SlideShare a Scribd company logo
1 of 36
Thinking big Doing better
Presented By…. 
Ashay Kothawale 
Diptee Karatkar 
Kavita D’souza 
Neel Kumar 
Prashob Menon 
Rakesh Mishra 
Roshan Joshi 
Thinking Big, Doing Better
 Adani Enterprises is Indian conglomerate based in 
Ahmedabad, Gujarat, India 
 It was founded by Mr. Gautam Adani, in the year 
Thinking Big, Doing Better 
1988. 
 The core businesses of the group is Power, Global 
Trading, Logistics, Energy, Port & SEZ and Mining. 
 Apart from the core businesses, the Group has 
expanded into Oil & Gas, Agri Business, FMCG 
products and Real Estate Development.
Vision Values Culture 
Courage: We shall 
embrace new ideas 
and businesses 
Trust:We shall believe 
in our employees and 
other stakeholders 
Commitment : We shall 
stand by our promises 
and adhere to high 
standards of business 
Thinking Big, Doing Better 
P - Passion 
R - Results 
I - Integration 
D - Dedication 
E - Entrepreneurship 
To be the admired 
leader in integrated 
infrastructure 
businesses with a 
deep commitment to 
nation building. 
To be known for the 
scale of our ambition, 
speed of execution 
and quality of our 
operation
End-to-End integrated solution which will contribute to accelerate the economic 
growth of India 
Resources: 
Owning and importing 
coal from mines 
(including trading in 
coal), oil and gas 
product ion. 
Logistics: 
A large network of ports, 
Special Economic Zone 
(SEZ) and mult i- model 
logistics – railways 
Thinking Big, Doing Better 
Energy: 
Power generation & 
t ransmission and gas 
dist ribution.
MINING PORT POWER 
Largest international 
coal linkage in India 
with over 33% of 
market share in 
India 
Largest port in India 
with a growth rate of 
4 times faster than 
the Industry average 
Thinking Big, Doing Better 
One of the largest 
world's largest single 
location thermal 
power plant
Thinking Big, Doing Better
• Your company was originally incorporated in 22 August 1996and 
started of as a Power trading company. 
• After rising 3016 cores through IPO in August 2009, it started 
generation in July 2009 by implementation of its first 330MW of 
4620 MW at Mundra. 
• Mundra power plant being a super mega project is the largest 
coal based power project of India and fifth largest in the world. 
• Earlier this year your company emerged as the largest private 
power producer in India with an overall installed capacity of 8,620 
MW after commissioning of the fourth unit of 660 megawatts 
(MW) at its power plant at Tiroda in Maharashtra. 
Thinking Big, Doing Better
• Though your company is mostly in Thermal power generation, we 
are in advanced stage of implementation of 100MW of solar 
power station at Surendranagar in Gujarat out of which 40MW is 
already commissioned. 
• Recently, your company has acquired Lanco Infratech's Udipi 
thermal power plant for Rs 6000 crore deal. This would add 
another 1200MW installed capacity to the existing capacity . 
Thinking Big, Doing Better
Gautam Adani 
Chairman -Adani Group 
Rajesh Adani 
Managing Director 
Thinking Big, Doing Better 
Vneet S Jaain 
Executive 
Director & CEO
National Award for “Meritorious Performance in Power Sector” in 
recognition of outstanding performance during 2011-12 for early completion 
of the 5th unit of Mundra Thermal Power Plant by Ministry of Power, 
Government of India 
The National Energy Conservation Award 2012 in Thermal Power 
Station Sector” by Ministry of Power (Bureau of Energy Efficiency) 
“Quality Excellence Award for Fastest Product Development” by 
National Quality Excellence Award, 2012 
Thinking Big, Doing Better
“Quality Excellence Award for Fastest Growing Company” by National 
Quality Excellence Award, 2012 
“Infrastructure Excellence Award 2011” by CNBC TV18 &Essar Steel 
Award for “Spearheading the Infra Power sector” 
“National Energy Conservation Award 2011: First Prize in Thermal 
Power Station Sector” by Ministry of Power (Bureau of Energy Efficiency) 
"The Most Admired Developer in Power Sector“: Two consecutive 
years (2010 & 2011) by KPMG & Infrastructure Today 
Clean Development Certification from the United Nations Framework 
Convention on Climate Change (UNFCCC) for being the first power 
company in India to use ‘supercritical’ technology to reduce CO2 
emissions 
Thinking Big, Doing Better
Thinking Big, Doing Better 
One of world’s largest 
single locat ion thermal 
power plant at Mundra 
Largest Single 
Locat ion 
Solar plant at Bitta 
2640 
1320 
Bhadreshwar 
3300 
Kawai 
Dahej 
Chhindware 
4620 
40 
(All f igures in MW) 
1320 
1320 1980 
Commissioned 
Tiroda 
Transmission 
Lines 
Transmission Adani Power Transmission 
plant 
Under 
Implementat ion 
Point Line 
Length 
(Km) 
Mundra - Dehgam 
1000 MW, 400 KV 
433 
Tiroda - Warora 
2000 MW, 400 KV 
200 
Mundra - 
Mohindergarh 
2500 MW, 500 KV 
HVDC 
1,000 
Tiroda - 
Aurangabad 
4500 MW, 765 KV 
1,290 
Total 2,923
During the year, your Company (along 
with subsidiaries) emerged has largest 
private power producer with 
installed capacity of 8580 MW. 
Your Company has also set a record in 
power generation by achieving full load 
of 4620 MW at Mundra power plant. 
Recently, your company has acquired 
Lanco Infratech's 1200 MW Udipi 
thermal power plant. After completion of 
the acquisition your company would 
have an installed capacity of 10480MW 
Thinking Big, Doing Better 
8580 
5940 
10000 
9000 
8000 
7000 
6000 
5000 
4000 
3000 
2000 
1000 
0 
FY13-14 FY12-13 
INSTALLED CAPACITY ( MW)
• The consolidated total revenue of 
your Company for FY 2013-14 
stood at ₹ 15,954.40 Crores as 
against ₹ 6,970.01 Crores for FY 
2012-13 showing an increase of 
129%. 
• The consolidated Net Loss for 
the year has reduced from (₹ 
2,295.01) Crores in FY 2012-13 
to (₹ 290.55) Crores in FY 2013- 
14. 
15500 
13500 
11500 
Thinking Big, Doing Better 
15768.08 
6779.39 
4129 
1332 
-290.55 -2295.01 
9500 
7500 
5500 
3500 
1500 
-500 
-2500 
FY13-14 FY12-13 FY13-14 FY12-13 FY13-14 FY12-13 
Revenue EBIDTA PAT 
in Crores
250000000 
200000000 
150000000 
100000000 
50000000 
Thinking Big, Doing Better 
70 
60 
50 
40 
30 
20 
10 
0 
0 
Total Turnover High (Inr) Low (Inr) 
• During the year the 
company share did the low 
of ₹ 31.60 and high of ₹ 
62.45. 
• During the year, the 
Company made preferential 
issue of 47,86,50,000 equity 
shares to the Promoter group 
at a premium of ₹ 43.11/- per 
share.
STRENGTHS 
We t ransport coal from our mine pits via our rails & ships – from and to our 
ports – to our power plants – to generate power –which reaches our 
customer ’s plug point through our t ransmission lines 
Mines Port Railways Power Plant Transmission 
Assured Revenue 
Thinking big Doing better 
Power 
Trading 
Long Term Power Purchase 
Agreements(PPA) 
In-house 
Consumpt ion 
1 2 3
STRENGTHS 
• The diversified nature of the group helps in the growth of Adani Power 
• Since the largest supplier of coal is Adani Enterprises, this reduces the 
cost of coal to Adani Power 
• Efficient workforce of apx. 2000 employees. 
• Operating Profit to sales ratio for Adani Power is higher than National 
average, indicating higher operational effiency. 
Thinking Big, Doing Better
STRENGTHS 
• Adani Power Plant is located very close to coal jetty which lowers the 
transportation cost of the raw material. 
• Close proximity to the sea ensures water for steam generation and 
Thinking Big, Doing Better 
cooling. 
• The integrated supply-chain model of the group, provides much required 
leverage and cost effectiveness to the company 
• Excellent execution track record and good relations with the existing state 
bureaucracy.
WEAKNESSES 
• We are present only in very few states namely Gujarat, 
Maharashtra, Haryana and Karnataka. 
• Our power plants use Chinese Equipment. 
• Non-payment of dues by the state distribution arm, leads to delay 
in receipt of money impacting cash flow. 
• Litigation with state distribution arm over PPA and Tariffs. 
Thinking big Doing better
India’s Installed Thermal 
Capacity (in GW) 
315 
275 
Thinking big Doing better 
208 
2020 
2017 
2012 
India - Energy Mix (2012) 
------------ Total Energy Need ----------- 
67% 19% 12% 2% 
Renewable – Solar,Wind 
India currently faces a deficit of 7556 MW 
32 
Thermal 
Renewable – Hydro 
Nuclear 
OPPORTUNITIES
OPPORTUNITIES 
• India has substantial non-conventional energy resource base and 
technologies to meet growing power requirements by tapping this 
energy. 
• 100% FDI in all sectors allowed 
• Opportunity to sell generation to Trading company 
• 50,000 MW Hydro initiative launched 
• Ultra Mega Power Project . 
Thinking Big, Doing Better
OPPORTUNITIES 
• Hydro-electric power generation. 
• Expand its operations and compete with other contenders 
• Opportunity to establish presence in other parts of the country 
• Opportunity in distribution . 
• Conducive Policy & Regulatory frame work for renewable energy 
Thinking Big, Doing Better 
domestically . 
• Technology break-through .
THREATS 
• The rising Maoist insurgency (with its greatest influence in states 
having the largest coal resources) could result coal shortage 
leading to higher costs. 
• Changes in International prices of coal and International policies 
on import of coal. 
• Any tariff hike delay or reduction by the CERC or state regulatory 
body, will impact the revenues and profitability 
• Increase in private sector power generation could lead to 
compressed rates of merchant power. 
• Continuation of high subsidies for diesel & kerosene. 
Thinking Big, Doing Better
THREATS 
• The improving trend in T&D losses due to rising investment in T&D 
could result in the fading of India’s power deficit at a quicker pace 
than expected. 
• Ability to maintain cost competitiveness vis-à-vis international 
Thinking Big, Doing Better 
markets . 
• Political support at the state government level/institutions vary 
widely . 
• Presence of more players supplying power selling power at 
cheaper rates than Adani .
Thinking Big, Doing Better 
Tata Power has a presence 
in all Segments - Thermal, 
Hydro, Solar, Wind, 
Transmission & Distribution. 
They moving towards 
national presence in the 
power sector as well as 
communication. 
They are implementing cost 
reduction strategies to 
emerge as a low cost power 
producer.
Thinking Big, Doing Better 
Reliance power is the only 
power generation company in 
India to have bagged three Ultra 
Mega Power Projects (UMPP) 
awarded by the Government of 
India. 
It has presence in most region 
and is also poised to have more 
than 10,000 mw of installed 
capacity. 
Recently, they acquired Hydro 
power projects from Jaypee 
Associates.
Thinking Big, Doing Better 
It is the Largest PSU power 
company with presence in 
the entire value chain of the 
power generation business, 
backed by the Government 
of India, which has a 
shareholding of 84.5%. 
They have diversified power 
projects comprising 56% 
coal, 16% Gas, 11% Nuclear 
and 17% Renewable Energy 
Sources.
With success comes responsibility 
Adani Foundation 
Our inclusive & progressive way of life 
Thinking Big, Doing Better
Thinking Big, Doing Better 
Our responsibility lies in making 
sure that India flourishes and 
prospers. 
We aim to touch and t ransform 
lives of people living in 
underprivileged and neglected 
regions. 
We seek to achieve this through 
accessible healthcare, good 
education, rural infrast ructure 
development and facilitating a 
means to a sustainable 
livelihood in communities that 
need it the most .
Thinking Big, Doing Better 
Education 
Empower a generat ion, and 
then the next with quality 
educat ion 
------------------------------------------- 
Ignit ing spark in over 
100,000 young minds
Thinking Big, Doing Better 
Community Healthcare 
Every life is precious 
------------------------------------------- 
Facilitating a healthier life to 
150,000 people every year
Thinking Big, Doing Better 
Sustainable Livelihood 
Development 
A livelihood is not just a pay 
check, it gives you dignity, a 
sense of purpose and true 
freedom 
------------------------------------------- 
Transformed more than 
25,000 lives by providing 
better opportunities to create 
self reliant life
Thinking Big, Doing Better 
Rural Infrastructure 
Development 
It is a misconception that 
infrastructure is urban led. 
Rural regions need it just the 
same. 
------------------------------------------- 
Improving life of over 
300,000 people in 90 cities 
& village by developing 
quality infrastructure
• Enter in distribution business, which would be long term 
revenue accretive 
• Acquire or install projects in renewable energy (solar and wind). 
• To enter or bid for Hydro power generation. 
• Enter in Carbon Credit trading. 
• Bid for Nuclear power projects, as when the government policy 
Thinking Big, Doing Better 
is conducive 
• Bid for International power projects. 
• To De-risk the current model, your company intends to have 
long-term coal linkages or acquire new mines internationally. 
• To expand bid for projects in various states for having a pan 
India presence.
Powering India's Progress. 
We are 
Thinking Big, Doing Better

More Related Content

What's hot

What's hot (20)

Mahindra and Mahindra Case Study
Mahindra and Mahindra Case StudyMahindra and Mahindra Case Study
Mahindra and Mahindra Case Study
 
Adani Group Presentation_Dec 2014
Adani Group Presentation_Dec 2014Adani Group Presentation_Dec 2014
Adani Group Presentation_Dec 2014
 
Jindal steel and power
Jindal steel and powerJindal steel and power
Jindal steel and power
 
HINDALCO PPT
HINDALCO PPT HINDALCO PPT
HINDALCO PPT
 
Adani group strategies
Adani group strategiesAdani group strategies
Adani group strategies
 
Tatapower.ppt
Tatapower.pptTatapower.ppt
Tatapower.ppt
 
A project report on ...
A project report                 on                                          ...A project report                 on                                          ...
A project report on ...
 
Ola Electric Scooter
Ola Electric Scooter Ola Electric Scooter
Ola Electric Scooter
 
PROJECT
PROJECTPROJECT
PROJECT
 
Strategic Management of Tata Steel
Strategic Management of Tata SteelStrategic Management of Tata Steel
Strategic Management of Tata Steel
 
Mahindra and Mahindra International Strategy
Mahindra and Mahindra International StrategyMahindra and Mahindra International Strategy
Mahindra and Mahindra International Strategy
 
WIPRO PRESENTATION
WIPRO PRESENTATIONWIPRO PRESENTATION
WIPRO PRESENTATION
 
Adani group csr
Adani group csrAdani group csr
Adani group csr
 
Technical Analysis SAIL vs Tata Steel
Technical Analysis   SAIL vs Tata Steel Technical Analysis   SAIL vs Tata Steel
Technical Analysis SAIL vs Tata Steel
 
larsen and toubro ppt
larsen and toubro pptlarsen and toubro ppt
larsen and toubro ppt
 
Strategy of Bharat forge
Strategy of Bharat forge Strategy of Bharat forge
Strategy of Bharat forge
 
Havells India Ltd
Havells India LtdHavells India Ltd
Havells India Ltd
 
Adani power
Adani powerAdani power
Adani power
 
Hindalco Indusries Limited
Hindalco Indusries LimitedHindalco Indusries Limited
Hindalco Indusries Limited
 
Royal Enfield
Royal EnfieldRoyal Enfield
Royal Enfield
 

Similar to Adani power (20)

Adani Power, Tirora- Project Report
Adani Power, Tirora- Project ReportAdani Power, Tirora- Project Report
Adani Power, Tirora- Project Report
 
Adani power Practice School
Adani power Practice SchoolAdani power Practice School
Adani power Practice School
 
PowerBrochure
PowerBrochurePowerBrochure
PowerBrochure
 
Energy sector
Energy sectorEnergy sector
Energy sector
 
Power industry
Power industryPower industry
Power industry
 
Adanipresentation 130311135708-phpapp01
Adanipresentation 130311135708-phpapp01Adanipresentation 130311135708-phpapp01
Adanipresentation 130311135708-phpapp01
 
adanipresentation-130311135708-phpapp01.pptx
adanipresentation-130311135708-phpapp01.pptxadanipresentation-130311135708-phpapp01.pptx
adanipresentation-130311135708-phpapp01.pptx
 
Is Indian Power Sector Ready for Ultra Super Critical Power Plants
Is Indian Power Sector Ready for Ultra Super Critical Power PlantsIs Indian Power Sector Ready for Ultra Super Critical Power Plants
Is Indian Power Sector Ready for Ultra Super Critical Power Plants
 
Our experience of Making in India
Our experience of Making in IndiaOur experience of Making in India
Our experience of Making in India
 
Reliance energy final ppt
Reliance energy final pptReliance energy final ppt
Reliance energy final ppt
 
Adani power
Adani powerAdani power
Adani power
 
Adani power plant
Adani power plantAdani power plant
Adani power plant
 
Geeta power industry
Geeta power industryGeeta power industry
Geeta power industry
 
217332 renewable energy
217332 renewable energy217332 renewable energy
217332 renewable energy
 
Reliance Power Operations
Reliance Power Operations Reliance Power Operations
Reliance Power Operations
 
Adani Power LTD
Adani Power LTDAdani Power LTD
Adani Power LTD
 
177683808 case-study
177683808 case-study177683808 case-study
177683808 case-study
 
NTPC LTD.
NTPC LTD.NTPC LTD.
NTPC LTD.
 
Ada power presentataion 30.03.2018
Ada  power presentataion  30.03.2018Ada  power presentataion  30.03.2018
Ada power presentataion 30.03.2018
 
Ntpc tranning report
Ntpc tranning report Ntpc tranning report
Ntpc tranning report
 

Recently uploaded

Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubssamaasim06
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxraffaeleoman
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaKayode Fayemi
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardsticksaastr
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsaqsarehman5055
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMoumonDas2
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyPooja Nehwal
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfSenaatti-kiinteistöt
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Vipesco
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 

Recently uploaded (20)

Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 

Adani power

  • 2. Presented By…. Ashay Kothawale Diptee Karatkar Kavita D’souza Neel Kumar Prashob Menon Rakesh Mishra Roshan Joshi Thinking Big, Doing Better
  • 3.  Adani Enterprises is Indian conglomerate based in Ahmedabad, Gujarat, India  It was founded by Mr. Gautam Adani, in the year Thinking Big, Doing Better 1988.  The core businesses of the group is Power, Global Trading, Logistics, Energy, Port & SEZ and Mining.  Apart from the core businesses, the Group has expanded into Oil & Gas, Agri Business, FMCG products and Real Estate Development.
  • 4. Vision Values Culture Courage: We shall embrace new ideas and businesses Trust:We shall believe in our employees and other stakeholders Commitment : We shall stand by our promises and adhere to high standards of business Thinking Big, Doing Better P - Passion R - Results I - Integration D - Dedication E - Entrepreneurship To be the admired leader in integrated infrastructure businesses with a deep commitment to nation building. To be known for the scale of our ambition, speed of execution and quality of our operation
  • 5. End-to-End integrated solution which will contribute to accelerate the economic growth of India Resources: Owning and importing coal from mines (including trading in coal), oil and gas product ion. Logistics: A large network of ports, Special Economic Zone (SEZ) and mult i- model logistics – railways Thinking Big, Doing Better Energy: Power generation & t ransmission and gas dist ribution.
  • 6. MINING PORT POWER Largest international coal linkage in India with over 33% of market share in India Largest port in India with a growth rate of 4 times faster than the Industry average Thinking Big, Doing Better One of the largest world's largest single location thermal power plant
  • 8. • Your company was originally incorporated in 22 August 1996and started of as a Power trading company. • After rising 3016 cores through IPO in August 2009, it started generation in July 2009 by implementation of its first 330MW of 4620 MW at Mundra. • Mundra power plant being a super mega project is the largest coal based power project of India and fifth largest in the world. • Earlier this year your company emerged as the largest private power producer in India with an overall installed capacity of 8,620 MW after commissioning of the fourth unit of 660 megawatts (MW) at its power plant at Tiroda in Maharashtra. Thinking Big, Doing Better
  • 9. • Though your company is mostly in Thermal power generation, we are in advanced stage of implementation of 100MW of solar power station at Surendranagar in Gujarat out of which 40MW is already commissioned. • Recently, your company has acquired Lanco Infratech's Udipi thermal power plant for Rs 6000 crore deal. This would add another 1200MW installed capacity to the existing capacity . Thinking Big, Doing Better
  • 10. Gautam Adani Chairman -Adani Group Rajesh Adani Managing Director Thinking Big, Doing Better Vneet S Jaain Executive Director & CEO
  • 11. National Award for “Meritorious Performance in Power Sector” in recognition of outstanding performance during 2011-12 for early completion of the 5th unit of Mundra Thermal Power Plant by Ministry of Power, Government of India The National Energy Conservation Award 2012 in Thermal Power Station Sector” by Ministry of Power (Bureau of Energy Efficiency) “Quality Excellence Award for Fastest Product Development” by National Quality Excellence Award, 2012 Thinking Big, Doing Better
  • 12. “Quality Excellence Award for Fastest Growing Company” by National Quality Excellence Award, 2012 “Infrastructure Excellence Award 2011” by CNBC TV18 &Essar Steel Award for “Spearheading the Infra Power sector” “National Energy Conservation Award 2011: First Prize in Thermal Power Station Sector” by Ministry of Power (Bureau of Energy Efficiency) "The Most Admired Developer in Power Sector“: Two consecutive years (2010 & 2011) by KPMG & Infrastructure Today Clean Development Certification from the United Nations Framework Convention on Climate Change (UNFCCC) for being the first power company in India to use ‘supercritical’ technology to reduce CO2 emissions Thinking Big, Doing Better
  • 13. Thinking Big, Doing Better One of world’s largest single locat ion thermal power plant at Mundra Largest Single Locat ion Solar plant at Bitta 2640 1320 Bhadreshwar 3300 Kawai Dahej Chhindware 4620 40 (All f igures in MW) 1320 1320 1980 Commissioned Tiroda Transmission Lines Transmission Adani Power Transmission plant Under Implementat ion Point Line Length (Km) Mundra - Dehgam 1000 MW, 400 KV 433 Tiroda - Warora 2000 MW, 400 KV 200 Mundra - Mohindergarh 2500 MW, 500 KV HVDC 1,000 Tiroda - Aurangabad 4500 MW, 765 KV 1,290 Total 2,923
  • 14. During the year, your Company (along with subsidiaries) emerged has largest private power producer with installed capacity of 8580 MW. Your Company has also set a record in power generation by achieving full load of 4620 MW at Mundra power plant. Recently, your company has acquired Lanco Infratech's 1200 MW Udipi thermal power plant. After completion of the acquisition your company would have an installed capacity of 10480MW Thinking Big, Doing Better 8580 5940 10000 9000 8000 7000 6000 5000 4000 3000 2000 1000 0 FY13-14 FY12-13 INSTALLED CAPACITY ( MW)
  • 15. • The consolidated total revenue of your Company for FY 2013-14 stood at ₹ 15,954.40 Crores as against ₹ 6,970.01 Crores for FY 2012-13 showing an increase of 129%. • The consolidated Net Loss for the year has reduced from (₹ 2,295.01) Crores in FY 2012-13 to (₹ 290.55) Crores in FY 2013- 14. 15500 13500 11500 Thinking Big, Doing Better 15768.08 6779.39 4129 1332 -290.55 -2295.01 9500 7500 5500 3500 1500 -500 -2500 FY13-14 FY12-13 FY13-14 FY12-13 FY13-14 FY12-13 Revenue EBIDTA PAT in Crores
  • 16. 250000000 200000000 150000000 100000000 50000000 Thinking Big, Doing Better 70 60 50 40 30 20 10 0 0 Total Turnover High (Inr) Low (Inr) • During the year the company share did the low of ₹ 31.60 and high of ₹ 62.45. • During the year, the Company made preferential issue of 47,86,50,000 equity shares to the Promoter group at a premium of ₹ 43.11/- per share.
  • 17. STRENGTHS We t ransport coal from our mine pits via our rails & ships – from and to our ports – to our power plants – to generate power –which reaches our customer ’s plug point through our t ransmission lines Mines Port Railways Power Plant Transmission Assured Revenue Thinking big Doing better Power Trading Long Term Power Purchase Agreements(PPA) In-house Consumpt ion 1 2 3
  • 18. STRENGTHS • The diversified nature of the group helps in the growth of Adani Power • Since the largest supplier of coal is Adani Enterprises, this reduces the cost of coal to Adani Power • Efficient workforce of apx. 2000 employees. • Operating Profit to sales ratio for Adani Power is higher than National average, indicating higher operational effiency. Thinking Big, Doing Better
  • 19. STRENGTHS • Adani Power Plant is located very close to coal jetty which lowers the transportation cost of the raw material. • Close proximity to the sea ensures water for steam generation and Thinking Big, Doing Better cooling. • The integrated supply-chain model of the group, provides much required leverage and cost effectiveness to the company • Excellent execution track record and good relations with the existing state bureaucracy.
  • 20. WEAKNESSES • We are present only in very few states namely Gujarat, Maharashtra, Haryana and Karnataka. • Our power plants use Chinese Equipment. • Non-payment of dues by the state distribution arm, leads to delay in receipt of money impacting cash flow. • Litigation with state distribution arm over PPA and Tariffs. Thinking big Doing better
  • 21. India’s Installed Thermal Capacity (in GW) 315 275 Thinking big Doing better 208 2020 2017 2012 India - Energy Mix (2012) ------------ Total Energy Need ----------- 67% 19% 12% 2% Renewable – Solar,Wind India currently faces a deficit of 7556 MW 32 Thermal Renewable – Hydro Nuclear OPPORTUNITIES
  • 22. OPPORTUNITIES • India has substantial non-conventional energy resource base and technologies to meet growing power requirements by tapping this energy. • 100% FDI in all sectors allowed • Opportunity to sell generation to Trading company • 50,000 MW Hydro initiative launched • Ultra Mega Power Project . Thinking Big, Doing Better
  • 23. OPPORTUNITIES • Hydro-electric power generation. • Expand its operations and compete with other contenders • Opportunity to establish presence in other parts of the country • Opportunity in distribution . • Conducive Policy & Regulatory frame work for renewable energy Thinking Big, Doing Better domestically . • Technology break-through .
  • 24. THREATS • The rising Maoist insurgency (with its greatest influence in states having the largest coal resources) could result coal shortage leading to higher costs. • Changes in International prices of coal and International policies on import of coal. • Any tariff hike delay or reduction by the CERC or state regulatory body, will impact the revenues and profitability • Increase in private sector power generation could lead to compressed rates of merchant power. • Continuation of high subsidies for diesel & kerosene. Thinking Big, Doing Better
  • 25. THREATS • The improving trend in T&D losses due to rising investment in T&D could result in the fading of India’s power deficit at a quicker pace than expected. • Ability to maintain cost competitiveness vis-à-vis international Thinking Big, Doing Better markets . • Political support at the state government level/institutions vary widely . • Presence of more players supplying power selling power at cheaper rates than Adani .
  • 26. Thinking Big, Doing Better Tata Power has a presence in all Segments - Thermal, Hydro, Solar, Wind, Transmission & Distribution. They moving towards national presence in the power sector as well as communication. They are implementing cost reduction strategies to emerge as a low cost power producer.
  • 27. Thinking Big, Doing Better Reliance power is the only power generation company in India to have bagged three Ultra Mega Power Projects (UMPP) awarded by the Government of India. It has presence in most region and is also poised to have more than 10,000 mw of installed capacity. Recently, they acquired Hydro power projects from Jaypee Associates.
  • 28. Thinking Big, Doing Better It is the Largest PSU power company with presence in the entire value chain of the power generation business, backed by the Government of India, which has a shareholding of 84.5%. They have diversified power projects comprising 56% coal, 16% Gas, 11% Nuclear and 17% Renewable Energy Sources.
  • 29. With success comes responsibility Adani Foundation Our inclusive & progressive way of life Thinking Big, Doing Better
  • 30. Thinking Big, Doing Better Our responsibility lies in making sure that India flourishes and prospers. We aim to touch and t ransform lives of people living in underprivileged and neglected regions. We seek to achieve this through accessible healthcare, good education, rural infrast ructure development and facilitating a means to a sustainable livelihood in communities that need it the most .
  • 31. Thinking Big, Doing Better Education Empower a generat ion, and then the next with quality educat ion ------------------------------------------- Ignit ing spark in over 100,000 young minds
  • 32. Thinking Big, Doing Better Community Healthcare Every life is precious ------------------------------------------- Facilitating a healthier life to 150,000 people every year
  • 33. Thinking Big, Doing Better Sustainable Livelihood Development A livelihood is not just a pay check, it gives you dignity, a sense of purpose and true freedom ------------------------------------------- Transformed more than 25,000 lives by providing better opportunities to create self reliant life
  • 34. Thinking Big, Doing Better Rural Infrastructure Development It is a misconception that infrastructure is urban led. Rural regions need it just the same. ------------------------------------------- Improving life of over 300,000 people in 90 cities & village by developing quality infrastructure
  • 35. • Enter in distribution business, which would be long term revenue accretive • Acquire or install projects in renewable energy (solar and wind). • To enter or bid for Hydro power generation. • Enter in Carbon Credit trading. • Bid for Nuclear power projects, as when the government policy Thinking Big, Doing Better is conducive • Bid for International power projects. • To De-risk the current model, your company intends to have long-term coal linkages or acquire new mines internationally. • To expand bid for projects in various states for having a pan India presence.
  • 36. Powering India's Progress. We are Thinking Big, Doing Better