SlideShare a Scribd company logo
1 of 117
egkjktiqj, Xokfy;j & 474 005
Maharajpur, GWALIOR - 474 005
CAMTECH/E/13-14/RRF/1.0
Hkkjr ljdkj GOVERNMENT OF INDIA
jsy ea=ky; MINISTRY OF RAILWAYS
REPORT
ON
RUNNING ROOM FACILITIES
TARGET GROUP: RUNNING ROOM IN-CHARGE
dsoy dk;Zky;hu mi;ksx gsrq
(For Official Use Only)
RReeppoorrtt
oonn
RRuunnnniinngg RRoooomm FFaacciilliittiieess
FOREWORD
The issue of resting facilities and other provisions for outstation rest of running staff has
been engaging the attention of Indian Railways time to time as is evident from the number of
letters and instructions issued on the subject by the Ministry of Railways and Zonal Railways.
Various Railways have taken up several steps to improve the conditions of Running
Room and made provision of various amenities and recreational facilities. Still there is scope of
improvement at various places.
In view of above CAMTECH has prepared this Report on “Running Room Facilities”
which shall be useful for Railways to improve the running rooms facilities and environment. The
check list will be useful to pride the missing facility.
CAMTECH, Gwalior A.R.Tupe
Date: 28th
March 2014 Executive Director
PREFACE
Running Room needs pride attention in order to ensure that crew rest is proper &
adequate. Sufficient facilities should be are available for the comfort of the running staff.
Various committees also drew attention of Railways on the subject to create the right kind of
environment for the running staff to take rest at outstation.
. CAMTECH has prepared this Report on “Running Room Facilities” to make improvement
in the facilities and amenities at Running Rooms. Good work done by various Railways along
with photographs has been incorporated in this report. CAMTECH also added a check list and
its recommendations on the subject.
It is clarified that this report does not supersede any existing provisions laid down by
Railway Board/ Zonal Railways. This report is for guidance only and it is not a statutory
document.
I am thankful to all field personnel who have helped us in preparing this report.
Technological up-gradation & learning is a continuous process. Hence feel free to write
to us for any addition or modification in this report. We shall highly appreciate your
contribution in this direction.
CAMTECH, Gwalior (Peeyoosh Gupta)
Date: 24th
March 2014 Jt.Director Electrical
e - mail id: direlcamtech@gmail.com
CONTENTS
Chapter No. Description Page No.
Foreword III
Preface IV
Contents V
Correction Slip VI
1. INTRODUCTION 01
2. GENERAL MANAGEMENT 04
3. ENGINEERING, ELECTRICAL AND GENERAL
INFRASTRUCTURE 21
4. BED ROOM 26
5. KITCHEN 36
6. DINNING HALL/ ROOM 47
7. TOILETS AND BATHROOM 52
8. READING ROOM 58
9. SAFETY AND SECURITY 62
10. YOGA, MEDITATION AND FITNESS 68
11. CAMTECH RECOMMENDATION 75
12. RECOMMENDED FACILITIES/INFRASTRUCTURE FOR
RUNNING ROOM 94
13. REFERENCES 108
ISSUE OF CORRECTION SLIPS
The correction slips to be issued in future for this handbook will be numbered as
follows:
CAMTECH/E/13-14/RRF. # XX date---------
Where “XX” is the serial number of the concerned correction slip (starting from 01
onwards).
CORRECTION SLIPS ISSUED
Sr. No. Date of issue Page no. and Item no.
modified
Remarks
CAMTECH/E/13-14/RRF/1.0 1
Report on Running Room Facilities March 2014
CHAPTER 1
INTRODUCTION
OBJECTIVE
To provide clean and quiet resting place for loco crew and guard along with
necessary messing, boarding and recreational facilities round the clock, Railway Board
has issued guidelines to Zonal Railways for implementation.
1.1 RAILWAY BOARD GUIDE LINES AS PER BOARD’S LETTER NO. 2001/M
(L)/467/2 DATED -10.11.03
1. Running room should be classified on the basis of number of users per day:
i.Category “A” – 51 users,
ii.Category “B” – between 21-50 users and
iii.Category “C” – up to 20 users.
2. Basic amenities like:
i.Proper hygiene, adequate toilet facilities and clear drinking water.
ii.Proper ventilation and lighting
iii.Desert cooler
iv.Reading room with magazine and newspaper
v.Cooking facilities to meet the needs of running staff
3. A norm of not more than two beds per room/cubicle should be adopted.
4. Where ever necessary boundary walls/fencing should be provided.
5. Standby power supply arrangement may be provided.
6. Mosquito nets/mosquito repellant etc. should be provided.
7. Railway and DOT phones should be provided.
8. Cooking utensils should be of stainless steel type.
9. Lockers should be provided to the running staff for keeping their personal
belongings/valuables.
10. First aid box and firefighting equipment should be provided.
11. Good quality linens should be provided.
1.2 A Report has been issued by Railway Board with a title “High Power Committee to
Review the Duty Hours of Running and Other Safety Related categories of Staff” on
August, 2013. Points pertaining to running room facilities are reproduced below for ready
reference:
1. Implementation of Railway Board’s Instructions on upkeep and maintenance of
the Running Rooms (Railway Board’s letter no.2001/M (L)/467/2 dated
10.11.2003), in particular the provision of two beds per room.
2 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
2. The provision of adequate accommodation in all Running Rooms so that there is
not even a single case of a loco pilot/ assistant loco pilot/ guard waiting for bed
after arriving in the running room.
3. Creation of a separate plan head for safety works including the works for running
room facilities and provision of adequate funds under this plan head. Until the
creation of the aforesaid plan head, works pertaining to running room facilities
should be permitted to be proposed under “Traffic facility” plan head with
adequate provision of funds.
4. Increase the powers of General Manager for sanctioning works related to running
rooms so that the proposals need not be sent to Board for approval unless the
value is very high.
5. The institution of running room standing committee should be revived to lend a
helping hand in solving the problems being faced by the running staff.
6. Regular monitoring and the compliance of the complaints made in the complaint
register of running rooms must be ensured.
7. All running rooms should be provided with air conditioning in due course
beginning with running rooms located in humid/ coastal areas, with 100% power
back up arrangements. A phase wise programme may be drawn and within 5
years, all running rooms on IR be provided with air conditioning facilities. Also,
new running rooms may be sanctioned with air conditioning facilities only.
8. The location for new running rooms should be decided taking into consideration
the noise pollution and air pollution. The proximity of running room to the
booking lobby should also be ensured to the extent possible.
9. Proper well lit pathways should be provided from Crew lobbies to running
rooms.
10. Provision of various facilities in running rooms as per the guidelines issued by
boards from time to time. Shoe polishing kit and ironing facility should also be
provided in all running rooms, in addition to what has already been prescribed.
11. Ministry of Railways letter no.2001/M (L)/467/2 dated 10-11-2003 inter-alia
provides categorization of the running rooms based on number of beds and
facilities as per this categorization. The committee agrees with the categorization
and provision of facilities as per this categorization along with the additional
facilities recommended above.
12. Ration based system should be done away with at the earliest.
13. Only the fully subsidized meals should be served to the running staff as is the
practice in civil aviation sector. Also, the catering contract should specifically lay
down the condition of preparing one or two extra dishes for running staff on
demand as per his requirement/ choice, on a token payment. For this purpose,
adequate provision of staff, specially the cooking staff, should be made in the
contract.
CAMTECH/E/13-14/RRF/1.0 3
Report on Running Room Facilities March 2014
14. For catering contract in the running rooms for the supply of pre cooked meals at
subsidized rates, the quality standard should be clearly defined in consultation
with a professional/ hotel management/ catering institute. The standard should not
be lower than that prescribed for AC 2- tier passengers in Rajdhani trains.
15. Estimated rates should be specified for catering contracts which should be
workable and comparable with the meal rates of AC 2 tier passengers in Rajdhani
trains. Also, to ensure the viability of the quoted rates. It should be clearly
stipulated in the tender conditions that the tenderer quoting below the estimates
rates would be disqualified.
16. To maintain the financial viability which, in turn, will ensure consistence in
quality, the accepted rate should be updated every 6 months on the basis of
consumer price index.
17. The selection of the service provider should be on the basis of two packet system
with pre-qualification bid ensuring his professional capability based on past
experience and should financial capacity.
18. Strict penal clauses should be inbuilt in the contract to ensure that there is no
compromise on quality during the execution of contract.
19. A bimonthly feedback system should be introduced. Under this system, the staff
can be asked to give feedback on a 5 or 10 point scale and the contract should be
terminated by giving only one chance to the contractor for improving the quality,
if the feedback is not satisfactory. The feedback forms and their collection boxes
should be kept in the lobby instead of running rooms to ensure fair and frank
feedback.
20. Wherever it is not feasible for the Zonal Railways to outsource the catering
contract due to location or size of the running room, the North Eastern Railway
model of providing the catering facilities through local management committee
may be considered for adoption.
21. The administration control of running rooms should be with the same authority
which controls the majority of running staff on the division/ area.
22. In metropolitan cities, a beginning may be made by providing 3 or 4 star hotel
accommodations to the running staff for resting at outstation. However, initially
it may be tried out for running staff working mail/ express/ passenger trains as
they work to a link which the arrival and departure timings are known in advance
quite accurately. Thus, planning for the accommodation for their stay can be done
easily.
4 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
CHAPTER 2
GENERAL MANAGEMENT
The following items shall be provided/ preferred:
1. ISO CERTIFICATION
2. GARDEN /HORTICULTURE
3. PROVISION OF COMPLAINT/SUGGESTION BOOK AND
RECORD OF ACTION TAKEN THEREON
4. PEST CONTROL
5. AVAILABILITY OF WASHING MACHINE /DRYER AND ELECTRIC
IRON
6. AVAILABILITY OF IMPREST AND ITS RECOUPMENT
7. STRENGTH OF RUNNING ROOM STAFF/ VACANCY
(SANCTIONED STAFF AS PER REQUIREMENT)
8. COMPUTERIZATION OF CHECKING IN FACILITY AT
RECEPTION
9. ROOM OCCUPANCY DISPLAY
10. STAFF IN PROPER UNIFORM WITH IDENTITY CARD
11. AVAILABILITY OF INSTRUCTION BOARDS
12. NOISE POLLUTION CONTROL
13. SPARE BEDS, MATTRESSES, LINEN AND PILLOW WITH
COVER
CAMTECH/E/13-14/RRF/1.0 5
Report on Running Room Facilities March 2014
1. ISO CERTIFICATION
Running Room, Shakurbasti,
Delhi Division, Northern Railway
ISO Certified 9001:2008
Running Room, Shakurbasti,
Western Railway
ISO Certified 9001:2008
Running room, Miraj, Pune
Division, Central Railway
ISO Certified 9001:2008
6 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
2. GARDEN /HORTICULTURE
Running Room, Ambala,
Northern Railway
Lawn and Garden
Running Room, Hospet,
South Western Railway
Lawn and Garden
CAMTECH/E/13-14/RRF/1.0 7
Report on Running Room Facilities March 2014
Running Room, Kakinada Port, South Central Railway
Lawn and Garden
Running Room, New Jalpaiguri,
Katihar, North Frontier Railway
Garden with a fountain gives serene
ambience in day time
Garden with a fountain gives
Serene Ambience in night time
8 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Over flowing water used for watering of plant
Watering of plant by
Over flowing water
Running Room, Titlagarh, East Coast Railway
Lawn and Garden
CAMTECH/E/13-14/RRF/1.0 9
Report on Running Room Facilities March 2014
Running Room, Sabarmati, Western Railway
Lawn and Garden
Running Room Nagpur, Nagpur Division, Central Railway
Lawn and Garden, planter kept on steel stand
10 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Garden view with Duck,
Pleasant view
Running Room,
Ernakulam, Southern Railway
Garden view with swan
3. PROVISION OF COMPLAINT/SUGGESTION BOOK AND RECORD OF
ACTION TAKEN THEREON
Running Room Ghorpuri, Pune Division, Central Railway
Encouraging suggestions &
maximizing performance by
using Complaint & Suggestion
Book
CAMTECH/E/13-14/RRF/1.0 11
Report on Running Room Facilities March 2014
Running Room, Ballarshah, Nagpur Division, Central Railway
Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway
12 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
4. PEST CONTROL
Prevention and control of pests & rodents in railway premises shall be carried out,
As per Railway Board Latter No. 2000/M(C)/141/7 Vol.IV dated. 21.12.2010
Running Room, Dhone,
Guntekal Division,
South Central Railway
5. AVAILABILITY WASHING MACHINE /DRYER AND ELECTRIC IRON
Running Room, Ballarshah, Nagpur Division, Central Railway
Running Room, Titlagarh, East Coast Railway
Running Room, Jhansi,
North Central Railway
Jhansi
Running Room, Kakinada Port,
South Central Railway
Pest-o-Flash unit and pest
control through spray
CAMTECH/E/13-14/RRF/1.0 13
Report on Running Room Facilities March 2014
6. AVAILABILITY OF IMPREST AND ITS RECOUPMENT
7. DISPLAY OF STRENGTH OF RUNNING ROOM STAFF/VACANCY
(SANCTIONED STRENGTH AS PER REQUIREMENT)
Running Room, Chakradharpur
South East Railway
8. COMPUTERIZATION OF CHECKING IN FACILITY AT RECEPTION
Running Room, Ballarshah, Central Railway Running Room, Nagpur, Central Railway
Running Room, Titlagarh, East Coast Railway
14 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway
Running Room, Sabarmati,Western Railway
Running Room Nagpur, Nagpur Division, Central
Railway
Return gift box to return the lost item of crew may be
kept at reception
Running Room, Sabarmati, Western Railway
कार्य पर जाने हेतु, क्र्ा आप स्वस्थ तथा अच्छे हैं स्वंर् को देखिर्े, हमारी तरफ से आपको शुभ र्ात्रा
CAMTECH/E/13-14/RRF/1.0 15
Report on Running Room Facilities March 2014
Running Room, Kanpur Central,
North Central Railway
Running room, Tiruchchirappalli
Southern Railway
Coir mat is provided in corridor and
wall for cooling of running room
Running Room, Bandra
Mumbai Division, Western Railway
Rail-net & Internet Facility is provided
Running Room, Dhone, Guntekal Division, South Central Railway
Personality keep up before departure
Automatic Shoe Shining Machine
SHOE SHINING MACHINE
Am I fit
16 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
9. ROOM OCCUPANCY DISPLAY
Running Room GMC, Kanpur, North Central Railway
Running Room, Erode, Salem Division, Running Room,Tiruchchrappalli
Southern Railway Southern Railway
CAMTECH/E/13-14/RRF/1.0 17
Report on Running Room Facilities March 2014
10. STAFF IN PROPER UNIFORM WITH I/CARD
Running Room, Erode, Salem Division,
Southern Railway
Running Room ,Chhapra
Varanasi Division,
North Eastern Railway
Running Room, New Jalpaiguri,
Katihar Division North Frontier Railway
Running Room, Nagpur
Central Railway
18 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
11. AVAILABILITY OF INSTRUCTION BOARDS
Running Room, Erode, Salem Division Southern Railway
Running Room, Guntur,
South Central Railway
Running Room, Kanpur, North Central Railway,
CAMTECH/E/13-14/RRF/1.0 19
Report on Running Room Facilities March 2014
Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway
Other Instruction Boards
12. NOISE POLLUTION
There are many methods which help to control the noise pollution.
 Construction of sound proof rooms for noisy machines in running room.
 Use of horns with jarring sounds to be banned.
 Proper law should be enforced to check the misuse of loudspeakers and public
announcements systems.
 Growing green plants/trees along roadside to reduce noise pollution as they absorb
sound.
 The source of noise must be reduced.
 Whereever possible the amount of traffic must be reduced near the running room by
planning diversion etc.
 The industries must be built away from the running room areas and the legal laws
must be established and observed to protect the humans from noise pollution.
 A general awareness programme to educate the people must be done.
20 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
13. SPARE BEDS, MATTRESSES, LINEN AND PILLOW WITH COVER
Towel may also be included in the linen packet.
Running Room, Chhapra, Varanasi Division, North Eastern Railway
Running Room GMC, Kanpur, North Central Railway
CAMTECH/E/13-14/RRF/1.0 21
Report on Running Room Facilities March 2014
CHAPTER 3
ENGINEERING, ELECTRICAL AND
GENERAL INFRASTRUCTURE
The following items shall be provided/ preferred:
1. POWER BACK UP
2. PERIODICAL WHITE WASHING AND REGULAR ENGINEERING
MAINTENANCE
3. ELECTRICAL WIRING AND PROPER MAINTENANCE
4. PROPER ILLUMINATION LEVEL
5. COMMUNICATION FACILITIES - RAILWAY AND DOT PHONES/CUG
6. PROVISION OF RAIN WATER HARVESTING
22 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
1. POWER BACK UP
Suitable power back shall be provided as per requirement so as to ensure continuous
electric supply to running rooms.
Running Room, Titlagarh
East Coast Railway
40 KVA DG Set
Running Room, Nagpur, Nagpur
Division, Central Railway
Running Room, Sabarmati
Western Railway
CAMTECH/E/13-14/RRF/1.0 23
Report on Running Room Facilities March 2014
2. WHITE WASHING AND ENGINEERING MAINTENANCE
Periodical white washing and regular engineering maintenance shall be ensured to
keep the running rooms in good condition.
By West Central Railway, Bhopal division white washing and Engg. maintenance
is being carried out through Zonal contract for their Integrated Running Room. Running
Room In-charge also uses imprest to take care of petty engineering repairs if the regular
departmental maintenance is taking time.
3. ELECTRICAL WIRING AND MAINTENANCE
Electrical wiring shall be checked periodically and regular attention shall be given
to light and fan points and other electrical fittings/equipment for their proper functioning.
This activity can be handled satisfactorily through departmental resources.
However, the Running Room imprest may also be allowed to get petty electrical general
works if departmental resources are taking time.
4. ILLUMINATION LEVEL
Sufficient illumination level shall be ensured in all areas of running room. The
running room may be provided with T5 and CFL lamps extensively in common areas like
Verandah, Reception, Reading Room, Kitchen, Dining halls, Toilet blocks etc.
Running Room Chhapra, Varanasi Division, North Eastern Railway,
Running Room, Kakinada Port
South Central Railway
24 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
5. COMMUNICATION FACILITIES
Adequate communication facilities railway phones
as well as DOT phones shall be provided for
communication.
Running Room Allahabad, North Central Railway,
Running Room, Phulera
North West Railway
Running Room, Kakinada Port
South Central Railway
Running Room, Erode, Salem Division,
Southern Railway
CAMTECH/E/13-14/RRF/1.0 25
Report on Running Room Facilities March 2014
6. RAIN WATER HARVESTING
Provision of Rain water harvesting shall be made during construction of new
running rooms and in existing running room it may also be done.
Pipe line arrangement for rain water harvesting at Running Room, Sabarmati,
Western Railway.
Running room, Kakinada Port
South Central Railway
Water pit arrangement for rain
water harvesting at Kakinada Port
Well type water pit arrangement for
rain water harvesting at Running
Room, Titlagarh, East Coast
Railway.
26 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
CHAPTER 4
BED ROOM
The following items shall be provided/ preferred:
1. NO. OF BEDS PER ROOM/CUBICLE:
i. Old Running Room - 4 Beds per Room
ii. New Running Room - 2 Beds per Room
2. WINDOW AND DOOR CURTAINS SHOULD BE OF DARK COLOR AND
SHOULD MATCH WITH INTERIORS.
3. MOSQUITO REPELLANT
4. DESERT COOLER FAN AND PUMP IN WORKING CONDITION
5. PROVISION OF ADEQUATE AVAILABILITY OF LOCKERS
6. PROVISION AND WORKING OF INDIVIDUAL READING LIGHTS AND
CHARGING POINTS
7. FOOT MAT/DOOR MAT
8. NUMBERING OF BEDS
9. PROVISION AND WORKING OF NIGHT LAMP
10. PEGS FOR CLOTHES
CAMTECH/E/13-14/RRF/1.0 27
Report on Running Room Facilities March 2014
1. NO. OF BEDS PER ROOM/CUBICLE:
i. Old Running Room- 4 Beds per Room
ii. New Running Room- 2- Beds per Room
2. WINDOW AND DOOR CURTAINS
Running Room, Phulera
North West Railway
i. Old running room
4 Beds per Room
Wooden four bedded room general
Running room, Hospet South Western Railway
ii. New Running Room
Two Bed per room
wooden
Running room
New Jalpaiguri,
Katihar,
North Frontier Railway
Two bed per room
Wooden
Curtain
Blanket
Mattress with bed sheets/covers
Mettress with bed sheets/ covers
Mosquito net
Wooden bed
Curtain
Blanket
Mosquito net
Mattress with bed sheets/ covers
Table and Chair
Corner stool
Curtain
Almirah
28 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Running room
Rourkela
South East Railway
Two bed room - Steel
Running room
Bilaspur, South East Central Railway
Two bed room - Wooden box type
Running room, Miraj, Pune Division, Central Railway
Each cubicle with curtains and entrance lamp
Mattress with bed
sheets/covers
Mosquito
net
Curtain
Blanket
Self
Contained
LockerChair
Space for
Footwear
Mosquit
o net
Window curtain
Curtain
CAMTECH/E/13-14/RRF/1.0 29
Report on Running Room Facilities March 2014
3. MOSQUITO REPELLANT
Mosquito repellant shall be provided in all rooms
Running Room Phulera
North West Railway
Running Room, Rourkela, South East Railway
Running Room Dhone, Guntekal Division,
South Central Railway
Running Room Nagpur
Central Railway
30 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
4. DESERT COOLER FAN AND PUMP IN WORKING CONDITION
Running room Jhansi
North Central Railway
Centralized Air Cooling System
Running Room Kakinada Port
South Central Railway
Running Room, Titlagarh East Coaost Railway,
Centralised Air Cooling System
Running Room Phulera, North West Railway
Centralized Cooling Plant
Centralized Cooling in Whole Building
COOLER
CAMTECH/E/13-14/RRF/1.0 31
Report on Running Room Facilities March 2014
5. PROVISION OF ADEQUATE AVAILABILITY OF LOCKERS
Running Room Phulera,
North West Railway
Bed Side Locker
Running Room Jhansi , North Central Railway
Running room Kakinada port, South Central Railway
Individual Lockers in each bed room
Running Room Nagpur, Central Railway
32 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
6. PROVISION AND WORKING OF INDIVIDUAL READING LIGHTS AND
CHARGING POINTS
Running Room Phulera, North West Railway
Running room Nagpur, Central Railway
Running Room, Jhansi
North Central Railway
Running Room, Kakinada Port, South Central Railway
READING LIGHT
READING LIGHT
READING LIGHT
READING LIGHT
CHARGING POINT
CAMTECH/E/13-14/RRF/1.0 33
Report on Running Room Facilities March 2014
7. FOOT MAT/DOOR MAT
Running Room, Bilaspur, South East Central Railway
Running Room, Erode, Salem division, Southern Railway
Running Room Kakinada Port, South Central Railway
DOOR MAT
FOOT MAT
34 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
8. NUMBERING OF BEDS
Running Room Phulera, North West
Railway
Running Room, Nagpur Central Railway Nagpur
Running Room, Jhansi
North Central Railway
Running Room, Kakinada Port
South Central Railway
NUMBERING OF BED
NUMBERING OF BED
NUMBERING OF BED
CAMTECH/E/13-14/RRF/1.0 35
Report on Running Room Facilities March 2014
9. PROVISION AND WORKING OF NIGHT LAMP
Running Room, Rourkela, South East Railway
Running Room, Kakinada Port
South Central Railway
Running Room, Phulera, North West
Railway
Running Room, Sabarmati
Western Railway
********
NIGHT LAMP
NIGHT LAMP
36 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
CHAPTER 5
KITCHEN
The following items shall be provided/ preferred:
1. QUALITY OF UTENSIL/CROCKERY
2. CLEANING AND HYGIENE
3. SUBSIDIZED MEAL
4. MEDICAL EXAMINATION OF KITCHEN STAFF PER YEAR
5. QUARTERLY VISIT OF DOCTOR
6. EXHAUST FAN /CHIMNEY
7. SYSTEM OF GARBAGE DISPOSAL
8. LPG CYLINDER BACK UP
CAMTECH/E/13-14/RRF/1.0 37
Report on Running Room Facilities March 2014
1. QUALITY OF UTENSIL/CROCKERY
Running Room, Titlagarh, East Coast Railway, Titlagarh
Steam Hot Case
Store Room Adjacent To Kitchen
Running Room, Bangalore, South Western Railway
Hot Case for Curries Referigerator and Microwave Oven
SS Dterilizing tank for crockery
Wet Grinder Attached Kitchen store
38 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Shakurbasti Running Room
Delhi Northern Railway
Modern Kitchen With Electrical Gadgets
Cooking Of Meals Hot Case
Mixture Refrigerator
Utensils
CAMTECH/E/13-14/RRF/1.0 39
Report on Running Room Facilities March 2014
Running Room, Phulera, North West Railway
Staff on Job Utensils & Crockery
Microwave Oven
Tea Vending Machine Refrigerator
Dish Washer Machine
40 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Running Room, Sabarmati, Western Railway
Modern Kitchen with Electric Chimney, Microwave, Mixer Grinder
and Double Door Refrigerator
Running Room, Bandra, Mumbai Division,
Western Railway
Deep Freezer is kept in kitchen
CAMTECH/E/13-14/RRF/1.0 41
Report on Running Room Facilities March 2014
2. CLEANING AND HYGIENE
Running Room, Kakinada Port,
South Central Railway
Running Room, Rourkela,
South East Railway
42 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
3. SUBSIDIZED MEAL
Running Room,Titlagarh, East Coast
Railway
Running Room, Guntur, South
Central Railway
Running Room, Phulera
North West Railway
Running Room, Kakinada Port South Central Railway
Running room, Miraj, Pune Division, Central Railway
Ben Merry For Hot & Fresh Meals/ Food to the Running Staff
CAMTECH/E/13-14/RRF/1.0 43
Report on Running Room Facilities March 2014
Running Room, Ghorpuri, Pune Division, Central Railway
ISO 22000:2005 certified Running Room in
Indian Railways, which has been certified
for food safety management system.
4. MEDICAL EXAMINATION OF KITCHEN STAFF PER YEAR
Ensure that regular interval medical examination should be done of outsourced staff.
5. QUARTERLY VISIT OF DOCTOR
Running Room Chhapra,
Varanasi Division,
North Eastern Railway
Regular health check up
camp by Medical department
44 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
6. EXHAUST FAN /CHIMNEY
Running Room, Titlagarh,
East Coast Railway
Running Room, Shakurbasti, Delhi
Division, Northern Railway
Running Room Kakinada Port, South Central Railway
Running Room, Jhansi
North Central Railway
Running Room,Bilaspur
South East Central Railway
CHIMNEY
EXHAUST FAN
CAMTECH/E/13-14/RRF/1.0 45
Report on Running Room Facilities March 2014
7. SYSTEM OF GARBAGE DISPOSAL
Running Room, Titlagarh,East Coast Railway
Separate Waste Bins for Biodegradable & Non Biodegradable Wastes
Running Room Guntur,
South Central Railway
Running Room New Jalpaiguri, Katihar
Division, North Frontier Railway
Running Room, Kakinada Port
South Central Railway
46 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
8. LPG CYLINDER BACK UP
Running Room Erode, Salem Division
Southern Railway
Running Room, Kakinada Port
South Central Railway
Running Room New Jalpaiguri,
Katihar Division,
North Frontier Railway
Running Room Bhopal,
West Central Railway
CAMTECH/E/13-14/RRF/1.0 47
Report on Running Room Facilities March 2014
CHAPTER 6
DINING HALL/ROOM
The following items shall be provided/ preferred:
1. TABLE AND CHAIR
2. LIGHT AND FANS
3. FLY CATCHER MACHINE
4. AVAILABILITY OF WATER PURIFIER AND WATER COOLER
48 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
1. TABLE AND CHAIR
Running Room Bangalore
South Western Railway
Running Room Erode,
Salem Division, Southern Railway
Runnin Room Hospet,
South Western Railway
CAMTECH/E/13-14/RRF/1.0 49
Report on Running Room Facilities March 2014
Running Room, Kakinada Port
South Central Railway
Running Room New Jalpaiguri Katihar Division
North Frontier Railway
Dining hall -1 Dining hall -2
Running Room, Dhone Guntekal Division,
South Central Railway
50 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
2. LIGHT AND FANS
Running Room Erode, Salem Division,
Southern Railway
Runnin Room Hospet
South Western Railway
Running Room New Jalpaiguri,
Katihar Division , North Frontier Railway
Running Room Bhopal,
West Central Railway
CAMTECH/E/13-14/RRF/1.0 51
Report on Running Room Facilities March 2014
3. FLY CATCHER MACHINE
Running Room Phulera,
North West Railway
Fly Catcher hanging position
Running Room Erode, Salem Division,
Southern Railway
Fly Catcher kept on table
Running Room Bilaspur
South East Central Railway
Fly Catcher hanging position
4. AVAILABILITY OF AQUA GUARD AND WATER COOLER
R.O. System Water Cooler
Running Room Phulera
North West Railway
Running Room Kakinada Port,
South Central Railway
Running Room GMC,
Kanpur
North Central Railway
Running Room,
Kanpur Central
North Central Railway
52 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
CHAPTER 7
TOILETS AND BATHROOM
The following items shall be provided/ preferred:
1. BUCKET AND MUGS AVAILABILITY AND CONDITION
2. WORKING OF FLUSH SYSTEM
3. SOLAR WATER HEATER/ GEYSER
4. ADEQUATE WATER SUPPLY
5. TOWEL/CLOTH HANGER ,SOAP STAND
6. CLEANLINESS
CAMTECH/E/13-14/RRF/1.0 53
Report on Running Room Facilities March 2014
1. AVAILABILITY OF BUCKET AND MUGS
2. WORKING OF FLUSH SYSTEM
Running Room, Erode, Salem Division Southern Railway
Running Room, Bilaspur, South East Central Railway
54 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Running Room, Sabarmati, Western Railway
CAMTECH/E/13-14/RRF/1.0 55
Report on Running Room Facilities March 2014
3. SOLAR WATER HEATER/ GEYSER
4. ADEQUATE WATER SUPPLY
Running Room, Erode,
Salem Division
Southern Railway
Running Room Amla, Nagpur Division Central Railway
Running Room, Rourkela South East Railway
Running Room Nagpur,
Nagpur Division
Central Railway
56 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
5. TOWEL/CLOTH HANGER, SOAP STAND
Running Room Nagpur,
Nagpur Division
Central Railway
Running Room Jhansi,
North Central Railway Jhansi
Running Room, Dhone,
Guntekal Division,
South Central Railway
Running Room Titlagarh, East Coast Railway
Tubular Aluminium Rack
Running Room, Phulera
North West Railway
Auto Freshener
CAMTECH/E/13-14/RRF/1.0 57
Report on Running Room Facilities March 2014
6. CLEANLINESS
Running Room, Dhone, Guntekal Division, South Central Railway
Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway
Running room Miraj, Pune Division, Central Railway
58 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
CHAPTER 8
READING ROOM
The following items shall be provided/ preferred:
1. AVAILABILITY OF NEWS PAPERS (MINIMUM 3), MAGAZINE
2. SAFETY BULLETINS
3. LIGHTS AND FANS
4. TABLE AND CHAIRS
5. RECREATION FACILITY (CAROM BOARD ETC)
CAMTECH/E/13-14/RRF/1.0 59
Report on Running Room Facilities March 2014
1. AVAILABILITY OF NEWS PAPERS (MINIMUM 3) MAGAZINE
Running Room Nagpur, Nagpur Division Central Railway
Running Room, New Jalpaiguri,
Katihar Division,
North Frontier Railway
1. Running Room, Chakradharpur,
2. South East Railway
Running Room, Titlagarh, East Coast Railway
60 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
2. SAFETY BULLETIN
Running Room Bhopal,
Bhopal Division,
West Central Railway
Running Room Nagpur,
Nagpur Division, Central Railway
Running Room, Bandra, Mumbai Division, Western Railway
Hindi Library is provided
CAMTECH/E/13-14/RRF/1.0 61
Report on Running Room Facilities March 2014
3. LIGHTS AND FANS AND TABLE AND CHAIRS
Running Room, Kakinada Port,
South Central Railway
Running Room, New Jalpaiguri,
Katihar Division, North Frontier
Railway
4. RECREATION FACILITIES (INDOOR GAMES ETC.)
62 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
CHAPTER 9
SAFETY AND SECURITY
The following items shall be provided/ preferred:
1. AVAILABILITY OF PUCCA PATHWAY AND ILLUMINATION FROM
RUNNING ROOM TO LOBBY
2. FIRE PROTECTION SYSTEM
3. FIRST AID BOX
4. BOUNDARY WALL/FENCING
5. TRAINING OF RUNNING ROOM STAFF ON FIRST AID AND FIRE
FIGHTING
CAMTECH/E/13-14/RRF/1.0 63
Report on Running Room Facilities March 2014
1. AVAILABILITY OF PUCCA PATHWAY AND ILLUMINATION FROM
RUNNING ROOM TO LOBBY
Running Room GMC, Kanpur, North Central Railway
Running Room Amla, Nagpur Division
Central Railway
Covered path way
Running Room, Guntur,
South Central Railway
64 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
2. FIRE PROTECTION SYSTEM
Running Room, Allahabad, North Central Railway, Allahabad
Running Room, Guntur, South Central Railway
Running Room, Titlagarh, East Coast Railway
Fire Bucket with sand
CAMTECH/E/13-14/RRF/1.0 65
Report on Running Room Facilities March 2014
3. FIRST AID BOX
Running Room, Guntur, South Central
Railway
Running Room Ghorpuri,
Pune Division, Central Railway
Running Room, Dhone, Guntekal Division,
South Central Railway
Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway
66 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
4. BOUNDARY WALL/ FENCING
Running Room, Guntur, South Central Railway
Running Room Amla, Nagpur Division Central Railway
CAMTECH/E/13-14/RRF/1.0 67
Report on Running Room Facilities March 2014
5. TRAINING OF RUNNING ROOM STAFF ON FIRST AID AND FIRE
FIGHTING
Running Room, Phulera North West Railway
Running Room, Kakinada Port,
South Central Railway
Running Room, Dhone, Guntekal Division, South
Central Railway
Running Room, Guntur,
South Central Railway
68 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
CHAPTER 10
YOGA, MEDITATION AND FITNESS
The following Amenities should be provided for Yoga, Meditation & fitness
1. ROOM/HALL FURNISHED WITH CARPET
2. LIGHT MUSIC SYSTEM
3. COMPUTER WITH LCD PROJECTOR
4. CONSECRATION BOARD
5. DISPLAY OF MOTIVATIONAL SLOGANS
6. FITNESS FACILITIES
CAMTECH/E/13-14/RRF/1.0 69
Report on Running Room Facilities March 2014
1. CONSECRATION BOARD AND ROOM FURNISHED WITH CARPET
Running Room, New Jalpaiguri,
Katihar Division,
North Frontier Railway
Running Room, Allahabad,
North Central Railway, Allahabad
Bangalore Running Room, South Western Railway
70 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Running Room Tiruvottiyur, Chennai Division, Southern Railway
Meditation hall decorated with white satin clothes on walls with Floor mat.
Running Room, Titlagarh, East Coast Railway
Running Room, Kakinada Port, South Central Railway
CAMTECH/E/13-14/RRF/1.0 71
Report on Running Room Facilities March 2014
2. LIGHT MUSIC SYSTEM
The yoga room at running room/Erode is
renovated and furnished with light music system.
Running Room, Erode, Salem Division
Southern Railway
3. DISPLAY OF MOTIVATIONAL SLOGAN
Running Room, Bandra, Mumbai Division, Western Railway
Display of digital moving safety slogans Display of LED digital display board
72 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Running Room, Idgah Agra, North Central Railway
Stress Management Note
4. PHYSICAL FITNESS FOR HEALTH & RELAXATION
Running Room, Ballarshah, Nagpur Division, Central Railway
Foot Massager and Gym Equipments for relaxation
Running Room Nagpur, Nagpur Division Central Railway
Foot Massager and Gym Equipments for relaxation
CAMTECH/E/13-14/RRF/1.0 73
Report on Running Room Facilities March 2014
Running Room, Titlagarh, East Coast Railway
Relax Reliving Equipment
Automatic shoe shine machine BMI Index and weight machine
Running room Miraj, Pune Division, Central Railway
Eye Massager BMI Charts Leg Massager
74 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Running Room, Sabarmati, Western Railway
Gym Equipments for relaxation
Running Room, Tiruchchrappalli, Tiruchchrappalli Division, Southern Railway
Jhoola for Relaxation
CAMTECH/E/13-14/RRF/1.0 75
Report on Running Room Facilities March 2014
CHAPTER 11
CAMTECH RECOMMENDATIONS
One seminar was organizes at CAMTECH Gwalior on 14.02.2014 on Running Room
Facilities. Running room inspectors of different Zonal Railways and Divisions participated in
the seminar. Following recommendations are made by CAMTECH for convenient stay of crew
at Running Rooms.
1. To Instill feeling of serving better following display is proposed at reception.
2. Many of the activities of running rooms are being
outsourced. To keep watch on unauthorized person,
one CCTV (Close Circuit Television) system may
be provided at reception. Similarly smoke detector
may also be provided to avoid fire incident.
76 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
3. Important DOT or mobile phone numbers
should be displayed at appropriate places.
4. Computer may be provided at
reception with internet connection to
locate exact position of train. This will
also reduce the work load at
TLC/Power controller. Many running
rooms are using software for check in
check out position of crew.
CCC/Jhansi using net facility
5. Daily ‘AAJ KA VICHAR’ ‘vkt dk fopkj ’ may be written
on board which is to be kept at reception for encouragement
of running crew.
6. Complain box may be kept at reception. The key of the
same should be with running room in-charge.
CAMTECH/E/13-14/RRF/1.0 77
Report on Running Room Facilities March 2014
7. Nails of kitchen staff should be properly
clean and well trimmed. It may be
checked weekly by running room in-
charge.
8. Industrial Chimney should be used for
venting hot flue gases or smoke from
boiler, stove, and furnace to the outside
atmosphere. Jhansi Division developed
the heavy duty chimney locally.
9. Heavy Duty (Hotel Grade i.e. more than 1000W)
Mixer Grinder is recommended for use in running
room. It has high productivity and used in commercial
and institutional kitchens.
Special Features of heavy duty mixer grinder is as
follows:
 Different sizes for different needs: 1½ Hp, 2 Hp &
3 Hp Motor with 4 Litres, 6 Litres, 10 Litres and
15 Litres Jar.
 Ruggedly built stainless steel jar.
 Safety interlocking between jar and motor
 Heavy duty induction motor, continuous duty
motor.
 The coupling is metal i.e. hence no wear or tears and long life bearing.
10. Reverse Osmosis (RO) system is a process of
physical separation of dissolved solids and minerals
present in water. This technology uses the principle
of osmosis, wherein the mineral concentration of
raw water is reduced by applying high pressure
through a semi-permeable membrane. The Quality
of purified water produced by Reverse Osmosis
process is roughly a constant percentage of the feed
water i.e. it reduces the TDS of water by 90%
78 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Following care should be taken while selecting RO system:
i. It should be RO with UV.
ii. It should be of industrial grade.
iii. Necessary AMC should also be processed in time.
iv. It should be used only if the TDS of water is on higher side. Many make of RO
system has got inbuilt controller which bypasses the function of membrane, if
TDS of water is low. Thus making function of membrane defunct & only UV
purification is made.
11. Food Safety Management System (FSMS) provides a
preventative approach to identify, prevent and reduce food-
borne hazards. This is to minimize the risk of food
poisoning and to make food safe for consumption. A
well designed FSMS with appropriate control measures can
help food establishments comply with food hygiene
regulations and ensure that food prepared for crew is
hygienic and safe for consumers. Food Safety Management
System is based on ISO 22000:2005
Running Room Ghorpuri, Pune Division,
Central Railway has been certified with ISO: 22000 –
2005. Major principle of the same like washing of
vegetable, prevention of cooked food etc. may be extended
to other running room also.
12. Name likes ANNAPOORNA/
BHOJNALAYA/ KITCHEN ROOM etc.
may be written on board of kitchen.
13. For different taste of breakfast, lunch and dinner menu may be fixed as per day basis. 1st
& 3rd
week and 2nd
& 4th
week menu may be kept same. Menu is required as it helps to
plan the contractor of subsidized meals in advance.
14. Lot of energy is being wasted in heating of water for cooking activity.
Arrangement should be made to use pre-heated water by solar energy for
cooking activity.
15. Hot & cold flask may be kept for drinking warm/cold water as per
requirement of weather.
CAMTECH/E/13-14/RRF/1.0 79
Report on Running Room Facilities March 2014
16. Many of the crew is diabetic therefore provision of sugar free tea/special meal may be
made. Tea/coffee vending machine may be provided at running room.
17. Hot water bottle may be kept at reception for those who are
suffering from pain arising out of spondylitis, Sciatica,
arthritis etc.
18. To cater for emergency First aid box including Digital medical equipment like Blood
Pressure, Thermometer, Blood sugar, eye massager etc. may be kept at reception.
Blood sugar tester Blood pressure tester
.
Thermometer
19. i. Room number may be displayed on
door and shall be closed properly
to avoid noise pollution. Flush type
lock which can be operated from
both sides may be provided.
ii. Door closer should be provided for
closing the door
80 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
20. Plantation may be done around running room building to protect from direct sun.
21. Civil authorities should be approached for removing the liquor shop
near the running room.
22. Bathroom floor should be lower than other floor surface to avoid water entry outside
bathroom
23. Dust bin may be kept in
bathroom/Toilet to
dispose waste etc.
24. Good quality shower may be provided in bath rooms which
give pleasure while bathing.
25. Many products are available in the market with brand thermocool and similar which
blocks the transfer of heat inwards while applied on roofs. Same may be applied on the
roof of the running room to keep the same cool during summer.
UPPERSURFACE
LOWERSURFACE
UPPERSURFACE
LOWERSURFACE
DUSTBIN
DUSTBIN
CAMTECH/E/13-14/RRF/1.0 81
Report on Running Room Facilities March 2014
26. Similar arrangement like insert key tag may be provided for
energy conservation and electrical safety.
27. Instead of direct lighting defused light/pathway lighting may be
provided in bed rooms.
28. Fresh air fan may be provided in toilet & bathroom.
29. Necessary switches for fan, light, cooler etc. may be provided
on table lamp desk for ease in reach duly taking safety
precaution.
30. Thermostat functioning should be
checked for geyser at regular interval
to avoid any unusual like bursting of
the same. Thermostat checking date
should be written on the geyser.
DIFUSED LIGHT
82 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
31. MCBs should be checked for proper functioning.
32. Call bell in each room should be provided if there is a
possibility of locking the room by Loco pilot from inside
33. At many places cooking gas is in shortage. Possibility of using induction cooker may be
explored.
34. Energy audit of running room can be carried out.
35. Fire fighting practical training may be given to all
running room staff including staff of contractor.
They must be told that whenever the operation of fire
extinguisher is carried out the pipe of the same
should be hold tightly and head should be backward
away from the body.
36. Automatic cut off sensor may be provided to save electrical energy. It has been provided
in Sabarmati running room, Western Railway.
37. Building may be decorated with greenery
CAMTECH/E/13-14/RRF/1.0 83
Report on Running Room Facilities March 2014
38. Necessary comfort may be provided at reception hall of running room.
Visitor Room
Jhoomer Lights
39. Muddy water spills over when plants are watered. Planter may be kept in steel body
case/tray at the entrance/corridor of the running room.
84 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
For beautification planter may be kept on stand as well.
40. Scriptures may be kept at reception
41. Aquarium may be kept at reception
42. Fly proof mesh to window and doors must be provided.
43. Corner table may be kept at suitable places
CAMTECH/E/13-14/RRF/1.0 85
Report on Running Room Facilities March 2014
44. Auto flush sensor may be provided
in urinals to avoid bad odor.
45. If the conventional dust bin gets damaged frequently, covered durable dustbins may be
kept in corridor as well as in common places.
46. Smoking should be strictly prohibited in the campus of running room.
47. Running crew is away from home during festivals also. To instill the feeling of
belongingness, festival may be organized in running rooms. Fasting meal should also be
served if required by running crew.
86 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
48. During seminar many in-charges were having opinion to change the name of running
rooms as the same does not give feeling of belongingness. Zonal Railways may initiate
proposal in this regard if desired so. The proposed names of running room are
i. Train crew rest house
ii. Train crew out station home
iii. Running staff guest house
iv. Running staff rest house
Similarly the name of subsidized meal may be changed to ‘Sahbhagi Bhojan’,lgHkkxh
Hkkstu’
49. The number of female crew is also increasing therefore suitable facilities may be made.
50. Cow catcher may be provided at main entrance to avoid entry of animals in the campus
of running room. Suitable chemical may be sprayed under cow catcher to remove/re
growth of vegetation.
51. To keep the magazine in order wooden/ steel body stand may be provided in reading
room.
Wooden Steel pipes fabricated Steel fabricated
52. The utilization of meditation and yoga
room is found to be very poor. Many
running rooms have arranged lectures by
motivational institutions such as
Ishwaria Prajapita Bharam kumari etc.
CAMTECH/E/13-14/RRF/1.0 87
Report on Running Room Facilities March 2014
53. Many loco pilots complain of not getting sleep. Few running rooms have kept yoga
NIDRA lecture in i-pod to be heard if crew not getting sleep.
54. Industrial vacuum cleaner may be made available for cleaning of carpet in meditation
room.
55. Manning of janitor shall be round the clock.
56. Spot purchase committee for purchasing running room’s should be developed.
57. Wherever possible the same room/bed may be allotted to the loco pilot for sound sleep.
58. Different types of wall papers/sceneries may be provided.
88 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
Bed Room Wall Scenery
59. There should be display of motivation/safety/ energy conservation/ enhance natural
resources slogans and Regional Ancient Art
CAMTECH/E/13-14/RRF/1.0 89
Report on Running Room Facilities March 2014
Display of slogans
90 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
CAMTECH/E/13-14/RRF/1.0 91
Report on Running Room Facilities March 2014
92 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
CAMTECH/E/13-14/RRF/1.0 93
Report on Running Room Facilities March 2014
60. Contractor staff needs training on ‘How to Attend Customer’ before deploying on running
room.
61. Optimum Size/ Number of fans for rooms of different Sizes (Source: NBC of India 2005)
Room
Width
ROOM LENGTH
m 4 m 5 m 6 m 7 m 8 m 9 m 10 m 11 m 12 m 14 m 16 m
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
3 1200/1 1400/1 1500/1 1050/2 1200/2 1400/2 1400/2 1400/2 1200/3 1400/3 1400/3
4 1200/1 1400/1 1200/2 1200/2 1200/2 1400/2 1400/2 1500/2 1200/3 1400/3 1500/3
5 1400/1 1400/1 1400/2 1400/2 1400/2 1400/2 1400/2 1500/2 1400/3 1400/3 1500/3
6 1200/2 1400/2 900/2 1050/4 1200/4 1400/4 1400/4 1500/4 1200/6 1400/6 1500/6
7 1200/2 1400/2 1050/4 1050/4 1200/4 1400/4 1400/4 1500/4 1200/6 1400/6 1500/6
8 1200/2 1400/2 1200/4 1200/4 1200/4 1400/4 1400/4 1500/4 1200/6 1400/6 1500/6
9 1400/2 1400/2 1400/4 1400/4 1400/4 1400/4 1400/4 1500/4 1400/6 1400/6 1500/6
10 1400/2 1400/2 1400/4 140/4 1400/4 1400/4 1400/4 1500/4 1400/6 1400/6 1500/6
11 1500/2 1400/2 1500/4 1500/4 1500/4 1500/4 1500/4 1500/4 1500/6 1500/6 1500/6
12 1200/3 1400/3 1200/6/ 1200/6 1200/6 1400/6 1400/6 1500/6 1200/9 1400/9 1400/9
13 1400/3 1400/3 1200/6 1200/6 1200/6 1400/6 1400/6 1500/6 1400/9 1400/9 1500/9
14 1200/3 1400/3 1400/6 1400/6 1400/6 1400/6 1400/6 1500/6 1400/9 1400/9 1500/9
94 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
RECOMMENDED FACILITIES/INFRASTRUCTURE FOR RUNNING ROOM
GENERAL MANAGEMENT
S. No. Items Scale/ other details
1. ISO Certification i. ISO 9001: 2008 for Quality
Management System
ii. ISO 22000 : 2005 for Food Safety
Management System
iii. Even if the certification is not processed the
principles of ISO 9001/ 22000 may be
implemented.
2. Garden /Horticulture i. Garden may be furnished with Italian grass.
ii. Fountain may be provided in garden.
iii. Seasonal flower and show plant may be
planted.
iv. Duck and Swan may be kept.
v. Bench may be provide in garden.
vi. Plantation may be done around running room
building to protect from direct sun.
vii. Jhoola should be provided in garden.
3. Provision of
Complaint/Suggestion
book
i. Complaint/suggestion book shall be kept at
reception.
ii. All complaints & suggestions shall be
closely monitored & rectified regularly.
iii. Prompt action & feedback shall be taken
regularly.
4. Pest Control i. Pest-o-flash units shall be provided
regularly for effective control of insects.
ii. The pest control operators/contractors shall
be required to use only those
chemicals/pesticides that have been approved
for the household purpose by "Central
Insecticides Board and Registration
Committee" under the provision of
Insecticides Rules 1971 framed under
Insecticides Act 1968.
iii. For prevention of pest control Railway
Board's letter of even No.2000/M
(C)/141/7Vol.IV dt.21.12.2012 may be
referred.
5. Spot purchase
committee
A standard spot purchase committee at
divisional level should make purchase of running
room items.
CAMTECH/E/13-14/RRF/1.0 95
Report on Running Room Facilities March 2014
GENERAL MANAGEMENT
S. No. Items Scale/ other details
6. Availability of imprest
and its recoupment
i. The officer in-charge of the running room and
its supervisor should be liberally empowered.
ii. A cash imprest of Rs. 25,000/- should be
provided with the officer in- charge of the
running room for petty engineering repairs
and replacement of electrical fittings.
iii.Imprest should be recouped quickly.
7. Allocation head A separate head should exist for booking all
running room expenses under one head
8. Strength of running
room staff/ vacancy
(sanctioned staff as per
requirement)
i. Vacancies of Railway staff should be fill up.
ii. Even if activities of running room are
outsourced at least one Railway
representative may be deputed round the
clock in running room.
9. At reception i. Necessary comfort may be provided at
reception hall of running room.
ii. Computer with Rail net & internet
connection may be provided at reception and
also in the office of supervisor room to check
occupancy and exact position of train.
iii. Full size mirror, height & weighing machine
should be provided at reception.
iv. Automatic shoe shining machine should be
kept at reception.
v. Walki-Talki charging point should be at
reception.
vi. Points to prevent SPAD should be at
reception.
vii. Jhoomer lights may be provided at reception
hall.
viii. Planter may be kept in steel body case/tray at
the reception/ entrance/corridor.
ix. Scriptures may be kept at reception.
x. Aquarium may be kept at reception.
xi. Cooler may be provided at reception hall.
xii. Different types of wall papers/sceneries
may be provided at reception hall.
xiii. Daily ‘AAJ KA VICHAR’ ‘vkt dk fopkj’
may be written.
xiv. To keep watch on unauthorized person, one
CCTV (Close Circuit Television) system
may be provided at reception. Similarly
smoke detector may also be provided to
avoid fire incident.
96 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
GENERAL MANAGEMENT
S. No. Items Scale/ other details
xv. To instill feeling of serving better
following may be display is proposed at
reception.
a. Serve with a smile
b. vfrfFk nsoks Hko ATITHI DEVO BHAVA
xvi. Wall clock should be provided at reception.
10. Room occupancy
display
Room occupancy board may be display at
reception
11. Staff in proper uniform
with identity card
All running room staff should wear proper
uniform and identity cards with laminated
photographs and other particulars.
12. Availability of
instruction boards
The following instruction board should be
display :
i. Motivation board
ii. Safety board
iii. Energy conservation board
iv. Enhance natural resources slogans board
v. Regional Ancient Art board
13. Noise pollution control i. Door closer should be provided for closing
the door.
ii. Flush type lock which can be operated
from both sides may be provided for proper
closing.
iii. Rubber sole shoe should be worn by
running room staff to have noiseless step.
14. Spare beds, mattresses,
linen and pillow with
cover
i. 6% spare beds should be available in good
condition in running room.
ii. Spare good quality mattresses should be
available in proper stacked with sufficient
quantity
iii. Polythene packed washed spare linen and
pillow with cover should be kept in
almirah.
iv. Linens/blankets/Towels should be marked
with date of supply, serial number, printing
year of purchase and available sufficient
quantity in running room.
CAMTECH/E/13-14/RRF/1.0 97
Report on Running Room Facilities March 2014
ENGINEERING, ELECTRICAL AND GENERAL INFRASTRUCTURE
S. No. Items Scale/ other details
1. Power back up i. Suitable power back up shall be provided as
per requirement so as to ensure continuous
electric supply to running rooms.
2. Colour and white wash
and regular
engineering
maintenance
i. Annual colour wash shall be done for bed
room, lounge and dining room.
ii. Annual white wash shall be done for box room,
store room.
iii. Quarterly white wash shall be done for bath
room, lavatory, urinals, kitchen and pantry.
iv. Periodical white washing and regular
engineering maintenance shall be ensured to
keep the running rooms in good condition
3. Electrical wiring and
proper maintenance
i. Electrical wiring shall be checked periodically
and regular attention shall be given to light and
fan points and other electrical
fittings/equipment for their proper functioning.
ii. Thermostat functioning of gyser should be
checked at regular interval to avoid any
unusual like bursting of the same.
iii. MCB should be checked for proper
functioning.
4. Proper illumination
level
i. Sufficient illumination level shall be ensured in
all areas of running room. The running room
may be provided with T-5 and CFL lamps
extensively in common areas like Verandah,
Reception, Reading Room, Kitchen, Dining
halls, Toilet blocks etc.
ii. Energy audit of running room can be carried
out.
iii. Automatic cut off sensor may be provided to
save electrical energy.
5. Communication
facilities - railway and
DOT phones
Both Railway & DOT communication facilities shall
be available.
6. Provision of rain water
harvesting
Rain water harvesting shall be made in running
room.
98 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
BED ROOM
S. No. Items Scale/ other details
1. Floor area 60 Sq. feet per person approximate
2. No. of beds per
room/cubicle
i. Bed size - 3’x6 ½’
ii. Rigid steel frame with hard plywood tops.
iii. Two beds per room.
3. Bed numbering and
display occupancy outside
the room
i. The bed in the running room should be
numbered.
ii. The name of the occupant of each bed
should be displayed on a small board
outside each room so that correct crew is
woken up without disturbing others.
4. Cubical The cubical should be perforated, should be
shoulder height, 6” below the mattress level.
5. Mattress Rubberized coir foam for one person per bed shall
be required.
6. Pillow and pillow cover i. Pillow shall be cotton filling in strong soft
cover (27”x16”) one per bed.
ii. Pillow cover shall be white soft 30”x 20” one
per bed.
iii. Requirement for washing numbers of pillow
x numbers of user x one day for laundry
7. Blanket i. Blanket shall be one or two blanket per user
in winter (To be fixed by officer in-charge).
ii. The quality of blanket should be same as
AC-I Coach.
iii. It must be sent to laundry once in three
months
8. Linen i. Two numbers polythene packed washed
linen shall be issued to each person
ii. The quality of linen shall be same as AC-1
Coach
iii. Requirement may be calculated as:
Number of users x washing cycle x 2+ 15%
reserve.
9. Door and window curtains i. Curtains should be of dark color and should
match with interiors.
ii. Curtain should be thick cotton cloth of
pleasing colour.
iii. Sun control black film on every window
may be provided to prevent ingress of direct
sun light.
10. Mosquito repellant Bed room shall be provided mosquito nets &
repellant
CAMTECH/E/13-14/RRF/1.0 99
Report on Running Room Facilities March 2014
BED ROOM
S. No. Items Scale/ other details
11. Desert cooler and Exhaust
fan
i. Wherever desert cooler are provided should be
checked periodically.
ii. One cooler per room for new running room
iii. One cooler for four person in existing running
rooms
iv. Minimum one exhaust fan shall be provided
per room, if ventilation is not proper.
v. Actual number of fan should be decided
locally.
12. Lockers Lockers/shelf shall be provided in bed room for
each bed.
13. Provision of lights i. Individual light shall be provided for each cot.
ii. Instead of direct lighting diffused
light/pathway lighting may be provided in bed
rooms.
iii. Night light may be provided at floor level
14.
Foot mat/door mat i. Individual foot mat shall be provided for each
bed.
ii. Door mats shall be provided at each and every
door as per requirement.
15. Windows & Doors i. Wire mesh should be fitted on window.
ii. Door should be Panel type.
16. Plug points Plug points shall be provided for mosquito
repellent, pedestal fan, room heater, mobile
charging etc.
17. Room heater Applicable only for cold area at the desertion
office in-charge.
18. Call bell i. Call bell shall be provided one push button/
cubical (Existing running room)
ii. Call bell shall be provided one push button/
room (New Running Room.
19. Pegs for clothes Individual pegs should be provided for each bed.
20. Ventilator Blue colour glasses should be provided in bed
room ventilator
21. Cleaning and hygiene i. Cleaning of room shall be done twice a day
ii. Cleaning of rooms shall be done every
vacation of the occupants.
100 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
KITCHEN
S. No. Items Scale/ other details
1 UTENSILS AND OTHER ITEMS :
As per need however general scale of item is furnished below
Up to 20 to be
catered at a time
Up to 50 to be
catered at a time
i. Degchies with covers (a)18” - 3
ii. Degchies with covers ( a)14” 2 4
iii. Degchies with covers (a)12” 4 2
iv. Degchies with covers (a)10” 2 2
v. Degchies with covers (a) 8”
All aluminum vessels should be
replaced by stainless steel
vessels to avoid health hazard
2 2
vi. Karahi (Iron) (a) 16”
Karahi (Iron) (b) 14”
--
1
--
1
vii. Frying Pans(a) 18”
(b) 9”
(c) 6”
--
1
1
1
1
1
viii. Kettle for boiling water for tea
for 20 cups
1 1
ix. Coffee filter stainless (Shere
required medium type)
1 2
x. Milk can (Aluminium)
(a) 12 lb
(b) 8 lb
-
1
1
1
xi. Tava 1 2
xii. Parat (knotting flour) (a)26”
Parat (Knotting flour) (B)18”
-
1
1
-
xiii. Thali to cover parat 1 1
xiv. Karahi (Iron) Scraper 1 1
xv. Serving spoon 1 1
xvi. Karahi with ladle 6 6
xvii. Iron fire tongs 1 1
xviii. Fire Pokar 1 1
xix. Chains
(a) for flour wire gauze
(b) Brass for boiled rice
1
1
1
1
xx. Meat mincing machine 1 1
xxi. Ladookash (Great/spreader) 1 1
xxii. Sil/Batta 1 1
CAMTECH/E/13-14/RRF/1.0 101
Report on Running Room Facilities March 2014
KITCHEN
S. No. Items Scale/ other details
Up to 20 to be
catered at a time
Up to 50 to be
catered at a time
xxiii. Kundi/Danda 1 1
xxiv. Chakla/Belan 1 1
xxv. Meat Knife 1 1
xxvi. Meat chopper 1 1
xxvii. Bread Knife 1 4
xxviii. Bread board 1 2
xxix. Toasting rack 1 2
xxx. Vegetable knife 2 1
xxxi. Pie dishes (Various sizes) 3 3
xxxii. Basins, brass4” 2 3
xxxiii. Receptable for rubbish (with
automatic closing lid)
1 -
xxxiv. Lotas 2 2
xxxv. Buckets 3 4
xxxvi. Tumbler brass 2 3
xxxvii. Tin cutter 1 2
2. WARE AND CUTLERY :
As per need
i. Mug-porcelain
ii. Steel ware full plates
iii. Steel ware quarter plate
iv. Trays for serving tea
v. Katories –steel two per person plus one small one for ghee in south only
vi. Thalis with pressed katories recesses may also be used.
vii. Steel tumblers
viii. Jugs of stainless steel
ix. Table spoon –stainless steel
x. Tea spoons
xi. Desert spoons
xii. Desert forkes ( One per full plate set)
xiii. Tea strainers (adequate number)
xiv. Salt cellar to every table
xv. Pepper cellar to every table
102 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
KITCHEN
S. No. Items Scale/ other details
3. STORE ROOM
i. Provisions i. Size – 5’ X 6’3” for 10 beds.
ii. Size - 6’6” X 8’ for 50 beds.
iii. Sufficient numbers of shelves of suitable
width should available (some open &
others with lockable doors)
iv. Receptacles for storage of different kinds
of main provisions. (Applicable only where
departmental catering is available).
ii. General Storage i. Size – 14’ X 8’ for 10 beds.
ii. Size - 27’ X 12’ for 50 beds.
iii. The size of store room may vary depending
upon the size of the running room.
iv. Sufficient numbers of naphthalene tablets
should be used to avoid damage to blankets
& other stock.
v. Steel almirah should be provided for
stacking linen materials.
vi. Steel cupboards should be provided for
storage of bed, table linen, blankets etc.
vii. Proper locking arrangement &
enough space for spare furniture etc.
4. Rack (with railing) It should be provided on the side wall near the
cooking range.
5. Stools Stool should be available as per requirement.
6. Vegetarian and non
vegetarian kitchen
Separate kitchen should be provided for
vegetarian and non vegetarian food.
7. Cleaning and hygiene i. Cleaning of kitchen shall be done twice a
day.
ii. Menu should be written on board outside the
kitchen daily.
iii. Only branded consumables such as edible
oil, aata, rice, spices etc. shall be used.
iv. Nails of kitchen staff should be properly
clean and well trimmed.
8. Subsidized meal i. Ben Merry, microwave and steam hot case
should be used for hot & fresh meals/ food to
the running staff.
ii. Hot plate should be used.
iii. Subsidized meal should available in all
running rooms.
CAMTECH/E/13-14/RRF/1.0 103
Report on Running Room Facilities March 2014
KITCHEN
S. No. Items Scale/ other details
9. Medical examination of
kitchen staff per year
i. Proper medical of all kitchen staff shall be
ensured.
ii. Use of apron, gloves, nail trimming etc.
shall be ensured.
iii. Health & food related stickers to be
displayed.
10. Quarterly visit of doctor Railway doctor should visit the running room and
seek opinion of the occupants about the food and
other environmental conditions.
11. Exhaust fan /chimney i. Exhaust fan should be provided
ii. Industrial electrical chimney should be used
for venting hot flue gases or smoke for
comfort of kitchen staff.
12. Mixture Grinder Heavy Duty (Hotel Grade i.e. more than 1000W)
Mixer Grinder is recommended for use in running
room.
13. System of garbage
disposal
Separate dustbins shall be provided for disposal
of Bio-degradable and Non-biodegradable
garbage.
14. LPG cylinder back up i. Back up LPG cylinder should be available in
exclusive gas room
ii. At many places cooking gas is in shortage.
Possibility of using induction cooker may be
explored.
DINING HALL/ROOM
1. Floor Area i. About 20 Sq.ft/person in lay out for 10 beds
ii. About 15 sq. ft /person in lay out for 50 beds
2. Window Wire mesh glazed window should be provided.
3. Doors Half glazed and half paneled swing type door
should be provided
4. Curtain Blue Cotton curtain on spring curtain rod should
be provided on the glazed portion only.
5. Dining table and chair Suitable size dining table and non-folding steel
type (superior quality) and wooden chair for
extremely cold places should be provided.
6. Mosquito Repellent (All
out or similar)
Minimum one number shall be provided. The
number can be increased based on area.
7. Light and Fans i. Sufficient illumination level shall be
ensured in dining hall.
ii. Dining hall may be provided with T-5 and
CFL lamps
iii. One fan should be provided for each table.
104 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
DINING HALL/ROOM
S. No. Items Scale/ other details
8. Water purifier and
water cooler
Reverse Osmosis (RO) system with water cooler
should be provided for supply of drinking water.
9. Call bell One push button on each table shall be provided.
TOILETS AND BATHROOM
1. Bath room i. Bathroom floor should be lower than other floor
surface to avoid water entry outside bathroom.
ii. Good quality shower may be provided in bath
rooms which give pleasure while bathing.
iii. Fresh air fan may be provided in toilet &
bathroom.
2. Lavatory i. Flush type
Both Indian (squatting) type and western
type to be provided.
ii. Dust bin may be kept in toilet to dispose waste
etc.
3. Urinals Auto flush sensor may be provided
in urinals to avoid bad odor.
4. Floor i. Antiskid tiles on floor.
ii. Granite tiles on walls up to 4’6”.
5. Wash basins &
mirrors
i. One per 8 beds (up to 50 beds).
ii. One for 10 beds (Beyond 50 bed).
6. Electric water heaters
(Geysers)
i. One for each bathroom.
ii. One standby for each running room.
7. Solar water heater Solar water heater should be provided.
8. General arrangement i. Bath rooms and lavatories should be separate.
ii. The complete bathroom and toilet area should
be tiled with antiskid tiles.
iii. Interior walls of lavatories and closets to be of
granite tiles to a minimum height of 4’6”.
Floor to be of antiskid tiles.
iv. Deodorant tablets must be provided in the
lavatory.
v. All bath rooms must be provided with coat
hooks /hanger
vi. Soap dish holders in sufficient nos.
vii. Liquid soap dispensers should be available
with every wash basins.
viii. Bath rooms soap dispensers should be
available with every wash basins.
ix. Adequate sanitary workers should be
available & earmarked for running room.
x. Arrangement for hanging cloths and towels.
CAMTECH/E/13-14/RRF/1.0 105
Report on Running Room Facilities March 2014
TOILETS AND BATHROOM
S. No. Items Scale/ other details
xi. Shower as well as the ordinary tap should be
available.
xii. One three gallon bucket and one mug for each
bathroom.
xiii. Emergency water tanks.
9. Cleanliness i. Material required for sanitary staff should be
provided as per requirement.
ii. Daily cleaning should be done
10. Fresh air fan Fresh air fan may be provided in toilet & bathroom.
11. Availability of
washing machine
/dryer and electric
iron
i. Washing machine and iron may be provided in
laundry room.
ii. Hand drier may be available at dining room
and toilet/bathroom also.
READING ROOM/ LOUNGE
1. Doors Doors should be panel type
2. Floor Area i. 30 sq. feet/person for 10 beds layout
ii. 15 sq. feet/person for 50 beds layout
(to be allotted o the basis of the number of beds
plus a margin for increase)
3. News papers &
Magazine
As per Railway Board guide lines.
4. Small library A small library should be maintained, in which GR,
SR, Accident Manual, Trouble Shooting Guide,
operating Manual and similar other books may be kept.
5. TV Sets /Radio Sets /
Music System
If provided then its user shall be closely monitored.
6. Chairs Five for every twenty beds, including one easy chair
should be provided.
7. Ceiling fans It should be decided as per norms given in National
Building Code issued by Bureau of energy
conservation. Optimization table is reproduced on
CAMTECH recommendation serial no 62 page no 98
in this report.
8. Call bell One push button should be provided
9. Wall clock Wall clock shall be provided in the lounge.
SAFETY AND SECURITY
1. Pucca pathway and
illumination from
running room to
lobby
i. Pucca pathway should be made main of station
gate to running room.
ii. Pathway should be covered by plastic sheet.
iii. Plantation should be done on both side of
pathway.
iv. Sufficient illumination should be made from
running room to lobby.
106 CAMTECH/E/13-14/RRF/1.0
March 2014 Report on Running Room Facilities
SAFETY AND SECURITY
S. No. Items Scale/ other details
2. Fire protection
system
i. Adequate number of fire extinguishers shall be
provided.
ii. Ensure availability of round bottom fire buckets
filled with sand & water.
3. First aid box and
training of running
room staff on first
aid and fire fighting
i. First aid box shall be well equipped with
necessary medicines.
ii. Medicines shall be checked periodically for expiry.
iii. Running room staff should be trained in giving
first-aid including contractor staff and use of fire-
fighting equipment.
4. Boundary
wall/fencing
i. Running room should have proper boundary
wall/fencing.
ii. Collapsible gate should be provided with locking
arrangement to ensure security during night.
5. Security i. Round the clock security should be available.
YOGA, MEDITATION AND FITNESS
1. Light music system Light music system should be provided in meditation
room
2. Concentration board Concentration board should be provided in meditation
room such as dhyan bindu, OM etc.
3. Display of
motivational slogans
Motivational slogan should be display.
4. Recreation Facilities
(indoor Game etc.)
Indoor game may be provided such as carom, chess etc.
5. Fitness Facilities The following equipment may be kept for fitness-
i. Foot massager for relaxation.
ii. Gym equipment and gym ball
iii. Treadmill equipment
iv. BMI index and weight machine
v. Eye massager
vi. Acupressure equipment
MISCELLANEOUS
1. Lost item A box with name “Return Gift Box” to return the lost
item of crew may be kept at reception.
2. Coir mat Coir mat may be provided in corridor and wall for
cooling of running room.
3. Complain box Complain box may be kept at reception. The key of
the same should be with running room in-charge.
4. Display of important
mobile & DOT
number
Important DOT or mobile phone numbers should be
displayed at appropriate places.
CAMTECH/E/13-14/RRF/1.0 107
Report on Running Room Facilities March 2014
MISCELLANEOUS
S. No. Items Scale/ other details
5. Female crew Since the numbers of female crew are increasing therefore
suitable facilities may be made.
6. Festival in
running room
Running crew is away from home during festivals also. To
instill the feeling of belongingness, festival may be
organized in running rooms. Fasting meal should also be
served if required by running crew.
7. Sensor Automatic cut off sensor may be provided to save electrical
energy.
8. Energy saving Similar arrangement like insert key tag may be provided
for energy conservation and electrical safety.
9. Hot & cold flask Hot & cold flask may be kept for drinking warm/cold
water as per requirement of weather.
10. Rubber hot
water bottle
Hot water bottle may be kept at reception for those who are
suffering from pain arising out of spondylitis, sciatica,
arthritis etc.
11. Diabetic crew Many of the crew is diabetic therefore provision of sugar
free tea/special meal may be made.
12. Energy audit Energy audit of running room can be carried out.
13. Thermocool Many products are available in the market with brand
thermocool and similar which blocks the transfer of heat
inwards if applied on roofs. Same may be applied on the
roof of the running room to keep the it cool during
summer.
14. Induction cooker At many places cooking gas is in shortage. Possibility of
using induction cooker may be explored
15. Closing of
liquor shop
Civil authorities should be approached for removing the
liquor shop near the running room.
16. Auto sensor in
urinals
Auto flush sensor may be provided in urinals to avoid
bad odor.
17. Cow catcher Cow catcher may be provided at main entrance to avoid
entry of animals in the campus of running room. Suitable
chemical may be sprayed under cow catcher to block/re-
growth of vegetation.
18. Sound sleep i. Many loco pilot complain of not getting sleep. Few
running rooms have kept yoga NINDRA lecture in i-
pod to be heard if crew not getting sleep.
ii. Wherever possible the same room/bed may be allotted
to the loco pilot for sound sleep.
19. Industrial
vacuum cleaner
Industrial vacuum cleaner may be made available for
cleaning of carpet.
20. Smoking Smoking should be strictly prohibited in the campus of
running room
21. Training of
contractor staff
Contractor staff needs training on customer behavior
before deploying on running room.
CAMTECH/E/13-14/RRF/1.0 108
Report on Running Room Facilities March 2014
REFERENCES
1. Railway Board Guide Lines as per Board’s letter No.2001/M (L)/467/2 Dated -10.11.03.
2. Report on High Power Committee to Review the Duty Hours of Running and Other
Safety Related categories of Staff has been issued by Railway Board on August, 2013.
3. Report of ED’s committee of Railway Board on implementation in running room and
crew lobbies November 2003.
4. Suggestions given by participants for various Railways during seminar conducted on
14.02.2014 at IRCAMTECH, Gwalior.
5. Suggestions given by CMPE/SER/Kolkata vide letter no. M1/718/Rg.Room/Pt.VII/138
dated. 20.03.2014
.
If you have any suggestions and any specific
Comments please write to us.
Contact person : Director (Elect.)
Postal Address : Indian Railways
Centre for Advanced
Maintenance technology,
Maharajpur, Gwalior.
Pin code – 474 005
Phone : 0751 – 2470740
0751 – 2470803
Fax : 0751 – 2470841
OUR OBJECTIVE
To upgrade maintenance technologies and
methodologies and achieve improvement in
productivity, performance of all Railway
assets and manpower which inter-alia would
cover reliability, availability, utilisation and
efficiency.

More Related Content

What's hot

ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduJogendra Yadvendu
 
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4) Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4) IJMER
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportALOK RAJ
 
TRAINING REPORT FULL
TRAINING REPORT FULLTRAINING REPORT FULL
TRAINING REPORT FULLanish malan
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPTSahil arora
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagonAjeet Kumar
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)anand prasad
 
Elevators presentation (altacit template)
Elevators presentation (altacit template)Elevators presentation (altacit template)
Elevators presentation (altacit template)Altacit Global
 
Study on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesStudy on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesrakeshmanthu
 
Scissor lift-manual
Scissor lift-manualScissor lift-manual
Scissor lift-manualPunya Benja
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 
design wheel for locomotive
design wheel for locomotivedesign wheel for locomotive
design wheel for locomotiveBurhan Awang
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysApeksha Shrivastav
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~ihaxxo24
 
Air brake system of railways
Air brake system of railwaysAir brake system of railways
Air brake system of railwaysShraddha Mahabare
 

What's hot (20)

ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by Yadvendu
 
Bmbs apm working system
Bmbs apm working systemBmbs apm working system
Bmbs apm working system
 
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4) Study on Bogie and Suspension System of an Electric Locomotive  (Wap-4)
Study on Bogie and Suspension System of an Electric Locomotive (Wap-4)
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
TRAINING REPORT FULL
TRAINING REPORT FULLTRAINING REPORT FULL
TRAINING REPORT FULL
 
RAILWAY WORKSHOP TRANING PPT
RAILWAY WORKSHOP TRANING  PPTRAILWAY WORKSHOP TRANING  PPT
RAILWAY WORKSHOP TRANING PPT
 
Railway Training ppt
Railway Training pptRailway Training ppt
Railway Training ppt
 
Carriage and wagon
Carriage and wagonCarriage and wagon
Carriage and wagon
 
Training report on railways (all workshop)
Training report on railways (all workshop)Training report on railways (all workshop)
Training report on railways (all workshop)
 
Elevators presentation (altacit template)
Elevators presentation (altacit template)Elevators presentation (altacit template)
Elevators presentation (altacit template)
 
Lift
LiftLift
Lift
 
Bogie
BogieBogie
Bogie
 
lifts
liftslifts
lifts
 
Study on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coachesStudy on Coach interior fittings of ICF and LHB coaches
Study on Coach interior fittings of ICF and LHB coaches
 
Scissor lift-manual
Scissor lift-manualScissor lift-manual
Scissor lift-manual
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
design wheel for locomotive
design wheel for locomotivedesign wheel for locomotive
design wheel for locomotive
 
Air brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railwaysAir brake system in boxnhl wagon ,indian railways
Air brake system in boxnhl wagon ,indian railways
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
 
Air brake system of railways
Air brake system of railwaysAir brake system of railways
Air brake system of railways
 

Viewers also liked

Model-Based Approaches for Railway Safety, Reliability & Security
Model-Based Approaches for Railway Safety, Reliability & SecurityModel-Based Approaches for Railway Safety, Reliability & Security
Model-Based Approaches for Railway Safety, Reliability & SecurityFrancesco Flammini
 
indian railway matunga carriage workshop
indian railway matunga carriage workshopindian railway matunga carriage workshop
indian railway matunga carriage workshopChirag Ramakrishnan
 
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)kalyan kumar
 

Viewers also liked (8)

railway_plant_layout
railway_plant_layoutrailway_plant_layout
railway_plant_layout
 
saftey and health
saftey and healthsaftey and health
saftey and health
 
Model-Based Approaches for Railway Safety, Reliability & Security
Model-Based Approaches for Railway Safety, Reliability & SecurityModel-Based Approaches for Railway Safety, Reliability & Security
Model-Based Approaches for Railway Safety, Reliability & Security
 
indian railway matunga carriage workshop
indian railway matunga carriage workshopindian railway matunga carriage workshop
indian railway matunga carriage workshop
 
Beml limited
Beml limitedBeml limited
Beml limited
 
PPT on Indian railway (LHB coaches)
PPT on Indian  railway (LHB coaches)PPT on Indian  railway (LHB coaches)
PPT on Indian railway (LHB coaches)
 
corrosion presentation
corrosion presentationcorrosion presentation
corrosion presentation
 
Corrosion.ppt
Corrosion.pptCorrosion.ppt
Corrosion.ppt
 

Similar to Report on running room facilities

EMPOWERMENT OF SLDC & RLDCs
EMPOWERMENT OF SLDC & RLDCsEMPOWERMENT OF SLDC & RLDCs
EMPOWERMENT OF SLDC & RLDCsIPPAI
 
Roll On-Roll Off service
Roll On-Roll Off serviceRoll On-Roll Off service
Roll On-Roll Off serviceGladwin Andrews
 
Watch keeping duties , responsibilities and cargo documentation
Watch keeping duties ,  responsibilities and cargo documentationWatch keeping duties ,  responsibilities and cargo documentation
Watch keeping duties , responsibilities and cargo documentationOladokun Sulaiman Olanrewaju
 
Revised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfRevised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfmajjisatish
 
Vocational training Report for ECE department
Vocational training  Report for ECE departmentVocational training  Report for ECE department
Vocational training Report for ECE departmentManoj Verma
 
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017Rishish Shukla
 
Eng. Ahmed Abdel Hafez Abdel Moniem El-Giar CV
Eng. Ahmed Abdel Hafez Abdel Moniem El-Giar CVEng. Ahmed Abdel Hafez Abdel Moniem El-Giar CV
Eng. Ahmed Abdel Hafez Abdel Moniem El-Giar CVAhmed abd el hafez
 
Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)Anuj Singh
 
Mc8.apprentices act,1961 & training of apprentices in railway establishments
Mc8.apprentices act,1961 & training of apprentices in railway establishmentsMc8.apprentices act,1961 & training of apprentices in railway establishments
Mc8.apprentices act,1961 & training of apprentices in railway establishmentsAbhey Dogra
 
Quarry business Plan
Quarry business PlanQuarry business Plan
Quarry business PlanAbdi Hussein
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specificationCARLOS RUIZ CARDENAS
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitItnesh Kumar
 
Desarrollo de Servicios NGN en Portugal
Desarrollo de Servicios NGN en PortugalDesarrollo de Servicios NGN en Portugal
Desarrollo de Servicios NGN en Portugalguestb2c12
 
Desarrollo de Servicios NGN en Portugal
Desarrollo de Servicios NGN en PortugalDesarrollo de Servicios NGN en Portugal
Desarrollo de Servicios NGN en PortugalJorge Bossio
 

Similar to Report on running room facilities (20)

EMPOWERMENT OF SLDC & RLDCs
EMPOWERMENT OF SLDC & RLDCsEMPOWERMENT OF SLDC & RLDCs
EMPOWERMENT OF SLDC & RLDCs
 
Roll On-Roll Off service
Roll On-Roll Off serviceRoll On-Roll Off service
Roll On-Roll Off service
 
Stcw
StcwStcw
Stcw
 
Watch keeping duties , responsibilities and cargo documentation
Watch keeping duties ,  responsibilities and cargo documentationWatch keeping duties ,  responsibilities and cargo documentation
Watch keeping duties , responsibilities and cargo documentation
 
Revised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfRevised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdf
 
Vocational training Report for ECE department
Vocational training  Report for ECE departmentVocational training  Report for ECE department
Vocational training Report for ECE department
 
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
R.D.S.O - Research Design & Standards Organisation- TESTING DIRECTORATE 2017
 
Eng. Ahmed Abdel Hafez Abdel Moniem El-Giar CV
Eng. Ahmed Abdel Hafez Abdel Moniem El-Giar CVEng. Ahmed Abdel Hafez Abdel Moniem El-Giar CV
Eng. Ahmed Abdel Hafez Abdel Moniem El-Giar CV
 
Circular-No-02-2021.pdf
Circular-No-02-2021.pdfCircular-No-02-2021.pdf
Circular-No-02-2021.pdf
 
Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)Coach rehabilitation workshop bhopal (crws)
Coach rehabilitation workshop bhopal (crws)
 
Mc8.apprentices act,1961 & training of apprentices in railway establishments
Mc8.apprentices act,1961 & training of apprentices in railway establishmentsMc8.apprentices act,1961 & training of apprentices in railway establishments
Mc8.apprentices act,1961 & training of apprentices in railway establishments
 
Quarry business Plan
Quarry business PlanQuarry business Plan
Quarry business Plan
 
Engineering SOP
Engineering SOPEngineering SOP
Engineering SOP
 
SOP ENGINEERING
SOP ENGINEERINGSOP ENGINEERING
SOP ENGINEERING
 
SOP Engg operationl
SOP Engg operationl  SOP Engg operationl
SOP Engg operationl
 
Harish rathi
Harish rathiHarish rathi
Harish rathi
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
Summer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgitSummer training report coach care new Delhi rkgit
Summer training report coach care new Delhi rkgit
 
Desarrollo de Servicios NGN en Portugal
Desarrollo de Servicios NGN en PortugalDesarrollo de Servicios NGN en Portugal
Desarrollo de Servicios NGN en Portugal
 
Desarrollo de Servicios NGN en Portugal
Desarrollo de Servicios NGN en PortugalDesarrollo de Servicios NGN en Portugal
Desarrollo de Servicios NGN en Portugal
 

More from SrinivasaRao Guduru

Basic training on Wabco load sensing device
Basic training on Wabco load sensing deviceBasic training on Wabco load sensing device
Basic training on Wabco load sensing deviceSrinivasaRao Guduru
 
Identification and treatment of bed bugs
Identification and treatment of bed bugsIdentification and treatment of bed bugs
Identification and treatment of bed bugsSrinivasaRao Guduru
 
Introduction handbook on LHB coaches
Introduction handbook on LHB coachesIntroduction handbook on LHB coaches
Introduction handbook on LHB coachesSrinivasaRao Guduru
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract managementSrinivasaRao Guduru
 
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01SrinivasaRao Guduru
 
Pamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogiePamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogieSrinivasaRao Guduru
 
Pamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockPamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockSrinivasaRao Guduru
 
Report on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering systemReport on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering systemSrinivasaRao Guduru
 
Draft handbook on linen management
Draft handbook on linen managementDraft handbook on linen management
Draft handbook on linen managementSrinivasaRao Guduru
 
Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)SrinivasaRao Guduru
 
Pamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coachesPamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coachesSrinivasaRao Guduru
 
Standardisation of enroute carriage watering system
Standardisation of enroute carriage watering systemStandardisation of enroute carriage watering system
Standardisation of enroute carriage watering systemSrinivasaRao Guduru
 
Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...SrinivasaRao Guduru
 
Handbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counterHandbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counterSrinivasaRao Guduru
 
GM weight loss diet management plan
GM weight loss diet management plan GM weight loss diet management plan
GM weight loss diet management plan SrinivasaRao Guduru
 
Maintenace of passenger emergency alarm system of coaching stock
Maintenace of passenger emergency alarm system of coaching stockMaintenace of passenger emergency alarm system of coaching stock
Maintenace of passenger emergency alarm system of coaching stockSrinivasaRao Guduru
 
Air suspension in Railway coaches
Air suspension in Railway coachesAir suspension in Railway coaches
Air suspension in Railway coachesSrinivasaRao Guduru
 
Air springs of indian railway coaches
Air springs of indian railway coachesAir springs of indian railway coaches
Air springs of indian railway coachesSrinivasaRao Guduru
 

More from SrinivasaRao Guduru (20)

Basic training on Wabco load sensing device
Basic training on Wabco load sensing deviceBasic training on Wabco load sensing device
Basic training on Wabco load sensing device
 
Air springs rdso 2009-cg-cmi-01
Air springs rdso 2009-cg-cmi-01Air springs rdso 2009-cg-cmi-01
Air springs rdso 2009-cg-cmi-01
 
Identification and treatment of bed bugs
Identification and treatment of bed bugsIdentification and treatment of bed bugs
Identification and treatment of bed bugs
 
Introduction handbook on LHB coaches
Introduction handbook on LHB coachesIntroduction handbook on LHB coaches
Introduction handbook on LHB coaches
 
Handbook on works contract management
Handbook on works contract managementHandbook on works contract management
Handbook on works contract management
 
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
Maintenance instructions on Air Suspension RDSO 2009-CG-CMI-01
 
Pamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogiePamphlet on air suspension system for fiat bogie
Pamphlet on air suspension system for fiat bogie
 
Pamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stockPamphlet on rake testing procedure for freight stock
Pamphlet on rake testing procedure for freight stock
 
Report on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering systemReport on standardisation of enroute carriage watering system
Report on standardisation of enroute carriage watering system
 
Bio toilets presentation
Bio toilets presentation Bio toilets presentation
Bio toilets presentation
 
Draft handbook on linen management
Draft handbook on linen managementDraft handbook on linen management
Draft handbook on linen management
 
Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)Handbook on wheel slide protection device (wsp)
Handbook on wheel slide protection device (wsp)
 
Pamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coachesPamphlet on air suspension system fitted on hybrid coaches
Pamphlet on air suspension system fitted on hybrid coaches
 
Standardisation of enroute carriage watering system
Standardisation of enroute carriage watering systemStandardisation of enroute carriage watering system
Standardisation of enroute carriage watering system
 
Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...Advance planning of works programme in Indian Railways alongwith with related...
Advance planning of works programme in Indian Railways alongwith with related...
 
Handbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counterHandbook on maintenance of digital axle counter
Handbook on maintenance of digital axle counter
 
GM weight loss diet management plan
GM weight loss diet management plan GM weight loss diet management plan
GM weight loss diet management plan
 
Maintenace of passenger emergency alarm system of coaching stock
Maintenace of passenger emergency alarm system of coaching stockMaintenace of passenger emergency alarm system of coaching stock
Maintenace of passenger emergency alarm system of coaching stock
 
Air suspension in Railway coaches
Air suspension in Railway coachesAir suspension in Railway coaches
Air suspension in Railway coaches
 
Air springs of indian railway coaches
Air springs of indian railway coachesAir springs of indian railway coaches
Air springs of indian railway coaches
 

Recently uploaded

2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at workChristina Parmionova
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Dipal Arora
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
Building the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageBuilding the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageTechSoup
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Roomishabajaj13
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 

Recently uploaded (20)

2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
Building the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized StorageBuilding the Commons: Community Archiving & Decentralized Storage
Building the Commons: Community Archiving & Decentralized Storage
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 

Report on running room facilities

  • 1. egkjktiqj, Xokfy;j & 474 005 Maharajpur, GWALIOR - 474 005 CAMTECH/E/13-14/RRF/1.0 Hkkjr ljdkj GOVERNMENT OF INDIA jsy ea=ky; MINISTRY OF RAILWAYS REPORT ON RUNNING ROOM FACILITIES TARGET GROUP: RUNNING ROOM IN-CHARGE dsoy dk;Zky;hu mi;ksx gsrq (For Official Use Only)
  • 3. FOREWORD The issue of resting facilities and other provisions for outstation rest of running staff has been engaging the attention of Indian Railways time to time as is evident from the number of letters and instructions issued on the subject by the Ministry of Railways and Zonal Railways. Various Railways have taken up several steps to improve the conditions of Running Room and made provision of various amenities and recreational facilities. Still there is scope of improvement at various places. In view of above CAMTECH has prepared this Report on “Running Room Facilities” which shall be useful for Railways to improve the running rooms facilities and environment. The check list will be useful to pride the missing facility. CAMTECH, Gwalior A.R.Tupe Date: 28th March 2014 Executive Director
  • 4. PREFACE Running Room needs pride attention in order to ensure that crew rest is proper & adequate. Sufficient facilities should be are available for the comfort of the running staff. Various committees also drew attention of Railways on the subject to create the right kind of environment for the running staff to take rest at outstation. . CAMTECH has prepared this Report on “Running Room Facilities” to make improvement in the facilities and amenities at Running Rooms. Good work done by various Railways along with photographs has been incorporated in this report. CAMTECH also added a check list and its recommendations on the subject. It is clarified that this report does not supersede any existing provisions laid down by Railway Board/ Zonal Railways. This report is for guidance only and it is not a statutory document. I am thankful to all field personnel who have helped us in preparing this report. Technological up-gradation & learning is a continuous process. Hence feel free to write to us for any addition or modification in this report. We shall highly appreciate your contribution in this direction. CAMTECH, Gwalior (Peeyoosh Gupta) Date: 24th March 2014 Jt.Director Electrical e - mail id: direlcamtech@gmail.com
  • 5. CONTENTS Chapter No. Description Page No. Foreword III Preface IV Contents V Correction Slip VI 1. INTRODUCTION 01 2. GENERAL MANAGEMENT 04 3. ENGINEERING, ELECTRICAL AND GENERAL INFRASTRUCTURE 21 4. BED ROOM 26 5. KITCHEN 36 6. DINNING HALL/ ROOM 47 7. TOILETS AND BATHROOM 52 8. READING ROOM 58 9. SAFETY AND SECURITY 62 10. YOGA, MEDITATION AND FITNESS 68 11. CAMTECH RECOMMENDATION 75 12. RECOMMENDED FACILITIES/INFRASTRUCTURE FOR RUNNING ROOM 94 13. REFERENCES 108
  • 6. ISSUE OF CORRECTION SLIPS The correction slips to be issued in future for this handbook will be numbered as follows: CAMTECH/E/13-14/RRF. # XX date--------- Where “XX” is the serial number of the concerned correction slip (starting from 01 onwards). CORRECTION SLIPS ISSUED Sr. No. Date of issue Page no. and Item no. modified Remarks
  • 7. CAMTECH/E/13-14/RRF/1.0 1 Report on Running Room Facilities March 2014 CHAPTER 1 INTRODUCTION OBJECTIVE To provide clean and quiet resting place for loco crew and guard along with necessary messing, boarding and recreational facilities round the clock, Railway Board has issued guidelines to Zonal Railways for implementation. 1.1 RAILWAY BOARD GUIDE LINES AS PER BOARD’S LETTER NO. 2001/M (L)/467/2 DATED -10.11.03 1. Running room should be classified on the basis of number of users per day: i.Category “A” – 51 users, ii.Category “B” – between 21-50 users and iii.Category “C” – up to 20 users. 2. Basic amenities like: i.Proper hygiene, adequate toilet facilities and clear drinking water. ii.Proper ventilation and lighting iii.Desert cooler iv.Reading room with magazine and newspaper v.Cooking facilities to meet the needs of running staff 3. A norm of not more than two beds per room/cubicle should be adopted. 4. Where ever necessary boundary walls/fencing should be provided. 5. Standby power supply arrangement may be provided. 6. Mosquito nets/mosquito repellant etc. should be provided. 7. Railway and DOT phones should be provided. 8. Cooking utensils should be of stainless steel type. 9. Lockers should be provided to the running staff for keeping their personal belongings/valuables. 10. First aid box and firefighting equipment should be provided. 11. Good quality linens should be provided. 1.2 A Report has been issued by Railway Board with a title “High Power Committee to Review the Duty Hours of Running and Other Safety Related categories of Staff” on August, 2013. Points pertaining to running room facilities are reproduced below for ready reference: 1. Implementation of Railway Board’s Instructions on upkeep and maintenance of the Running Rooms (Railway Board’s letter no.2001/M (L)/467/2 dated 10.11.2003), in particular the provision of two beds per room.
  • 8. 2 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 2. The provision of adequate accommodation in all Running Rooms so that there is not even a single case of a loco pilot/ assistant loco pilot/ guard waiting for bed after arriving in the running room. 3. Creation of a separate plan head for safety works including the works for running room facilities and provision of adequate funds under this plan head. Until the creation of the aforesaid plan head, works pertaining to running room facilities should be permitted to be proposed under “Traffic facility” plan head with adequate provision of funds. 4. Increase the powers of General Manager for sanctioning works related to running rooms so that the proposals need not be sent to Board for approval unless the value is very high. 5. The institution of running room standing committee should be revived to lend a helping hand in solving the problems being faced by the running staff. 6. Regular monitoring and the compliance of the complaints made in the complaint register of running rooms must be ensured. 7. All running rooms should be provided with air conditioning in due course beginning with running rooms located in humid/ coastal areas, with 100% power back up arrangements. A phase wise programme may be drawn and within 5 years, all running rooms on IR be provided with air conditioning facilities. Also, new running rooms may be sanctioned with air conditioning facilities only. 8. The location for new running rooms should be decided taking into consideration the noise pollution and air pollution. The proximity of running room to the booking lobby should also be ensured to the extent possible. 9. Proper well lit pathways should be provided from Crew lobbies to running rooms. 10. Provision of various facilities in running rooms as per the guidelines issued by boards from time to time. Shoe polishing kit and ironing facility should also be provided in all running rooms, in addition to what has already been prescribed. 11. Ministry of Railways letter no.2001/M (L)/467/2 dated 10-11-2003 inter-alia provides categorization of the running rooms based on number of beds and facilities as per this categorization. The committee agrees with the categorization and provision of facilities as per this categorization along with the additional facilities recommended above. 12. Ration based system should be done away with at the earliest. 13. Only the fully subsidized meals should be served to the running staff as is the practice in civil aviation sector. Also, the catering contract should specifically lay down the condition of preparing one or two extra dishes for running staff on demand as per his requirement/ choice, on a token payment. For this purpose, adequate provision of staff, specially the cooking staff, should be made in the contract.
  • 9. CAMTECH/E/13-14/RRF/1.0 3 Report on Running Room Facilities March 2014 14. For catering contract in the running rooms for the supply of pre cooked meals at subsidized rates, the quality standard should be clearly defined in consultation with a professional/ hotel management/ catering institute. The standard should not be lower than that prescribed for AC 2- tier passengers in Rajdhani trains. 15. Estimated rates should be specified for catering contracts which should be workable and comparable with the meal rates of AC 2 tier passengers in Rajdhani trains. Also, to ensure the viability of the quoted rates. It should be clearly stipulated in the tender conditions that the tenderer quoting below the estimates rates would be disqualified. 16. To maintain the financial viability which, in turn, will ensure consistence in quality, the accepted rate should be updated every 6 months on the basis of consumer price index. 17. The selection of the service provider should be on the basis of two packet system with pre-qualification bid ensuring his professional capability based on past experience and should financial capacity. 18. Strict penal clauses should be inbuilt in the contract to ensure that there is no compromise on quality during the execution of contract. 19. A bimonthly feedback system should be introduced. Under this system, the staff can be asked to give feedback on a 5 or 10 point scale and the contract should be terminated by giving only one chance to the contractor for improving the quality, if the feedback is not satisfactory. The feedback forms and their collection boxes should be kept in the lobby instead of running rooms to ensure fair and frank feedback. 20. Wherever it is not feasible for the Zonal Railways to outsource the catering contract due to location or size of the running room, the North Eastern Railway model of providing the catering facilities through local management committee may be considered for adoption. 21. The administration control of running rooms should be with the same authority which controls the majority of running staff on the division/ area. 22. In metropolitan cities, a beginning may be made by providing 3 or 4 star hotel accommodations to the running staff for resting at outstation. However, initially it may be tried out for running staff working mail/ express/ passenger trains as they work to a link which the arrival and departure timings are known in advance quite accurately. Thus, planning for the accommodation for their stay can be done easily.
  • 10. 4 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities CHAPTER 2 GENERAL MANAGEMENT The following items shall be provided/ preferred: 1. ISO CERTIFICATION 2. GARDEN /HORTICULTURE 3. PROVISION OF COMPLAINT/SUGGESTION BOOK AND RECORD OF ACTION TAKEN THEREON 4. PEST CONTROL 5. AVAILABILITY OF WASHING MACHINE /DRYER AND ELECTRIC IRON 6. AVAILABILITY OF IMPREST AND ITS RECOUPMENT 7. STRENGTH OF RUNNING ROOM STAFF/ VACANCY (SANCTIONED STAFF AS PER REQUIREMENT) 8. COMPUTERIZATION OF CHECKING IN FACILITY AT RECEPTION 9. ROOM OCCUPANCY DISPLAY 10. STAFF IN PROPER UNIFORM WITH IDENTITY CARD 11. AVAILABILITY OF INSTRUCTION BOARDS 12. NOISE POLLUTION CONTROL 13. SPARE BEDS, MATTRESSES, LINEN AND PILLOW WITH COVER
  • 11. CAMTECH/E/13-14/RRF/1.0 5 Report on Running Room Facilities March 2014 1. ISO CERTIFICATION Running Room, Shakurbasti, Delhi Division, Northern Railway ISO Certified 9001:2008 Running Room, Shakurbasti, Western Railway ISO Certified 9001:2008 Running room, Miraj, Pune Division, Central Railway ISO Certified 9001:2008
  • 12. 6 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 2. GARDEN /HORTICULTURE Running Room, Ambala, Northern Railway Lawn and Garden Running Room, Hospet, South Western Railway Lawn and Garden
  • 13. CAMTECH/E/13-14/RRF/1.0 7 Report on Running Room Facilities March 2014 Running Room, Kakinada Port, South Central Railway Lawn and Garden Running Room, New Jalpaiguri, Katihar, North Frontier Railway Garden with a fountain gives serene ambience in day time Garden with a fountain gives Serene Ambience in night time
  • 14. 8 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Over flowing water used for watering of plant Watering of plant by Over flowing water Running Room, Titlagarh, East Coast Railway Lawn and Garden
  • 15. CAMTECH/E/13-14/RRF/1.0 9 Report on Running Room Facilities March 2014 Running Room, Sabarmati, Western Railway Lawn and Garden Running Room Nagpur, Nagpur Division, Central Railway Lawn and Garden, planter kept on steel stand
  • 16. 10 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Garden view with Duck, Pleasant view Running Room, Ernakulam, Southern Railway Garden view with swan 3. PROVISION OF COMPLAINT/SUGGESTION BOOK AND RECORD OF ACTION TAKEN THEREON Running Room Ghorpuri, Pune Division, Central Railway Encouraging suggestions & maximizing performance by using Complaint & Suggestion Book
  • 17. CAMTECH/E/13-14/RRF/1.0 11 Report on Running Room Facilities March 2014 Running Room, Ballarshah, Nagpur Division, Central Railway Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway
  • 18. 12 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 4. PEST CONTROL Prevention and control of pests & rodents in railway premises shall be carried out, As per Railway Board Latter No. 2000/M(C)/141/7 Vol.IV dated. 21.12.2010 Running Room, Dhone, Guntekal Division, South Central Railway 5. AVAILABILITY WASHING MACHINE /DRYER AND ELECTRIC IRON Running Room, Ballarshah, Nagpur Division, Central Railway Running Room, Titlagarh, East Coast Railway Running Room, Jhansi, North Central Railway Jhansi Running Room, Kakinada Port, South Central Railway Pest-o-Flash unit and pest control through spray
  • 19. CAMTECH/E/13-14/RRF/1.0 13 Report on Running Room Facilities March 2014 6. AVAILABILITY OF IMPREST AND ITS RECOUPMENT 7. DISPLAY OF STRENGTH OF RUNNING ROOM STAFF/VACANCY (SANCTIONED STRENGTH AS PER REQUIREMENT) Running Room, Chakradharpur South East Railway 8. COMPUTERIZATION OF CHECKING IN FACILITY AT RECEPTION Running Room, Ballarshah, Central Railway Running Room, Nagpur, Central Railway Running Room, Titlagarh, East Coast Railway
  • 20. 14 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway Running Room, Sabarmati,Western Railway Running Room Nagpur, Nagpur Division, Central Railway Return gift box to return the lost item of crew may be kept at reception Running Room, Sabarmati, Western Railway कार्य पर जाने हेतु, क्र्ा आप स्वस्थ तथा अच्छे हैं स्वंर् को देखिर्े, हमारी तरफ से आपको शुभ र्ात्रा
  • 21. CAMTECH/E/13-14/RRF/1.0 15 Report on Running Room Facilities March 2014 Running Room, Kanpur Central, North Central Railway Running room, Tiruchchirappalli Southern Railway Coir mat is provided in corridor and wall for cooling of running room Running Room, Bandra Mumbai Division, Western Railway Rail-net & Internet Facility is provided Running Room, Dhone, Guntekal Division, South Central Railway Personality keep up before departure Automatic Shoe Shining Machine SHOE SHINING MACHINE Am I fit
  • 22. 16 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 9. ROOM OCCUPANCY DISPLAY Running Room GMC, Kanpur, North Central Railway Running Room, Erode, Salem Division, Running Room,Tiruchchrappalli Southern Railway Southern Railway
  • 23. CAMTECH/E/13-14/RRF/1.0 17 Report on Running Room Facilities March 2014 10. STAFF IN PROPER UNIFORM WITH I/CARD Running Room, Erode, Salem Division, Southern Railway Running Room ,Chhapra Varanasi Division, North Eastern Railway Running Room, New Jalpaiguri, Katihar Division North Frontier Railway Running Room, Nagpur Central Railway
  • 24. 18 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 11. AVAILABILITY OF INSTRUCTION BOARDS Running Room, Erode, Salem Division Southern Railway Running Room, Guntur, South Central Railway Running Room, Kanpur, North Central Railway,
  • 25. CAMTECH/E/13-14/RRF/1.0 19 Report on Running Room Facilities March 2014 Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway Other Instruction Boards 12. NOISE POLLUTION There are many methods which help to control the noise pollution.  Construction of sound proof rooms for noisy machines in running room.  Use of horns with jarring sounds to be banned.  Proper law should be enforced to check the misuse of loudspeakers and public announcements systems.  Growing green plants/trees along roadside to reduce noise pollution as they absorb sound.  The source of noise must be reduced.  Whereever possible the amount of traffic must be reduced near the running room by planning diversion etc.  The industries must be built away from the running room areas and the legal laws must be established and observed to protect the humans from noise pollution.  A general awareness programme to educate the people must be done.
  • 26. 20 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 13. SPARE BEDS, MATTRESSES, LINEN AND PILLOW WITH COVER Towel may also be included in the linen packet. Running Room, Chhapra, Varanasi Division, North Eastern Railway Running Room GMC, Kanpur, North Central Railway
  • 27. CAMTECH/E/13-14/RRF/1.0 21 Report on Running Room Facilities March 2014 CHAPTER 3 ENGINEERING, ELECTRICAL AND GENERAL INFRASTRUCTURE The following items shall be provided/ preferred: 1. POWER BACK UP 2. PERIODICAL WHITE WASHING AND REGULAR ENGINEERING MAINTENANCE 3. ELECTRICAL WIRING AND PROPER MAINTENANCE 4. PROPER ILLUMINATION LEVEL 5. COMMUNICATION FACILITIES - RAILWAY AND DOT PHONES/CUG 6. PROVISION OF RAIN WATER HARVESTING
  • 28. 22 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 1. POWER BACK UP Suitable power back shall be provided as per requirement so as to ensure continuous electric supply to running rooms. Running Room, Titlagarh East Coast Railway 40 KVA DG Set Running Room, Nagpur, Nagpur Division, Central Railway Running Room, Sabarmati Western Railway
  • 29. CAMTECH/E/13-14/RRF/1.0 23 Report on Running Room Facilities March 2014 2. WHITE WASHING AND ENGINEERING MAINTENANCE Periodical white washing and regular engineering maintenance shall be ensured to keep the running rooms in good condition. By West Central Railway, Bhopal division white washing and Engg. maintenance is being carried out through Zonal contract for their Integrated Running Room. Running Room In-charge also uses imprest to take care of petty engineering repairs if the regular departmental maintenance is taking time. 3. ELECTRICAL WIRING AND MAINTENANCE Electrical wiring shall be checked periodically and regular attention shall be given to light and fan points and other electrical fittings/equipment for their proper functioning. This activity can be handled satisfactorily through departmental resources. However, the Running Room imprest may also be allowed to get petty electrical general works if departmental resources are taking time. 4. ILLUMINATION LEVEL Sufficient illumination level shall be ensured in all areas of running room. The running room may be provided with T5 and CFL lamps extensively in common areas like Verandah, Reception, Reading Room, Kitchen, Dining halls, Toilet blocks etc. Running Room Chhapra, Varanasi Division, North Eastern Railway, Running Room, Kakinada Port South Central Railway
  • 30. 24 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 5. COMMUNICATION FACILITIES Adequate communication facilities railway phones as well as DOT phones shall be provided for communication. Running Room Allahabad, North Central Railway, Running Room, Phulera North West Railway Running Room, Kakinada Port South Central Railway Running Room, Erode, Salem Division, Southern Railway
  • 31. CAMTECH/E/13-14/RRF/1.0 25 Report on Running Room Facilities March 2014 6. RAIN WATER HARVESTING Provision of Rain water harvesting shall be made during construction of new running rooms and in existing running room it may also be done. Pipe line arrangement for rain water harvesting at Running Room, Sabarmati, Western Railway. Running room, Kakinada Port South Central Railway Water pit arrangement for rain water harvesting at Kakinada Port Well type water pit arrangement for rain water harvesting at Running Room, Titlagarh, East Coast Railway.
  • 32. 26 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities CHAPTER 4 BED ROOM The following items shall be provided/ preferred: 1. NO. OF BEDS PER ROOM/CUBICLE: i. Old Running Room - 4 Beds per Room ii. New Running Room - 2 Beds per Room 2. WINDOW AND DOOR CURTAINS SHOULD BE OF DARK COLOR AND SHOULD MATCH WITH INTERIORS. 3. MOSQUITO REPELLANT 4. DESERT COOLER FAN AND PUMP IN WORKING CONDITION 5. PROVISION OF ADEQUATE AVAILABILITY OF LOCKERS 6. PROVISION AND WORKING OF INDIVIDUAL READING LIGHTS AND CHARGING POINTS 7. FOOT MAT/DOOR MAT 8. NUMBERING OF BEDS 9. PROVISION AND WORKING OF NIGHT LAMP 10. PEGS FOR CLOTHES
  • 33. CAMTECH/E/13-14/RRF/1.0 27 Report on Running Room Facilities March 2014 1. NO. OF BEDS PER ROOM/CUBICLE: i. Old Running Room- 4 Beds per Room ii. New Running Room- 2- Beds per Room 2. WINDOW AND DOOR CURTAINS Running Room, Phulera North West Railway i. Old running room 4 Beds per Room Wooden four bedded room general Running room, Hospet South Western Railway ii. New Running Room Two Bed per room wooden Running room New Jalpaiguri, Katihar, North Frontier Railway Two bed per room Wooden Curtain Blanket Mattress with bed sheets/covers Mettress with bed sheets/ covers Mosquito net Wooden bed Curtain Blanket Mosquito net Mattress with bed sheets/ covers Table and Chair Corner stool Curtain Almirah
  • 34. 28 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Running room Rourkela South East Railway Two bed room - Steel Running room Bilaspur, South East Central Railway Two bed room - Wooden box type Running room, Miraj, Pune Division, Central Railway Each cubicle with curtains and entrance lamp Mattress with bed sheets/covers Mosquito net Curtain Blanket Self Contained LockerChair Space for Footwear Mosquit o net Window curtain Curtain
  • 35. CAMTECH/E/13-14/RRF/1.0 29 Report on Running Room Facilities March 2014 3. MOSQUITO REPELLANT Mosquito repellant shall be provided in all rooms Running Room Phulera North West Railway Running Room, Rourkela, South East Railway Running Room Dhone, Guntekal Division, South Central Railway Running Room Nagpur Central Railway
  • 36. 30 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 4. DESERT COOLER FAN AND PUMP IN WORKING CONDITION Running room Jhansi North Central Railway Centralized Air Cooling System Running Room Kakinada Port South Central Railway Running Room, Titlagarh East Coaost Railway, Centralised Air Cooling System Running Room Phulera, North West Railway Centralized Cooling Plant Centralized Cooling in Whole Building COOLER
  • 37. CAMTECH/E/13-14/RRF/1.0 31 Report on Running Room Facilities March 2014 5. PROVISION OF ADEQUATE AVAILABILITY OF LOCKERS Running Room Phulera, North West Railway Bed Side Locker Running Room Jhansi , North Central Railway Running room Kakinada port, South Central Railway Individual Lockers in each bed room Running Room Nagpur, Central Railway
  • 38. 32 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 6. PROVISION AND WORKING OF INDIVIDUAL READING LIGHTS AND CHARGING POINTS Running Room Phulera, North West Railway Running room Nagpur, Central Railway Running Room, Jhansi North Central Railway Running Room, Kakinada Port, South Central Railway READING LIGHT READING LIGHT READING LIGHT READING LIGHT CHARGING POINT
  • 39. CAMTECH/E/13-14/RRF/1.0 33 Report on Running Room Facilities March 2014 7. FOOT MAT/DOOR MAT Running Room, Bilaspur, South East Central Railway Running Room, Erode, Salem division, Southern Railway Running Room Kakinada Port, South Central Railway DOOR MAT FOOT MAT
  • 40. 34 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 8. NUMBERING OF BEDS Running Room Phulera, North West Railway Running Room, Nagpur Central Railway Nagpur Running Room, Jhansi North Central Railway Running Room, Kakinada Port South Central Railway NUMBERING OF BED NUMBERING OF BED NUMBERING OF BED
  • 41. CAMTECH/E/13-14/RRF/1.0 35 Report on Running Room Facilities March 2014 9. PROVISION AND WORKING OF NIGHT LAMP Running Room, Rourkela, South East Railway Running Room, Kakinada Port South Central Railway Running Room, Phulera, North West Railway Running Room, Sabarmati Western Railway ******** NIGHT LAMP NIGHT LAMP
  • 42. 36 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities CHAPTER 5 KITCHEN The following items shall be provided/ preferred: 1. QUALITY OF UTENSIL/CROCKERY 2. CLEANING AND HYGIENE 3. SUBSIDIZED MEAL 4. MEDICAL EXAMINATION OF KITCHEN STAFF PER YEAR 5. QUARTERLY VISIT OF DOCTOR 6. EXHAUST FAN /CHIMNEY 7. SYSTEM OF GARBAGE DISPOSAL 8. LPG CYLINDER BACK UP
  • 43. CAMTECH/E/13-14/RRF/1.0 37 Report on Running Room Facilities March 2014 1. QUALITY OF UTENSIL/CROCKERY Running Room, Titlagarh, East Coast Railway, Titlagarh Steam Hot Case Store Room Adjacent To Kitchen Running Room, Bangalore, South Western Railway Hot Case for Curries Referigerator and Microwave Oven SS Dterilizing tank for crockery Wet Grinder Attached Kitchen store
  • 44. 38 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Shakurbasti Running Room Delhi Northern Railway Modern Kitchen With Electrical Gadgets Cooking Of Meals Hot Case Mixture Refrigerator Utensils
  • 45. CAMTECH/E/13-14/RRF/1.0 39 Report on Running Room Facilities March 2014 Running Room, Phulera, North West Railway Staff on Job Utensils & Crockery Microwave Oven Tea Vending Machine Refrigerator Dish Washer Machine
  • 46. 40 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Running Room, Sabarmati, Western Railway Modern Kitchen with Electric Chimney, Microwave, Mixer Grinder and Double Door Refrigerator Running Room, Bandra, Mumbai Division, Western Railway Deep Freezer is kept in kitchen
  • 47. CAMTECH/E/13-14/RRF/1.0 41 Report on Running Room Facilities March 2014 2. CLEANING AND HYGIENE Running Room, Kakinada Port, South Central Railway Running Room, Rourkela, South East Railway
  • 48. 42 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 3. SUBSIDIZED MEAL Running Room,Titlagarh, East Coast Railway Running Room, Guntur, South Central Railway Running Room, Phulera North West Railway Running Room, Kakinada Port South Central Railway Running room, Miraj, Pune Division, Central Railway Ben Merry For Hot & Fresh Meals/ Food to the Running Staff
  • 49. CAMTECH/E/13-14/RRF/1.0 43 Report on Running Room Facilities March 2014 Running Room, Ghorpuri, Pune Division, Central Railway ISO 22000:2005 certified Running Room in Indian Railways, which has been certified for food safety management system. 4. MEDICAL EXAMINATION OF KITCHEN STAFF PER YEAR Ensure that regular interval medical examination should be done of outsourced staff. 5. QUARTERLY VISIT OF DOCTOR Running Room Chhapra, Varanasi Division, North Eastern Railway Regular health check up camp by Medical department
  • 50. 44 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 6. EXHAUST FAN /CHIMNEY Running Room, Titlagarh, East Coast Railway Running Room, Shakurbasti, Delhi Division, Northern Railway Running Room Kakinada Port, South Central Railway Running Room, Jhansi North Central Railway Running Room,Bilaspur South East Central Railway CHIMNEY EXHAUST FAN
  • 51. CAMTECH/E/13-14/RRF/1.0 45 Report on Running Room Facilities March 2014 7. SYSTEM OF GARBAGE DISPOSAL Running Room, Titlagarh,East Coast Railway Separate Waste Bins for Biodegradable & Non Biodegradable Wastes Running Room Guntur, South Central Railway Running Room New Jalpaiguri, Katihar Division, North Frontier Railway Running Room, Kakinada Port South Central Railway
  • 52. 46 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 8. LPG CYLINDER BACK UP Running Room Erode, Salem Division Southern Railway Running Room, Kakinada Port South Central Railway Running Room New Jalpaiguri, Katihar Division, North Frontier Railway Running Room Bhopal, West Central Railway
  • 53. CAMTECH/E/13-14/RRF/1.0 47 Report on Running Room Facilities March 2014 CHAPTER 6 DINING HALL/ROOM The following items shall be provided/ preferred: 1. TABLE AND CHAIR 2. LIGHT AND FANS 3. FLY CATCHER MACHINE 4. AVAILABILITY OF WATER PURIFIER AND WATER COOLER
  • 54. 48 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 1. TABLE AND CHAIR Running Room Bangalore South Western Railway Running Room Erode, Salem Division, Southern Railway Runnin Room Hospet, South Western Railway
  • 55. CAMTECH/E/13-14/RRF/1.0 49 Report on Running Room Facilities March 2014 Running Room, Kakinada Port South Central Railway Running Room New Jalpaiguri Katihar Division North Frontier Railway Dining hall -1 Dining hall -2 Running Room, Dhone Guntekal Division, South Central Railway
  • 56. 50 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 2. LIGHT AND FANS Running Room Erode, Salem Division, Southern Railway Runnin Room Hospet South Western Railway Running Room New Jalpaiguri, Katihar Division , North Frontier Railway Running Room Bhopal, West Central Railway
  • 57. CAMTECH/E/13-14/RRF/1.0 51 Report on Running Room Facilities March 2014 3. FLY CATCHER MACHINE Running Room Phulera, North West Railway Fly Catcher hanging position Running Room Erode, Salem Division, Southern Railway Fly Catcher kept on table Running Room Bilaspur South East Central Railway Fly Catcher hanging position 4. AVAILABILITY OF AQUA GUARD AND WATER COOLER R.O. System Water Cooler Running Room Phulera North West Railway Running Room Kakinada Port, South Central Railway Running Room GMC, Kanpur North Central Railway Running Room, Kanpur Central North Central Railway
  • 58. 52 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities CHAPTER 7 TOILETS AND BATHROOM The following items shall be provided/ preferred: 1. BUCKET AND MUGS AVAILABILITY AND CONDITION 2. WORKING OF FLUSH SYSTEM 3. SOLAR WATER HEATER/ GEYSER 4. ADEQUATE WATER SUPPLY 5. TOWEL/CLOTH HANGER ,SOAP STAND 6. CLEANLINESS
  • 59. CAMTECH/E/13-14/RRF/1.0 53 Report on Running Room Facilities March 2014 1. AVAILABILITY OF BUCKET AND MUGS 2. WORKING OF FLUSH SYSTEM Running Room, Erode, Salem Division Southern Railway Running Room, Bilaspur, South East Central Railway
  • 60. 54 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Running Room, Sabarmati, Western Railway
  • 61. CAMTECH/E/13-14/RRF/1.0 55 Report on Running Room Facilities March 2014 3. SOLAR WATER HEATER/ GEYSER 4. ADEQUATE WATER SUPPLY Running Room, Erode, Salem Division Southern Railway Running Room Amla, Nagpur Division Central Railway Running Room, Rourkela South East Railway Running Room Nagpur, Nagpur Division Central Railway
  • 62. 56 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 5. TOWEL/CLOTH HANGER, SOAP STAND Running Room Nagpur, Nagpur Division Central Railway Running Room Jhansi, North Central Railway Jhansi Running Room, Dhone, Guntekal Division, South Central Railway Running Room Titlagarh, East Coast Railway Tubular Aluminium Rack Running Room, Phulera North West Railway Auto Freshener
  • 63. CAMTECH/E/13-14/RRF/1.0 57 Report on Running Room Facilities March 2014 6. CLEANLINESS Running Room, Dhone, Guntekal Division, South Central Railway Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway Running room Miraj, Pune Division, Central Railway
  • 64. 58 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities CHAPTER 8 READING ROOM The following items shall be provided/ preferred: 1. AVAILABILITY OF NEWS PAPERS (MINIMUM 3), MAGAZINE 2. SAFETY BULLETINS 3. LIGHTS AND FANS 4. TABLE AND CHAIRS 5. RECREATION FACILITY (CAROM BOARD ETC)
  • 65. CAMTECH/E/13-14/RRF/1.0 59 Report on Running Room Facilities March 2014 1. AVAILABILITY OF NEWS PAPERS (MINIMUM 3) MAGAZINE Running Room Nagpur, Nagpur Division Central Railway Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway 1. Running Room, Chakradharpur, 2. South East Railway Running Room, Titlagarh, East Coast Railway
  • 66. 60 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 2. SAFETY BULLETIN Running Room Bhopal, Bhopal Division, West Central Railway Running Room Nagpur, Nagpur Division, Central Railway Running Room, Bandra, Mumbai Division, Western Railway Hindi Library is provided
  • 67. CAMTECH/E/13-14/RRF/1.0 61 Report on Running Room Facilities March 2014 3. LIGHTS AND FANS AND TABLE AND CHAIRS Running Room, Kakinada Port, South Central Railway Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway 4. RECREATION FACILITIES (INDOOR GAMES ETC.)
  • 68. 62 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities CHAPTER 9 SAFETY AND SECURITY The following items shall be provided/ preferred: 1. AVAILABILITY OF PUCCA PATHWAY AND ILLUMINATION FROM RUNNING ROOM TO LOBBY 2. FIRE PROTECTION SYSTEM 3. FIRST AID BOX 4. BOUNDARY WALL/FENCING 5. TRAINING OF RUNNING ROOM STAFF ON FIRST AID AND FIRE FIGHTING
  • 69. CAMTECH/E/13-14/RRF/1.0 63 Report on Running Room Facilities March 2014 1. AVAILABILITY OF PUCCA PATHWAY AND ILLUMINATION FROM RUNNING ROOM TO LOBBY Running Room GMC, Kanpur, North Central Railway Running Room Amla, Nagpur Division Central Railway Covered path way Running Room, Guntur, South Central Railway
  • 70. 64 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 2. FIRE PROTECTION SYSTEM Running Room, Allahabad, North Central Railway, Allahabad Running Room, Guntur, South Central Railway Running Room, Titlagarh, East Coast Railway Fire Bucket with sand
  • 71. CAMTECH/E/13-14/RRF/1.0 65 Report on Running Room Facilities March 2014 3. FIRST AID BOX Running Room, Guntur, South Central Railway Running Room Ghorpuri, Pune Division, Central Railway Running Room, Dhone, Guntekal Division, South Central Railway Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway
  • 72. 66 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 4. BOUNDARY WALL/ FENCING Running Room, Guntur, South Central Railway Running Room Amla, Nagpur Division Central Railway
  • 73. CAMTECH/E/13-14/RRF/1.0 67 Report on Running Room Facilities March 2014 5. TRAINING OF RUNNING ROOM STAFF ON FIRST AID AND FIRE FIGHTING Running Room, Phulera North West Railway Running Room, Kakinada Port, South Central Railway Running Room, Dhone, Guntekal Division, South Central Railway Running Room, Guntur, South Central Railway
  • 74. 68 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities CHAPTER 10 YOGA, MEDITATION AND FITNESS The following Amenities should be provided for Yoga, Meditation & fitness 1. ROOM/HALL FURNISHED WITH CARPET 2. LIGHT MUSIC SYSTEM 3. COMPUTER WITH LCD PROJECTOR 4. CONSECRATION BOARD 5. DISPLAY OF MOTIVATIONAL SLOGANS 6. FITNESS FACILITIES
  • 75. CAMTECH/E/13-14/RRF/1.0 69 Report on Running Room Facilities March 2014 1. CONSECRATION BOARD AND ROOM FURNISHED WITH CARPET Running Room, New Jalpaiguri, Katihar Division, North Frontier Railway Running Room, Allahabad, North Central Railway, Allahabad Bangalore Running Room, South Western Railway
  • 76. 70 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Running Room Tiruvottiyur, Chennai Division, Southern Railway Meditation hall decorated with white satin clothes on walls with Floor mat. Running Room, Titlagarh, East Coast Railway Running Room, Kakinada Port, South Central Railway
  • 77. CAMTECH/E/13-14/RRF/1.0 71 Report on Running Room Facilities March 2014 2. LIGHT MUSIC SYSTEM The yoga room at running room/Erode is renovated and furnished with light music system. Running Room, Erode, Salem Division Southern Railway 3. DISPLAY OF MOTIVATIONAL SLOGAN Running Room, Bandra, Mumbai Division, Western Railway Display of digital moving safety slogans Display of LED digital display board
  • 78. 72 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Running Room, Idgah Agra, North Central Railway Stress Management Note 4. PHYSICAL FITNESS FOR HEALTH & RELAXATION Running Room, Ballarshah, Nagpur Division, Central Railway Foot Massager and Gym Equipments for relaxation Running Room Nagpur, Nagpur Division Central Railway Foot Massager and Gym Equipments for relaxation
  • 79. CAMTECH/E/13-14/RRF/1.0 73 Report on Running Room Facilities March 2014 Running Room, Titlagarh, East Coast Railway Relax Reliving Equipment Automatic shoe shine machine BMI Index and weight machine Running room Miraj, Pune Division, Central Railway Eye Massager BMI Charts Leg Massager
  • 80. 74 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Running Room, Sabarmati, Western Railway Gym Equipments for relaxation Running Room, Tiruchchrappalli, Tiruchchrappalli Division, Southern Railway Jhoola for Relaxation
  • 81. CAMTECH/E/13-14/RRF/1.0 75 Report on Running Room Facilities March 2014 CHAPTER 11 CAMTECH RECOMMENDATIONS One seminar was organizes at CAMTECH Gwalior on 14.02.2014 on Running Room Facilities. Running room inspectors of different Zonal Railways and Divisions participated in the seminar. Following recommendations are made by CAMTECH for convenient stay of crew at Running Rooms. 1. To Instill feeling of serving better following display is proposed at reception. 2. Many of the activities of running rooms are being outsourced. To keep watch on unauthorized person, one CCTV (Close Circuit Television) system may be provided at reception. Similarly smoke detector may also be provided to avoid fire incident.
  • 82. 76 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 3. Important DOT or mobile phone numbers should be displayed at appropriate places. 4. Computer may be provided at reception with internet connection to locate exact position of train. This will also reduce the work load at TLC/Power controller. Many running rooms are using software for check in check out position of crew. CCC/Jhansi using net facility 5. Daily ‘AAJ KA VICHAR’ ‘vkt dk fopkj ’ may be written on board which is to be kept at reception for encouragement of running crew. 6. Complain box may be kept at reception. The key of the same should be with running room in-charge.
  • 83. CAMTECH/E/13-14/RRF/1.0 77 Report on Running Room Facilities March 2014 7. Nails of kitchen staff should be properly clean and well trimmed. It may be checked weekly by running room in- charge. 8. Industrial Chimney should be used for venting hot flue gases or smoke from boiler, stove, and furnace to the outside atmosphere. Jhansi Division developed the heavy duty chimney locally. 9. Heavy Duty (Hotel Grade i.e. more than 1000W) Mixer Grinder is recommended for use in running room. It has high productivity and used in commercial and institutional kitchens. Special Features of heavy duty mixer grinder is as follows:  Different sizes for different needs: 1½ Hp, 2 Hp & 3 Hp Motor with 4 Litres, 6 Litres, 10 Litres and 15 Litres Jar.  Ruggedly built stainless steel jar.  Safety interlocking between jar and motor  Heavy duty induction motor, continuous duty motor.  The coupling is metal i.e. hence no wear or tears and long life bearing. 10. Reverse Osmosis (RO) system is a process of physical separation of dissolved solids and minerals present in water. This technology uses the principle of osmosis, wherein the mineral concentration of raw water is reduced by applying high pressure through a semi-permeable membrane. The Quality of purified water produced by Reverse Osmosis process is roughly a constant percentage of the feed water i.e. it reduces the TDS of water by 90%
  • 84. 78 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Following care should be taken while selecting RO system: i. It should be RO with UV. ii. It should be of industrial grade. iii. Necessary AMC should also be processed in time. iv. It should be used only if the TDS of water is on higher side. Many make of RO system has got inbuilt controller which bypasses the function of membrane, if TDS of water is low. Thus making function of membrane defunct & only UV purification is made. 11. Food Safety Management System (FSMS) provides a preventative approach to identify, prevent and reduce food- borne hazards. This is to minimize the risk of food poisoning and to make food safe for consumption. A well designed FSMS with appropriate control measures can help food establishments comply with food hygiene regulations and ensure that food prepared for crew is hygienic and safe for consumers. Food Safety Management System is based on ISO 22000:2005 Running Room Ghorpuri, Pune Division, Central Railway has been certified with ISO: 22000 – 2005. Major principle of the same like washing of vegetable, prevention of cooked food etc. may be extended to other running room also. 12. Name likes ANNAPOORNA/ BHOJNALAYA/ KITCHEN ROOM etc. may be written on board of kitchen. 13. For different taste of breakfast, lunch and dinner menu may be fixed as per day basis. 1st & 3rd week and 2nd & 4th week menu may be kept same. Menu is required as it helps to plan the contractor of subsidized meals in advance. 14. Lot of energy is being wasted in heating of water for cooking activity. Arrangement should be made to use pre-heated water by solar energy for cooking activity. 15. Hot & cold flask may be kept for drinking warm/cold water as per requirement of weather.
  • 85. CAMTECH/E/13-14/RRF/1.0 79 Report on Running Room Facilities March 2014 16. Many of the crew is diabetic therefore provision of sugar free tea/special meal may be made. Tea/coffee vending machine may be provided at running room. 17. Hot water bottle may be kept at reception for those who are suffering from pain arising out of spondylitis, Sciatica, arthritis etc. 18. To cater for emergency First aid box including Digital medical equipment like Blood Pressure, Thermometer, Blood sugar, eye massager etc. may be kept at reception. Blood sugar tester Blood pressure tester . Thermometer 19. i. Room number may be displayed on door and shall be closed properly to avoid noise pollution. Flush type lock which can be operated from both sides may be provided. ii. Door closer should be provided for closing the door
  • 86. 80 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 20. Plantation may be done around running room building to protect from direct sun. 21. Civil authorities should be approached for removing the liquor shop near the running room. 22. Bathroom floor should be lower than other floor surface to avoid water entry outside bathroom 23. Dust bin may be kept in bathroom/Toilet to dispose waste etc. 24. Good quality shower may be provided in bath rooms which give pleasure while bathing. 25. Many products are available in the market with brand thermocool and similar which blocks the transfer of heat inwards while applied on roofs. Same may be applied on the roof of the running room to keep the same cool during summer. UPPERSURFACE LOWERSURFACE UPPERSURFACE LOWERSURFACE DUSTBIN DUSTBIN
  • 87. CAMTECH/E/13-14/RRF/1.0 81 Report on Running Room Facilities March 2014 26. Similar arrangement like insert key tag may be provided for energy conservation and electrical safety. 27. Instead of direct lighting defused light/pathway lighting may be provided in bed rooms. 28. Fresh air fan may be provided in toilet & bathroom. 29. Necessary switches for fan, light, cooler etc. may be provided on table lamp desk for ease in reach duly taking safety precaution. 30. Thermostat functioning should be checked for geyser at regular interval to avoid any unusual like bursting of the same. Thermostat checking date should be written on the geyser. DIFUSED LIGHT
  • 88. 82 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 31. MCBs should be checked for proper functioning. 32. Call bell in each room should be provided if there is a possibility of locking the room by Loco pilot from inside 33. At many places cooking gas is in shortage. Possibility of using induction cooker may be explored. 34. Energy audit of running room can be carried out. 35. Fire fighting practical training may be given to all running room staff including staff of contractor. They must be told that whenever the operation of fire extinguisher is carried out the pipe of the same should be hold tightly and head should be backward away from the body. 36. Automatic cut off sensor may be provided to save electrical energy. It has been provided in Sabarmati running room, Western Railway. 37. Building may be decorated with greenery
  • 89. CAMTECH/E/13-14/RRF/1.0 83 Report on Running Room Facilities March 2014 38. Necessary comfort may be provided at reception hall of running room. Visitor Room Jhoomer Lights 39. Muddy water spills over when plants are watered. Planter may be kept in steel body case/tray at the entrance/corridor of the running room.
  • 90. 84 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities For beautification planter may be kept on stand as well. 40. Scriptures may be kept at reception 41. Aquarium may be kept at reception 42. Fly proof mesh to window and doors must be provided. 43. Corner table may be kept at suitable places
  • 91. CAMTECH/E/13-14/RRF/1.0 85 Report on Running Room Facilities March 2014 44. Auto flush sensor may be provided in urinals to avoid bad odor. 45. If the conventional dust bin gets damaged frequently, covered durable dustbins may be kept in corridor as well as in common places. 46. Smoking should be strictly prohibited in the campus of running room. 47. Running crew is away from home during festivals also. To instill the feeling of belongingness, festival may be organized in running rooms. Fasting meal should also be served if required by running crew.
  • 92. 86 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities 48. During seminar many in-charges were having opinion to change the name of running rooms as the same does not give feeling of belongingness. Zonal Railways may initiate proposal in this regard if desired so. The proposed names of running room are i. Train crew rest house ii. Train crew out station home iii. Running staff guest house iv. Running staff rest house Similarly the name of subsidized meal may be changed to ‘Sahbhagi Bhojan’,lgHkkxh Hkkstu’ 49. The number of female crew is also increasing therefore suitable facilities may be made. 50. Cow catcher may be provided at main entrance to avoid entry of animals in the campus of running room. Suitable chemical may be sprayed under cow catcher to remove/re growth of vegetation. 51. To keep the magazine in order wooden/ steel body stand may be provided in reading room. Wooden Steel pipes fabricated Steel fabricated 52. The utilization of meditation and yoga room is found to be very poor. Many running rooms have arranged lectures by motivational institutions such as Ishwaria Prajapita Bharam kumari etc.
  • 93. CAMTECH/E/13-14/RRF/1.0 87 Report on Running Room Facilities March 2014 53. Many loco pilots complain of not getting sleep. Few running rooms have kept yoga NIDRA lecture in i-pod to be heard if crew not getting sleep. 54. Industrial vacuum cleaner may be made available for cleaning of carpet in meditation room. 55. Manning of janitor shall be round the clock. 56. Spot purchase committee for purchasing running room’s should be developed. 57. Wherever possible the same room/bed may be allotted to the loco pilot for sound sleep. 58. Different types of wall papers/sceneries may be provided.
  • 94. 88 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities Bed Room Wall Scenery 59. There should be display of motivation/safety/ energy conservation/ enhance natural resources slogans and Regional Ancient Art
  • 95. CAMTECH/E/13-14/RRF/1.0 89 Report on Running Room Facilities March 2014 Display of slogans
  • 96. 90 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities
  • 97. CAMTECH/E/13-14/RRF/1.0 91 Report on Running Room Facilities March 2014
  • 98. 92 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities
  • 99. CAMTECH/E/13-14/RRF/1.0 93 Report on Running Room Facilities March 2014 60. Contractor staff needs training on ‘How to Attend Customer’ before deploying on running room. 61. Optimum Size/ Number of fans for rooms of different Sizes (Source: NBC of India 2005) Room Width ROOM LENGTH m 4 m 5 m 6 m 7 m 8 m 9 m 10 m 11 m 12 m 14 m 16 m (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) 3 1200/1 1400/1 1500/1 1050/2 1200/2 1400/2 1400/2 1400/2 1200/3 1400/3 1400/3 4 1200/1 1400/1 1200/2 1200/2 1200/2 1400/2 1400/2 1500/2 1200/3 1400/3 1500/3 5 1400/1 1400/1 1400/2 1400/2 1400/2 1400/2 1400/2 1500/2 1400/3 1400/3 1500/3 6 1200/2 1400/2 900/2 1050/4 1200/4 1400/4 1400/4 1500/4 1200/6 1400/6 1500/6 7 1200/2 1400/2 1050/4 1050/4 1200/4 1400/4 1400/4 1500/4 1200/6 1400/6 1500/6 8 1200/2 1400/2 1200/4 1200/4 1200/4 1400/4 1400/4 1500/4 1200/6 1400/6 1500/6 9 1400/2 1400/2 1400/4 1400/4 1400/4 1400/4 1400/4 1500/4 1400/6 1400/6 1500/6 10 1400/2 1400/2 1400/4 140/4 1400/4 1400/4 1400/4 1500/4 1400/6 1400/6 1500/6 11 1500/2 1400/2 1500/4 1500/4 1500/4 1500/4 1500/4 1500/4 1500/6 1500/6 1500/6 12 1200/3 1400/3 1200/6/ 1200/6 1200/6 1400/6 1400/6 1500/6 1200/9 1400/9 1400/9 13 1400/3 1400/3 1200/6 1200/6 1200/6 1400/6 1400/6 1500/6 1400/9 1400/9 1500/9 14 1200/3 1400/3 1400/6 1400/6 1400/6 1400/6 1400/6 1500/6 1400/9 1400/9 1500/9
  • 100. 94 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities RECOMMENDED FACILITIES/INFRASTRUCTURE FOR RUNNING ROOM GENERAL MANAGEMENT S. No. Items Scale/ other details 1. ISO Certification i. ISO 9001: 2008 for Quality Management System ii. ISO 22000 : 2005 for Food Safety Management System iii. Even if the certification is not processed the principles of ISO 9001/ 22000 may be implemented. 2. Garden /Horticulture i. Garden may be furnished with Italian grass. ii. Fountain may be provided in garden. iii. Seasonal flower and show plant may be planted. iv. Duck and Swan may be kept. v. Bench may be provide in garden. vi. Plantation may be done around running room building to protect from direct sun. vii. Jhoola should be provided in garden. 3. Provision of Complaint/Suggestion book i. Complaint/suggestion book shall be kept at reception. ii. All complaints & suggestions shall be closely monitored & rectified regularly. iii. Prompt action & feedback shall be taken regularly. 4. Pest Control i. Pest-o-flash units shall be provided regularly for effective control of insects. ii. The pest control operators/contractors shall be required to use only those chemicals/pesticides that have been approved for the household purpose by "Central Insecticides Board and Registration Committee" under the provision of Insecticides Rules 1971 framed under Insecticides Act 1968. iii. For prevention of pest control Railway Board's letter of even No.2000/M (C)/141/7Vol.IV dt.21.12.2012 may be referred. 5. Spot purchase committee A standard spot purchase committee at divisional level should make purchase of running room items.
  • 101. CAMTECH/E/13-14/RRF/1.0 95 Report on Running Room Facilities March 2014 GENERAL MANAGEMENT S. No. Items Scale/ other details 6. Availability of imprest and its recoupment i. The officer in-charge of the running room and its supervisor should be liberally empowered. ii. A cash imprest of Rs. 25,000/- should be provided with the officer in- charge of the running room for petty engineering repairs and replacement of electrical fittings. iii.Imprest should be recouped quickly. 7. Allocation head A separate head should exist for booking all running room expenses under one head 8. Strength of running room staff/ vacancy (sanctioned staff as per requirement) i. Vacancies of Railway staff should be fill up. ii. Even if activities of running room are outsourced at least one Railway representative may be deputed round the clock in running room. 9. At reception i. Necessary comfort may be provided at reception hall of running room. ii. Computer with Rail net & internet connection may be provided at reception and also in the office of supervisor room to check occupancy and exact position of train. iii. Full size mirror, height & weighing machine should be provided at reception. iv. Automatic shoe shining machine should be kept at reception. v. Walki-Talki charging point should be at reception. vi. Points to prevent SPAD should be at reception. vii. Jhoomer lights may be provided at reception hall. viii. Planter may be kept in steel body case/tray at the reception/ entrance/corridor. ix. Scriptures may be kept at reception. x. Aquarium may be kept at reception. xi. Cooler may be provided at reception hall. xii. Different types of wall papers/sceneries may be provided at reception hall. xiii. Daily ‘AAJ KA VICHAR’ ‘vkt dk fopkj’ may be written. xiv. To keep watch on unauthorized person, one CCTV (Close Circuit Television) system may be provided at reception. Similarly smoke detector may also be provided to avoid fire incident.
  • 102. 96 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities GENERAL MANAGEMENT S. No. Items Scale/ other details xv. To instill feeling of serving better following may be display is proposed at reception. a. Serve with a smile b. vfrfFk nsoks Hko ATITHI DEVO BHAVA xvi. Wall clock should be provided at reception. 10. Room occupancy display Room occupancy board may be display at reception 11. Staff in proper uniform with identity card All running room staff should wear proper uniform and identity cards with laminated photographs and other particulars. 12. Availability of instruction boards The following instruction board should be display : i. Motivation board ii. Safety board iii. Energy conservation board iv. Enhance natural resources slogans board v. Regional Ancient Art board 13. Noise pollution control i. Door closer should be provided for closing the door. ii. Flush type lock which can be operated from both sides may be provided for proper closing. iii. Rubber sole shoe should be worn by running room staff to have noiseless step. 14. Spare beds, mattresses, linen and pillow with cover i. 6% spare beds should be available in good condition in running room. ii. Spare good quality mattresses should be available in proper stacked with sufficient quantity iii. Polythene packed washed spare linen and pillow with cover should be kept in almirah. iv. Linens/blankets/Towels should be marked with date of supply, serial number, printing year of purchase and available sufficient quantity in running room.
  • 103. CAMTECH/E/13-14/RRF/1.0 97 Report on Running Room Facilities March 2014 ENGINEERING, ELECTRICAL AND GENERAL INFRASTRUCTURE S. No. Items Scale/ other details 1. Power back up i. Suitable power back up shall be provided as per requirement so as to ensure continuous electric supply to running rooms. 2. Colour and white wash and regular engineering maintenance i. Annual colour wash shall be done for bed room, lounge and dining room. ii. Annual white wash shall be done for box room, store room. iii. Quarterly white wash shall be done for bath room, lavatory, urinals, kitchen and pantry. iv. Periodical white washing and regular engineering maintenance shall be ensured to keep the running rooms in good condition 3. Electrical wiring and proper maintenance i. Electrical wiring shall be checked periodically and regular attention shall be given to light and fan points and other electrical fittings/equipment for their proper functioning. ii. Thermostat functioning of gyser should be checked at regular interval to avoid any unusual like bursting of the same. iii. MCB should be checked for proper functioning. 4. Proper illumination level i. Sufficient illumination level shall be ensured in all areas of running room. The running room may be provided with T-5 and CFL lamps extensively in common areas like Verandah, Reception, Reading Room, Kitchen, Dining halls, Toilet blocks etc. ii. Energy audit of running room can be carried out. iii. Automatic cut off sensor may be provided to save electrical energy. 5. Communication facilities - railway and DOT phones Both Railway & DOT communication facilities shall be available. 6. Provision of rain water harvesting Rain water harvesting shall be made in running room.
  • 104. 98 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities BED ROOM S. No. Items Scale/ other details 1. Floor area 60 Sq. feet per person approximate 2. No. of beds per room/cubicle i. Bed size - 3’x6 ½’ ii. Rigid steel frame with hard plywood tops. iii. Two beds per room. 3. Bed numbering and display occupancy outside the room i. The bed in the running room should be numbered. ii. The name of the occupant of each bed should be displayed on a small board outside each room so that correct crew is woken up without disturbing others. 4. Cubical The cubical should be perforated, should be shoulder height, 6” below the mattress level. 5. Mattress Rubberized coir foam for one person per bed shall be required. 6. Pillow and pillow cover i. Pillow shall be cotton filling in strong soft cover (27”x16”) one per bed. ii. Pillow cover shall be white soft 30”x 20” one per bed. iii. Requirement for washing numbers of pillow x numbers of user x one day for laundry 7. Blanket i. Blanket shall be one or two blanket per user in winter (To be fixed by officer in-charge). ii. The quality of blanket should be same as AC-I Coach. iii. It must be sent to laundry once in three months 8. Linen i. Two numbers polythene packed washed linen shall be issued to each person ii. The quality of linen shall be same as AC-1 Coach iii. Requirement may be calculated as: Number of users x washing cycle x 2+ 15% reserve. 9. Door and window curtains i. Curtains should be of dark color and should match with interiors. ii. Curtain should be thick cotton cloth of pleasing colour. iii. Sun control black film on every window may be provided to prevent ingress of direct sun light. 10. Mosquito repellant Bed room shall be provided mosquito nets & repellant
  • 105. CAMTECH/E/13-14/RRF/1.0 99 Report on Running Room Facilities March 2014 BED ROOM S. No. Items Scale/ other details 11. Desert cooler and Exhaust fan i. Wherever desert cooler are provided should be checked periodically. ii. One cooler per room for new running room iii. One cooler for four person in existing running rooms iv. Minimum one exhaust fan shall be provided per room, if ventilation is not proper. v. Actual number of fan should be decided locally. 12. Lockers Lockers/shelf shall be provided in bed room for each bed. 13. Provision of lights i. Individual light shall be provided for each cot. ii. Instead of direct lighting diffused light/pathway lighting may be provided in bed rooms. iii. Night light may be provided at floor level 14. Foot mat/door mat i. Individual foot mat shall be provided for each bed. ii. Door mats shall be provided at each and every door as per requirement. 15. Windows & Doors i. Wire mesh should be fitted on window. ii. Door should be Panel type. 16. Plug points Plug points shall be provided for mosquito repellent, pedestal fan, room heater, mobile charging etc. 17. Room heater Applicable only for cold area at the desertion office in-charge. 18. Call bell i. Call bell shall be provided one push button/ cubical (Existing running room) ii. Call bell shall be provided one push button/ room (New Running Room. 19. Pegs for clothes Individual pegs should be provided for each bed. 20. Ventilator Blue colour glasses should be provided in bed room ventilator 21. Cleaning and hygiene i. Cleaning of room shall be done twice a day ii. Cleaning of rooms shall be done every vacation of the occupants.
  • 106. 100 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities KITCHEN S. No. Items Scale/ other details 1 UTENSILS AND OTHER ITEMS : As per need however general scale of item is furnished below Up to 20 to be catered at a time Up to 50 to be catered at a time i. Degchies with covers (a)18” - 3 ii. Degchies with covers ( a)14” 2 4 iii. Degchies with covers (a)12” 4 2 iv. Degchies with covers (a)10” 2 2 v. Degchies with covers (a) 8” All aluminum vessels should be replaced by stainless steel vessels to avoid health hazard 2 2 vi. Karahi (Iron) (a) 16” Karahi (Iron) (b) 14” -- 1 -- 1 vii. Frying Pans(a) 18” (b) 9” (c) 6” -- 1 1 1 1 1 viii. Kettle for boiling water for tea for 20 cups 1 1 ix. Coffee filter stainless (Shere required medium type) 1 2 x. Milk can (Aluminium) (a) 12 lb (b) 8 lb - 1 1 1 xi. Tava 1 2 xii. Parat (knotting flour) (a)26” Parat (Knotting flour) (B)18” - 1 1 - xiii. Thali to cover parat 1 1 xiv. Karahi (Iron) Scraper 1 1 xv. Serving spoon 1 1 xvi. Karahi with ladle 6 6 xvii. Iron fire tongs 1 1 xviii. Fire Pokar 1 1 xix. Chains (a) for flour wire gauze (b) Brass for boiled rice 1 1 1 1 xx. Meat mincing machine 1 1 xxi. Ladookash (Great/spreader) 1 1 xxii. Sil/Batta 1 1
  • 107. CAMTECH/E/13-14/RRF/1.0 101 Report on Running Room Facilities March 2014 KITCHEN S. No. Items Scale/ other details Up to 20 to be catered at a time Up to 50 to be catered at a time xxiii. Kundi/Danda 1 1 xxiv. Chakla/Belan 1 1 xxv. Meat Knife 1 1 xxvi. Meat chopper 1 1 xxvii. Bread Knife 1 4 xxviii. Bread board 1 2 xxix. Toasting rack 1 2 xxx. Vegetable knife 2 1 xxxi. Pie dishes (Various sizes) 3 3 xxxii. Basins, brass4” 2 3 xxxiii. Receptable for rubbish (with automatic closing lid) 1 - xxxiv. Lotas 2 2 xxxv. Buckets 3 4 xxxvi. Tumbler brass 2 3 xxxvii. Tin cutter 1 2 2. WARE AND CUTLERY : As per need i. Mug-porcelain ii. Steel ware full plates iii. Steel ware quarter plate iv. Trays for serving tea v. Katories –steel two per person plus one small one for ghee in south only vi. Thalis with pressed katories recesses may also be used. vii. Steel tumblers viii. Jugs of stainless steel ix. Table spoon –stainless steel x. Tea spoons xi. Desert spoons xii. Desert forkes ( One per full plate set) xiii. Tea strainers (adequate number) xiv. Salt cellar to every table xv. Pepper cellar to every table
  • 108. 102 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities KITCHEN S. No. Items Scale/ other details 3. STORE ROOM i. Provisions i. Size – 5’ X 6’3” for 10 beds. ii. Size - 6’6” X 8’ for 50 beds. iii. Sufficient numbers of shelves of suitable width should available (some open & others with lockable doors) iv. Receptacles for storage of different kinds of main provisions. (Applicable only where departmental catering is available). ii. General Storage i. Size – 14’ X 8’ for 10 beds. ii. Size - 27’ X 12’ for 50 beds. iii. The size of store room may vary depending upon the size of the running room. iv. Sufficient numbers of naphthalene tablets should be used to avoid damage to blankets & other stock. v. Steel almirah should be provided for stacking linen materials. vi. Steel cupboards should be provided for storage of bed, table linen, blankets etc. vii. Proper locking arrangement & enough space for spare furniture etc. 4. Rack (with railing) It should be provided on the side wall near the cooking range. 5. Stools Stool should be available as per requirement. 6. Vegetarian and non vegetarian kitchen Separate kitchen should be provided for vegetarian and non vegetarian food. 7. Cleaning and hygiene i. Cleaning of kitchen shall be done twice a day. ii. Menu should be written on board outside the kitchen daily. iii. Only branded consumables such as edible oil, aata, rice, spices etc. shall be used. iv. Nails of kitchen staff should be properly clean and well trimmed. 8. Subsidized meal i. Ben Merry, microwave and steam hot case should be used for hot & fresh meals/ food to the running staff. ii. Hot plate should be used. iii. Subsidized meal should available in all running rooms.
  • 109. CAMTECH/E/13-14/RRF/1.0 103 Report on Running Room Facilities March 2014 KITCHEN S. No. Items Scale/ other details 9. Medical examination of kitchen staff per year i. Proper medical of all kitchen staff shall be ensured. ii. Use of apron, gloves, nail trimming etc. shall be ensured. iii. Health & food related stickers to be displayed. 10. Quarterly visit of doctor Railway doctor should visit the running room and seek opinion of the occupants about the food and other environmental conditions. 11. Exhaust fan /chimney i. Exhaust fan should be provided ii. Industrial electrical chimney should be used for venting hot flue gases or smoke for comfort of kitchen staff. 12. Mixture Grinder Heavy Duty (Hotel Grade i.e. more than 1000W) Mixer Grinder is recommended for use in running room. 13. System of garbage disposal Separate dustbins shall be provided for disposal of Bio-degradable and Non-biodegradable garbage. 14. LPG cylinder back up i. Back up LPG cylinder should be available in exclusive gas room ii. At many places cooking gas is in shortage. Possibility of using induction cooker may be explored. DINING HALL/ROOM 1. Floor Area i. About 20 Sq.ft/person in lay out for 10 beds ii. About 15 sq. ft /person in lay out for 50 beds 2. Window Wire mesh glazed window should be provided. 3. Doors Half glazed and half paneled swing type door should be provided 4. Curtain Blue Cotton curtain on spring curtain rod should be provided on the glazed portion only. 5. Dining table and chair Suitable size dining table and non-folding steel type (superior quality) and wooden chair for extremely cold places should be provided. 6. Mosquito Repellent (All out or similar) Minimum one number shall be provided. The number can be increased based on area. 7. Light and Fans i. Sufficient illumination level shall be ensured in dining hall. ii. Dining hall may be provided with T-5 and CFL lamps iii. One fan should be provided for each table.
  • 110. 104 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities DINING HALL/ROOM S. No. Items Scale/ other details 8. Water purifier and water cooler Reverse Osmosis (RO) system with water cooler should be provided for supply of drinking water. 9. Call bell One push button on each table shall be provided. TOILETS AND BATHROOM 1. Bath room i. Bathroom floor should be lower than other floor surface to avoid water entry outside bathroom. ii. Good quality shower may be provided in bath rooms which give pleasure while bathing. iii. Fresh air fan may be provided in toilet & bathroom. 2. Lavatory i. Flush type Both Indian (squatting) type and western type to be provided. ii. Dust bin may be kept in toilet to dispose waste etc. 3. Urinals Auto flush sensor may be provided in urinals to avoid bad odor. 4. Floor i. Antiskid tiles on floor. ii. Granite tiles on walls up to 4’6”. 5. Wash basins & mirrors i. One per 8 beds (up to 50 beds). ii. One for 10 beds (Beyond 50 bed). 6. Electric water heaters (Geysers) i. One for each bathroom. ii. One standby for each running room. 7. Solar water heater Solar water heater should be provided. 8. General arrangement i. Bath rooms and lavatories should be separate. ii. The complete bathroom and toilet area should be tiled with antiskid tiles. iii. Interior walls of lavatories and closets to be of granite tiles to a minimum height of 4’6”. Floor to be of antiskid tiles. iv. Deodorant tablets must be provided in the lavatory. v. All bath rooms must be provided with coat hooks /hanger vi. Soap dish holders in sufficient nos. vii. Liquid soap dispensers should be available with every wash basins. viii. Bath rooms soap dispensers should be available with every wash basins. ix. Adequate sanitary workers should be available & earmarked for running room. x. Arrangement for hanging cloths and towels.
  • 111. CAMTECH/E/13-14/RRF/1.0 105 Report on Running Room Facilities March 2014 TOILETS AND BATHROOM S. No. Items Scale/ other details xi. Shower as well as the ordinary tap should be available. xii. One three gallon bucket and one mug for each bathroom. xiii. Emergency water tanks. 9. Cleanliness i. Material required for sanitary staff should be provided as per requirement. ii. Daily cleaning should be done 10. Fresh air fan Fresh air fan may be provided in toilet & bathroom. 11. Availability of washing machine /dryer and electric iron i. Washing machine and iron may be provided in laundry room. ii. Hand drier may be available at dining room and toilet/bathroom also. READING ROOM/ LOUNGE 1. Doors Doors should be panel type 2. Floor Area i. 30 sq. feet/person for 10 beds layout ii. 15 sq. feet/person for 50 beds layout (to be allotted o the basis of the number of beds plus a margin for increase) 3. News papers & Magazine As per Railway Board guide lines. 4. Small library A small library should be maintained, in which GR, SR, Accident Manual, Trouble Shooting Guide, operating Manual and similar other books may be kept. 5. TV Sets /Radio Sets / Music System If provided then its user shall be closely monitored. 6. Chairs Five for every twenty beds, including one easy chair should be provided. 7. Ceiling fans It should be decided as per norms given in National Building Code issued by Bureau of energy conservation. Optimization table is reproduced on CAMTECH recommendation serial no 62 page no 98 in this report. 8. Call bell One push button should be provided 9. Wall clock Wall clock shall be provided in the lounge. SAFETY AND SECURITY 1. Pucca pathway and illumination from running room to lobby i. Pucca pathway should be made main of station gate to running room. ii. Pathway should be covered by plastic sheet. iii. Plantation should be done on both side of pathway. iv. Sufficient illumination should be made from running room to lobby.
  • 112. 106 CAMTECH/E/13-14/RRF/1.0 March 2014 Report on Running Room Facilities SAFETY AND SECURITY S. No. Items Scale/ other details 2. Fire protection system i. Adequate number of fire extinguishers shall be provided. ii. Ensure availability of round bottom fire buckets filled with sand & water. 3. First aid box and training of running room staff on first aid and fire fighting i. First aid box shall be well equipped with necessary medicines. ii. Medicines shall be checked periodically for expiry. iii. Running room staff should be trained in giving first-aid including contractor staff and use of fire- fighting equipment. 4. Boundary wall/fencing i. Running room should have proper boundary wall/fencing. ii. Collapsible gate should be provided with locking arrangement to ensure security during night. 5. Security i. Round the clock security should be available. YOGA, MEDITATION AND FITNESS 1. Light music system Light music system should be provided in meditation room 2. Concentration board Concentration board should be provided in meditation room such as dhyan bindu, OM etc. 3. Display of motivational slogans Motivational slogan should be display. 4. Recreation Facilities (indoor Game etc.) Indoor game may be provided such as carom, chess etc. 5. Fitness Facilities The following equipment may be kept for fitness- i. Foot massager for relaxation. ii. Gym equipment and gym ball iii. Treadmill equipment iv. BMI index and weight machine v. Eye massager vi. Acupressure equipment MISCELLANEOUS 1. Lost item A box with name “Return Gift Box” to return the lost item of crew may be kept at reception. 2. Coir mat Coir mat may be provided in corridor and wall for cooling of running room. 3. Complain box Complain box may be kept at reception. The key of the same should be with running room in-charge. 4. Display of important mobile & DOT number Important DOT or mobile phone numbers should be displayed at appropriate places.
  • 113. CAMTECH/E/13-14/RRF/1.0 107 Report on Running Room Facilities March 2014 MISCELLANEOUS S. No. Items Scale/ other details 5. Female crew Since the numbers of female crew are increasing therefore suitable facilities may be made. 6. Festival in running room Running crew is away from home during festivals also. To instill the feeling of belongingness, festival may be organized in running rooms. Fasting meal should also be served if required by running crew. 7. Sensor Automatic cut off sensor may be provided to save electrical energy. 8. Energy saving Similar arrangement like insert key tag may be provided for energy conservation and electrical safety. 9. Hot & cold flask Hot & cold flask may be kept for drinking warm/cold water as per requirement of weather. 10. Rubber hot water bottle Hot water bottle may be kept at reception for those who are suffering from pain arising out of spondylitis, sciatica, arthritis etc. 11. Diabetic crew Many of the crew is diabetic therefore provision of sugar free tea/special meal may be made. 12. Energy audit Energy audit of running room can be carried out. 13. Thermocool Many products are available in the market with brand thermocool and similar which blocks the transfer of heat inwards if applied on roofs. Same may be applied on the roof of the running room to keep the it cool during summer. 14. Induction cooker At many places cooking gas is in shortage. Possibility of using induction cooker may be explored 15. Closing of liquor shop Civil authorities should be approached for removing the liquor shop near the running room. 16. Auto sensor in urinals Auto flush sensor may be provided in urinals to avoid bad odor. 17. Cow catcher Cow catcher may be provided at main entrance to avoid entry of animals in the campus of running room. Suitable chemical may be sprayed under cow catcher to block/re- growth of vegetation. 18. Sound sleep i. Many loco pilot complain of not getting sleep. Few running rooms have kept yoga NINDRA lecture in i- pod to be heard if crew not getting sleep. ii. Wherever possible the same room/bed may be allotted to the loco pilot for sound sleep. 19. Industrial vacuum cleaner Industrial vacuum cleaner may be made available for cleaning of carpet. 20. Smoking Smoking should be strictly prohibited in the campus of running room 21. Training of contractor staff Contractor staff needs training on customer behavior before deploying on running room.
  • 114.
  • 115. CAMTECH/E/13-14/RRF/1.0 108 Report on Running Room Facilities March 2014 REFERENCES 1. Railway Board Guide Lines as per Board’s letter No.2001/M (L)/467/2 Dated -10.11.03. 2. Report on High Power Committee to Review the Duty Hours of Running and Other Safety Related categories of Staff has been issued by Railway Board on August, 2013. 3. Report of ED’s committee of Railway Board on implementation in running room and crew lobbies November 2003. 4. Suggestions given by participants for various Railways during seminar conducted on 14.02.2014 at IRCAMTECH, Gwalior. 5. Suggestions given by CMPE/SER/Kolkata vide letter no. M1/718/Rg.Room/Pt.VII/138 dated. 20.03.2014 .
  • 116.
  • 117. If you have any suggestions and any specific Comments please write to us. Contact person : Director (Elect.) Postal Address : Indian Railways Centre for Advanced Maintenance technology, Maharajpur, Gwalior. Pin code – 474 005 Phone : 0751 – 2470740 0751 – 2470803 Fax : 0751 – 2470841 OUR OBJECTIVE To upgrade maintenance technologies and methodologies and achieve improvement in productivity, performance of all Railway assets and manpower which inter-alia would cover reliability, availability, utilisation and efficiency.