• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Dpwh kabugao pudtol_2nd qtr_f
 

Dpwh kabugao pudtol_2nd qtr_f

on

  • 379 views

 

Statistics

Views

Total Views
379
Views on SlideShare
379
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Dpwh kabugao pudtol_2nd qtr_f Dpwh kabugao pudtol_2nd qtr_f Document Transcript

    • PROJECT PROGRESS REPORT As of June 2012Project Title: Kabugao-Pudtol-Luna-Cagayan Boundary RoadImplementing Agency: Department of Public Works and Highways - CARDonor: (x) GOP Loan/Grant Proceeds: ( ) Loan Peso Counterpart: ( ) Grant Total Project Cost: P 58.827 MLocation/Area Apayao ProvinceCoverage:Description:The road is a major component of the Cordillera Roads Improvement Project (CRIP)as the northern tip of the regional backbone. It traverses the municipalities ofKabugao, Pudtol and Luna in Apayao and turns east to Abulog in Cagayan.The Kabugao-Pudtol-Luna-Abulug Road (95.7 km) directly links the capital townKabugao to lower Apayao. The road starts at junction Lenneng along the Kabugao-Conner-Abbut Road and going north-east traverses municipalities of Kabugao, Pudtoland Luna and ends at Junction Luna in Abulug, Cagayan along the Pan-PhilippineHighway. The Pan-Philippine Highway connects Laoag, Ilocos Norte andTuguegarao, Cagayan.The bridge construction across Maton and Nagan Rivers has been completed. Theserivers are major tributaries of Apayao River.The gap at the Kabugao side (19.359 km.), traverses a rugged mountainous terrain,then slowly goes down to the Paco Valley, which was then proposed as governmentcenter. The road will also traverse the Mataguisi Valley in Pudtol. The valleys havevast potential for agricultural production. While, Luna, is the location of the newprovincial capitol.The specific project output is road construction of 2.873 kms.Project Duration: Start: February 20, 2012 End: October 16, 2012 PROJECT PROGRESS For CY 2012 AO 1 Quarter AO 2nd Quarter AO 3rd Quarter AO 4th Quarter stTarget 5% 50%Actual 5% 35.7%SlippageCumulative Status: Status Physical Financial(Since start of Target 55%project) Actual 40.70% 31.18% Slippage (14.3%) 2nd Quarter RPMES Report CY 2012
    • CurrentImplementationIssues and/orProblemsEncountered (if any):Actions Taken/Recommendations:Remarks: Memo (Nov. 3, 2011) from Secretary Singson: Approved for upgrading from Secondary to Arterial RoadAgency Contact DIR. EDILBERTO P. CARABBACANPerson: Regional Director, DPWH – CAR Engineer’s Hill 2600 Baguio City Tel. 444-8838 2nd Quarter RPMES Report CY 2012
    • Project Location Kabugao-Pudtol-Luna Cagayan Bdry Road New Apayao Provincial Capitol in LunaLandmarks 2nd Quarter RPMES Report CY 2012
    • Kabugao-Pudtol-Luna Cagayan Bdry. Road Mataguisi Valley Babulayan Bridge across Apayao River Junction Lenneng Paco Valley (Kabugao) 2nd Quarter RPMES Report CY 2012