Successful construction with PERI

532 views
468 views

Published on

Presentation by Alexandre, LC11N

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
532
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
17
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Successful construction with PERI

  1. 1. Successful construction with PERI
  2. 2. Building Rehabilitation, LisbonAdvanced Seminar 26-10-2009Alexandre JacintoPERI Portugal, Queijas
  3. 3. Building Rehabilitation, Lisbon CITY MAP 3
  4. 4. Building Rehabilitation, Lisbon JOBSITE  Location: Av. da Republica ( Main Street )  Height: 59 m  High pedestrian flow 4
  5. 5. Building Rehabilitation, Lisbon SOLUTION PLAN  Top View 5
  6. 6. Building Rehabilitation, Lisbon SOLUTION PLAN  Av. da Republica 6
  7. 7. Building Rehabilitation, Lisbon GENERAL DATA  Scaffold Maximum Height = 59 m  Scaffold Total Area = 3342 m²  Scaffold Total Weight = 63091 Kg  Scaffold = 18.878 Kg/m²  Assembly Team = 12 PERI workers  Assembly Time = 3 weeks (15 work days)  Scaffold moved ≈ 350.50 Kg/day/worker  Scaffold assembled ≈ 18.56 m²/day/worker 7
  8. 8. Building Rehabilitation, Lisbon JOBSITE PICTURES 8
  9. 9. Building Rehabilitation, Lisbon FINAL RESULT 9
  10. 10. Building Rehabilitation, Lisbon THANK YOU FOR YOUR ATTENTION. 10
  11. 11. Formwork Scaffolding Engineering | www.peri.pt

×