6. PROBLEM RECKOGNITIONPROBLEM RECKOGNITION
Dissatisfaction with existing system.Dissatisfaction with existing system.
Management directivesManagement directives
Planning aheadPlanning ahead
Search for opportunitySearch for opportunity
Request for new systemRequest for new system
Roadblocks to developmentRoadblocks to development
7. PLANNINGPLANNING
Planning LevelsPlanning Levels
Planning toolsPlanning tools
Assessing the CorporateAssessing the Corporate
CultureCulture
Priority CriterionPriority Criterion
Planning Specific ProjectsPlanning Specific Projects
8. FEASIBILITY STUDYFEASIBILITY STUDY
Organization of StudyOrganization of Study
Search for SolutionSearch for Solution
Feasibility AnalysisFeasibility Analysis
Choice of a SolutionChoice of a Solution
13. USER SPECIFICATIONSUSER SPECIFICATIONS
Data CollectionData Collection
Tools and techniques ofTools and techniques of
analysis of collected dataanalysis of collected data
Choosing appropriate aids toChoosing appropriate aids to
analysisanalysis
Requirements specificationRequirements specification
documentdocument
14. SYSTEM DESIGNSYSTEM DESIGN
Generations of design tools andGenerations of design tools and
techniquetechnique
ModelingModeling
Selection of design MethodologySelection of design Methodology
Design DocumentationsDesign Documentations
15. DESIGN OF OUT PUT SYSTEMDESIGN OF OUT PUT SYSTEM
Output design processOutput design process
Output categoriesOutput categories
Output media andOutput media and
equipmentequipment
Principles of output designPrinciples of output design
Design DocumentationDesign Documentation
16. PROCESSING DESIGNPROCESSING DESIGN
PreprocessingPreprocessing
Main ProgramMain Program
ProcessingProcessing
SupportSupport
Post ProcessingPost Processing
17. DESIGN OF INPUT SYSTEMDESIGN OF INPUT SYSTEM
Data collectionData collection
organization andorganization and
preparationpreparation
Offline captureOffline capture
Online entryOnline entry
ValidationValidation
Human factors inHuman factors in
input( output ) designinput( output ) design