Successful construction with PERI
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

Successful construction with PERI

on

  • 610 views

Presentation by Alexandre, LC11N

Presentation by Alexandre, LC11N

Statistics

Views

Total Views
610
Views on SlideShare
610
Embed Views
0

Actions

Likes
0
Downloads
11
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Successful construction with PERI Presentation Transcript

  • 1. Successful construction with PERI
  • 2. Building Rehabilitation, LisbonAdvanced Seminar 26-10-2009Alexandre JacintoPERI Portugal, Queijas
  • 3. Building Rehabilitation, Lisbon CITY MAP 3
  • 4. Building Rehabilitation, Lisbon JOBSITE  Location: Av. da Republica ( Main Street )  Height: 59 m  High pedestrian flow 4
  • 5. Building Rehabilitation, Lisbon SOLUTION PLAN  Top View 5
  • 6. Building Rehabilitation, Lisbon SOLUTION PLAN  Av. da Republica 6
  • 7. Building Rehabilitation, Lisbon GENERAL DATA  Scaffold Maximum Height = 59 m  Scaffold Total Area = 3342 m²  Scaffold Total Weight = 63091 Kg  Scaffold = 18.878 Kg/m²  Assembly Team = 12 PERI workers  Assembly Time = 3 weeks (15 work days)  Scaffold moved ≈ 350.50 Kg/day/worker  Scaffold assembled ≈ 18.56 m²/day/worker 7
  • 8. Building Rehabilitation, Lisbon JOBSITE PICTURES 8
  • 9. Building Rehabilitation, Lisbon FINAL RESULT 9
  • 10. Building Rehabilitation, Lisbon THANK YOU FOR YOUR ATTENTION. 10