Operation Research Project Work
 Topic: Planning the Product Mix at
      Panchtantra Corporation
Introduction
• Mr. Ganesh had to prepare a production plan of
  Intensive Handloom Development project for the next
  month.

• Types of handloom to be produced :
                • Lungi (60sx40s)
                • Shirting (40sx40s)

• The main objective of Mr. Ganesh was to decide over
  how many metres of Lungi and shirting should be
  produced in order to maximize the profit satisfying the
  various constraints.
Exihibit 1
S. No.                        Parameter               Lungi   Shirting
     1 Selling Price (Rs. Per metre)                  10.9      6.6
     2 Variable Cost
         2.a. Wages paid to weavers (Rs. Per metre)    4.5      1.5
         2.b. Yarn Cost (Rs. Per metre)                5.5      4.5
     3 Contribution (Rs. Per metre)                    0.9      0.6
     4 Production Rate (No. of metre per loom day)     5        12
     5 Yarn Consumption (grams per metre)
         5.a. 40s yarn                                 60       100
         5.b. 60s yarn                                 40        0
Decision Variables
• Mr. Ganesh had to decide over the product
  Mix i.e. how many metres of Lungi and
  Shirting should be produced.

Therefore Decision Variable are :
       Length of Lungi to be produced (in metres) = X1
       Length of Shirting to be produced (in metres) = X2
Objective Function
• Maximizing the Total Sales Profit
        Profit per metre of Lungi = Rs. 0.9
        Profit per metre of Shirting = Rs. 0.6

        Therefore, Objective Function is :

                     Max (0.9 X1 + 0.6 X2)
Constraints
• Various constraints that affect the production and
  the decision variables are listed in following slides

1. Maximum number of Loom Days available are 3000
           Loom Days <= 3000
        » (X1/5)+(X2/12) <= 3000
        » 12X1 + 5X2 <= 3000 x 60
        »   12X1 + 5X2 <= 180000      --(1)
Constraints (contd.)
2. 60s Yarn available was 480 Kgs.
              60s yarn <= 480 kgs.
   60s yarn is used only for Lungi at the rate of 40 grams per
   metre.
             » 40X1 <= 480x1000 --(2)

3. 40s Yarn available was 2400 Kgs.
              40s yarn <= 2400 kgs.
   40s yarn is used in Lungi at the rate of 60 grams per metre
   and in Shirting at the rate of 100 grams per metre
              » 60X1 + 100X2 <= 240x1000 --(3)
Constraints (contd.)
4. As per sales department, due to piled up stocks in
   inventory, production of Shirting should not be more
   than 22000 metres.
       Sales level of Shirting <= 22000 metres
                   » X2 <= 22000        --(4)
5. As per sales department, due to piled up stocks in
  inventory, production of Lungi should not be more
  than 11000 metres.
      Sales level of Lungi <= 11000 metres
                   » X1 <= 11000        --(5)
Problem #1 - Analysis
• Mr. Ganesh wanted to produce as much of lungi
  as possible, therefore he would want to use the
  entire sales limit of 11000 mts.
  Therefore, the constraint #5 would be as :
            X1 = 11000        --(5.a)

• Mr. Ganphathy was however in favor of
  producing only the optimal level of Lungi so that
  the rest of the resources can be used for
  maximizing the profit.
  Therefore, the constraint #5 would be as :
            X1 <= 11000             --(5.b)
Problem #1 - Solution
  • Refer “Model_Question1” sheet in the attached Solver Model excel
    file.
                                                     As per Mr. Ganesh's      As per Mr.
                                                            plan           Ganphathy's plan
X1 = Length of Lungi to be produced (in metres)            11000               6666.67
X2 = Length of Shirting to be produced (in metres)          9600                20000
Total Profit                                               15660                18000


  • Hence To optimize the profit, following should be the production
    plan for the next month (we should go with Mr. Ganphaty's Plan):
         • Length of Lungi to be produced = 6666.67 metres
         • Length of Shirting to be produced = 20000 metres

  • Increase in profit in this way will be Rs. 2340 with optimal profit of
    Rs. 18000
Problem #2 – Additional Constraint
• Additional constraint added to ensure that on an
  average, the production paid as wages to the weavers at
  least Rs. 20.5 per loom day.
• Total wages for the production could be given by
              4.5X1 + 1.5X2
• Total number of loom days used could be given by
              (X1/5) + (X2/12)
• Therefore
                 4.5X1 + 1.5X2 >= 20.5 x [(X1/5) + (X2/12)]
              » (4.5-20.5/5)X1 + (1.5 - 20.5/12)X2 >= 0
             » 0.4X1 – 0.2083X2 >= 0             -- (6)
Problem #2 - Solution
 • Refer “Model_Question2” sheet in the attached Solver Model excel
   file.
                                                                               For wages >=
                                                     Plan suggested in Q.1   Rs.20.5/loom day

X1 = Length of Lungi to be produced (in meters)            6666.67               8333.33

X2 = Length of Shirting to be produced (in meters)          20000                 16000

Wages to weavers per loom day                                 20                   20.5

Total Profit                                                18000                 17100

 • Hence to satisfy the minimum wage constraint for weavers,
   following should be the production plan for next month:
        • Length of Lungi to be produced = 8333.33 metres
        • Length of Shirting to be produced = 16000 metres

 • Increase in wages paid to weavers in this way would be Rs. 0.5 per
   loom day
Problem #3 – Additional Constraint
• As informed by Finance Manager, Cash
  available with Panchtantra Corporation is Rs.
  1.50 Lakhs
• Variable (Wages and Yarn cost) were paid in
  cash. Therefore, total variable cost during
  production will be :
            (4.5+5.5)X1 + (1.5+4.5)X2
• Hence, the additional constraint :
      (4.5+5.5)X1 + (1.5+4.5)X2 <= 150000 --(7)
Problem #3 – Solution
  • Refer “Model_Question3” sheet in the attached
    Solver Model excel file.
  • Hence, by taking the cash constraint into the
    consideration, following should be the production
    plan for next month:

X1 = Length of Lungi to be produced (in metres)      6970.26

X2 = Length of Shirting to be produced (in metres)   13382.90

Optimal Profit                                       14302.97
Solver Answer Report
• Wages and Cash constraints are binding constraints that
  limit the optimal profit.
• All the other constraints are having slack which indicates
  the possibilities of increased profit if wage or cash
  constraints are eased.
Solver Sensitivity Report
End of slides

More Related Content

What's hot

Huron Automotive - An Accounting Analysis
Huron Automotive - An Accounting AnalysisHuron Automotive - An Accounting Analysis
Huron Automotive - An Accounting Analysis
Nishant Nishant
 
Presentation Case Tri Star - Final
Presentation Case Tri Star - FinalPresentation Case Tri Star - Final
Presentation Case Tri Star - Final
Spencer Cheung
 
Red Brand Canners
Red Brand CannersRed Brand Canners
Red Brand Canners
jindalm
 
Kristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case studyKristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case study
Arfan Afzal
 
Nitish@solutions unlimited
Nitish@solutions unlimitedNitish@solutions unlimited
Nitish@solutions unlimited
Shashank Shukla
 

What's hot (20)

Huron Automotive - An Accounting Analysis
Huron Automotive - An Accounting AnalysisHuron Automotive - An Accounting Analysis
Huron Automotive - An Accounting Analysis
 
Mountain dew
Mountain dewMountain dew
Mountain dew
 
Applichem case Analysis
Applichem case AnalysisApplichem case Analysis
Applichem case Analysis
 
Presentation Case Tri Star - Final
Presentation Case Tri Star - FinalPresentation Case Tri Star - Final
Presentation Case Tri Star - Final
 
Chateau Margaux case study
Chateau Margaux case studyChateau Margaux case study
Chateau Margaux case study
 
A Study of the Sales and Distribution System at AMUL
A Study of the Sales and Distribution System at AMULA Study of the Sales and Distribution System at AMUL
A Study of the Sales and Distribution System at AMUL
 
Red Brand Canners
Red Brand CannersRed Brand Canners
Red Brand Canners
 
Cottle Taylor:Expanding the Oral Care Group in India
Cottle Taylor:Expanding the Oral Care Group in IndiaCottle Taylor:Expanding the Oral Care Group in India
Cottle Taylor:Expanding the Oral Care Group in India
 
Pople management fiasco in HMSI case analysis
Pople management fiasco in HMSI case analysisPople management fiasco in HMSI case analysis
Pople management fiasco in HMSI case analysis
 
GE's Two-Decade Transformation: Jack Welch's Leadership
GE's Two-Decade Transformation: Jack Welch's LeadershipGE's Two-Decade Transformation: Jack Welch's Leadership
GE's Two-Decade Transformation: Jack Welch's Leadership
 
163405478 case-analysis-of-nitish-solutions-unlimited
163405478 case-analysis-of-nitish-solutions-unlimited163405478 case-analysis-of-nitish-solutions-unlimited
163405478 case-analysis-of-nitish-solutions-unlimited
 
Baldwin Bicycle
Baldwin BicycleBaldwin Bicycle
Baldwin Bicycle
 
Manzana insurance
Manzana insuranceManzana insurance
Manzana insurance
 
A case study on lifebuoy
A case study on lifebuoyA case study on lifebuoy
A case study on lifebuoy
 
Kristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case studyKristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case study
 
Vanraj tractor case analysis
Vanraj tractor case analysis Vanraj tractor case analysis
Vanraj tractor case analysis
 
Cola Wars - Coke Vs Pepsi Harvard Business School Case Study
Cola Wars - Coke Vs Pepsi Harvard Business School Case StudyCola Wars - Coke Vs Pepsi Harvard Business School Case Study
Cola Wars - Coke Vs Pepsi Harvard Business School Case Study
 
Nitish@solutions unlimited
Nitish@solutions unlimitedNitish@solutions unlimited
Nitish@solutions unlimited
 
Manzana insurance case study analysis.
Manzana insurance case study analysis.Manzana insurance case study analysis.
Manzana insurance case study analysis.
 
Donner case Operations Management
Donner case Operations ManagementDonner case Operations Management
Donner case Operations Management
 

Viewers also liked

Operation research project
Operation research projectOperation research project
Operation research project
Arun Kumar
 
Operations research with case study on gm and ford
Operations research with case study on gm and fordOperations research with case study on gm and ford
Operations research with case study on gm and ford
Chhatrapal Surve
 
Transportation Problem in Operational Research
Transportation Problem in Operational ResearchTransportation Problem in Operational Research
Transportation Problem in Operational Research
Neha Sharma
 
Solving Transportation Problem in Operations Research
Solving Transportation Problem in Operations ResearchSolving Transportation Problem in Operations Research
Solving Transportation Problem in Operations Research
Chandan Pahelwani
 
applications of operation research in business
applications of operation research in businessapplications of operation research in business
applications of operation research in business
raaz kumar
 
Transportation Assignment
Transportation AssignmentTransportation Assignment
Transportation Assignment
Nilam Kabra
 
Case Study on Nissan Automobiles
Case Study on Nissan AutomobilesCase Study on Nissan Automobiles
Case Study on Nissan Automobiles
orion_06
 
Vogel's Approximation Method & Modified Distribution Method
Vogel's Approximation Method & Modified Distribution MethodVogel's Approximation Method & Modified Distribution Method
Vogel's Approximation Method & Modified Distribution Method
Kaushik Maitra
 
Operational research on Assignment ppt
Operational research on Assignment pptOperational research on Assignment ppt
Operational research on Assignment ppt
Nirali Solanki
 
Linear programming - Model formulation, Graphical Method
Linear programming  - Model formulation, Graphical MethodLinear programming  - Model formulation, Graphical Method
Linear programming - Model formulation, Graphical Method
Joseph Konnully
 

Viewers also liked (20)

Operation research project
Operation research projectOperation research project
Operation research project
 
Operations research with case study on gm and ford
Operations research with case study on gm and fordOperations research with case study on gm and ford
Operations research with case study on gm and ford
 
Operational Research case studies
Operational Research case studiesOperational Research case studies
Operational Research case studies
 
Transportation Problem in Operational Research
Transportation Problem in Operational ResearchTransportation Problem in Operational Research
Transportation Problem in Operational Research
 
Solving Transportation Problem in Operations Research
Solving Transportation Problem in Operations ResearchSolving Transportation Problem in Operations Research
Solving Transportation Problem in Operations Research
 
Operational reseach ppt
Operational reseach pptOperational reseach ppt
Operational reseach ppt
 
applications of operation research in business
applications of operation research in businessapplications of operation research in business
applications of operation research in business
 
Transportation and Assignment
Transportation and AssignmentTransportation and Assignment
Transportation and Assignment
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation Problem
 
Transportation Assignment
Transportation AssignmentTransportation Assignment
Transportation Assignment
 
Case Study on Nissan Automobiles
Case Study on Nissan AutomobilesCase Study on Nissan Automobiles
Case Study on Nissan Automobiles
 
Operation research and its application
Operation research and its applicationOperation research and its application
Operation research and its application
 
Vogel's Approximation Method & Modified Distribution Method
Vogel's Approximation Method & Modified Distribution MethodVogel's Approximation Method & Modified Distribution Method
Vogel's Approximation Method & Modified Distribution Method
 
Operation research
Operation research Operation research
Operation research
 
Operation research project
Operation research projectOperation research project
Operation research project
 
Operational research on Assignment ppt
Operational research on Assignment pptOperational research on Assignment ppt
Operational research on Assignment ppt
 
transporation problem - stepping stone method
transporation problem - stepping stone methodtransporation problem - stepping stone method
transporation problem - stepping stone method
 
Transportation model
Transportation modelTransportation model
Transportation model
 
Operations research ppt
Operations research pptOperations research ppt
Operations research ppt
 
Linear programming - Model formulation, Graphical Method
Linear programming  - Model formulation, Graphical MethodLinear programming  - Model formulation, Graphical Method
Linear programming - Model formulation, Graphical Method
 

Similar to Operation research project work

Linear programming
Linear programmingLinear programming
Linear programming
Tarun Gehlot
 
LPP Graphical.ppt
LPP Graphical.pptLPP Graphical.ppt
LPP Graphical.ppt
cutmolp
 

Similar to Operation research project work (20)

Intro week3 excel vba_114e
Intro week3 excel vba_114eIntro week3 excel vba_114e
Intro week3 excel vba_114e
 
Decision making
Decision makingDecision making
Decision making
 
Linear programming
Linear programmingLinear programming
Linear programming
 
Linear programming
Linear programmingLinear programming
Linear programming
 
Lecture - Linear Programming.pdf
Lecture - Linear Programming.pdfLecture - Linear Programming.pdf
Lecture - Linear Programming.pdf
 
Linear programming
Linear programmingLinear programming
Linear programming
 
5case
5case5case
5case
 
LPP Graphical.ppt
LPP Graphical.pptLPP Graphical.ppt
LPP Graphical.ppt
 
3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt3. Capacity 22 HR.ppt
3. Capacity 22 HR.ppt
 
Operational Research
Operational ResearchOperational Research
Operational Research
 
Lect or1 (2)
Lect or1 (2)Lect or1 (2)
Lect or1 (2)
 
Lecture: Introduction to Linear Programming for Natural Resource Economists a...
Lecture: Introduction to Linear Programming for Natural Resource Economists a...Lecture: Introduction to Linear Programming for Natural Resource Economists a...
Lecture: Introduction to Linear Programming for Natural Resource Economists a...
 
Mba i ot unit-1.1_linear programming
Mba i ot unit-1.1_linear programmingMba i ot unit-1.1_linear programming
Mba i ot unit-1.1_linear programming
 
Capacity-Planning-I.ppt
Capacity-Planning-I.pptCapacity-Planning-I.ppt
Capacity-Planning-I.ppt
 
LINEAR PROGRAMMING
LINEAR PROGRAMMINGLINEAR PROGRAMMING
LINEAR PROGRAMMING
 
OR_L03.pdf
OR_L03.pdfOR_L03.pdf
OR_L03.pdf
 
Direct proportion
Direct proportionDirect proportion
Direct proportion
 
Economies of scale to exploit quantity discount
Economies of scale to exploit quantity discountEconomies of scale to exploit quantity discount
Economies of scale to exploit quantity discount
 
Textile Calculations and Equations
Textile  Calculations and EquationsTextile  Calculations and Equations
Textile Calculations and Equations
 
Bagian 3 PTI
Bagian 3 PTIBagian 3 PTI
Bagian 3 PTI
 

Recently uploaded

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 

Recently uploaded (20)

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 

Operation research project work

  • 1. Operation Research Project Work Topic: Planning the Product Mix at Panchtantra Corporation
  • 2. Introduction • Mr. Ganesh had to prepare a production plan of Intensive Handloom Development project for the next month. • Types of handloom to be produced : • Lungi (60sx40s) • Shirting (40sx40s) • The main objective of Mr. Ganesh was to decide over how many metres of Lungi and shirting should be produced in order to maximize the profit satisfying the various constraints.
  • 3. Exihibit 1 S. No. Parameter Lungi Shirting 1 Selling Price (Rs. Per metre) 10.9 6.6 2 Variable Cost 2.a. Wages paid to weavers (Rs. Per metre) 4.5 1.5 2.b. Yarn Cost (Rs. Per metre) 5.5 4.5 3 Contribution (Rs. Per metre) 0.9 0.6 4 Production Rate (No. of metre per loom day) 5 12 5 Yarn Consumption (grams per metre) 5.a. 40s yarn 60 100 5.b. 60s yarn 40 0
  • 4. Decision Variables • Mr. Ganesh had to decide over the product Mix i.e. how many metres of Lungi and Shirting should be produced. Therefore Decision Variable are : Length of Lungi to be produced (in metres) = X1 Length of Shirting to be produced (in metres) = X2
  • 5. Objective Function • Maximizing the Total Sales Profit Profit per metre of Lungi = Rs. 0.9 Profit per metre of Shirting = Rs. 0.6 Therefore, Objective Function is : Max (0.9 X1 + 0.6 X2)
  • 6. Constraints • Various constraints that affect the production and the decision variables are listed in following slides 1. Maximum number of Loom Days available are 3000 Loom Days <= 3000 » (X1/5)+(X2/12) <= 3000 » 12X1 + 5X2 <= 3000 x 60 » 12X1 + 5X2 <= 180000 --(1)
  • 7. Constraints (contd.) 2. 60s Yarn available was 480 Kgs. 60s yarn <= 480 kgs. 60s yarn is used only for Lungi at the rate of 40 grams per metre. » 40X1 <= 480x1000 --(2) 3. 40s Yarn available was 2400 Kgs. 40s yarn <= 2400 kgs. 40s yarn is used in Lungi at the rate of 60 grams per metre and in Shirting at the rate of 100 grams per metre » 60X1 + 100X2 <= 240x1000 --(3)
  • 8. Constraints (contd.) 4. As per sales department, due to piled up stocks in inventory, production of Shirting should not be more than 22000 metres. Sales level of Shirting <= 22000 metres » X2 <= 22000 --(4) 5. As per sales department, due to piled up stocks in inventory, production of Lungi should not be more than 11000 metres. Sales level of Lungi <= 11000 metres » X1 <= 11000 --(5)
  • 9. Problem #1 - Analysis • Mr. Ganesh wanted to produce as much of lungi as possible, therefore he would want to use the entire sales limit of 11000 mts. Therefore, the constraint #5 would be as : X1 = 11000 --(5.a) • Mr. Ganphathy was however in favor of producing only the optimal level of Lungi so that the rest of the resources can be used for maximizing the profit. Therefore, the constraint #5 would be as : X1 <= 11000 --(5.b)
  • 10. Problem #1 - Solution • Refer “Model_Question1” sheet in the attached Solver Model excel file. As per Mr. Ganesh's As per Mr. plan Ganphathy's plan X1 = Length of Lungi to be produced (in metres) 11000 6666.67 X2 = Length of Shirting to be produced (in metres) 9600 20000 Total Profit 15660 18000 • Hence To optimize the profit, following should be the production plan for the next month (we should go with Mr. Ganphaty's Plan): • Length of Lungi to be produced = 6666.67 metres • Length of Shirting to be produced = 20000 metres • Increase in profit in this way will be Rs. 2340 with optimal profit of Rs. 18000
  • 11. Problem #2 – Additional Constraint • Additional constraint added to ensure that on an average, the production paid as wages to the weavers at least Rs. 20.5 per loom day. • Total wages for the production could be given by 4.5X1 + 1.5X2 • Total number of loom days used could be given by (X1/5) + (X2/12) • Therefore 4.5X1 + 1.5X2 >= 20.5 x [(X1/5) + (X2/12)] » (4.5-20.5/5)X1 + (1.5 - 20.5/12)X2 >= 0 » 0.4X1 – 0.2083X2 >= 0 -- (6)
  • 12. Problem #2 - Solution • Refer “Model_Question2” sheet in the attached Solver Model excel file. For wages >= Plan suggested in Q.1 Rs.20.5/loom day X1 = Length of Lungi to be produced (in meters) 6666.67 8333.33 X2 = Length of Shirting to be produced (in meters) 20000 16000 Wages to weavers per loom day 20 20.5 Total Profit 18000 17100 • Hence to satisfy the minimum wage constraint for weavers, following should be the production plan for next month: • Length of Lungi to be produced = 8333.33 metres • Length of Shirting to be produced = 16000 metres • Increase in wages paid to weavers in this way would be Rs. 0.5 per loom day
  • 13. Problem #3 – Additional Constraint • As informed by Finance Manager, Cash available with Panchtantra Corporation is Rs. 1.50 Lakhs • Variable (Wages and Yarn cost) were paid in cash. Therefore, total variable cost during production will be : (4.5+5.5)X1 + (1.5+4.5)X2 • Hence, the additional constraint : (4.5+5.5)X1 + (1.5+4.5)X2 <= 150000 --(7)
  • 14. Problem #3 – Solution • Refer “Model_Question3” sheet in the attached Solver Model excel file. • Hence, by taking the cash constraint into the consideration, following should be the production plan for next month: X1 = Length of Lungi to be produced (in metres) 6970.26 X2 = Length of Shirting to be produced (in metres) 13382.90 Optimal Profit 14302.97
  • 15. Solver Answer Report • Wages and Cash constraints are binding constraints that limit the optimal profit. • All the other constraints are having slack which indicates the possibilities of increased profit if wage or cash constraints are eased.