PM World Today – August 2011 (Vol. XIII, Issue VIII)


                   PM WORLD TODAY – PM ADVISORY – AUGUST 2011


        Ten Common Problems on Poor Performing Programs

                                                     By Bob Prieto

Program Management involves dealing with a scale and complexity that goes well
beyond that experienced in many projects. These challenges are compounded by new
linkages across multiple projects; indirect inter-dependencies as a result of “constraint
coupling”; and new risks and opportunities which may lurk in the white spaces between
projects. The greatest sources of poor performance in large programs, however, have
more to do with the context and frameworks established than the new and often hidden
risks.

This paper identifies ten common problems found on poor performing programs and
provides the program manager with a convenient diagnostic tool to assess his
program’s susceptibility to degraded performance. Periodic review of these problems
experienced on many programs facilitates early corrective action and improved program
performance.




© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 1
PM World Today – August 2011 (Vol. XIII, Issue VIII)


1.0       Planning Basis Not Well Founded

Large, complex programs require a well thought out and developed foundation upon
which to build the program structure consisting of a program execution strategy and
plan, a supporting organizational framework, and an infrastructure of processes and
procedures that tie the program together. But just like any structure, programs will only
perform as good as the foundation upon which they are built.

In programs experiencing problems related to an inadequately developed planning
basis there are several root causes that are routinely identified. These include:
         Program team begins work without detailed program and project execution plans.
         Strategic Business Objectives (SBO) not well defined or communicated.
         Project team does not spend sufficient effort to gather and understand                        all
          relevant information

         Flawed planning assumptions driven by bias that limits consideration of best
          ideas
         Limited buy-in from the team

         Lack of team alignment results in a culture lacking trust setting the stage for
          micro-management, slowing the program down

A structured process, beginning with identification and articulation of Strategic Business
Objectives, strategy definition, careful project portfolio selection, structured alignment
and complementary organizational change management can help organizations avoid
many of these planning basis problems.

2.0       Team Not Well Defined or Lacking Requisite Skills
The best strategy, plans and tools are only as good as the individuals assigned the
responsibility to utilize them. Skills must match requirements as well as likely challenges
the program will face. Clear responsibilities must be assigned and an assessment
conducted of existing team and individual skills gaps. These gaps must be addressed.
Programs experiencing team definition and skills problems typically experience one or
more of the following root causes:
         Team skills not consistent with changed requirements the program requires.
         Lack of program management training.
         Team never possessed required management skills.

         Team members unaware of their roles and responsibilities.
© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 2
PM World Today – August 2011 (Vol. XIII, Issue VIII)


         Team members function inconsistent with desired program outcomes.

         Team members frustrated by lack of role, responsibility and outcome definition.

         Roles and responsibilities not discussed early enough in the program

         Team member expertise does not match program requirements requiring them to
          function outside their comfort zone

         Role is out of one’s expertise

         Lack of education to expand team member skill sets.

RACI (Responsible, Accountable, Consulted, Informed) chart development can serve to
provide role clarity as well as be extended to identify requisite skills. Training programs
can be identified and tailored to meet specific program team needs in many instances.

3.0       Lack of a Culture of Responsibility, Authority & Accountability; Lack of
          Organizational Change Management

The “soft” issues really do matter and by any measure the “soft” issues are hard. In the
previous section we looked at some of the people issues we need to address in large
programs but even more is require. Team culture, a focus on change and a recognition
that people change in different ways at different rates are all important to program
success.

When programs suffer from a lack of a culture of responsibility, matched with requisite
authority and accountability, we should not be surprised since an assessable set of root
causes typically have shown themselves well in advance.

Additionally, inadequate attention to planning and managing the change process itself
can be a major contributor to poor program performance.

Root causes that should be watched out for include:

         No formal way of evaluating the work
         Lack of feedback from other team members (360 Review)
         Weak performance review processes – poor performers continue to receive
          strong performance evaluations.
         Roles and responsibilities not clearly defined and well communicated


© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 3
PM World Today – August 2011 (Vol. XIII, Issue VIII)


         RACI (Responsible, Accountable, Consulted, Informed) charts inadequate, non
          existent or not followed.
         Lack of cascading metrics (Key Performance Indicators (KPIs))
         Infrequent assessment of program quality, progress and achievement
         Project teams lacks a values statement; team culture not built and reinforced

         Underestimating the difficulty and impact of change

         Lack of recognition that change is a multi-step process

         Inadequate description of the new or desired team culture

         Change agents and early embracers of change not adequately thought through

         Evaluation of teamwork not conducted on a regular basis


4.0       Flawed Baseline

In some instances program failure or underperformance is assured from the outset. A
principle cause of such “assured” failures is weak planning and weak associated
baselines. In reality serious program execution planning has not happened.
Many factors can contribute to flawed program baselines including pressures to produce
the “right” answer, when “right” is based on a strategy of hope and a dream. Strong
baseline centric execution improves program performance but such execution can only
be as good as the desired baselines.
In many instances of flawed baselines we find that articulation of the program’s
Strategic Business Objectives have not been clearly articulated or agreed to.
Some symptoms of flawed baselines include:

         Timeline Not Realistic

         Known unknowns not sufficiently identified and provided for

         Planned on best guess basis; not credible with execution team

         Flawed baseline planning process repeated across multiple projects in program

         Baseline not communicated, managed to or reported against.

         Scope not well defined

© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 4
PM World Today – August 2011 (Vol. XIII, Issue VIII)


         Work Breakdown Structure lacked sufficient detail

         Assumptions not well thought out or limited in scope

         Assumptions not documented, communicated and tracked

         Risk Analysis Inadequate

         Risk drivers not identified

         Risk evolution over program not considered

         Risk realization not planned for; inadequate risk management plan


5.0       Weak Program Execution Plan

Well defined Strategic Business Objectives, a solid baseline and an aligned program
team contribute to strong program performance. At times however problems still arise
because of an associated program execution plan that was mismatched to the
program’s objectives, strategy and constraints. And while we may have clearly defined
roles and responsibilities at an earlier stage they may not match with the requirements
implicit in the program execution plan.
Factors contributing to a weak program execution plan can include:

         Execution strategy did not build on defined Strategic Business Objectives and
          program scope

         Execution plan did not align with selected strategy

         Execution plan was not resource loaded (time; $; constrained resources)

         Execution plan not aligned with risk management strategy

         Roles and responsibilities not clearly defined

         Execution sequence does not adequately recognize interdependencies and
          “constraint coupling”

6.0       Weak Execution

The best of plans, poorly executed, will not produce the outcomes we want. The list of
factors contributing to weak program execution could take volumes to describe but from

© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 5
PM World Today – August 2011 (Vol. XIII, Issue VIII)


observation and experience the following warrant closer inspection and attention by the
program manager throughout the program.

         Inadequately structured decision process

         The value of time in decision making not recognized
         Decision dates not established, recognized or respected
         Seeking perfection in the face of uncertainty
         Uninformed direction undermines management team effectiveness
         No sense of priorities – “kangaroo” management
         Lack of understanding of links and interdependencies
         Role of project constraints not understood
         Relationship power seeks to trump clear organizational roles and responsibilities
         Inadequate team alignment
         Inadequate team training
         Change not controlled resulting in scope growth, cost growth, schedule slippages
          and changed risk profile
         Work process durations, reviews, approvals not well defined or respected
         Work processes are not streamlined
         Too many people have approval authority

7.0       Poor or No Communication Plan

In real estate the mantra is location, location, location. In program management it is
communication, communication, communication.
When we fail to heed this admonishment in the execution of large programs we
experience difficulties in many aspects of the program. Everything becomes just a little
bit tougher.
Communication is always a challenge and one of the greatest problems encountered is
the perception that it exists. This is often not the case in programs experiencing
performance difficulties. Some symptoms of a weak communication plan include:

         Importance of communication not recognized
         No understanding of when and how communications will be delivered.

© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 6
PM World Today – August 2011 (Vol. XIII, Issue VIII)


         Frequency of communication does not support program needs
         Continuous communication between organizational levels does not occur
         Good program dashboard does not exist
         Program status, action items and their closeout are not tracked and reported
         Critical path activities and their dates have inadequate visibility by the program
          team
         Linkages, interdependencies and precedence are not discussed or adequately
          communicated
         Absence of strong change order process allows informal decisions to be made
          without adequate communication
         Approved changes not communicated to team in a timely and comprehensive
          manner
         Fear of retribution discourages issue identification
         Broad team awareness of information and issues does not exist

8.0       Lack Of Strategic Audits

The word “audit” often stirs emotions associated with fear and avoidance. Done
correctly, audits can provide great value to program teams by bringing the fresh eyes
that programs require. In large programs these audits must go well beyond the fiduciary,
quality and safety audits common to large programs by looking at issues related to
governance and strategy.
Programs with a weak audit framework are often characterized by:

         Program progress not tracked or monitored from outside execution team

         Audit process not used to drive program progress – people do what is measured

         Audit of quality process not used to drive quality improvement.

         Audits not conducted on a regular basis throughout entire program (project
          selection, initiation, execution, closeout)
         Audits do not assess program skills needs (management and other), resourcing
          plan and actual skills and levels (requirements/resource mismatch)


© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 7
PM World Today – August 2011 (Vol. XIII, Issue VIII)


9.0       Team Not Reinforced

Team performance is a measure of program success. But do we truly have a team?
Many of our activities related to alignment and organizational change management are
focused on building such teams, but they must be sustained throughout the life of the
program. The concept and reality of one team must be continuously reinforced.
When teams come off the track three common root causes typically show up:

         Silos allowed to exist and develop value destroying behaviors

         Common values not continuously communicated and demonstrated

         Information not shared

10.0      Weak Lessons Learned and Best Practices

We learn by doing and we learn by our mistakes. We also learn from others. Program
teams must be learning organizations. This is one of the contributions that a strong
team culture provides. Knowledge capture, sharing and management contribute to
sustained superior performance by program teams. Where this lacking we may find:

         Close out of major phases does not occur letting lessons learned to be lost and
          best practices to not be communicated in timely manner
         Lessons learned are incorporated without review to ensure they represent best
          practice (no unintended consequences)
         Inadequate knowledge management processes


Conclusion
Understanding, avoiding and continuously looking for, and addressing, the common
problems experienced in poor performing programs is essential to high performance
programs. This assessment of program readiness, both to begin as well as continue on,
can be aided by a structured assessment of the program to determine whether any of
the potential problems exist or might emerge.

The checklist that follows can provide a convenient tool for such an assessment and
can be incorporated as part of the ongoing strategic audit process.




© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 8
PM World Today – August 2011 (Vol. XIII, Issue VIII)




                        Common Program Problem Checklist

     1.0 Planning Basis Not Well Founded
               1.1       Program team begins work without detailed
                         program and project execution plans.
               1.2       Strategic Business Objectives (SBO) not well
                         defined or communicated.
               1.3       Project team does not spend sufficient effort to
                         gather and understand all relevant information
               1.4       Flawed planning assumptions driven by bias that
                         limits consideration of best ideas
               1.5       Limited buy-in from the team
               1.6       Lack of team alignment results in a culture lacking
                         trust setting the stage for micro-management,
                         slowing the program down


     2.0       Team Not Well Defined or Lacking Requisite Skills
               2.1       Team skills not consistent with changed
                         requirements the program requires.
               2.2       Lack of program management training.
               2.3       Team never possessed required management
                         skills.
               2.4       Team members unaware of their roles and
                         responsibilities.
               2.5       Team members function inconsistent with desired
                         program outcomes.
               2.6       Team members frustrated by lack of role,
                         responsibility and outcome definition.
               2.7       Roles and responsibilities not discussed early
                         enough in the program
               2.8       Team member expertise does not match program
                         requirements requiring them to function outside
                         their comfort zone
               2.9       Role is out of one’s expertise
               2.10      Lack of education to expand team member skill
                         sets.
© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 9
PM World Today – August 2011 (Vol. XIII, Issue VIII)



     3.0       Lack of a Culture of Responsibility, Authority &
               Accountability; Lack of Organizational Change
               Management
               3.1   No formal way of evaluating the work
               3.2   Lack of feedback from other team members (360
                     Review)
               3.3   Weak performance review processes – poor
                     performers continue to receive strong performance
                     evaluations.
               3.4   Roles and responsibilities not clearly defined and
                     well communicated
               3.5   RACI (Responsible, Accountable, Consulted,
                     Informed) charts inadequate, non existent or not
                     followed.
               3.6   Lack of cascading metrics (Key Performance
                     Indicators (KPIs))
               3.7   Infrequent assessment of program quality,
                     progress and achievement
               3.8   Project teams lacks a values statement; team
                     culture not built and reinforced
               3.9       Underestimating the difficulty and impact of change
               3.10      Lack of recognition that change is a multi-step
                         process
               3.11      Inadequate description of the new or desired team
                         culture
               3.12      Change agents and early embracers of change not
                         adequately thought through
               3.13      Evaluation of teamwork not conducted on a regular
                         basis


     4.0       Flawed Baseline
               4.1       Timeline Not Realistic
               4.2       Known unknowns not sufficiently identified and
                         provided for
               4.3       Planned on best guess basis; not credible with
                         execution team
               4.4       Flawed baseline planning process repeated across
                         multiple projects in program
© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 10
PM World Today – August 2011 (Vol. XIII, Issue VIII)


               4.5       Baseline not communicated, managed to or
                         reported against.
               4.6       Scope not well defined
               4.7       Work Breakdown Structure lacked sufficient detail
               4.8       Assumptions not well thought out or limited in
                         scope
               4.9       Assumptions not documented, communicated and
                         tracked
               4.10      Risk Analysis Inadequate
               4.11      Risk drivers not identified
               4.12      Risk evolution over program not considered
               4.13      Risk realization not planned for; inadequate risk
                         management plan


     5.0       Weak Program Execution Plan
               5.1       Execution strategy did not build on defined
                         Strategic Business Objectives and program scope
               5.2       Execution plan did not align with selected strategy
               5.3       Execution plan was not resource loaded (time; $;
                         constrained resources)
               5.4       Execution plan not aligned with risk management
                         strategy
               5.5       Roles and responsibilities not clearly defined
               5.6       Execution sequence does not adequately
                         recognize interdependencies and “constraint
                         coupling”


     6.0       Weak Execution
               6.1       Inadequately structured decision process
               6.2       The value of time in decision making not
                         recognized
               6.3       Decision dates not established, recognized or
                         respected
               6.4       Seeking perfection in the face of uncertainty
               6.5       Uninformed direction undermines management
                         team effectiveness
© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 11
PM World Today – August 2011 (Vol. XIII, Issue VIII)


               6.6       No sense of priorities – “kangaroo” management
               6.7       Lack of understanding of links and
                         interdependencies
               6.8       Role of project constraints not understood
               6.9       Relationship power seeks to trump clear
                         organizational roles and responsibilities
               6.10      Inadequate team alignment
               6.11      Inadequate team training
               6.12      Change not controlled resulting in scope growth,
                         cost growth, schedule slippages and changed risk
                         profile
               6.13      Work process durations, reviews, approvals not
                         well defined or respected
               6.14      Work processes are not streamlined
               6.15      Too many people have approval authority

     7.0       Poor or No Communication Plan
               7.1       Importance of communication not recognized
               7.2       No understanding of when and how
                         communications will be delivered.
               7.3       Frequency of communication does not support
                         program needs
               7.4       Continuous communication between organizational
                         levels does not occur
               7.5       Good program dashboard does not exist
               7.6       Program status, action items and their closeout are
                         not tracked and reported
               7.7       Critical path activities and their dates have
                         inadequate visibility by the program team
               7.8       Linkages, interdependencies and precedence are
                         not discussed or adequately communicated
               7.9       Absence of strong change order process allows
                         informal decisions to be made without adequate
                         communication
               7.10      Approved changes not communicated to team in a
                         timely and comprehensive manner
               7.11      Fear of retribution discourages issue identification
               7.12      Broad team awareness of information and issues
                         does not exist




© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 12
PM World Today – August 2011 (Vol. XIII, Issue VIII)


     8.0       Lack Of Strategic Audits
               8.1       Program progress not tracked or monitored from
                         outside execution team
               8.2       Audit process not used to drive program progress –
                         people do what is measured
               8.3       Audit of quality process not used to drive quality
                         improvement.
               8.4       Audits not conducted on a regular basis throughout
                         entire program (project selection, initiation,
                         execution, closeout)
               8.5       Audits do not assess program skills needs
                         (management and other), resourcing plan and
                         actual skills and levels (requirements/resource
                         mismatch)


     9.0       Team Not Reinforced
               9.1       Silos allowed to exist and develop value destroying
                         behaviors
               9.2       Common values not continuously communicated
                         and demonstrated
               9.3       Information not shared


     10.0      Weak Lessons Learned and Best Practices
               10.1      Close out of major phases does not occur letting
                         lessons learned to be lost and best practices to not
                         be communicated in timely manner
               10.2      Lessons learned are incorporated without review to
                         ensure they represent best practice (no unintended
                         consequences)
               10.3      Inadequate knowledge management processes




© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 13
PM World Today – August 2011 (Vol. XIII, Issue VIII)


About the Author


                               Bob Prieto

                               Author




                       Bob Prieto is a Senior Vice President of Fluor Corporation, one of
                       America’s largest engineering, construction and project
management firms, where he is responsible for strategy in support of the firm’s
Industrial & Infrastructure Group and its key clients. He focuses on the development,
delivery and oversight of large, complex projects worldwide. Prior to joining Fluor, Bob
served as chairman of Parsons Brinckerhoff Inc. He served as a member of the
executive committee of the National Center for Asia-Pacific Economic Cooperation, a
member of the Industry Leaders’ Council of the American Society of Civil Engineers
(ASCE), and co-founder of the Disaster Resource Network. He currently serves on a
number of committees looking at issues related to infrastructure delivery and resiliency
and disaster response and rebuilding. Until 2006 he served as one of three U.S.
presidential appointees to the Asia Pacific Economic Cooperation (APEC) Business
Advisory Council (ABAC) and previously served as chairman of the Engineering and
Construction Governors of The World Economic Forum and co-chair of the
infrastructure task force formed after September 11th by the New York City Chamber of
Commerce. He recently completed ten year tenure as a member of the board of
trustees of Polytechnic University of New York culminating in its merger with New York
University. Bob is the author of “Strategic Program Management” published by the
Construction Management Association of America (CMAA) and more recently a
companion work entitled “Topics in Strategic Program Management”.




© 2011 Bob Prieto
PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net   Page 14

More Related Content

What's hot

Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementUW Madison
 
Continuous Alignment
Continuous AlignmentContinuous Alignment
Continuous AlignmentBob Prieto
 
Introduction to Project Portfolio Management
Introduction to Project Portfolio ManagementIntroduction to Project Portfolio Management
Introduction to Project Portfolio ManagementLuis Javier Serrano
 
Why projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsWhy projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsTa Ngoc
 
Project Management Survey Research
Project Management Survey ResearchProject Management Survey Research
Project Management Survey ResearchDavid Robins
 
Agile and Lean Program Management
Agile and Lean Program ManagementAgile and Lean Program Management
Agile and Lean Program ManagementChristopher Daily
 
Project governance
Project governanceProject governance
Project governanceGlen Alleman
 
APM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAPM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAssociation for Project Management
 
Research Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryResearch Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryPM Solutions
 
Project Governance and Failure
Project Governance and FailureProject Governance and Failure
Project Governance and FailureMichael Krigsman
 
Project Management Paper
Project Management PaperProject Management Paper
Project Management PaperPam Simpson
 
StrategicFront: Assessing PMO Maturity in Your Organization
StrategicFront: Assessing PMO Maturity in Your OrganizationStrategicFront: Assessing PMO Maturity in Your Organization
StrategicFront: Assessing PMO Maturity in Your OrganizationSasha Lapshina
 
Project Management case analysis
Project Management case analysisProject Management case analysis
Project Management case analysisWakas Khalid
 
Project management framework 01
Project management framework 01Project management framework 01
Project management framework 01Muhammad Younis
 
Project organization
Project organizationProject organization
Project organizationAbdal Babar
 

What's hot (20)

Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
7 keys
7 keys7 keys
7 keys
 
Continuous Alignment
Continuous AlignmentContinuous Alignment
Continuous Alignment
 
Introduction to Project Portfolio Management
Introduction to Project Portfolio ManagementIntroduction to Project Portfolio Management
Introduction to Project Portfolio Management
 
Why projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsWhy projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfalls
 
Program Management
Program ManagementProgram Management
Program Management
 
Project Management Survey Research
Project Management Survey ResearchProject Management Survey Research
Project Management Survey Research
 
People in portfolio management
People in portfolio management People in portfolio management
People in portfolio management
 
DGiles_Project_World_TO_May_2011_presented
DGiles_Project_World_TO_May_2011_presentedDGiles_Project_World_TO_May_2011_presented
DGiles_Project_World_TO_May_2011_presented
 
Agile and Lean Program Management
Agile and Lean Program ManagementAgile and Lean Program Management
Agile and Lean Program Management
 
Project governance
Project governanceProject governance
Project governance
 
APM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challengesAPM Presents - Why project governance and its key principles and challenges
APM Presents - Why project governance and its key principles and challenges
 
Research Report: Strategies for Project Recovery
Research Report: Strategies for Project RecoveryResearch Report: Strategies for Project Recovery
Research Report: Strategies for Project Recovery
 
Project Governance and Failure
Project Governance and FailureProject Governance and Failure
Project Governance and Failure
 
Project Management Paper
Project Management PaperProject Management Paper
Project Management Paper
 
StrategicFront: Assessing PMO Maturity in Your Organization
StrategicFront: Assessing PMO Maturity in Your OrganizationStrategicFront: Assessing PMO Maturity in Your Organization
StrategicFront: Assessing PMO Maturity in Your Organization
 
Program Management
Program ManagementProgram Management
Program Management
 
Project Management case analysis
Project Management case analysisProject Management case analysis
Project Management case analysis
 
Project management framework 01
Project management framework 01Project management framework 01
Project management framework 01
 
Project organization
Project organizationProject organization
Project organization
 

Similar to Ten Common Problems on Poor Performing Programs

How to get started - managing a programme
How to get started - managing a programmeHow to get started - managing a programme
How to get started - managing a programmeMaven
 
10 Project Management Mistakes
10 Project Management Mistakes10 Project Management Mistakes
10 Project Management MistakesOrangescrum
 
Critical success factors in effective project implementation
Critical success factors in effective project implementationCritical success factors in effective project implementation
Critical success factors in effective project implementationSk. Mohtasim Billah
 
Planning Programs and Developing Objectives Final
Planning Programs and Developing Objectives FinalPlanning Programs and Developing Objectives Final
Planning Programs and Developing Objectives FinalTiffani Luckey
 
Module One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxModule One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxgilpinleeanna
 
project fails
project failsproject fails
project failsjbp07
 
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docxgilbertkpeters11344
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementYamanta Raj Niroula, PMP
 
Vulnerability Management Program Development Program
Vulnerability Management Program Development ProgramVulnerability Management Program Development Program
Vulnerability Management Program Development ProgramSusan Cox
 
MGT323 SEUMid
MGT323 SEUMidMGT323 SEUMid
MGT323 SEUMidJammyDe
 
Social work: Crafting Goals and Objectives
Social work: Crafting Goals and ObjectivesSocial work: Crafting Goals and Objectives
Social work: Crafting Goals and Objectivesbernie3524
 
9 Common Challenges in the Software Development Process
9 Common Challenges in the Software Development Process9 Common Challenges in the Software Development Process
9 Common Challenges in the Software Development ProcessSattrix Software Solutions
 
USER GUIDE M&E 2014 LENNY HIDAYAT
USER GUIDE M&E 2014 LENNY HIDAYATUSER GUIDE M&E 2014 LENNY HIDAYAT
USER GUIDE M&E 2014 LENNY HIDAYATLenny Hidayat
 
THE CONTEXT OF INTERNATIONAL PROJECTS IN TERMS OF ORGANI.docx
THE CONTEXT OF INTERNATIONAL PROJECTS IN TERMS OF ORGANI.docxTHE CONTEXT OF INTERNATIONAL PROJECTS IN TERMS OF ORGANI.docx
THE CONTEXT OF INTERNATIONAL PROJECTS IN TERMS OF ORGANI.docxarnoldmeredith47041
 

Similar to Ten Common Problems on Poor Performing Programs (20)

How to get started - managing a programme
How to get started - managing a programmeHow to get started - managing a programme
How to get started - managing a programme
 
module
modulemodule
module
 
10 Project Management Mistakes
10 Project Management Mistakes10 Project Management Mistakes
10 Project Management Mistakes
 
Critical success factors in effective project implementation
Critical success factors in effective project implementationCritical success factors in effective project implementation
Critical success factors in effective project implementation
 
Planning Programs and Developing Objectives Final
Planning Programs and Developing Objectives FinalPlanning Programs and Developing Objectives Final
Planning Programs and Developing Objectives Final
 
Portfolio management knowledge development
Portfolio management knowledge developmentPortfolio management knowledge development
Portfolio management knowledge development
 
A white paper on Program Management
A white paper on Program ManagementA white paper on Program Management
A white paper on Program Management
 
Module One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxModule One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docx
 
project fails
project failsproject fails
project fails
 
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
4 Project Goals, Scope, and CharterChaosDigital VisionGe.docx
 
PROGRAMME MANAGEMENT BEST PRATICE
PROGRAMME MANAGEMENT BEST PRATICEPROGRAMME MANAGEMENT BEST PRATICE
PROGRAMME MANAGEMENT BEST PRATICE
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
 
Vulnerability Management Program Development Program
Vulnerability Management Program Development ProgramVulnerability Management Program Development Program
Vulnerability Management Program Development Program
 
MGT323 SEUMid
MGT323 SEUMidMGT323 SEUMid
MGT323 SEUMid
 
Some Challenges of M&E
Some Challenges of M&ESome Challenges of M&E
Some Challenges of M&E
 
Risk managementorrussianroulette -whitepaper_16
Risk managementorrussianroulette -whitepaper_16Risk managementorrussianroulette -whitepaper_16
Risk managementorrussianroulette -whitepaper_16
 
Social work: Crafting Goals and Objectives
Social work: Crafting Goals and ObjectivesSocial work: Crafting Goals and Objectives
Social work: Crafting Goals and Objectives
 
9 Common Challenges in the Software Development Process
9 Common Challenges in the Software Development Process9 Common Challenges in the Software Development Process
9 Common Challenges in the Software Development Process
 
USER GUIDE M&E 2014 LENNY HIDAYAT
USER GUIDE M&E 2014 LENNY HIDAYATUSER GUIDE M&E 2014 LENNY HIDAYAT
USER GUIDE M&E 2014 LENNY HIDAYAT
 
THE CONTEXT OF INTERNATIONAL PROJECTS IN TERMS OF ORGANI.docx
THE CONTEXT OF INTERNATIONAL PROJECTS IN TERMS OF ORGANI.docxTHE CONTEXT OF INTERNATIONAL PROJECTS IN TERMS OF ORGANI.docx
THE CONTEXT OF INTERNATIONAL PROJECTS IN TERMS OF ORGANI.docx
 

More from Bob Prieto

Application of system life cycle processes to large complex engineering and c...
Application of system life cycle processes to large complex engineering and c...Application of system life cycle processes to large complex engineering and c...
Application of system life cycle processes to large complex engineering and c...Bob Prieto
 
Engineering and construction project startup
Engineering and construction project startupEngineering and construction project startup
Engineering and construction project startupBob Prieto
 
Deeper look at the physics of projects
Deeper look at the physics of projectsDeeper look at the physics of projects
Deeper look at the physics of projectsBob Prieto
 
Systems nature of large complex projects
Systems nature of large complex projectsSystems nature of large complex projects
Systems nature of large complex projectsBob Prieto
 
Governance of mega and giga programs
Governance of mega and giga programsGovernance of mega and giga programs
Governance of mega and giga programsBob Prieto
 
Strengthen outcome based capital project delivery
Strengthen outcome based capital project deliveryStrengthen outcome based capital project delivery
Strengthen outcome based capital project deliveryBob Prieto
 
Rethinking Interface Management
Rethinking Interface ManagementRethinking Interface Management
Rethinking Interface ManagementBob Prieto
 
Rework in Engineering & Construction Projects
Rework in Engineering & Construction ProjectsRework in Engineering & Construction Projects
Rework in Engineering & Construction ProjectsBob Prieto
 
Reversing Global Warming
Reversing Global WarmingReversing Global Warming
Reversing Global WarmingBob Prieto
 
Improving infrastructure project success
Improving infrastructure project successImproving infrastructure project success
Improving infrastructure project successBob Prieto
 
Large complex project success
Large complex project successLarge complex project success
Large complex project successBob Prieto
 
Impact of correlation on risks in programs and projects
Impact of correlation on risks in programs and projects Impact of correlation on risks in programs and projects
Impact of correlation on risks in programs and projects Bob Prieto
 
Decision Making Under Uncertainty
Decision Making Under UncertaintyDecision Making Under Uncertainty
Decision Making Under UncertaintyBob Prieto
 
Post Dorian Engineering & Construction in the Bahamas
Post Dorian Engineering & Construction in the BahamasPost Dorian Engineering & Construction in the Bahamas
Post Dorian Engineering & Construction in the BahamasBob Prieto
 
Debating project decisions in an ai enabled environment
Debating project decisions in an ai enabled environmentDebating project decisions in an ai enabled environment
Debating project decisions in an ai enabled environmentBob Prieto
 
Chapters 11 12 13
Chapters 11  12  13Chapters 11  12  13
Chapters 11 12 13Bob Prieto
 
Theory of Management of Large Complex Projects - Chapter 7
Theory of Management of Large Complex Projects - Chapter 7Theory of Management of Large Complex Projects - Chapter 7
Theory of Management of Large Complex Projects - Chapter 7Bob Prieto
 

More from Bob Prieto (20)

Application of system life cycle processes to large complex engineering and c...
Application of system life cycle processes to large complex engineering and c...Application of system life cycle processes to large complex engineering and c...
Application of system life cycle processes to large complex engineering and c...
 
Engineering and construction project startup
Engineering and construction project startupEngineering and construction project startup
Engineering and construction project startup
 
Deeper look at the physics of projects
Deeper look at the physics of projectsDeeper look at the physics of projects
Deeper look at the physics of projects
 
Systems nature of large complex projects
Systems nature of large complex projectsSystems nature of large complex projects
Systems nature of large complex projects
 
Governance of mega and giga programs
Governance of mega and giga programsGovernance of mega and giga programs
Governance of mega and giga programs
 
Strengthen outcome based capital project delivery
Strengthen outcome based capital project deliveryStrengthen outcome based capital project delivery
Strengthen outcome based capital project delivery
 
Rethinking Interface Management
Rethinking Interface ManagementRethinking Interface Management
Rethinking Interface Management
 
Rework in Engineering & Construction Projects
Rework in Engineering & Construction ProjectsRework in Engineering & Construction Projects
Rework in Engineering & Construction Projects
 
Reversing Global Warming
Reversing Global WarmingReversing Global Warming
Reversing Global Warming
 
Improving infrastructure project success
Improving infrastructure project successImproving infrastructure project success
Improving infrastructure project success
 
Large complex project success
Large complex project successLarge complex project success
Large complex project success
 
Impact of correlation on risks in programs and projects
Impact of correlation on risks in programs and projects Impact of correlation on risks in programs and projects
Impact of correlation on risks in programs and projects
 
Decision Making Under Uncertainty
Decision Making Under UncertaintyDecision Making Under Uncertainty
Decision Making Under Uncertainty
 
Post Dorian Engineering & Construction in the Bahamas
Post Dorian Engineering & Construction in the BahamasPost Dorian Engineering & Construction in the Bahamas
Post Dorian Engineering & Construction in the Bahamas
 
Debating project decisions in an ai enabled environment
Debating project decisions in an ai enabled environmentDebating project decisions in an ai enabled environment
Debating project decisions in an ai enabled environment
 
Chapters 11 12 13
Chapters 11  12  13Chapters 11  12  13
Chapters 11 12 13
 
Chapter 10
Chapter 10Chapter 10
Chapter 10
 
Chapter 9
Chapter 9Chapter 9
Chapter 9
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 
Theory of Management of Large Complex Projects - Chapter 7
Theory of Management of Large Complex Projects - Chapter 7Theory of Management of Large Complex Projects - Chapter 7
Theory of Management of Large Complex Projects - Chapter 7
 

Recently uploaded

SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escortdlhescort
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...lizamodels9
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 

Recently uploaded (20)

SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 

Ten Common Problems on Poor Performing Programs

  • 1. PM World Today – August 2011 (Vol. XIII, Issue VIII) PM WORLD TODAY – PM ADVISORY – AUGUST 2011 Ten Common Problems on Poor Performing Programs By Bob Prieto Program Management involves dealing with a scale and complexity that goes well beyond that experienced in many projects. These challenges are compounded by new linkages across multiple projects; indirect inter-dependencies as a result of “constraint coupling”; and new risks and opportunities which may lurk in the white spaces between projects. The greatest sources of poor performance in large programs, however, have more to do with the context and frameworks established than the new and often hidden risks. This paper identifies ten common problems found on poor performing programs and provides the program manager with a convenient diagnostic tool to assess his program’s susceptibility to degraded performance. Periodic review of these problems experienced on many programs facilitates early corrective action and improved program performance. © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 1
  • 2. PM World Today – August 2011 (Vol. XIII, Issue VIII) 1.0 Planning Basis Not Well Founded Large, complex programs require a well thought out and developed foundation upon which to build the program structure consisting of a program execution strategy and plan, a supporting organizational framework, and an infrastructure of processes and procedures that tie the program together. But just like any structure, programs will only perform as good as the foundation upon which they are built. In programs experiencing problems related to an inadequately developed planning basis there are several root causes that are routinely identified. These include:  Program team begins work without detailed program and project execution plans.  Strategic Business Objectives (SBO) not well defined or communicated.  Project team does not spend sufficient effort to gather and understand all relevant information  Flawed planning assumptions driven by bias that limits consideration of best ideas  Limited buy-in from the team  Lack of team alignment results in a culture lacking trust setting the stage for micro-management, slowing the program down A structured process, beginning with identification and articulation of Strategic Business Objectives, strategy definition, careful project portfolio selection, structured alignment and complementary organizational change management can help organizations avoid many of these planning basis problems. 2.0 Team Not Well Defined or Lacking Requisite Skills The best strategy, plans and tools are only as good as the individuals assigned the responsibility to utilize them. Skills must match requirements as well as likely challenges the program will face. Clear responsibilities must be assigned and an assessment conducted of existing team and individual skills gaps. These gaps must be addressed. Programs experiencing team definition and skills problems typically experience one or more of the following root causes:  Team skills not consistent with changed requirements the program requires.  Lack of program management training.  Team never possessed required management skills.  Team members unaware of their roles and responsibilities. © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 2
  • 3. PM World Today – August 2011 (Vol. XIII, Issue VIII)  Team members function inconsistent with desired program outcomes.  Team members frustrated by lack of role, responsibility and outcome definition.  Roles and responsibilities not discussed early enough in the program  Team member expertise does not match program requirements requiring them to function outside their comfort zone  Role is out of one’s expertise  Lack of education to expand team member skill sets. RACI (Responsible, Accountable, Consulted, Informed) chart development can serve to provide role clarity as well as be extended to identify requisite skills. Training programs can be identified and tailored to meet specific program team needs in many instances. 3.0 Lack of a Culture of Responsibility, Authority & Accountability; Lack of Organizational Change Management The “soft” issues really do matter and by any measure the “soft” issues are hard. In the previous section we looked at some of the people issues we need to address in large programs but even more is require. Team culture, a focus on change and a recognition that people change in different ways at different rates are all important to program success. When programs suffer from a lack of a culture of responsibility, matched with requisite authority and accountability, we should not be surprised since an assessable set of root causes typically have shown themselves well in advance. Additionally, inadequate attention to planning and managing the change process itself can be a major contributor to poor program performance. Root causes that should be watched out for include:  No formal way of evaluating the work  Lack of feedback from other team members (360 Review)  Weak performance review processes – poor performers continue to receive strong performance evaluations.  Roles and responsibilities not clearly defined and well communicated © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 3
  • 4. PM World Today – August 2011 (Vol. XIII, Issue VIII)  RACI (Responsible, Accountable, Consulted, Informed) charts inadequate, non existent or not followed.  Lack of cascading metrics (Key Performance Indicators (KPIs))  Infrequent assessment of program quality, progress and achievement  Project teams lacks a values statement; team culture not built and reinforced  Underestimating the difficulty and impact of change  Lack of recognition that change is a multi-step process  Inadequate description of the new or desired team culture  Change agents and early embracers of change not adequately thought through  Evaluation of teamwork not conducted on a regular basis 4.0 Flawed Baseline In some instances program failure or underperformance is assured from the outset. A principle cause of such “assured” failures is weak planning and weak associated baselines. In reality serious program execution planning has not happened. Many factors can contribute to flawed program baselines including pressures to produce the “right” answer, when “right” is based on a strategy of hope and a dream. Strong baseline centric execution improves program performance but such execution can only be as good as the desired baselines. In many instances of flawed baselines we find that articulation of the program’s Strategic Business Objectives have not been clearly articulated or agreed to. Some symptoms of flawed baselines include:  Timeline Not Realistic  Known unknowns not sufficiently identified and provided for  Planned on best guess basis; not credible with execution team  Flawed baseline planning process repeated across multiple projects in program  Baseline not communicated, managed to or reported against.  Scope not well defined © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 4
  • 5. PM World Today – August 2011 (Vol. XIII, Issue VIII)  Work Breakdown Structure lacked sufficient detail  Assumptions not well thought out or limited in scope  Assumptions not documented, communicated and tracked  Risk Analysis Inadequate  Risk drivers not identified  Risk evolution over program not considered  Risk realization not planned for; inadequate risk management plan 5.0 Weak Program Execution Plan Well defined Strategic Business Objectives, a solid baseline and an aligned program team contribute to strong program performance. At times however problems still arise because of an associated program execution plan that was mismatched to the program’s objectives, strategy and constraints. And while we may have clearly defined roles and responsibilities at an earlier stage they may not match with the requirements implicit in the program execution plan. Factors contributing to a weak program execution plan can include:  Execution strategy did not build on defined Strategic Business Objectives and program scope  Execution plan did not align with selected strategy  Execution plan was not resource loaded (time; $; constrained resources)  Execution plan not aligned with risk management strategy  Roles and responsibilities not clearly defined  Execution sequence does not adequately recognize interdependencies and “constraint coupling” 6.0 Weak Execution The best of plans, poorly executed, will not produce the outcomes we want. The list of factors contributing to weak program execution could take volumes to describe but from © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 5
  • 6. PM World Today – August 2011 (Vol. XIII, Issue VIII) observation and experience the following warrant closer inspection and attention by the program manager throughout the program.  Inadequately structured decision process  The value of time in decision making not recognized  Decision dates not established, recognized or respected  Seeking perfection in the face of uncertainty  Uninformed direction undermines management team effectiveness  No sense of priorities – “kangaroo” management  Lack of understanding of links and interdependencies  Role of project constraints not understood  Relationship power seeks to trump clear organizational roles and responsibilities  Inadequate team alignment  Inadequate team training  Change not controlled resulting in scope growth, cost growth, schedule slippages and changed risk profile  Work process durations, reviews, approvals not well defined or respected  Work processes are not streamlined  Too many people have approval authority 7.0 Poor or No Communication Plan In real estate the mantra is location, location, location. In program management it is communication, communication, communication. When we fail to heed this admonishment in the execution of large programs we experience difficulties in many aspects of the program. Everything becomes just a little bit tougher. Communication is always a challenge and one of the greatest problems encountered is the perception that it exists. This is often not the case in programs experiencing performance difficulties. Some symptoms of a weak communication plan include:  Importance of communication not recognized  No understanding of when and how communications will be delivered. © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 6
  • 7. PM World Today – August 2011 (Vol. XIII, Issue VIII)  Frequency of communication does not support program needs  Continuous communication between organizational levels does not occur  Good program dashboard does not exist  Program status, action items and their closeout are not tracked and reported  Critical path activities and their dates have inadequate visibility by the program team  Linkages, interdependencies and precedence are not discussed or adequately communicated  Absence of strong change order process allows informal decisions to be made without adequate communication  Approved changes not communicated to team in a timely and comprehensive manner  Fear of retribution discourages issue identification  Broad team awareness of information and issues does not exist 8.0 Lack Of Strategic Audits The word “audit” often stirs emotions associated with fear and avoidance. Done correctly, audits can provide great value to program teams by bringing the fresh eyes that programs require. In large programs these audits must go well beyond the fiduciary, quality and safety audits common to large programs by looking at issues related to governance and strategy. Programs with a weak audit framework are often characterized by:  Program progress not tracked or monitored from outside execution team  Audit process not used to drive program progress – people do what is measured  Audit of quality process not used to drive quality improvement.  Audits not conducted on a regular basis throughout entire program (project selection, initiation, execution, closeout)  Audits do not assess program skills needs (management and other), resourcing plan and actual skills and levels (requirements/resource mismatch) © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 7
  • 8. PM World Today – August 2011 (Vol. XIII, Issue VIII) 9.0 Team Not Reinforced Team performance is a measure of program success. But do we truly have a team? Many of our activities related to alignment and organizational change management are focused on building such teams, but they must be sustained throughout the life of the program. The concept and reality of one team must be continuously reinforced. When teams come off the track three common root causes typically show up:  Silos allowed to exist and develop value destroying behaviors  Common values not continuously communicated and demonstrated  Information not shared 10.0 Weak Lessons Learned and Best Practices We learn by doing and we learn by our mistakes. We also learn from others. Program teams must be learning organizations. This is one of the contributions that a strong team culture provides. Knowledge capture, sharing and management contribute to sustained superior performance by program teams. Where this lacking we may find:  Close out of major phases does not occur letting lessons learned to be lost and best practices to not be communicated in timely manner  Lessons learned are incorporated without review to ensure they represent best practice (no unintended consequences)  Inadequate knowledge management processes Conclusion Understanding, avoiding and continuously looking for, and addressing, the common problems experienced in poor performing programs is essential to high performance programs. This assessment of program readiness, both to begin as well as continue on, can be aided by a structured assessment of the program to determine whether any of the potential problems exist or might emerge. The checklist that follows can provide a convenient tool for such an assessment and can be incorporated as part of the ongoing strategic audit process. © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 8
  • 9. PM World Today – August 2011 (Vol. XIII, Issue VIII) Common Program Problem Checklist 1.0 Planning Basis Not Well Founded 1.1 Program team begins work without detailed program and project execution plans. 1.2 Strategic Business Objectives (SBO) not well defined or communicated. 1.3 Project team does not spend sufficient effort to gather and understand all relevant information 1.4 Flawed planning assumptions driven by bias that limits consideration of best ideas 1.5 Limited buy-in from the team 1.6 Lack of team alignment results in a culture lacking trust setting the stage for micro-management, slowing the program down 2.0 Team Not Well Defined or Lacking Requisite Skills 2.1 Team skills not consistent with changed requirements the program requires. 2.2 Lack of program management training. 2.3 Team never possessed required management skills. 2.4 Team members unaware of their roles and responsibilities. 2.5 Team members function inconsistent with desired program outcomes. 2.6 Team members frustrated by lack of role, responsibility and outcome definition. 2.7 Roles and responsibilities not discussed early enough in the program 2.8 Team member expertise does not match program requirements requiring them to function outside their comfort zone 2.9 Role is out of one’s expertise 2.10 Lack of education to expand team member skill sets. © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 9
  • 10. PM World Today – August 2011 (Vol. XIII, Issue VIII) 3.0 Lack of a Culture of Responsibility, Authority & Accountability; Lack of Organizational Change Management 3.1 No formal way of evaluating the work 3.2 Lack of feedback from other team members (360 Review) 3.3 Weak performance review processes – poor performers continue to receive strong performance evaluations. 3.4 Roles and responsibilities not clearly defined and well communicated 3.5 RACI (Responsible, Accountable, Consulted, Informed) charts inadequate, non existent or not followed. 3.6 Lack of cascading metrics (Key Performance Indicators (KPIs)) 3.7 Infrequent assessment of program quality, progress and achievement 3.8 Project teams lacks a values statement; team culture not built and reinforced 3.9 Underestimating the difficulty and impact of change 3.10 Lack of recognition that change is a multi-step process 3.11 Inadequate description of the new or desired team culture 3.12 Change agents and early embracers of change not adequately thought through 3.13 Evaluation of teamwork not conducted on a regular basis 4.0 Flawed Baseline 4.1 Timeline Not Realistic 4.2 Known unknowns not sufficiently identified and provided for 4.3 Planned on best guess basis; not credible with execution team 4.4 Flawed baseline planning process repeated across multiple projects in program © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 10
  • 11. PM World Today – August 2011 (Vol. XIII, Issue VIII) 4.5 Baseline not communicated, managed to or reported against. 4.6 Scope not well defined 4.7 Work Breakdown Structure lacked sufficient detail 4.8 Assumptions not well thought out or limited in scope 4.9 Assumptions not documented, communicated and tracked 4.10 Risk Analysis Inadequate 4.11 Risk drivers not identified 4.12 Risk evolution over program not considered 4.13 Risk realization not planned for; inadequate risk management plan 5.0 Weak Program Execution Plan 5.1 Execution strategy did not build on defined Strategic Business Objectives and program scope 5.2 Execution plan did not align with selected strategy 5.3 Execution plan was not resource loaded (time; $; constrained resources) 5.4 Execution plan not aligned with risk management strategy 5.5 Roles and responsibilities not clearly defined 5.6 Execution sequence does not adequately recognize interdependencies and “constraint coupling” 6.0 Weak Execution 6.1 Inadequately structured decision process 6.2 The value of time in decision making not recognized 6.3 Decision dates not established, recognized or respected 6.4 Seeking perfection in the face of uncertainty 6.5 Uninformed direction undermines management team effectiveness © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 11
  • 12. PM World Today – August 2011 (Vol. XIII, Issue VIII) 6.6 No sense of priorities – “kangaroo” management 6.7 Lack of understanding of links and interdependencies 6.8 Role of project constraints not understood 6.9 Relationship power seeks to trump clear organizational roles and responsibilities 6.10 Inadequate team alignment 6.11 Inadequate team training 6.12 Change not controlled resulting in scope growth, cost growth, schedule slippages and changed risk profile 6.13 Work process durations, reviews, approvals not well defined or respected 6.14 Work processes are not streamlined 6.15 Too many people have approval authority 7.0 Poor or No Communication Plan 7.1 Importance of communication not recognized 7.2 No understanding of when and how communications will be delivered. 7.3 Frequency of communication does not support program needs 7.4 Continuous communication between organizational levels does not occur 7.5 Good program dashboard does not exist 7.6 Program status, action items and their closeout are not tracked and reported 7.7 Critical path activities and their dates have inadequate visibility by the program team 7.8 Linkages, interdependencies and precedence are not discussed or adequately communicated 7.9 Absence of strong change order process allows informal decisions to be made without adequate communication 7.10 Approved changes not communicated to team in a timely and comprehensive manner 7.11 Fear of retribution discourages issue identification 7.12 Broad team awareness of information and issues does not exist © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 12
  • 13. PM World Today – August 2011 (Vol. XIII, Issue VIII) 8.0 Lack Of Strategic Audits 8.1 Program progress not tracked or monitored from outside execution team 8.2 Audit process not used to drive program progress – people do what is measured 8.3 Audit of quality process not used to drive quality improvement. 8.4 Audits not conducted on a regular basis throughout entire program (project selection, initiation, execution, closeout) 8.5 Audits do not assess program skills needs (management and other), resourcing plan and actual skills and levels (requirements/resource mismatch) 9.0 Team Not Reinforced 9.1 Silos allowed to exist and develop value destroying behaviors 9.2 Common values not continuously communicated and demonstrated 9.3 Information not shared 10.0 Weak Lessons Learned and Best Practices 10.1 Close out of major phases does not occur letting lessons learned to be lost and best practices to not be communicated in timely manner 10.2 Lessons learned are incorporated without review to ensure they represent best practice (no unintended consequences) 10.3 Inadequate knowledge management processes © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 13
  • 14. PM World Today – August 2011 (Vol. XIII, Issue VIII) About the Author Bob Prieto Author Bob Prieto is a Senior Vice President of Fluor Corporation, one of America’s largest engineering, construction and project management firms, where he is responsible for strategy in support of the firm’s Industrial & Infrastructure Group and its key clients. He focuses on the development, delivery and oversight of large, complex projects worldwide. Prior to joining Fluor, Bob served as chairman of Parsons Brinckerhoff Inc. He served as a member of the executive committee of the National Center for Asia-Pacific Economic Cooperation, a member of the Industry Leaders’ Council of the American Society of Civil Engineers (ASCE), and co-founder of the Disaster Resource Network. He currently serves on a number of committees looking at issues related to infrastructure delivery and resiliency and disaster response and rebuilding. Until 2006 he served as one of three U.S. presidential appointees to the Asia Pacific Economic Cooperation (APEC) Business Advisory Council (ABAC) and previously served as chairman of the Engineering and Construction Governors of The World Economic Forum and co-chair of the infrastructure task force formed after September 11th by the New York City Chamber of Commerce. He recently completed ten year tenure as a member of the board of trustees of Polytechnic University of New York culminating in its merger with New York University. Bob is the author of “Strategic Program Management” published by the Construction Management Association of America (CMAA) and more recently a companion work entitled “Topics in Strategic Program Management”. © 2011 Bob Prieto PM World Today is a free monthly eJournal - Subscriptions available at http://www.pmworldtoday.net Page 14