c r o development program. The opening of the center was anticipated to worsen traffic in the area, which, in turn, would certainly hinder Simulation S-Paramics is the latest version of the success of the project. the widely applicable Paramics micro Using S-Paramics software, TEAM GROUP generated traffic simulation traffic flow modeling system, simulation models to predict a wide variety of traffic conditions and software for the analysis and design of proposed mitigation measures to facilitate traffic flow in the vicinity urban and highway networks. It is the most of the site. versatile and comprehensive road traffic flow analysis system for all sizes of road network, available to traffic planners and modelers throughout the world. It presents 14.9 - its output as a performance index and a real-time visual display for traffic management and road network design. 5.24 9.66 S-Paramics S-Paramics 3 23 Team1-64.indd 23 4/2/10 7:25:24 PM
  24. 24. Traffic simulation of Sri Nagarindra-Sukhumvit 103 Intersection - 103 Underpass at the Sri Nagarindra-Sukhumvit 103 Intersection – 103 Clients: Bangkok Metropolitan Administration (BMA) SEAFCO Public Company Limited Administered by: TEAM Logistics and Transport Co., Ltd. : ( ) : TEAM GROUP was assigned to devise a traffic management plan to ensure minimal impact from the - 103 construction of the underpass. ( ) The Sri Nagarindra-Sukhumvit 103 (Udom Suk) intersection on Sri Nagarindra Road is one of the most congested areas in Bangkok. The BMA therefore proposed the construction of an underpass to allow drivers to continue without the need to wait for the traffic lights to turn green. The underpass, 18 meters wide and 1,018 meters . 4 long, is on Sri Nagarindra Road and features four 18 1,018 lanes. During construction, partial closure of Sri Nagarindra Road is anticipated to increase traffic 50 congestion by 50%. 24 Team1-64.indd 24 4/2/10 7:25:25 PM
  25. 25. National Road No. 67 (Anlong Veng-Siem Reap), Cambodia 67 ( – ) Client: Ministry of Public Works and Transport, Kingdom of Cambodia Administered by: TEAM Consulting Engineering and Management Co., Ltd. : : TEAM GROUP assisted the client in civil work construction, overall management and monitoring of the project. We also provided Cambodian personnel with training in all aspects of the work. The National Road Number 67 construction, initiated by Cambodia’s Ministry of Public Works and Transport, is the first 67 project to provide a link between Thailand and Cambodia. The road, 131 kilometers in length, not only facilitates travel between the two countries but also provides access to 131 Cambodia’s renowned tourist attractions, such as Angkor Wat, Angkor Thom, Banteay Srei and the last stronghold of the Khmer Rouge in Anlong Veng. It also helps to promote cross- border trading. The road was completed and officially opened to traffic on 4 July 2009. 67 4 2552 25 Team1-64.indd 25 4/2/10 7:25:25 PM
  26. 26. 26 Team1-64.indd 26 4/2/10 7:25:26 PM
  27. 27. Environment With over 30 years of experience in this field, TEAM GROUP offers the clients a one-stop service, including initial environmental examination (IEE), environmental impact assessment (EIA), environmental management planning (EMP) and resettlement action plan (RAP). Meeting new social requirements, we are also among those service providers pioneering social and health impact assessments (SIA and HIA). We also provide environmental engineering expertise in support of waterworks and wastewater management. This extends from master planning and design to construction supervision and implementation. 30 27 Team1-64.indd 27 4/2/10 7:25:29 PM
  28. 28. Environmental Monitoring for the Natural Gas Pipeline Project ( ) Client: PTT Public Company Limited Administered by: TEAM Consulting Engineering and Management Co., Ltd. : . ( ) : We put to use our full breadth of knowledge and experience in monitoring the environmental impact mitigation measures and conducting an environmental quality examination for the 18 extension of natural gas pipeline to the Government Complex on Chaeng Watthana Road and the National Energy Center throughout the 18-month construction. The extension covered the areas in Bangkok and Pathum Thani Province. We also monitored the security, health and . environmental specifications, as defined by PTT. The main line starts from the existing pipeline system around Rangsit railway station, runs along the railway and merges with the Suvarnabhumi- Phaya Thai NGV pipeline at Phaya Thai railway - station. There are secondary lines to the Bang Kadi Industrial Park, the Government Complex, the National Energy Center and the Royal Chitralada 41.85 Projects. These combine to form a total length of 41.85 kilometers. The project will have the added benefit of encouraging more extensive use of natural gas in transportation, industry and businesses. This is in response to the government’s policy to promote the use of alternative energy. 28 Team1-64.indd 28 4/2/10 7:25:32 PM
  29. 29. HIA is an effective way to promote wellbeing, health and equity. HIA for the MTT Jetty and Tank Farm Project Client: Map Ta Phut Tank Terminal Co., Ltd. (MTT) Administered by: TEAM Consulting Engineering and Management Co., Ltd. : : TEAM GROUP conducted a health impact assessment in accordance with national laws with the intention of anticipating the health impacts of the project, devising health impact mitigation measures and proposing health impact monitoring guidelines to verify the efficacy of the measures. Located in Map Ta Phut Industrial Estate in Rayong Province, Map Ta Phut Tank Terminal Co., Ltd. currently owns two jetties and 25 storage tanks for raw materials and products, and plans to construct two more jetties and seven more storage tanks to provide support for petrochemical-related industries, thus enhancing this industry’s import and export potential. 2 25 2 7 29 Team1-64.indd 29 4/2/10 7:25:34 PM
  30. 30. EIA for the Chana Power Plant Project 2,485.58 (824 ) (340 Client: Electricity Generating Authority of Thailand (EGAT) ) Administered by: TEAM Consulting Engineering and Management Co., Ltd. 1 (725 ) : ( .) : 2559 . 2 The current installed capacity for electricity generation in Southern Thailand amounts to 2,485.58 MW. Major generators include the private Khanom thermal power plant in Nakhon Si 42 Thammarat (824 MW), the Krabi thermal power plant in Krabi (340 MW) and the first unit of Chana combined cycle power plant in Songkhla (725 MW). To ensure sufficient electricity supply for 2557 economic and industrial development and to strengthen national energy stability, EGAT planned the construction of a second unit at 860 Chana power plant in 2011 as a substitute for the Khanom power plant, which is due to close in 2016. Construction will take 1 approximately 42 months. The new power plant, with an installed capacity of about 860 MW, is slated to operate in July 2014. Having assessed the environmental impacts resulting from the construction and operation of the first unit, TEAM GROUP was 2 entrusted with conducting social, environmental and health impact assessments for the second unit and, following this, the formulation of 2 mitigation measures to ensure public acceptance of the second unit matched that of the first unit. 1 30 Team1-64.indd 30 4/2/10 7:25:34 PM
  31. 31. EMP, RAP and Raw Water System Design for Hongsa Coal-Fired Power Plant, Lao PDR . Client: Banpu Public Company Limited The Hongsa Power Plant Project Administered by: TEAM Consulting Engineering and Management Co., Ltd. consists of a large open-pit lignite mine with reserves of 361 million tons, a : ( ) coal-fired power plant with three 626 : MW-generating units, and 67 kilometers of 500 kV double-circuit transmission line running from the power plant to the Thai-Lao border. The raw water system consists of a rock-filled clay-cored dam 235 meters in length and 51 meters in height, a spillway, 5,500 meters of 1,000-1,200 mm diameter pipe, and a pump station equipped with four pump engines. 361 Located in Hongsa, Xayabouri Province, Lao PDR, this project is a large-scale Thai-Lao venture, for which Banpu PLC., Ratchaburi Electricity 626 3 Generating Holding PCL. and the Lao Government are joint shareholders. 500 It is the first thermal power plant and the largest ongoing power project in - Lao PDR. With a generating capacity of 1,653 MW, the plant will enhance 67 considerably Lao energy generating potential and stability. TEAM GROUP designed the raw water system supplying the plant and since 2007 has served continuously as project consultant for implementation of the environmental management plan and resettlement 235 51 action plan, in accordance with the Lao Water Resource and Environmental 1,000-1,200 Authority’s technical guidelines on resettlement and compensation. This 5,500 ensures that environmental impacts during construction and operation will 4 be effectively mitigated and that the 367 affected families in 5 villages will be appropriately relocated to resettlement sites. . . ( ) ( ) . . . 1,653 . 367 5 2550 31 Team1-64.indd 31 4/2/10 7:25:36 PM
  32. 32. EIA for Coal-Fired Power Plant in Stueng Hav, Sihanoukville, Cambodia Client: Cambodian Energy Limited Administered by: TEAM Consulting Engineering and Management Co., Ltd. 100 TEAM Consulting and Management (Cambodia) Co., Ltd. : Cambodian Energy Limited : TEAM Consulting and Management (Cambodia) Co., Ltd. TEAM GROUP conducted an environmental impact assessment and set up a monitoring program to minimize the environmental impacts from the power plant in Stueng Hav, Sihanoukville. Located in southern Cambodia, the province of Sihanoukville is a renowned seaside resort while its Stueng Hav District hosts a free trade and industrial zone along with a large, modern deep- sea port. The Cambodian government thus decided on a power plant development scheme to facilitate growth in tourism and industry in the province. / This coal-fired power plant boasts a capacity of 100 MW. The coal will be transported from overseas via Panamax- and/or 3,000 DWT Handymax-sized sea vessels to the project’s 3,000 DWT coal jetty. 32 Team1-64.indd 32 4/2/10 7:25:37 PM
  33. 33. Master Plan for Wastewater Management in River Basins Client: Wastewater Management Authority (WMA) Administered by: TEAM Consulting Engineering and Management Co., Ltd. : : TEAM GROUP was appointed the consultant for the master plan development of the wastewater 4 management in four major river basins around Thailand, namely Mae Sa river basin in the North, Chao Phraya river basin in the Central part, Huai Sam Mo river basin in the Northeast and Songkhla lake basin in the South. Quality of water resources in these basins has been declined due to the community expansion and human activities. The master plan will serve as a framework for the development of a community wastewater management master plan and investment. It will also provide a database for wastewater management in 4 Mike 11 the communities of these four basins. By using Mike 11 software program, the study will provide cause-effect analysis and solutions to the wastewater management in each basin to tackle the current water resource problems and prevent the reoccurrence. Mike 11 is a software program used in the simulation of water flow. The Mike 11 software models water flow characteristics and levels as well as the flow of sediments in waterways and flooded areas. This assists in the analysis of water quality and in flood prevention. 33 Team1-64.indd 33 4/2/10 7:25:39 PM
  34. 34. Metropolitan Water Productivity Enhancement Client: Metropolitan Waterworks Authority (MWA) Administered by: TEAM Consulting Engineering and Management Co., Ltd. : ( .) : To meet the ever-increasing demand for water Station 3, Bang Khen Water Treatment Plant, a large supply and water services in Bangkok, Nonthaburi water plant with a water production capacity of 3.6 and Samut Prakan, the MWA decided to expand its million cu.m./day supplying most areas of Bangkok. productivity and transmission tunnel network. The installation will enhance the MWA’s water TEAM GROUP has been involved in the productivity and distribution and help it to meet development of Maha Sawat Water Treatment Plant increasing demand. in Nonthaburi since 1995 and was entrusted, in 2009, In the eastern area of Bangkok, we designed and with the design of phase 4 and its accompanying supervised the construction of a 3,200 mm-diameter transmission conduit. transmission tunnel from the Highway No. 351 A scheme to increase its productivity was divided Intersection, running beneath Kanchanaphisek (East into eight phases, each of which was planned to portion) Road, to merge with the existing tunnel increase daily production capacity by 400,000 cu.m. around Thap Chang Intersection. Water will be Upon its completion of phase 4, the plant will be able distributed through this 13-km long tunnel to those to produce 1.6 million cu.m./day of water for communities which currently rely on groundwater, a Bangkok’s Thon Buri side and for Nonthaburi. When all cause of land subsidence. The tunnel will also increase eight phases are finished in 2017, the total production water supply for the Lat Krabang and Bang Phli capacity will amount to 3.2 million cu.m./day. pumping stations and so help to accommodate growth TEAM GROUP also supervised the installation of in industrial zones in the vicinity of Suvarnabhumi 300 cu.m./minute pump engines at the Pumping Airport. Maha Sawat Water Treatment Plant 34 Team1-64.indd 34 4/2/10 11:23:33 PM
  35. 35. . 300 / 3 3.6 . 2538 2552 4 3,200 351 8 ( ) 400,000 4 13 1.6 2560 3.2 . Nawamin-Thap Chang Transmission Tunnel - A pump engine at Bang Khen Water Treatment Plant 35 Team1-64.indd 35 4/2/10 7:25:41 PM
  36. 36. 36 36 Team1-64.indd 36 4/2/10 7:25:42 PM
  37. 37. Water Resources Drawing on our 30 years of accumulated knowledge and experience in water resource development, hydroelectric power projects , and drainage and flood control projects , TEAM GROUP today is not only a trusted consultant for the public and private sectors in Thailand, but also for those in neighboring countries. 30 37 Team1-64.indd 37 4/3/10 7:33:24 PM
  38. 38. Drainage Tunnel from Saen Saep and Lat Phrao Canals to the Chao Phraya River Client: IN Joint Venture Co., Ltd. Administered by: TEAM Consulting Engineering and Management Co., Ltd. : : 38 Team1-64.indd 38 4/2/10 7:25:47 PM
  39. 39. TEAM GROUP provided quality control services for the construction of the drainage tunnel from Saen Saep and Lat Phrao canals to the Chao Phraya River, by means of which the BMA plans to lessen the ongoing problem of annual flooding in the eastern Bangkok area. 150 This drainage tunnel can rapidly discharge a large volume of flood water and so alleviate flood problems in the 150 km2 area of Bang Kapi, Wang Thonglang, Huai Khwang, Din Daeng, Phaya Thai, Saphan Sung, 5 Lat Phrao, Bueng Kum, Khan Na Yao, Lat Krabang and 9 71 Min Buri. 5.11 With a total length of 5.11 kilometers, this 5-meter diameter drainage tunnel is at present the 60 longest in Thailand. Starting from the Rama IX swamp and running along Saen Saep Canal, Soi Sukhumvit 71, Sukhumvit Road and Phra Khanong Canal, water 27 is rapidly drained into the Chao Phraya River by the 60 cu.m./second pumping facility installed at the end of the tunnel, which, to avoid impacts on an MRT subway tunnel and on the foundations of surrounding buildings, is at a depth of 27 meters. 39 Team1-64.indd 39 4/2/10 7:25:49 PM
  40. 40. Nam Ngum 2 Hydroelectric Power Project 2 . Client: CH. Karnchang Public Company Limited Administered by: TEAM Consulting Engineering and Management Co., Ltd. ATT Consultants Co., Ltd. : . ( ) : 40 Team1-64.indd 40 4/2/10 7:25:51 PM
  41. 41. Nam Ngum 2 Hydroelectric Power Project is located 90 kilometers north of Vientiane Province. The powerhouse will come on stream by 2011 and will generate an annual average of 2,218 GWh of electricity for Nam Ngum 2 export to Thailand, thus boosting the economy of Lao PDR. Given the size of the dam and accompanying tunnels as well as its Hydroelectric capacity, Nam Ngum 2 is a huge project which has challenged our Power Project engineering competency. In addition to generating detailed design and supervising the construction, in 2009 TEAM GROUP also implemented the environmental management and resettlement action plans for the 2 relocation of about 6,100 ethnic minorities from 17 villages. The project includes a concrete- faced rock-filled dam – 182 meters 2 . high and 485 meters long, a reservoir 90 with a capacity of 6,774 million cu.m., 11.7 meters wide diversion tunnels and 2554 2,218 a powerhouse with 615 MW installed . capacity. 2 2 182 485 6,774 2552 6,100 11.7 17 615 41 Team1-64.indd 41 4/2/10 7:25:54 PM
  42. 42. Xayabouri Hydroelectric Power Project . Client: CH. Karnchang Public Company Limited Administered by: TEAM Consulting Engineering and Management Co., Ltd. Geotechnical & Foundation Engineering Co., Ltd. ATT Consultants Co., Ltd. : . ( ) : 42 Team1-64.indd 42 4/2/10 11:29:41 PM
  43. 43. Xayabouri Hydroelectric Power Project is part of the Mekong cascade development plan, which comprises nine run-of-the-river hydroelectric power projects. When operates, in 2015, the powerhouse will have the installed capacity of up to 1,260 MW or approximately twice that of the Nam Ngum 2 dam. Most of the electricity produced will be sold to the Electricity Generating Authority of Thailand, thus securing the electricity provision in Thailand and fostering Lao PDR’s economic growth. Located in Xayabouri Province, the project is designated with the fish passage facility designed for different breeds of fish, the first of its type in Southeast Asia. Having previously provided the project’s feasibility study and environmental and social impact assessments, TEAM GROUP was assigned in 2009 to conduct civil work design, estimate the cost, set up an operation plan and prepare tender documents for the project. 9 2558 1,260 2 2 . “ ” . 43 Team1-64.indd 43 4/2/10 7:25:57 PM
  44. 44. 44 44 Team1-64.indd 44 4/2/10 7:26:03 PM
  45. 45. Energy TEAM GROUP is not only committed to service excellence in the development of electricity systems and the oil industry, but also strives to bring clean, reliable and affordable energy technologies to the marketplace. With our decades of engineering experience, we are able to offer a full range of renewable energy technologies. 45 Team1-64.indd 45 4/2/10 7:26:06 PM
  46. 46. Chit Lom Electricity Terminal Station and Transmission Line Tunnel Client: Metropolitan Electricity Authority (MEA) Administered by: ATT Consultants Co., Ltd. : ( .) : TEAM GROUP was entrusted with the design and decided to construct a large new terminal station and construction supervision of the Chit Lom electricity underground conduit. terminal station, along with a transmission tunnel The new station is housed in a reinforced connecting Bang Kapi and Chit Lom stations. This concrete 10-storey structure with a total functional project was initiated to enhance the electricity area of 8,500 m2, designed for the installation of three distribution efficiency of MEA in order to meet the 230/69 kV 300 MVA transformers (two are currently increasing demand for electricity in Bangkok’s installed), SCADA system, oil tanks for the oil-filled business areas. cables, and other control systems. The Chit Lom station was first constructed in 1980 The 7-kilometer long, 2.60-meter diameter tunnel to transmit electricity from Bang Kapi station to the was built at a depth of 30 meters beneath Saen Saep areas of Ratchaprasong, Phloen Chit, Sukhumvit, Silom Canal, deeper than the BMA’s drainage tunnel and and Pathumwan. However, oil leakage from the the MRT’s subway structure. Installed inside will be underground and time-worn oil-filled transmission three circuits of oil-filled 230 kV transmission lines lines caused frequent short circuits, affecting the (two are currently installed). security of the distribution system. The MEA thus 46 Team1-64.indd 46 4/2/10 7:26:08 PM
  47. 47. FIRST AND FOREMOST Thailand’s first electricity station equipped with large transformers inside a tall building. Protective is emphasized, resulting in safety to officials being in charge. The 230/69 kV, 300 MVA transformer is the largest of its kind in Thailand. The first MEA high-voltage transmission tunnel project led by a Thai-based construction supervision and management consultant. 2523 . 230/69 kV 320 MVA 10 8,500 . 230/69 kV 300 MVA 3 ( 2 ) SCADA 2.60 7 30 . 230 3 ( 2 ) 47 Team1-64.indd 47 4/2/10 7:26:09 PM
  48. 48. Tank Farm Terminal in Phetchaburi Province Client: Bangchak Petroleum Public Company Limited Administered by: ATT Consultants Co., Ltd. : ( ) : To increase its exports, Bangchak ( ) Petroleum PCL planned to purchase an EIA- certified seaside tank farm owned by Pan Asia Storage & Terminal Co., Ltd., located in Phetchaburi. TEAM GROUP conducted the technical due diligence of this oil terminal and estimated the costs to repair the facility, to assist the client in making a decision on future investment. ( ) The tank farm consists of 16 storage tanks 16 with a combined capacity of 500 million liters, 500 16 a 16-truck loading bay, a 30,000-ton sea 30,000 / berth, three 16 inch-diameter submarine oil 16 6.5 3 pipelines, and other utilities and associated infrastructure. 48 Team1-64.indd 48 4/3/10 7:36:06 PM
  49. 49. Client: Bangchak Biofuel Company Limited Administered by: TEAM Consulting Engineering and Management Co., Ltd. : : Biodiesel Plant in Phra Nakhon Si Ayutthaya Through our services in construction supervision and project management, we anticipate to support the production of inexpensive and environmentally- friendly fuel for domestic consumption. Bangchak Petroleum PCL and Universal Adsorbents & Chemicals Company Limited ( ) established the Bangchak Biofuel Company Limited as a subsidiary primarily responsible for the construction of a palm oil biodiesel (B100) plant next to its tank (B100) farm in Bang Pa In District, Phra Nakhon Si Ayutthaya . . Province. It is planned that the plant will produce 300,000 liters of biodiesel daily. This is in response to 300,000 the government’s policy of promoting the use of biodiesel as a means of reducing imports of diesel, securing national energy supplies, and encouraging the use of energy from domestic agricultural produce, which will in turn help to alleviate air pollution and to improve the quality of life of the people. 49 Team1-64.indd 49 4/2/10 7:26:12 PM
  50. 50. 50 50 Team1-64.indd 50 4/2/10 7:26:13 PM
  51. 51. Message from the Chairman In this ever-changing world, consultancies are required to find prompt and effective solutions to the new and critical challenges which are constantly emerging. Through their expertise, accrued experience and state-of-the-art technology, the staff of TEAM GROUP are able to meet these requirements and in the process develop their specializations. This has led to the Group’s becoming the top-ranked Thai consultant in its areas. To give one example of our success, faced with the world’s ongoing energy problems and the need to develop alternative energy, we have played a vital role in many projects involving clean energy and energy conservation and, helping to alleviate the problem of climate change, TEAM GROUP has devised a multitude of innovative outcomes. TEAM GROUP is foremost among consulting service providers which assist the public and private sectors in developing such measures. Our other works include services in environmentally-friendly buildings, planning and development of pollution-free transit systems, environmental management, solid waste and wastewater management, and waste-to-energy. In 2009, TEAM GROUP was entrusted with a number of important projects in both Thailand and neighboring countries. The year thus represented an important phase in TEAM GROUP’s growth. In addition to our ability to address new challenges, another key to this success is our capacity to offer integrated solutions delivered by a professional workforce, focused solely on the optimal satisfaction of the client. Effective and timely solutions within budget are always assured. Decades-long experience and the trust we have obtained build our confidence in directing the organization toward international expansion, especially in the Southeast Asian region. I strongly believe that our highly professional staff will be able to prove the potential of Thai consultants in the international arena and, as they have already done in Thailand, steer TEAM GROUP to the position of leading consultancy in this region. (D Prasert Patramai) (Dr. P t P t i) Chairman of the Board 2 Team1-64.indd 2 4/2/10 7:22:06 PM
  52. 52. Management and Training project and Offering consulting services in organization management , corporate strategic management, financial management, investment, marketing and human resource development, we assist our clients in project implementation and organizational and personnel capacity building to enhance their competitiveness. 51 Team1-64.indd 51 4/2/10 7:26:16 PM
  53. 53. Economic Value Management (EVM) Clients: The Airports of Thailand Public Company Limited (AOT) Central Pattana Public Company Limited (CPN) Administered by: Management Solutions International Ltd. : ( ) ( ) : We assisted with the implementation of the EVM We also developed the EVM system for the CPN, system for AOT, a corporatized state enterprise with one of Thailand’s leading retail property developers, an internationally-oriented operation, so that it could and raised the EVM awareness throughout the operate in response to the government’s policies while organization to ensure its most effective operation. generating benefits for both the state and its In 2009, the implementation of EVM system at shareholders. Engineering considerations were also both organizations continued to the implementation applied when devising the corporate strategy to phase. When the system is completely linked with develop airport utilities efficiently. their corporate management, they will be able to set their investment plan and activities to generate value- added and fair benefits for all stakeholders. 52 Team1-64.indd 52 4/2/10 7:26:18 PM
  54. 54. Today, most international organizations have adopted the EVM system as their organization management guidelines. The system focuses on value creation through the organization’s operating, investment and financing activities. Economic Profit (EP) is used as a key performance metric. One of the most useful strategic management tools, and one which is frequently used in successful EVM implementation, is the Balanced Scorecard (BSC). In general, the implementation of EVM and BSC is divided into three phases as follows. Phase 1: Organization and personnel preparation Phase 2: Personnel training and development of EVM center Phase 3: Linking EVM with corporate management system EVM (Economic Value Management: EVM) ( ) (Economic Profit: EP) Balanced Scorecard (BSC) EVM ( ) EVM BSC 3 1 2552 EVM EVM 2 EVM 3 EVM 53 Team1-64.indd 53 4/3/10 7:42:06 PM
  55. 55. Project Management of the New Tobacco Factory at Rojana Industrial Park, Phra Nakhon Si Ayutthaya Client: Thailand Tobacco Monopoly (TTM) Administered by: Management Solutions International Ltd. : : TEAM GROUP has recently been assigned as an official consultant by Thailand Tobacco Monopoly (TTM) to manage the construction of its new headquarters and tobacco 2553 production facilities following our successful completion of the project site selection, feasibility study as well as its detailed design. Construction will commence in mid 2010 and operations are scheduled to start in 2013. With our integrated expertise in construction and management, we will continue . to provide consultancy services in project management. TTM decided that it needed to move its existing headquarters and production facilities to a new location in Rojana Industrial Park, Phra Nakhon Si Ayutthaya. This is to improve its manufacturing processes, modernize its organization and optimize value to all stakeholders. The relocation requires expertise in diverse disciplines, not only in construction and machinery, but also in computer program design as information technology will be applied to corporate management to enhance operational efficiency and to eliminate redundant procedures. 2556 The new plant will produce approximately 32 billion 32,000 cigarettes per year. 54 Team1-64.indd 54 4/2/10 7:26:20 PM

×