SlideShare a Scribd company logo
1 of 51
1
Presentation
                     to

              HIS EXCELLENCY
       CHIEF MINISTER OF SINDH

POST FLOODS/RAINS 2010/11 REHABILITATAION AND
      MONSOON 2012 PREPAREDNESS LEVELS

                     By
         SECRETARY REHABILITATION
           GOVERNMENT OF SINDH
               24th April, 2012
                                           2
   Districts Affected by Rains 2011
   Losses & Damages Due to Rain 2011
   Flood Related Schemes in ADP 2011 – 12
   Relief Provided
   Release of Funds for Flood Fight Relief Efforts.
   Rabi Assistance by Government of Sindh
   Status of Pakistan Card and CDCP
   Cluster’s Activities – Recovery.
   Monsoon Hazards in Sindh.
   PDMA’s Pre-Monsoon 2012 preparations.
   PDMA’s and District Requirements
   Challenges
   Recommendations
                                                       3
1. BADIN            7. THATTA      13. SHAHEED
                                   BENAZIRABAD
2. MIRPURKHAS       8. HYDERABAD   14. JAMSHORO

3. TANDO ALLAHYAR   9. KHAIRPUR    15. DADU

4. TANDO MUHAMMAD 10. NAUSHAHRO    16.GHOTKI
KHAN              FEROZE
5. THARPARKAR       11. SANGHAR

6. UMERKOT          12. MATIARI




                                                  4
District Wise/ Sector-Wise Losses (Rs. in Million)
Name of       Total    Agri     LS&F   Roads   Educ   Health   Housing   WS&D
District
Badin         99402    37,797   413    1,443   151    226      59,297    75

Sanghar       60,098   35,861   30     1,381   385    375      21,980    86

Benaziraba    49,422   17,210   535    193     274    795      30,000    416
d
Umerkot       42,050   10,895   366    899     77     676      28,726    411

Mirpurkhas    41,081   17,255   468    1,478   249    825      20,559    246

Khairpur      21,034   18,399   53     837     56     0        1,572     118

T.M. Khan     18,340   7,851    15     228     156    233      9,829     28
Thatta        18,323   16,588   18     350     85     150      1,133     0

T.Allahyar    16,549   8,214    3      331     11     318      7,619     53
Matiari       14,429   8,217    7      322     24     82       5,660     116
Dadu          12,564   9,783    59     405     66     0        2,251     0
Ghotki        11,307   6,909    2      323     23     0        4,022     27
N.Feroze      10,890   7,410    11     565     22     675      2,120     87
Jamshoro      9,687    3,937    9      64      34     150      5,494     0
                                                                                5
Source: P&D Dept:
District Wise/ Sector-Wise Losses (Rs. in Million)

  Name of       Total   Agri      LS&F    Roads    Educ    Health   Housing   WS&D
  District
  Tharparkar    5,767   1,272     272     1,154    128     918      2,010     13

  Hyderabad     3,437   2638      11      272      20      0        496       0

  Sukkur        2,801   3696      4       98       2       0        0         0

  Larkana       2,464   543       5       1263     3       0        651       0

  Shikarpur     2,229   2034      2       117      2       0        6         68

  Kashmore      2,005   1462      16      264      14               249       0

  Kamber        1,589   422       10      584      22      0        550       0
  Jacobabad     851     362       14      294      12      0        169       0

  Karachi       35      0         0       34       0       0        1         0
  Total         446,245 217,756   2,322   12,899   1,816   5,422    204,394   1,745




Source: P&D Dept:

                                                                                      6
Water Supply & Drainage Schemes Damaged
                       In Flood 2010 Along with Their Tentative Cost
                                      of Rehabilitation
                                WATER SUPPLY      DRAINAGE SCHEMES
                              SCHEMES DAMAGED         DAMAGED                 TOTAL
Sr.
               DISTRICT       No. OF    REHB:      No. OF    REHB:     No. OF     REHB:
 #
                             SCHEMES   COST IN    SCHEMES   COST IN   SCHEME     COST IN
                                       MILLION              MILLION      S       MILLION

1     Ghotki                     1       8.000       4      25.500       5        33.500

2     Shikarpur                  8      43.600       7      42.500      15        86.100

3     Jamshoro                  28      141.500      0       0.000      28       141.500

4     Kamber / Shahdadkot       51      650.900     16      341.800     67       992.700

5     Kashmore / Kandhkot        5      99.000       6      65.900      11       164.900

6     Khairpur                   0       0.000       1       6.100       1        6.100

7     Jacobabad                 54      464.110     19      211.600     73       675.710

8     Dadu                       7      80.000       3      44.000      10       124.000

9     Thatta                     2      22.000       0       0.000       2        22.000

             Total:-            156    1509.110     56      737.400     212      2246.510
                                                                                      7
Source: PHED
Irrigation System Damages (2011)
                 Left Bank Canals (Kotri Barrage)

  S.No        Features            Fulleli          Guni        Akram
 1.       D. Discharge      17956           5629          3714
          (Cs)

 2.       Length (miles)    519.49          339.63        472.14

 3.       No of channels    46              39            48

 4        Breaches          64              90            45

 5        Damages           50%             70%           65%

 6        Category          Moderate        Severe        Severe



Source: Irrigation Deptt;                                              8
Irrigation System Damages (2011)
                     Nara Canal (Sukkur Barrage)

 S.No         Features          Nara (lower)         Jamrao        Mithrao

 1.       D. Discharge      13600              3500           2500
          (Cs)
 2.       Length (miles)    115                174            84

 3.       No of channels    22                 76             56

 4        Breaches          -                  30             33

 5        Damages           20%                50%            50%

 6        Category          Moderate           Severe         Severe

Source: Irrigation Deptt;                                                    9
Damages to Drainage Network
 S.No              Name of Drain       Total Length (RD)    Damages
 1       Spinal Drain                  662.96              40%
 2       Surfaces Drains Nawabshah 1967.88                 25%
         Component
 3       Surface Drains        Sanghar 1398.37             35%
         Component
 4       Surface drains     Mirpurkhas 1474.63             50%
         Component
 5       Dhoro Puran Out fall Drain 127                    70%
         (DPOD)
 6       Kadhan Pateji out fall Drain 180.40               20%
         (KPOD)
         (RD 159.000 to RD -21.400)

 7       Surface Drains in Badin Area 1886.06              60%

Source: Irrigation Deptt;                                         10
Abstract of Drainage Restoration Works
             Short Term Phase-I (District Wise)
                                     Short Term Phase-I
                               Emergent Works    Works to be
Sr.#      Name of District     to be completed completed from    Total
                                from March to   April-2012 to
                                  June, 2012     June-2013
  1.       Badin & Thatta          484.00         1157.00       1641.00
  2.           Umerkot             170.00          340.00       510.00
  3.         Mirpurkhas            545.00          510.00       1055.00
  4.           Sanghar             301.00          340.00       641.00
  5.      Tando Allahyar            63.00          217.00       280.00
  6.      S. Benazirabad           421.00          179.00       600.00
  7.      Larkana & Dadu             --             80.00        80.00
  8.       Other Drains &           80.00          112.00       192.00
            Misc. works
                       TOTAL      2064.00         2936.00       5000.00
Source: Irrigation Deptt;                                            11
PHYSICAL STATUS OF SCHOOLS
          COMPLETELY DESTROYED BY FLOOD/
                     RAIN 2011         Rs. In million
 Sr.       Sector wise                         Physical Status
 No.       Institutions
                                No. of     Tentative         No. of     Tentative
                               schools     estimated        school      estimated
                              completely      cost          partially      cost
                              destroyed                    damaged

  1    Primary Schools          1195       Rs. 2390.00       2035       Rs. 2035.00
  2    Middle Schools            102        Rs. 255.00        214        Rs. 214.00
  3    Secondary Schools         36         Rs. 126.00        90         Rs. 198.00
  4.   Higher Secondary           9          Rs. 45.00        29          Rs.30.00
       Schools
  5.   Intermediate/ Degree       0                    0      39         Rs. 50.00
          TOTAL                 1342       Rs. 2816.00       2407       Rs. 2527.00

Source: Education Deptt.                                                       12
FURNITURE & FIXTURE STATUS OF SCHOOLS
             DESTROYED BY FLOOD/RAIN 2011
                                                                        Rs. In million
  Sr.      Sector wise                   Furniture & Fixture Status
  No.      Institutions
                              No. of       Tentative         No. of      Tentative
                             schools       estimated        school       estimated
                            completely        cost          partially       cost
                            destroyed                      damaged

   1    Primary Schools       5307              Rs.          8926          Rs. 900.0
                                             1200.00
   2    Middle Schools         256         Rs. 512.00         346          Rs. 35.00
   3    Secondary Schools      233          Rs. 93.00        2150          Rs. 45.00
   4.   Higher Secondary       100         Rs. 200.00         410         Rs.200.00
        Schools
   5.   Intermediate/           0                      0      40           Rs. 20.00
        Degree
           TOTAL              5896        Rs. 2005.00       11872       Rs. 1165.00


Source: Education Deptt.                                                            13
TOTAL NUMBER OF SCHOOLS EFFECTED
               BY FLOOD/RAIN 2011 &
        ESTIMATED COST FOR REHABILITATION
                                                             Rs. In million
 Sr.    Sector wise Institutions     Total No. of     Estimated cost
 No.                               schools effected     required for
                                                       rehabilitation
  1    Primary Schools                  17463                Rs. 6525.00
  2    Middle Schools                    918                  Rs.1016.00
  3    Secondary Schools                2509                   Rs. 462.00
  4.   Higher Secondary Schools          548                   Rs. 475.00
  5.   Intermediate/ Degree              79                     Rs. 70.00
              TOTAL                     21517                Rs. 8548.00


                                                       Say Rs. 9.0 billion


Source: Education Deptt.                                                14
S.No District               No. of roads   Affected length   Estimated
                                            (in Kms)          Cost (In Rs.)
 1      Thatta i/c Coastal   13             36.00             100.238
 2      Sukkur               17             11.26             76.389
 3      Ghotki               15             27.77             107.078
 4      Khairpur             14             38.00             174.826
 5      N.Feroze             8              24.30             99.653
 6      Shikarpur            11             16.50             72.410
 7      Jacobabad            10             28.36             122.140
 8      Kashmore             8              17.74             117.255

 9      Larkana              10             20.83             20.020

        Total                184            581.33            2055.444

Source: W&S Deptt;                                                       15
Rehabilitation of Rain Affected Roads 2011
                        (PRIORITY – II)
      • Affected Length = 985.30 Kms (Completely / Partially Damaged)


      •   Estimated Cost for Rehabilitation = Rs. 3773.855 Million


      •  PC-I of these roads are under Process of submission to P&D
      Department for approval.




Source: W&S Deptt;                                                    16
Present Status.

PMU notified                               28th June 2011.

Design consultants mobilized               10th October 2011

Pre-qualified contractors                              1st December
2011.

Project Management Consultants mobilized: 31st December 2011.

Phase-1 (10 packages of 244 kms) started      7th February 2012.

Phase-2 (16 packages of 302 kms) started      March 2012

Bids for Phase-3 ( 16 packages of 318 kms)   11th April 2012



                                                                    17
Animals Losses / Damages
Sr.   District     Animal    Value (Rs)    Sr.   District      Animal   Value (Rs)
No.                Died                    No.                 Died
1.    Thatta       131       5,780,000     14.   Shikarpur     28       840,000
2.    Dadu         161       7,216,000     15.   Badin         10,060   225,698,000
3.    Jamshoro     83        1,704,000     16.   Umerkot       18,824   416,016,000
4.    Hyderabad 32           1,816,000     17.   Tharparkar    30,623   336,058,000
5.    Matiari      1101      36,158,000    18.   T. Allahyar   197      3,536,000
6.    T.M. Khan    187       6,384,000     19.   Mirpurkhas    12,280   210,782,000
7.    S.B. Abad    22,646    627,936,000   20.   Sanghar       19,040   401,496,000
8.    Larkana      92        4,034,000           TOTAL         116,548 2321,200,000
9.    Kambar       219       6,330,000
10.   Kashmore     4         240,000
11.   N. Feroze    512       18,084,000
12.   Khairpur     327       11,032,000
13.   Ghotki       01        60,000


Source: Livestock & Fisheries Deptt;                                              18
Flood Related Schemes in ADP 2011-12
   ADP #                   Name of Scheme                Cost   Allocation

   1597       Municipal Services Delivery Program                 1000

   1598       Development of Township in Major Urban     5000     2000
              Centres (50,000 No’s 80 Square Yard Plot
              with all Civil Services)

   1599       Flood Affected Village Rehabilitation      4000     2000
              (2000 Villages 40,000 Houses)

   1600       Flood affected Town Rehabilitation         5000     2000
              Italian Debt Swap                                    700
              USAID                                              12000
    222       Flood Emergency Reconstruction Project              3500
              Bunds / Canals (ADB Funded)


Source: P&D Dept:           Total                               23200        19
RELIEF PROVIDED



                  20
Relief Provided (in Quantified Terms)
            ITEMS             GOVERNMENT                               OTHERS*
   Tents                                304,311                                           19,310

   Plastic Sheets                       113,861                                           10,655

   Mosquito Nets                        359,424                                             6,894

   Family Packs                      364,882,6                                            37,325

   Rice Bags                              36,535                                                     -

   Water Purification Units                  3,247                                                   -

   Dewatering Pumps                             851                                             106

   Blankets                             516,133                                                      -
   Razai/ Rilly                          16,978


                                 * The relief provision/ assistance in ‘Others’ do not include the supplies
Source: PDMA                                  by major UN Agencies carried out from aid of          21
                                                       USD 170,656,780 received.
Relief Expenditure (in Monetary Terms)
                                 Food Items
                 Particulars                       Expenditure
Family Packs                                     Rs. 1,041,823,624
Drinking Water                                    Rs. 19,792,382
                               Non Food Items
                 Particulars                       Expenditure
Tents, Plastics sheets, Mosquito nets            Rs. 1,020,306,020

De-Watering Pumps                                 Rs. 18,800,220

                               Miscellaneous
Transportation                                    Rs. 71,709,340
Miscellaneous                                     Rs. 59,931,223
Total Expenditures                              Rs. 2,232,362,809
Source: PDMA                                                         22
Rabi Assistance By Government of Sindh,
               Agriculture Department

       ITEMS                   QUANTITY        QUANTITY
                              ALLOCATED        PROVIDED
                              (Metric Tons)   (Metric Tons)
Wheat Seed                       55,000          53,900
Urea For Wheat                    55,000         27,269

Sun Flower                         500            500
Seed



Source : Agriculture Department                           23
Rabi Crop Position 2011-12

      Crop          Area Cultivated      Area Cultivated    % Decrease
                    During 2010-11       During 2011-12    Over Last Year

Wheat                  1,144,367           1,047,374            8.5

Onion                   63,220               43,000             32

Rape &                  43,493               42,078             3.2
Mustard
Sunflower               266,964             188,663             29

Gram                    19,658               19,810              --

Masoor                   3,294               3,403               --



Source : Early Recovery Framework 2011                                  24
Release of funds for Flood Fight Relief Efforts (Rs. in Million)
Department          Budge         Out Side     Federal    Total
                    Estimates     Budget       Transfer
                    2011-12 (GOS) 2011-12      2011-12
Relief              107.868       (GOS)
                                  2,652.550    -          2,760.418
Commissioner
PDMA                248.990       2,063.658    -          2,312.648
UBL & HBL for       -             1138.9       1500.000   12,889.00
Pak-Card
Irrigation Dept     -             720.000      -          220.000
Work & Services     -             300.000      -          300.000
Dept
Public Health       -             864.080      -          864.080
Services
Health              -             100.000      -          100.000
Department
Agriculture Dept    -             1000.000     -          1000.000
Total ‘A’           390.258       20,159.860   1500.000   22,050.118
Source : Finance Department                                       25
Status of Pakistan Cards (as of 21-04-2012)
Funds Released by Sindh Government Rs. 12.889 Billion
Funds Released by Federal            Rs. 1.5 Billion
Government
Total Processed So far by NADRA      1,216,782
Total Processed So Far by Banks      1,212,963
Total Cards Activated                1,187,445
Cash Disbursed from HBL out of 5.7   Rs. 5,647,114,429
Bn
Cash Disbursed from UBL out of 7.189 Rs. 6,120,203,867
Bn
Total Cash Disbursed                 Rs. 11,767,318,296

Source: NADRA
                                                       26
Post Floods 2010 Cash Transfer Project
         CDCP PHASE – II (as of 21st April 2012 )
  Final Caseload of 14 districts        248,948
  Watan Cards Processed to-date         149,187
  Cards Activated                       148,079
  Funds Disbursed                       Rs. 3,279,920,000

   CDCP PHASE – I (stands closed on 16.12.2011)
     Cards Distributed                 654,572
     Funds Disbursed                   Rs. 13.04 Billion
        50 % matching amount by Federal and Provincial
                        Government
Source: NADRA                                               27
CLUSTERS’ ACTIVITIES- RECOVERY




                                 28
Stakeholders’ Roles & Responsibilities(Coordination
                   Mechanism)
 Sector wise Government /INGO Coordination Mechanism
            Sector          Government Department      INGO Cluster
Agriculture              Agriculture                   FAO
Camp Management          District Government           UNHCR
Community Restoration    Planning & Dev. Dept.         E.R
Education                Education Dept.               UNICEF
Emergency Shelter        PDMA & RC                     IOM
Food                     Food Dept. / Dist. Govt.      WFP
Health                   Health Dept.                  WHO
Information Management   PDMA                          OCHA
Logistics                Armed Forces                  WFP
WASH                     PPHI/Health/PHED              UNICEF/WHO
Protection               Home Dept./Social Welfare Dept. UNDP
                                                                29
MONSOON PREPAREDNESS 2012




                        30
Monsoon Hazards in Sindh

 Climatic Hazards
 Riverine Floods
 Flash Floods
 LBOD Floods
 Urban Floods




                                     31
Monsoon Hazards in Sindh
  Climatic Hazards




                           32
Monsoon Hazards in Sindh
               Climatic Hazards: Causes


  Heavy Rains/River              Extreme Rainfall (Monsoon)
  Flooding


Torrential Rain/Flash Flooding   Extreme Rainfall (Monsoon)



 Urban Flooding                  Extreme Rainfall (Monsoon)


Snow-melt Flooding               Extreme Heat in May/June



                                       Tropical Cyclones
Cyclones/Coastal Flooding
                                     (Pre & Post Monsoon)33
Monsoon Hazards in Sindh
                      Riverine Floods




  Kashmore             Ghotki        Sukkur          Thatta
   Shikarpur         Jacobabad       Kamber         T.M.Khan
   Khairpur           Larkana    Naushahro Feroze   Jamshoro
Sh. Benazirabad        Dadu         Hyderabad        Matiari




                                                               34
Monsoon Hazards in Sindh

                 Flash Floods




Dadu Jacobabad   Jamshoro   Kamber   Larkana




                                               35
Monsoon Hazards in Sindh
     LBOD Floods




                           36
Monsoon Hazards in Sindh

          Urban Floods




Karachi             Hyderabad




                                37
Plan Showing the Location of Barrages & Alignment
                 of River Bunds




                                              38   5
Zone1

        Zone2



 Zone3



    Zone4



   Zone5



Zone6



                        39
PDMA’s Pre-Monsoon 2012 Preparations
• PDMA has convened meetings with DCs and relevant
  stakeholders in March and April 2012 to assess, identify and
  put in place the Preparedness, Relief Measures & mobilization
  of Resources.

• PDMA has advised Line Departments and DDMAs to prepare
  comprehensive Monsoon/Floods Contingency Plans 2012
  following the lessons learnt from floods-2010 and Rains-2011.

• Districts have prepared Districts’ Disaster Contingency Plans

• This will follow the Provincial Monsoon/Floods Contingency
  Plan 2012, in which Roles & Responsibilities of each
  stakeholder will be defined.

                                                             40
PDMA’s Pre-Monsoon 2012 Preparations
•   Liaison of PDMA with Stakeholders:

•   DDMAs
•   Irrigation Department
•   Local Government
•   Health
•   Home
•   Meteorological Department,
•   Armed Forces (including Cantonments/Maritime/DHAs)
•   Civic Amenities Agencies (KWSB, KESC, SSGC, KPT,
    PQA, PTCL etc)
•   Education
•   Local / International/NGOSs, CBOs (Edhi/Aman/Chippa)


                                                    41
PDMA’s Pre-Monsoon 2012 Preparations
•   Monsoon preparations with DDMAs include following:

•   To allocate sufficient funds (2% of District Budget) under the head ‘Disaster
    Management’.
•   To ascertain and enhance preparedness levels of the district stakeholders,
    Civil Defence etc.
•   District Contingency Plan for 2012 and SOP guidelines for each stakeholder.
•   Formation of District & Taluka Committees for Risk Management, Rescue,
    Evacuation, Relief, Vigilance, Transport, Machinery, Health, Sanitation, Food,
    Veterinary, Hygiene etc.)
•   To prepare inventory of available resources/equipment (both the district & the
    privately held) like Tractors, Trolleys, Bulldozers, Dewatering Machines,
    Excavators etc.

•   Emergency Directory of all Important Phone Numbers & Focal Persons.


                                                                             42
PDMA’s Pre-Monsoon 2012 Preparations

• To seek the district needs for meeting the emergent situation.

• To plug communication gap and enhance coordination.

• Irrigation Department to ensure completion of all rehabilitation
  works on river embankments & drainage schemes.
• Works & Services Department to ensure the repair of roads
  damaged in Flood-2010.

• PDMA is organizing Monsoon Contingency Workshop-2012 for
  stakeholders, NGOs/iNGOs to prepare for Monsoon.




                                                              43
Status of Flood Relief Equipment
S.#                  ITEMS             QUANTITY
1.    FRP Boats (19 ft. length)           40
2.    Out Board Engine (Yamaha 25 HP      40
      Engine)
3.    Anchor                              40
4.    FRP Oars                            80
5.    Boat Hook                           40
6.    Buoys with Lashing                  40
7.    Search Lights (Handheld)            40
8.    Fathom / Anchor Rope (meters)       40
9.    Life Jackets                       400

                                                  44
Flood Stores Held With PDMA
S.#           ITEMS         QUANTITY         SOURCE
1.    TENTS                    1300        China, Korea,
                                        Bangladesh, Russia,
                                           Saudi Arabia
2.    MOSQUITO NETS            9000            PDMA

3.    DE-WATERING PUMPS         81         PDMA, UNDP

4.    BLANKETS                 7000      Bangladesh, Korea,
                                           Egypt, France

      JERRY CANS, KITCHEN SETS, WATER PURIFIERS, TEA



                                                       45
PDMA and Districts’ Requirements
• PDMA has moved a Summary for release of Rs. 720
  Million for payment of liabilities owed to vendors of
  relief supplies made during rain 2011 as well as to
  make pre-emptive procurement of key relief supplies
  such as tents, family ration packs, plastic sheets, de-
  watering pumps.
• Additional funds would also be required to meet the
  demands of districts for strengthening their response
  mechanism
• Revamping of Rehabilitation Department              by
  integrating Relief and Civil Defence
• Approval of PDMA Service Rules                     46
Challenges
• Illegal Zamindari Bunds
• Permanent Settlements
• Encroachments in River/Flood plains
• People living in Katcha Areas
• Restoring Sukkur Barrage to its original capacity
• De-silting of Barrage Upstream storage area
• Raising of Manchar lake bund level



                                                      47
Challenges
• Early warning remains a sore-point with respect to
  the flood prone Indus River
• Absence of Flash Flood Monitoring System
• Limited forecasting capabilities of the PMD
• Lack of medium-to-long term forecasting capabilities
• Capacity constraints of PDMA / DDMAs
• Timely availability of air & aviation support
• Timely availability of cash flow


                                                    48
Recommendations

• Land use planning and regulatory mechanisms
• Regular maintenance of irrigation infrastructure
• Strengthening of vulnerable points / river banks.
• Strengthening capabilities of PMD with respect to
  • Extended weather radar coverage
  • Medium and long term weather forecasting
  • Flash flood monitoring
• Capacity enhancement of PDMAs/DDMA’s system.

                                                      49
Recommendations
•   Restoring educational & health institutions damaged during
    2010 floods and monsoon rains 2011
•   Completion of Comprehensive Flood Management Plan by
    FFC.
•   Immediate operationalizing of High Level Flood Vigilance
    Committee by FFC
•   Management of cross border irrigation systems by a Central
    body during flood season
•   Institutional arrangements to be put in place for timely
    availability of air & aviation support
•   Timely availability of cash flow


                                                           50
THANKS

         51

More Related Content

Similar to Presentation for cm 24.04.2012

SACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-KSACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-K
India Water Portal
 
R.P.B. Thilakasiri, Microcredit and Job Creation
R.P.B. Thilakasiri, Microcredit and Job CreationR.P.B. Thilakasiri, Microcredit and Job Creation
R.P.B. Thilakasiri, Microcredit and Job Creation
Microcredit Summit Campaign
 
Piloting the global protocol for community scale greenhouse gas emissions in ...
Piloting the global protocol for community scale greenhouse gas emissions in ...Piloting the global protocol for community scale greenhouse gas emissions in ...
Piloting the global protocol for community scale greenhouse gas emissions in ...
icarb
 
Acceptance challege and Way forward
Acceptance challege and Way forwardAcceptance challege and Way forward
Acceptance challege and Way forward
Md. Sharif Ahammed
 
Kala azar jharkhand (2005-2011)
Kala azar jharkhand (2005-2011)Kala azar jharkhand (2005-2011)
Kala azar jharkhand (2005-2011)
Prabir Chatterjee
 
Maharashtra population01
Maharashtra population01Maharashtra population01
Maharashtra population01
ganilsoft731
 

Similar to Presentation for cm 24.04.2012 (20)

SACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-KSACHETANA Project Experience with recharge - BIRD-K
SACHETANA Project Experience with recharge - BIRD-K
 
Maharashtra Listenership List
Maharashtra Listenership ListMaharashtra Listenership List
Maharashtra Listenership List
 
More than an advisory committee ingels
More than an advisory committee   ingelsMore than an advisory committee   ingels
More than an advisory committee ingels
 
R.P.B. Thilakasiri, Microcredit and Job Creation
R.P.B. Thilakasiri, Microcredit and Job CreationR.P.B. Thilakasiri, Microcredit and Job Creation
R.P.B. Thilakasiri, Microcredit and Job Creation
 
Installed capacity
Installed capacityInstalled capacity
Installed capacity
 
Seo2 india bharat nirman
Seo2 india  bharat nirmanSeo2 india  bharat nirman
Seo2 india bharat nirman
 
ZREAC 2021 18.04.2021.ppt
ZREAC 2021 18.04.2021.pptZREAC 2021 18.04.2021.ppt
ZREAC 2021 18.04.2021.ppt
 
Piloting the global protocol for community scale greenhouse gas emissions in ...
Piloting the global protocol for community scale greenhouse gas emissions in ...Piloting the global protocol for community scale greenhouse gas emissions in ...
Piloting the global protocol for community scale greenhouse gas emissions in ...
 
Census vital data 2011 pop size and decadal change
Census vital data 2011 pop size and decadal changeCensus vital data 2011 pop size and decadal change
Census vital data 2011 pop size and decadal change
 
3rd amjad
3rd amjad3rd amjad
3rd amjad
 
Monitoring the fluoride level in the drinking water of naharkatia circle of t...
Monitoring the fluoride level in the drinking water of naharkatia circle of t...Monitoring the fluoride level in the drinking water of naharkatia circle of t...
Monitoring the fluoride level in the drinking water of naharkatia circle of t...
 
MCL Annual Report 2009-10
MCL Annual Report 2009-10MCL Annual Report 2009-10
MCL Annual Report 2009-10
 
Current Status and Challenges of the Indonesian Fishery Industry
Current Status and Challenges of the Indonesian Fishery IndustryCurrent Status and Challenges of the Indonesian Fishery Industry
Current Status and Challenges of the Indonesian Fishery Industry
 
Acceptance challege and Way forward
Acceptance challege and Way forwardAcceptance challege and Way forward
Acceptance challege and Way forward
 
Kala azar jharkhand (2005-2011)
Kala azar jharkhand (2005-2011)Kala azar jharkhand (2005-2011)
Kala azar jharkhand (2005-2011)
 
PPT On Dated 31-07-2021 (3).pptx
PPT On Dated 31-07-2021 (3).pptxPPT On Dated 31-07-2021 (3).pptx
PPT On Dated 31-07-2021 (3).pptx
 
Pivate Financing Initiave Through Community Based Coastal Carbon Corridor Ini...
Pivate Financing Initiave Through Community Based Coastal Carbon Corridor Ini...Pivate Financing Initiave Through Community Based Coastal Carbon Corridor Ini...
Pivate Financing Initiave Through Community Based Coastal Carbon Corridor Ini...
 
Sutp for middle sized cities in nekrtc
Sutp for middle sized cities in nekrtcSutp for middle sized cities in nekrtc
Sutp for middle sized cities in nekrtc
 
Maharashtra population01
Maharashtra population01Maharashtra population01
Maharashtra population01
 
(8.1.2013) kaltim
(8.1.2013) kaltim(8.1.2013) kaltim
(8.1.2013) kaltim
 

Recently uploaded

Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 

Presentation for cm 24.04.2012

  • 1. 1
  • 2. Presentation to HIS EXCELLENCY CHIEF MINISTER OF SINDH POST FLOODS/RAINS 2010/11 REHABILITATAION AND MONSOON 2012 PREPAREDNESS LEVELS By SECRETARY REHABILITATION GOVERNMENT OF SINDH 24th April, 2012 2
  • 3. Districts Affected by Rains 2011  Losses & Damages Due to Rain 2011  Flood Related Schemes in ADP 2011 – 12  Relief Provided  Release of Funds for Flood Fight Relief Efforts.  Rabi Assistance by Government of Sindh  Status of Pakistan Card and CDCP  Cluster’s Activities – Recovery.  Monsoon Hazards in Sindh.  PDMA’s Pre-Monsoon 2012 preparations.  PDMA’s and District Requirements  Challenges  Recommendations 3
  • 4. 1. BADIN 7. THATTA 13. SHAHEED BENAZIRABAD 2. MIRPURKHAS 8. HYDERABAD 14. JAMSHORO 3. TANDO ALLAHYAR 9. KHAIRPUR 15. DADU 4. TANDO MUHAMMAD 10. NAUSHAHRO 16.GHOTKI KHAN FEROZE 5. THARPARKAR 11. SANGHAR 6. UMERKOT 12. MATIARI 4
  • 5. District Wise/ Sector-Wise Losses (Rs. in Million) Name of Total Agri LS&F Roads Educ Health Housing WS&D District Badin 99402 37,797 413 1,443 151 226 59,297 75 Sanghar 60,098 35,861 30 1,381 385 375 21,980 86 Benaziraba 49,422 17,210 535 193 274 795 30,000 416 d Umerkot 42,050 10,895 366 899 77 676 28,726 411 Mirpurkhas 41,081 17,255 468 1,478 249 825 20,559 246 Khairpur 21,034 18,399 53 837 56 0 1,572 118 T.M. Khan 18,340 7,851 15 228 156 233 9,829 28 Thatta 18,323 16,588 18 350 85 150 1,133 0 T.Allahyar 16,549 8,214 3 331 11 318 7,619 53 Matiari 14,429 8,217 7 322 24 82 5,660 116 Dadu 12,564 9,783 59 405 66 0 2,251 0 Ghotki 11,307 6,909 2 323 23 0 4,022 27 N.Feroze 10,890 7,410 11 565 22 675 2,120 87 Jamshoro 9,687 3,937 9 64 34 150 5,494 0 5 Source: P&D Dept:
  • 6. District Wise/ Sector-Wise Losses (Rs. in Million) Name of Total Agri LS&F Roads Educ Health Housing WS&D District Tharparkar 5,767 1,272 272 1,154 128 918 2,010 13 Hyderabad 3,437 2638 11 272 20 0 496 0 Sukkur 2,801 3696 4 98 2 0 0 0 Larkana 2,464 543 5 1263 3 0 651 0 Shikarpur 2,229 2034 2 117 2 0 6 68 Kashmore 2,005 1462 16 264 14 249 0 Kamber 1,589 422 10 584 22 0 550 0 Jacobabad 851 362 14 294 12 0 169 0 Karachi 35 0 0 34 0 0 1 0 Total 446,245 217,756 2,322 12,899 1,816 5,422 204,394 1,745 Source: P&D Dept: 6
  • 7. Water Supply & Drainage Schemes Damaged In Flood 2010 Along with Their Tentative Cost of Rehabilitation WATER SUPPLY DRAINAGE SCHEMES SCHEMES DAMAGED DAMAGED TOTAL Sr. DISTRICT No. OF REHB: No. OF REHB: No. OF REHB: # SCHEMES COST IN SCHEMES COST IN SCHEME COST IN MILLION MILLION S MILLION 1 Ghotki 1 8.000 4 25.500 5 33.500 2 Shikarpur 8 43.600 7 42.500 15 86.100 3 Jamshoro 28 141.500 0 0.000 28 141.500 4 Kamber / Shahdadkot 51 650.900 16 341.800 67 992.700 5 Kashmore / Kandhkot 5 99.000 6 65.900 11 164.900 6 Khairpur 0 0.000 1 6.100 1 6.100 7 Jacobabad 54 464.110 19 211.600 73 675.710 8 Dadu 7 80.000 3 44.000 10 124.000 9 Thatta 2 22.000 0 0.000 2 22.000 Total:- 156 1509.110 56 737.400 212 2246.510 7 Source: PHED
  • 8. Irrigation System Damages (2011) Left Bank Canals (Kotri Barrage) S.No Features Fulleli Guni Akram 1. D. Discharge 17956 5629 3714 (Cs) 2. Length (miles) 519.49 339.63 472.14 3. No of channels 46 39 48 4 Breaches 64 90 45 5 Damages 50% 70% 65% 6 Category Moderate Severe Severe Source: Irrigation Deptt; 8
  • 9. Irrigation System Damages (2011) Nara Canal (Sukkur Barrage) S.No Features Nara (lower) Jamrao Mithrao 1. D. Discharge 13600 3500 2500 (Cs) 2. Length (miles) 115 174 84 3. No of channels 22 76 56 4 Breaches - 30 33 5 Damages 20% 50% 50% 6 Category Moderate Severe Severe Source: Irrigation Deptt; 9
  • 10. Damages to Drainage Network S.No Name of Drain Total Length (RD) Damages 1 Spinal Drain 662.96 40% 2 Surfaces Drains Nawabshah 1967.88 25% Component 3 Surface Drains Sanghar 1398.37 35% Component 4 Surface drains Mirpurkhas 1474.63 50% Component 5 Dhoro Puran Out fall Drain 127 70% (DPOD) 6 Kadhan Pateji out fall Drain 180.40 20% (KPOD) (RD 159.000 to RD -21.400) 7 Surface Drains in Badin Area 1886.06 60% Source: Irrigation Deptt; 10
  • 11. Abstract of Drainage Restoration Works Short Term Phase-I (District Wise) Short Term Phase-I Emergent Works Works to be Sr.# Name of District to be completed completed from Total from March to April-2012 to June, 2012 June-2013 1. Badin & Thatta 484.00 1157.00 1641.00 2. Umerkot 170.00 340.00 510.00 3. Mirpurkhas 545.00 510.00 1055.00 4. Sanghar 301.00 340.00 641.00 5. Tando Allahyar 63.00 217.00 280.00 6. S. Benazirabad 421.00 179.00 600.00 7. Larkana & Dadu -- 80.00 80.00 8. Other Drains & 80.00 112.00 192.00 Misc. works TOTAL 2064.00 2936.00 5000.00 Source: Irrigation Deptt; 11
  • 12. PHYSICAL STATUS OF SCHOOLS COMPLETELY DESTROYED BY FLOOD/ RAIN 2011 Rs. In million Sr. Sector wise Physical Status No. Institutions No. of Tentative No. of Tentative schools estimated school estimated completely cost partially cost destroyed damaged 1 Primary Schools 1195 Rs. 2390.00 2035 Rs. 2035.00 2 Middle Schools 102 Rs. 255.00 214 Rs. 214.00 3 Secondary Schools 36 Rs. 126.00 90 Rs. 198.00 4. Higher Secondary 9 Rs. 45.00 29 Rs.30.00 Schools 5. Intermediate/ Degree 0 0 39 Rs. 50.00 TOTAL 1342 Rs. 2816.00 2407 Rs. 2527.00 Source: Education Deptt. 12
  • 13. FURNITURE & FIXTURE STATUS OF SCHOOLS DESTROYED BY FLOOD/RAIN 2011 Rs. In million Sr. Sector wise Furniture & Fixture Status No. Institutions No. of Tentative No. of Tentative schools estimated school estimated completely cost partially cost destroyed damaged 1 Primary Schools 5307 Rs. 8926 Rs. 900.0 1200.00 2 Middle Schools 256 Rs. 512.00 346 Rs. 35.00 3 Secondary Schools 233 Rs. 93.00 2150 Rs. 45.00 4. Higher Secondary 100 Rs. 200.00 410 Rs.200.00 Schools 5. Intermediate/ 0 0 40 Rs. 20.00 Degree TOTAL 5896 Rs. 2005.00 11872 Rs. 1165.00 Source: Education Deptt. 13
  • 14. TOTAL NUMBER OF SCHOOLS EFFECTED BY FLOOD/RAIN 2011 & ESTIMATED COST FOR REHABILITATION Rs. In million Sr. Sector wise Institutions Total No. of Estimated cost No. schools effected required for rehabilitation 1 Primary Schools 17463 Rs. 6525.00 2 Middle Schools 918 Rs.1016.00 3 Secondary Schools 2509 Rs. 462.00 4. Higher Secondary Schools 548 Rs. 475.00 5. Intermediate/ Degree 79 Rs. 70.00 TOTAL 21517 Rs. 8548.00 Say Rs. 9.0 billion Source: Education Deptt. 14
  • 15. S.No District No. of roads Affected length Estimated (in Kms) Cost (In Rs.) 1 Thatta i/c Coastal 13 36.00 100.238 2 Sukkur 17 11.26 76.389 3 Ghotki 15 27.77 107.078 4 Khairpur 14 38.00 174.826 5 N.Feroze 8 24.30 99.653 6 Shikarpur 11 16.50 72.410 7 Jacobabad 10 28.36 122.140 8 Kashmore 8 17.74 117.255 9 Larkana 10 20.83 20.020 Total 184 581.33 2055.444 Source: W&S Deptt; 15
  • 16. Rehabilitation of Rain Affected Roads 2011 (PRIORITY – II) • Affected Length = 985.30 Kms (Completely / Partially Damaged) • Estimated Cost for Rehabilitation = Rs. 3773.855 Million • PC-I of these roads are under Process of submission to P&D Department for approval. Source: W&S Deptt; 16
  • 17. Present Status. PMU notified 28th June 2011. Design consultants mobilized 10th October 2011 Pre-qualified contractors 1st December 2011. Project Management Consultants mobilized: 31st December 2011. Phase-1 (10 packages of 244 kms) started 7th February 2012. Phase-2 (16 packages of 302 kms) started March 2012 Bids for Phase-3 ( 16 packages of 318 kms) 11th April 2012 17
  • 18. Animals Losses / Damages Sr. District Animal Value (Rs) Sr. District Animal Value (Rs) No. Died No. Died 1. Thatta 131 5,780,000 14. Shikarpur 28 840,000 2. Dadu 161 7,216,000 15. Badin 10,060 225,698,000 3. Jamshoro 83 1,704,000 16. Umerkot 18,824 416,016,000 4. Hyderabad 32 1,816,000 17. Tharparkar 30,623 336,058,000 5. Matiari 1101 36,158,000 18. T. Allahyar 197 3,536,000 6. T.M. Khan 187 6,384,000 19. Mirpurkhas 12,280 210,782,000 7. S.B. Abad 22,646 627,936,000 20. Sanghar 19,040 401,496,000 8. Larkana 92 4,034,000 TOTAL 116,548 2321,200,000 9. Kambar 219 6,330,000 10. Kashmore 4 240,000 11. N. Feroze 512 18,084,000 12. Khairpur 327 11,032,000 13. Ghotki 01 60,000 Source: Livestock & Fisheries Deptt; 18
  • 19. Flood Related Schemes in ADP 2011-12 ADP # Name of Scheme Cost Allocation 1597 Municipal Services Delivery Program 1000 1598 Development of Township in Major Urban 5000 2000 Centres (50,000 No’s 80 Square Yard Plot with all Civil Services) 1599 Flood Affected Village Rehabilitation 4000 2000 (2000 Villages 40,000 Houses) 1600 Flood affected Town Rehabilitation 5000 2000 Italian Debt Swap 700 USAID 12000 222 Flood Emergency Reconstruction Project 3500 Bunds / Canals (ADB Funded) Source: P&D Dept: Total 23200 19
  • 21. Relief Provided (in Quantified Terms) ITEMS GOVERNMENT OTHERS* Tents 304,311 19,310 Plastic Sheets 113,861 10,655 Mosquito Nets 359,424 6,894 Family Packs 364,882,6 37,325 Rice Bags 36,535 - Water Purification Units 3,247 - Dewatering Pumps 851 106 Blankets 516,133 - Razai/ Rilly 16,978 * The relief provision/ assistance in ‘Others’ do not include the supplies Source: PDMA by major UN Agencies carried out from aid of 21 USD 170,656,780 received.
  • 22. Relief Expenditure (in Monetary Terms) Food Items Particulars Expenditure Family Packs Rs. 1,041,823,624 Drinking Water Rs. 19,792,382 Non Food Items Particulars Expenditure Tents, Plastics sheets, Mosquito nets Rs. 1,020,306,020 De-Watering Pumps Rs. 18,800,220 Miscellaneous Transportation Rs. 71,709,340 Miscellaneous Rs. 59,931,223 Total Expenditures Rs. 2,232,362,809 Source: PDMA 22
  • 23. Rabi Assistance By Government of Sindh, Agriculture Department ITEMS QUANTITY QUANTITY ALLOCATED PROVIDED (Metric Tons) (Metric Tons) Wheat Seed 55,000 53,900 Urea For Wheat 55,000 27,269 Sun Flower 500 500 Seed Source : Agriculture Department 23
  • 24. Rabi Crop Position 2011-12 Crop Area Cultivated Area Cultivated % Decrease During 2010-11 During 2011-12 Over Last Year Wheat 1,144,367 1,047,374 8.5 Onion 63,220 43,000 32 Rape & 43,493 42,078 3.2 Mustard Sunflower 266,964 188,663 29 Gram 19,658 19,810 -- Masoor 3,294 3,403 -- Source : Early Recovery Framework 2011 24
  • 25. Release of funds for Flood Fight Relief Efforts (Rs. in Million) Department Budge Out Side Federal Total Estimates Budget Transfer 2011-12 (GOS) 2011-12 2011-12 Relief 107.868 (GOS) 2,652.550 - 2,760.418 Commissioner PDMA 248.990 2,063.658 - 2,312.648 UBL & HBL for - 1138.9 1500.000 12,889.00 Pak-Card Irrigation Dept - 720.000 - 220.000 Work & Services - 300.000 - 300.000 Dept Public Health - 864.080 - 864.080 Services Health - 100.000 - 100.000 Department Agriculture Dept - 1000.000 - 1000.000 Total ‘A’ 390.258 20,159.860 1500.000 22,050.118 Source : Finance Department 25
  • 26. Status of Pakistan Cards (as of 21-04-2012) Funds Released by Sindh Government Rs. 12.889 Billion Funds Released by Federal Rs. 1.5 Billion Government Total Processed So far by NADRA 1,216,782 Total Processed So Far by Banks 1,212,963 Total Cards Activated 1,187,445 Cash Disbursed from HBL out of 5.7 Rs. 5,647,114,429 Bn Cash Disbursed from UBL out of 7.189 Rs. 6,120,203,867 Bn Total Cash Disbursed Rs. 11,767,318,296 Source: NADRA 26
  • 27. Post Floods 2010 Cash Transfer Project CDCP PHASE – II (as of 21st April 2012 ) Final Caseload of 14 districts 248,948 Watan Cards Processed to-date 149,187 Cards Activated 148,079 Funds Disbursed Rs. 3,279,920,000 CDCP PHASE – I (stands closed on 16.12.2011) Cards Distributed 654,572 Funds Disbursed Rs. 13.04 Billion 50 % matching amount by Federal and Provincial Government Source: NADRA 27
  • 29. Stakeholders’ Roles & Responsibilities(Coordination Mechanism) Sector wise Government /INGO Coordination Mechanism Sector Government Department INGO Cluster Agriculture Agriculture FAO Camp Management District Government UNHCR Community Restoration Planning & Dev. Dept. E.R Education Education Dept. UNICEF Emergency Shelter PDMA & RC IOM Food Food Dept. / Dist. Govt. WFP Health Health Dept. WHO Information Management PDMA OCHA Logistics Armed Forces WFP WASH PPHI/Health/PHED UNICEF/WHO Protection Home Dept./Social Welfare Dept. UNDP 29
  • 31. Monsoon Hazards in Sindh  Climatic Hazards  Riverine Floods  Flash Floods  LBOD Floods  Urban Floods 31
  • 32. Monsoon Hazards in Sindh Climatic Hazards 32
  • 33. Monsoon Hazards in Sindh Climatic Hazards: Causes Heavy Rains/River Extreme Rainfall (Monsoon) Flooding Torrential Rain/Flash Flooding Extreme Rainfall (Monsoon) Urban Flooding Extreme Rainfall (Monsoon) Snow-melt Flooding Extreme Heat in May/June Tropical Cyclones Cyclones/Coastal Flooding (Pre & Post Monsoon)33
  • 34. Monsoon Hazards in Sindh Riverine Floods Kashmore Ghotki Sukkur Thatta Shikarpur Jacobabad Kamber T.M.Khan Khairpur Larkana Naushahro Feroze Jamshoro Sh. Benazirabad Dadu Hyderabad Matiari 34
  • 35. Monsoon Hazards in Sindh Flash Floods Dadu Jacobabad Jamshoro Kamber Larkana 35
  • 36. Monsoon Hazards in Sindh LBOD Floods 36
  • 37. Monsoon Hazards in Sindh Urban Floods Karachi Hyderabad 37
  • 38. Plan Showing the Location of Barrages & Alignment of River Bunds 38 5
  • 39. Zone1 Zone2 Zone3 Zone4 Zone5 Zone6 39
  • 40. PDMA’s Pre-Monsoon 2012 Preparations • PDMA has convened meetings with DCs and relevant stakeholders in March and April 2012 to assess, identify and put in place the Preparedness, Relief Measures & mobilization of Resources. • PDMA has advised Line Departments and DDMAs to prepare comprehensive Monsoon/Floods Contingency Plans 2012 following the lessons learnt from floods-2010 and Rains-2011. • Districts have prepared Districts’ Disaster Contingency Plans • This will follow the Provincial Monsoon/Floods Contingency Plan 2012, in which Roles & Responsibilities of each stakeholder will be defined. 40
  • 41. PDMA’s Pre-Monsoon 2012 Preparations • Liaison of PDMA with Stakeholders: • DDMAs • Irrigation Department • Local Government • Health • Home • Meteorological Department, • Armed Forces (including Cantonments/Maritime/DHAs) • Civic Amenities Agencies (KWSB, KESC, SSGC, KPT, PQA, PTCL etc) • Education • Local / International/NGOSs, CBOs (Edhi/Aman/Chippa) 41
  • 42. PDMA’s Pre-Monsoon 2012 Preparations • Monsoon preparations with DDMAs include following: • To allocate sufficient funds (2% of District Budget) under the head ‘Disaster Management’. • To ascertain and enhance preparedness levels of the district stakeholders, Civil Defence etc. • District Contingency Plan for 2012 and SOP guidelines for each stakeholder. • Formation of District & Taluka Committees for Risk Management, Rescue, Evacuation, Relief, Vigilance, Transport, Machinery, Health, Sanitation, Food, Veterinary, Hygiene etc.) • To prepare inventory of available resources/equipment (both the district & the privately held) like Tractors, Trolleys, Bulldozers, Dewatering Machines, Excavators etc. • Emergency Directory of all Important Phone Numbers & Focal Persons. 42
  • 43. PDMA’s Pre-Monsoon 2012 Preparations • To seek the district needs for meeting the emergent situation. • To plug communication gap and enhance coordination. • Irrigation Department to ensure completion of all rehabilitation works on river embankments & drainage schemes. • Works & Services Department to ensure the repair of roads damaged in Flood-2010. • PDMA is organizing Monsoon Contingency Workshop-2012 for stakeholders, NGOs/iNGOs to prepare for Monsoon. 43
  • 44. Status of Flood Relief Equipment S.# ITEMS QUANTITY 1. FRP Boats (19 ft. length) 40 2. Out Board Engine (Yamaha 25 HP 40 Engine) 3. Anchor 40 4. FRP Oars 80 5. Boat Hook 40 6. Buoys with Lashing 40 7. Search Lights (Handheld) 40 8. Fathom / Anchor Rope (meters) 40 9. Life Jackets 400 44
  • 45. Flood Stores Held With PDMA S.# ITEMS QUANTITY SOURCE 1. TENTS 1300 China, Korea, Bangladesh, Russia, Saudi Arabia 2. MOSQUITO NETS 9000 PDMA 3. DE-WATERING PUMPS 81 PDMA, UNDP 4. BLANKETS 7000 Bangladesh, Korea, Egypt, France JERRY CANS, KITCHEN SETS, WATER PURIFIERS, TEA 45
  • 46. PDMA and Districts’ Requirements • PDMA has moved a Summary for release of Rs. 720 Million for payment of liabilities owed to vendors of relief supplies made during rain 2011 as well as to make pre-emptive procurement of key relief supplies such as tents, family ration packs, plastic sheets, de- watering pumps. • Additional funds would also be required to meet the demands of districts for strengthening their response mechanism • Revamping of Rehabilitation Department by integrating Relief and Civil Defence • Approval of PDMA Service Rules 46
  • 47. Challenges • Illegal Zamindari Bunds • Permanent Settlements • Encroachments in River/Flood plains • People living in Katcha Areas • Restoring Sukkur Barrage to its original capacity • De-silting of Barrage Upstream storage area • Raising of Manchar lake bund level 47
  • 48. Challenges • Early warning remains a sore-point with respect to the flood prone Indus River • Absence of Flash Flood Monitoring System • Limited forecasting capabilities of the PMD • Lack of medium-to-long term forecasting capabilities • Capacity constraints of PDMA / DDMAs • Timely availability of air & aviation support • Timely availability of cash flow 48
  • 49. Recommendations • Land use planning and regulatory mechanisms • Regular maintenance of irrigation infrastructure • Strengthening of vulnerable points / river banks. • Strengthening capabilities of PMD with respect to • Extended weather radar coverage • Medium and long term weather forecasting • Flash flood monitoring • Capacity enhancement of PDMAs/DDMA’s system. 49
  • 50. Recommendations • Restoring educational & health institutions damaged during 2010 floods and monsoon rains 2011 • Completion of Comprehensive Flood Management Plan by FFC. • Immediate operationalizing of High Level Flood Vigilance Committee by FFC • Management of cross border irrigation systems by a Central body during flood season • Institutional arrangements to be put in place for timely availability of air & aviation support • Timely availability of cash flow 50
  • 51. THANKS 51