MARITIME ACCESS & LOGISTIC OPERATIONS
on the REBO terminal in ENERGY PORT OOSTENDE
© Alstom
no locks
outstanding geographical location
excellent & immediate access to open sea
priority to offshore wind vessels
WHY PORT OF OOSTENDE?
1/ MARITIME ACCESS
outstanding geographical location
excellent & immediate access to open sea
no locks
priority to offshore wind vessels
127 ha available in the port of Oostende for renewable energy activities
quays with a capacity able to handle from 4T/m2
to 20 T/m2
15 Ha of terminal surfaces (with heavy lift capacity) and with capacity for extension
>
>
>
>
>
>
1/ MARITIME ACCESS
WHY PORT OF OOSTENDE?
1/ MARITIME ACCESS
200 KM
WHY PORT OF OOSTENDE?
WHY PORT OF OOSTENDE?
MultitechCMI
Falck
Fabricom
Multitech
grindbed
new
H
20T/m²
Alstom
Parkwind
Senvion
GeoSea
ReboB
Flansea
C-Power
VISSERIJDOK
ZEEWEZENDOK
HALVE
M
AAN
HAVENGEUL
ary
lex
Vestas
OOSTENDE
ZEEBRUGGE
ZONES RESERVED
FOR WIND FARMS
29 km
Thorntonbank
Blighbank
Lodewijkbank
NORTHER: 350 MW
TOTAL: 2 120 MW
C-POWER: 325 MW
RENTEL: 288 - 312 MW
NORTHWIND: 216 MW
SEASTAR: 246 - 432 MW
BELWIND: 330 MW
449 -
490 MW
MERMAID
NORTHWESTERN II
72 x
41-62 x
24 x
36-78 x
49-73 x
20 x
55 x
30 x
NORTH SEA
connection to Oostende
connection to Zeebrugge
future Stevin connection
operational ongoing in preparation
1/ MARITIME ACCESS
WHY PORT OF OOSTENDE?
29 KM
WHY REBO?
zone km from
coast
WIND FARM STATUS TURBINE TYPE # TOTAL MW SHARE HOLDERS
1 22 Norther in preparation not know yet 350 MW Eneco + Elicio (ex. Electrawinds) (PMV)
2 29 C-Power operational Senvion 5 MW 6 30 MW EDF - Socofé - Nuhma - Marguerite fund - Deme
operational Senvion 6.15 MW 48 295.2 MW
3 Rentel in preparation not know yet 288 - 312 MW Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port -
Elicio (ex. Electrawinds) (PMV) )
4 43 Northwind ongoing Vestas 3 MW 72 216 MW Parkwind (Colruyt - PMV - Korys) - Sumitomo - Aspiravi - WE Power
5 Seastar in preparation not know yet 246 - 432 MW Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port -
Elicio (ex. Electrawinds) (PMV) )
6 55 Belwind I operational Vestas 3 MW 55 165 MW Parkwind (Colruyt - PMV - Korys) - Sumitomo
ongoing Alstom Haliade 6 MW 1 6 MW Alstom Wind (100%)
Belwind II 2015 not know yet 165 MW Parkwind (Colruyt - PMV - Korys) - Sumitomo
7 Northwestern II in preparation not know yet
449 - 490 MW
8 Mermaid in preparation not know yet Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port -
Elicio (ex. Electrawinds) (PMV) ) - Electrabel
total 2 120 MW
15%
15%
15%
15%
40%
office
pontoon
grindbed
H
20T/m²
B
C-Power
crew changes
& refueling
VLOTDOK
VISSERIJDOK
ZEEWEZENDOK
HALVE
M
AAN
HAVENGEUL
HOUTDOK
ZWAAIDOK
geoXYZ
marine services
OOSTENDE
ZEEBRUGGE
29 km
Thorntonbank
Blighbank
Lodewijkbank
NORTHER: 350 MW
TOTAL: 2 120 MW
C-POWER: 325 MW
RENTEL: 288 - 312 MW
NORTHWIND: 216 MW
72 x
41-62 x
24 x
36-78 x
49-73 x
20 x
55 x
30 x
NORTH SEA
Multitech
MultitechCMI
Falck
Fabricom
Energynew
Alstom
Parkwind
GeoSea
Rebo terminal
sanitarycomplex
Vestas
Senvion
Halve maan
- site prepared for offshore
wind works
- surface: 5 ha
- quay length: 100 m
- quay capacity: 10 T/m²
- draught: -8 LAT
Zeewezendok
- site prepared for offshore
wind works
- surface: 15 ha
- quay length: 600 m
- quay capacity:
4 T/m² to 20 T/m²
- draught: - 8m LAT
Vlotdok
- site prepared for 		
berthing & refueling
- length: 800 m
berthing places
RENEWEABLE ENERGY SITES
assembly & storage area
with direct access to open
sea
offices & storage
assembly & storage
area behind the locks
1/ MARITIME ACCESS
+/- 1 hour sailing
pilotage
- for vessels with a LOA of 80 M or +
- 24 hrs from Wandelaar pilot
- tugs available
GEOGRAPHICAL POSITION
1/ MARITIME ACCESS
VHF 65
Traffic centre
Wandelaar
(VHF 09
Port
Control)
0
2
5
0
51°
14'
0
56'
51°14,62'N
Dem
ey-
sluis
(VHF
10)
56'
2°55'
51°
14'
5,1m
4,2m
2
F.G.14m10M
Vlotdok
8m
8m
G
2°56,52'E
1,1m
8m
m250
0
9,9m
0
5
9,9m
7,4m
2
Fl.G.5s
2
G
2°54,72'E
2°55'
2,6m
Voorhaven
m250
Gebaggerdediepten(zienota)
Dredgeddepths(seenote)
51°13,37'N
6,2m
Obscd
OH
1:15000 (51°20')
OOSTENDE
Vism
ijn
3,1m
MRCC
5,1m
Q.Y
F
F.G
Tijdok
F.R
6,5m
5,5m
Port Control
5,4m
Zeewezen-
2,1m
dok
Visserijdok
Visserijsluis
Fl(3)10s65m27M
Vuurtorendok
3,7m
3,7m
(VHF 20)
Iso.4s38m4M
Iso.4s48m4M
5,1mMontgomerydok
2,6m
5,7m
Q.Y
5,1m
Tide gauge
R
Mercator
R
3,1m
OH2
Q.R
R
143°
Q.G
Q.Y
G
O6
O5
OH7
Wk
Bell4s
SS (Traffic)
8m
dokken
Radar Tr Surveillance Station
Fl(3)G.10s
(VHF14)
8m
OH6
OH8
G
Q.R
Q.R
G
Q.R
OH1
Mercatorsluis
Fl.G.5s
R
APPROACH FROM OPEN SEA TO PORT
alignment 143° indicated
by leading lights
new construction of 2 moles
> access of vessels up to
200 m length
> entrance = 130 m wide at -8.4 m TAW
> broadens out 5 cables
inside the entrance
> to a turning basin with
a diameter of 300m
1 - 2
3.
4.
2
3
4
1/ MARITIME ACCESS
1
270 m
130 m
300 m
APPROACH FROM OPEN SEA TO PORT
1/ MARITIME ACCESS
APPROACH FROM OPEN SEA TO PORT
1/ MARITIME ACCESSharbour wall heads
WIDENING EASTERN SHORE - 2015
> the last phase of the new harbour entrance project
> removing the current slope and dolphins on the
eastern side of the approach to the turning basin
> result: widening the channel by 50 m
50 m clearance
to new shore
removal of the
dolphins
1/ MARITIME ACCESS
603
103
APPROACH FROM OPEN SEA TO PORT
Neptune
length overall (LOA) 60 m
breadth 38 m
maximum draft 3.9 m
accommodation 60 p
1/ MARITIME ACCESS
Pacfic Osprey
length overall (LOA) 160.9 m
breadth 49 m
minimum draft 5.5 m
maximum draft 6 m
accommodation 111 p
49
APPROACH FROM OPEN SEA TO PORT
603
103
1/ MARITIME ACCESS
INFRASTRUCTURE
1/ MARITIME ACCESSgravel reinforced seabed
quaywall
- 8 m
gravel reinforced seabed
spud
spud
INFRASTRUCTURE
1/ MARITIME ACCESSRORO pontoons
INSTALLATION VESSELS
Aeulus - Van Oord
INSTALLATION VESSELS
Bold Tern - Fred Olsen
INSTALLATION VESSELS
RWE - Friedrich Ernestine
INSTALLATION VESSELS
Innovation - Geosea
port: Port of Aalborg (DK)
project: Westermost Rough Offshore Windfarm (UK)
INSTALLATION VESSELS
Innovation - Geosea
INSTALLATION VESSELS
JB115 - JB Barges
INSTALLATION VESSELS
Neptune - Geosea
INSTALLATION VESSELS
Pacific Orca - Swire
INSTALLATION VESSELS
Sea Installer - A2Sea
INSTALLATION VESSELS
Seafox 5 - Workfox
INSTALLATION VESSELS
Vidar - Hochtief
heavy lift capacity up to 20 T/m2
heavy load bearing quays
dedicated pontoons
127 ha dedicated areas for wind farm logistics
15 Ha of terminal surfaces with heavy lift capacity up to 20 T/m2
heavy load bearing quays
dedicated pontoons, mooring facilities for workboats, tugboats, crew vessels
>
>
>
>
WHY REBO?
2/ LOGISTIC OPERATIONS
foundations
construction & loading of 6 Gravity Base Foundations (GBF)
site ‘Halve Maan’ - unit weight: 2700 tons
2/ LOGISTIC OPERATIONS
GBF - preparation for loading with Rambiz floating crane
foundations
2/ LOGISTIC OPERATIONS
GBF - move on SPMT
foundations
2/ LOGISTIC OPERATIONS
GBF - lift-of
foundations
2/ LOGISTIC OPERATIONS
GBF - move backwards
foundations
2/ LOGISTIC OPERATIONS
GBF - half submerged (weight reduction)
foundations
2/ LOGISTIC OPERATIONS
storage for jackets on pontoons
foundations
2/ LOGISTIC OPERATIONS
prepiles - Flinter Rose unloading
ARRIVAL & STORAGE OF MAIN PARTS
2/ LOGISTIC OPERATIONS
2/ LOGISTIC OPERATIONSprepiles - storage on quayside
ARRIVAL & STORAGE OF MAIN PARTS
arrival of Sarens 1250T shore crane - arrival of Intonation 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
arrival of Sarens 1250 T shore crane - unloading of ship 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
nacelles, 4 hubs, 8 tower sections - pontoon manoeuvering
pontoon manoeuvering
2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
harbour tug Ensor in assistance
pontoon moored at quay
blades arrival - by road (night transport only) (63.5 m long)
truck turning in to harbour area
2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
blades arrival - by road (night transport only) (63.5 m long)
back of the truck
2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
blades arrive by ship - ship moored 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
blades arrive by ship - unloading blades 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
blades shipped by ferry - transport waiting 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
blades shipped by ferry - entering ferry
ARRIVAL & STORAGE OF MAIN PARTS
2/ LOGISTIC OPERATIONS
arrival & unloading of Alstom haliade (420 T)
arrival on pontoon square onto quay
ARRIVAL & STORAGE OF MAIN PARTS
2/ LOGISTIC OPERATIONS
arrival & unloading of Alstom haliade (420 T)
moved by SPMT on quayside
2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
arrival & unloading of Alstom haliade (420 T)
off it comes
ARRIVAL & STORAGE OF MAIN PARTS
2/ LOGISTIC OPERATIONS
arrival & unloading of Alstom haliade (420 T)
ready positioned
2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
cable Northwind - Jan De Nul 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
cable Northwind - Jan De Nul 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
presenting blade to nacelle 2/ LOGISTIC OPERATIONS
Alstom turbine & BLADES ‘in bunny’
ready for assembly 2/ LOGISTIC OPERATIONS
Alstom turbine & BLADES ‘in bunny’
almost there 2/ LOGISTIC OPERATIONS
Alstom turbine & BLADES ‘in bunny’
proud of achievement 2/ LOGISTIC OPERATIONS
Alstom turbine & BLADES ‘in bunny’
Neptune & Goliath in the port 2/ LOGISTIC OPERATIONS
LOADING OF PLATFORMS
Neptune & Bold Tern in the port 2/ LOGISTIC OPERATIONS
LOADING OF PLATFORMS
hub with blades on Neptune 2/ LOGISTIC OPERATIONS
LOADING OF PLATFORMS
positioning in between spuds & towers 2/ LOGISTIC OPERATIONS
LOADING OF PLATFORMS
Haliade 150 loaded on Bold Tern in floating position 2/ LOGISTIC OPERATIONS
LOADING OF PLATFORMS
Haliade 150 loaded on Bold Tern in floating position 2/ LOGISTIC OPERATIONS
LOADING OF PLATFORMS
Alstom
ready to go to sea 2/ LOGISTIC OPERATIONS
SAILING OUT OF LOADED PLATFORM
passing harbour walls heads 2/ LOGISTIC OPERATIONS
SAILING OUT OF LOADED PLATFORM
Bolf Tern sailing out with Haliade 150 2/ LOGISTIC OPERATIONS
SAILING OUT OF LOADED PLATFORM
© C-Power N.V., fotograaf Tom D’Haenens
Deme platforms at work 2/ LOGISTIC OPERATIONS
INSTALLATION AT SEA
Bold Tern at work 2/ LOGISTIC OPERATIONS
INSTALLATION AT SEA
© Alstom
office, warehouse & sanitary accomodation on site
technical support & service companies in immediate vicinity
3 telescopic crane companies within 1 km (< 400T, < 130 m)
Falck training center on site
3/ WIND ENERGY CLUSTER
SITE OVERVIEW
along the quay
MHI Vestas - Alstom - Parkwind - Geosea
3/ WIND ENERGY CLUSTER
NEW & RENOVATED BUILDINGS
3/ WIND ENERGY CLUSTERwith direct access to the quay
NEW & RENOVATED BUILDINGS
Falck – Cofely Senvion – OWA - Technum - Flidar - Ecoast
3/ WIND ENERGY CLUSTERheli port
Quay INFRASTRUCTURE - O&M
3 pontoons and 1 fixed crane for service vessels 3/ WIND ENERGY CLUSTER
Quay INFRASTRUCTURE - O&M
3 pontoons and 1 fixed crane for service vessels 3/ WIND ENERGY CLUSTER
Quay INFRASTRUCTURE - O&M
3000 movements a year 3/ WIND ENERGY CLUSTER
SERVICE VESSELS - O&M
online ‘Ensor’ booking system 3/ WIND ENERGY CLUSTER
SERVICE VESSELS - PONTOONS
MRCC: Maritime Rescue & Coordination Centre 3/ WIND ENERGY CLUSTER
PRIORITY FOR OFFSHORE WIND VESSELS
MRCC: Maritime Rescue & Coordination Centre 3/ WIND ENERGY CLUSTER
PRIORITY FOR OFFSHORE WIND VESSELS
4/ TO SUMMARIZE
OSTEND, HOMEBASE FOR ...
SEE YOU SOON
www.reboostende.be
GENERAL
PORT OF OOSTENDE
Slijkensesteenweg 2
BE 8400 Oostende
T +32 59 34 07 11
F + 32 59 34 07 10
www.portofoostende.be
info@portofoostende.be
REBO
Slijkensesteenweg 2
BE 8400 Oostende
T +32 59 34 07 11
www.reboostende.be
COMMERCIAL SERVICES
Jan Allaert
Commercial Manager
jan.allaert@portofoostende.be
HARBOUR SERVICES
Mario Calbert
Harbour Master
mario.calbert@portofoostende.be
Emmanuël Timmermans
business development manager
e.timmermans@reboostende.be
CONTACT

More Related Content

What's hot

Leffler 2003 deepwater petroleum exploration
Leffler 2003 deepwater petroleum explorationLeffler 2003 deepwater petroleum exploration
Leffler 2003 deepwater petroleum explorationVlad Econ
 
New osx project update_agosto_final_inglês
New osx project update_agosto_final_inglêsNew osx project update_agosto_final_inglês
New osx project update_agosto_final_inglêsosxri
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004David Seow
 
Site Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkSite Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkAbdul Rahim
 
Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Abdul Basith C
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16Paolo Aguzzi
 

What's hot (9)

Leffler 2003 deepwater petroleum exploration
Leffler 2003 deepwater petroleum explorationLeffler 2003 deepwater petroleum exploration
Leffler 2003 deepwater petroleum exploration
 
FAST Ship Slides B
FAST Ship Slides BFAST Ship Slides B
FAST Ship Slides B
 
New osx project update_agosto_final_inglês
New osx project update_agosto_final_inglêsNew osx project update_agosto_final_inglês
New osx project update_agosto_final_inglês
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
Afra Marine Technologies Pte Ltd Brochure
Afra Marine Technologies Pte Ltd BrochureAfra Marine Technologies Pte Ltd Brochure
Afra Marine Technologies Pte Ltd Brochure
 
Site Surveys_Rig Safety-Link
Site Surveys_Rig Safety-LinkSite Surveys_Rig Safety-Link
Site Surveys_Rig Safety-Link
 
Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16
 

Similar to Rebo general presentation 2014-07

Rebo general presentation 2014-07
Rebo general presentation 2014-07Rebo general presentation 2014-07
Rebo general presentation 2014-07reboostende
 
REBO general - 2015-10-15
REBO general - 2015-10-15 REBO general - 2015-10-15
REBO general - 2015-10-15 reboostende
 
Rebo general 2015-05-04
Rebo general 2015-05-04Rebo general 2015-05-04
Rebo general 2015-05-04reboostende
 
Fama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eFama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eandreastzortzis
 
Quang Ninh Port's presentation
Quang Ninh Port's presentationQuang Ninh Port's presentation
Quang Ninh Port's presentationNguyen Huu Thanh
 
Benjamin colbrandt | C-Power offshore windmolenpark
Benjamin colbrandt  | C-Power offshore windmolenparkBenjamin colbrandt  | C-Power offshore windmolenpark
Benjamin colbrandt | C-Power offshore windmolenparkGreenbridge nv
 
Rebo installation vessels 2014-07
Rebo installation vessels 2014-07Rebo installation vessels 2014-07
Rebo installation vessels 2014-07reboostende
 
Rebo folder 2014-05
Rebo folder 2014-05Rebo folder 2014-05
Rebo folder 2014-05reboostende
 
2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdfKhalidJ6
 
Petrobras oim presentation rev tt nov 2010 vsersion
 Petrobras oim presentation  rev tt nov 2010 vsersion Petrobras oim presentation  rev tt nov 2010 vsersion
Petrobras oim presentation rev tt nov 2010 vsersiontom_toth
 
Petrobras oim presentation rev tt nov 2010 vsersion
 Petrobras oim presentation  rev tt nov 2010 vsersion Petrobras oim presentation  rev tt nov 2010 vsersion
Petrobras oim presentation rev tt nov 2010 vsersiontom_toth
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1robinking277
 
Ocean pride nov 16
Ocean pride    nov 16Ocean pride    nov 16
Ocean pride nov 16Duong Truong
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overviewminh nguyễn
 
Amplus VPU Presentation
Amplus VPU PresentationAmplus VPU Presentation
Amplus VPU PresentationThomas Jeannin
 

Similar to Rebo general presentation 2014-07 (20)

Rebo general presentation 2014-07
Rebo general presentation 2014-07Rebo general presentation 2014-07
Rebo general presentation 2014-07
 
REBO general - 2015-10-15
REBO general - 2015-10-15 REBO general - 2015-10-15
REBO general - 2015-10-15
 
Rebo general 2015-05-04
Rebo general 2015-05-04Rebo general 2015-05-04
Rebo general 2015-05-04
 
OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2OSX1 FPSO Buyers Rev2
OSX1 FPSO Buyers Rev2
 
OFFSHORE INDUSTRY SERVICE 2014
OFFSHORE INDUSTRY SERVICE 2014OFFSHORE INDUSTRY SERVICE 2014
OFFSHORE INDUSTRY SERVICE 2014
 
Fama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.eFama group shipyards past projects.at.22.26.23.001.e
Fama group shipyards past projects.at.22.26.23.001.e
 
Havila subsea.pdf
Havila subsea.pdfHavila subsea.pdf
Havila subsea.pdf
 
Quang Ninh Port's presentation
Quang Ninh Port's presentationQuang Ninh Port's presentation
Quang Ninh Port's presentation
 
Benjamin colbrandt | C-Power offshore windmolenpark
Benjamin colbrandt  | C-Power offshore windmolenparkBenjamin colbrandt  | C-Power offshore windmolenpark
Benjamin colbrandt | C-Power offshore windmolenpark
 
G.E.T. Smart - Smart Renewables: Principal Power Presentation
G.E.T. Smart - Smart Renewables: Principal Power PresentationG.E.T. Smart - Smart Renewables: Principal Power Presentation
G.E.T. Smart - Smart Renewables: Principal Power Presentation
 
Rebo installation vessels 2014-07
Rebo installation vessels 2014-07Rebo installation vessels 2014-07
Rebo installation vessels 2014-07
 
Rebo folder 2014-05
Rebo folder 2014-05Rebo folder 2014-05
Rebo folder 2014-05
 
2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf2301 16 PODC General Presentation.pdf
2301 16 PODC General Presentation.pdf
 
Petrobras oim presentation rev tt nov 2010 vsersion
 Petrobras oim presentation  rev tt nov 2010 vsersion Petrobras oim presentation  rev tt nov 2010 vsersion
Petrobras oim presentation rev tt nov 2010 vsersion
 
Petrobras oim presentation rev tt nov 2010 vsersion
 Petrobras oim presentation  rev tt nov 2010 vsersion Petrobras oim presentation  rev tt nov 2010 vsersion
Petrobras oim presentation rev tt nov 2010 vsersion
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
Leonardo Fortuin Resume.2
Leonardo Fortuin Resume.2Leonardo Fortuin Resume.2
Leonardo Fortuin Resume.2
 
Ocean pride nov 16
Ocean pride    nov 16Ocean pride    nov 16
Ocean pride nov 16
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Amplus VPU Presentation
Amplus VPU PresentationAmplus VPU Presentation
Amplus VPU Presentation
 

Recently uploaded

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 

Recently uploaded (20)

Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 

Rebo general presentation 2014-07

  • 1. MARITIME ACCESS & LOGISTIC OPERATIONS on the REBO terminal in ENERGY PORT OOSTENDE © Alstom
  • 2. no locks outstanding geographical location excellent & immediate access to open sea priority to offshore wind vessels
  • 3. WHY PORT OF OOSTENDE? 1/ MARITIME ACCESS outstanding geographical location excellent & immediate access to open sea no locks priority to offshore wind vessels 127 ha available in the port of Oostende for renewable energy activities quays with a capacity able to handle from 4T/m2 to 20 T/m2 15 Ha of terminal surfaces (with heavy lift capacity) and with capacity for extension > > > > > >
  • 4. 1/ MARITIME ACCESS WHY PORT OF OOSTENDE?
  • 5. 1/ MARITIME ACCESS 200 KM WHY PORT OF OOSTENDE?
  • 6. WHY PORT OF OOSTENDE? MultitechCMI Falck Fabricom Multitech grindbed new H 20T/m² Alstom Parkwind Senvion GeoSea ReboB Flansea C-Power VISSERIJDOK ZEEWEZENDOK HALVE M AAN HAVENGEUL ary lex Vestas OOSTENDE ZEEBRUGGE ZONES RESERVED FOR WIND FARMS 29 km Thorntonbank Blighbank Lodewijkbank NORTHER: 350 MW TOTAL: 2 120 MW C-POWER: 325 MW RENTEL: 288 - 312 MW NORTHWIND: 216 MW SEASTAR: 246 - 432 MW BELWIND: 330 MW 449 - 490 MW MERMAID NORTHWESTERN II 72 x 41-62 x 24 x 36-78 x 49-73 x 20 x 55 x 30 x NORTH SEA connection to Oostende connection to Zeebrugge future Stevin connection operational ongoing in preparation 1/ MARITIME ACCESS WHY PORT OF OOSTENDE? 29 KM
  • 7. WHY REBO? zone km from coast WIND FARM STATUS TURBINE TYPE # TOTAL MW SHARE HOLDERS 1 22 Norther in preparation not know yet 350 MW Eneco + Elicio (ex. Electrawinds) (PMV) 2 29 C-Power operational Senvion 5 MW 6 30 MW EDF - Socofé - Nuhma - Marguerite fund - Deme operational Senvion 6.15 MW 48 295.2 MW 3 Rentel in preparation not know yet 288 - 312 MW Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port - Elicio (ex. Electrawinds) (PMV) ) 4 43 Northwind ongoing Vestas 3 MW 72 216 MW Parkwind (Colruyt - PMV - Korys) - Sumitomo - Aspiravi - WE Power 5 Seastar in preparation not know yet 246 - 432 MW Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port - Elicio (ex. Electrawinds) (PMV) ) 6 55 Belwind I operational Vestas 3 MW 55 165 MW Parkwind (Colruyt - PMV - Korys) - Sumitomo ongoing Alstom Haliade 6 MW 1 6 MW Alstom Wind (100%) Belwind II 2015 not know yet 165 MW Parkwind (Colruyt - PMV - Korys) - Sumitomo 7 Northwestern II in preparation not know yet 449 - 490 MW 8 Mermaid in preparation not know yet Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port - Elicio (ex. Electrawinds) (PMV) ) - Electrabel total 2 120 MW 15% 15% 15% 15% 40%
  • 8. office pontoon grindbed H 20T/m² B C-Power crew changes & refueling VLOTDOK VISSERIJDOK ZEEWEZENDOK HALVE M AAN HAVENGEUL HOUTDOK ZWAAIDOK geoXYZ marine services OOSTENDE ZEEBRUGGE 29 km Thorntonbank Blighbank Lodewijkbank NORTHER: 350 MW TOTAL: 2 120 MW C-POWER: 325 MW RENTEL: 288 - 312 MW NORTHWIND: 216 MW 72 x 41-62 x 24 x 36-78 x 49-73 x 20 x 55 x 30 x NORTH SEA Multitech MultitechCMI Falck Fabricom Energynew Alstom Parkwind GeoSea Rebo terminal sanitarycomplex Vestas Senvion Halve maan - site prepared for offshore wind works - surface: 5 ha - quay length: 100 m - quay capacity: 10 T/m² - draught: -8 LAT Zeewezendok - site prepared for offshore wind works - surface: 15 ha - quay length: 600 m - quay capacity: 4 T/m² to 20 T/m² - draught: - 8m LAT Vlotdok - site prepared for berthing & refueling - length: 800 m berthing places RENEWEABLE ENERGY SITES assembly & storage area with direct access to open sea offices & storage assembly & storage area behind the locks 1/ MARITIME ACCESS
  • 9. +/- 1 hour sailing pilotage - for vessels with a LOA of 80 M or + - 24 hrs from Wandelaar pilot - tugs available GEOGRAPHICAL POSITION 1/ MARITIME ACCESS
  • 10. VHF 65 Traffic centre Wandelaar (VHF 09 Port Control) 0 2 5 0 51° 14' 0 56' 51°14,62'N Dem ey- sluis (VHF 10) 56' 2°55' 51° 14' 5,1m 4,2m 2 F.G.14m10M Vlotdok 8m 8m G 2°56,52'E 1,1m 8m m250 0 9,9m 0 5 9,9m 7,4m 2 Fl.G.5s 2 G 2°54,72'E 2°55' 2,6m Voorhaven m250 Gebaggerdediepten(zienota) Dredgeddepths(seenote) 51°13,37'N 6,2m Obscd OH 1:15000 (51°20') OOSTENDE Vism ijn 3,1m MRCC 5,1m Q.Y F F.G Tijdok F.R 6,5m 5,5m Port Control 5,4m Zeewezen- 2,1m dok Visserijdok Visserijsluis Fl(3)10s65m27M Vuurtorendok 3,7m 3,7m (VHF 20) Iso.4s38m4M Iso.4s48m4M 5,1mMontgomerydok 2,6m 5,7m Q.Y 5,1m Tide gauge R Mercator R 3,1m OH2 Q.R R 143° Q.G Q.Y G O6 O5 OH7 Wk Bell4s SS (Traffic) 8m dokken Radar Tr Surveillance Station Fl(3)G.10s (VHF14) 8m OH6 OH8 G Q.R Q.R G Q.R OH1 Mercatorsluis Fl.G.5s R APPROACH FROM OPEN SEA TO PORT alignment 143° indicated by leading lights new construction of 2 moles > access of vessels up to 200 m length > entrance = 130 m wide at -8.4 m TAW > broadens out 5 cables inside the entrance > to a turning basin with a diameter of 300m 1 - 2 3. 4. 2 3 4 1/ MARITIME ACCESS 1
  • 11. 270 m 130 m 300 m APPROACH FROM OPEN SEA TO PORT 1/ MARITIME ACCESS
  • 12. APPROACH FROM OPEN SEA TO PORT 1/ MARITIME ACCESSharbour wall heads
  • 13. WIDENING EASTERN SHORE - 2015 > the last phase of the new harbour entrance project > removing the current slope and dolphins on the eastern side of the approach to the turning basin > result: widening the channel by 50 m 50 m clearance to new shore removal of the dolphins 1/ MARITIME ACCESS
  • 14. 603 103 APPROACH FROM OPEN SEA TO PORT Neptune length overall (LOA) 60 m breadth 38 m maximum draft 3.9 m accommodation 60 p 1/ MARITIME ACCESS
  • 15. Pacfic Osprey length overall (LOA) 160.9 m breadth 49 m minimum draft 5.5 m maximum draft 6 m accommodation 111 p 49 APPROACH FROM OPEN SEA TO PORT 603 103 1/ MARITIME ACCESS
  • 16. INFRASTRUCTURE 1/ MARITIME ACCESSgravel reinforced seabed quaywall - 8 m gravel reinforced seabed spud spud
  • 20. INSTALLATION VESSELS RWE - Friedrich Ernestine
  • 22. port: Port of Aalborg (DK) project: Westermost Rough Offshore Windfarm (UK) INSTALLATION VESSELS Innovation - Geosea
  • 29. heavy lift capacity up to 20 T/m2 heavy load bearing quays dedicated pontoons
  • 30. 127 ha dedicated areas for wind farm logistics 15 Ha of terminal surfaces with heavy lift capacity up to 20 T/m2 heavy load bearing quays dedicated pontoons, mooring facilities for workboats, tugboats, crew vessels > > > > WHY REBO? 2/ LOGISTIC OPERATIONS
  • 31. foundations construction & loading of 6 Gravity Base Foundations (GBF) site ‘Halve Maan’ - unit weight: 2700 tons 2/ LOGISTIC OPERATIONS
  • 32. GBF - preparation for loading with Rambiz floating crane foundations 2/ LOGISTIC OPERATIONS
  • 33. GBF - move on SPMT foundations 2/ LOGISTIC OPERATIONS
  • 34. GBF - lift-of foundations 2/ LOGISTIC OPERATIONS
  • 35. GBF - move backwards foundations 2/ LOGISTIC OPERATIONS
  • 36. GBF - half submerged (weight reduction) foundations 2/ LOGISTIC OPERATIONS
  • 37. storage for jackets on pontoons foundations 2/ LOGISTIC OPERATIONS
  • 38. prepiles - Flinter Rose unloading ARRIVAL & STORAGE OF MAIN PARTS 2/ LOGISTIC OPERATIONS
  • 39. 2/ LOGISTIC OPERATIONSprepiles - storage on quayside ARRIVAL & STORAGE OF MAIN PARTS
  • 40. arrival of Sarens 1250T shore crane - arrival of Intonation 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 41. arrival of Sarens 1250 T shore crane - unloading of ship 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 42. nacelles, 4 hubs, 8 tower sections - pontoon manoeuvering pontoon manoeuvering 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS harbour tug Ensor in assistance pontoon moored at quay
  • 43. blades arrival - by road (night transport only) (63.5 m long) truck turning in to harbour area 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 44. blades arrival - by road (night transport only) (63.5 m long) back of the truck 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 45. blades arrive by ship - ship moored 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 46. blades arrive by ship - unloading blades 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 47. blades shipped by ferry - transport waiting 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 48. blades shipped by ferry - entering ferry ARRIVAL & STORAGE OF MAIN PARTS 2/ LOGISTIC OPERATIONS
  • 49. arrival & unloading of Alstom haliade (420 T) arrival on pontoon square onto quay ARRIVAL & STORAGE OF MAIN PARTS 2/ LOGISTIC OPERATIONS
  • 50. arrival & unloading of Alstom haliade (420 T) moved by SPMT on quayside 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 51. arrival & unloading of Alstom haliade (420 T) off it comes ARRIVAL & STORAGE OF MAIN PARTS 2/ LOGISTIC OPERATIONS
  • 52. arrival & unloading of Alstom haliade (420 T) ready positioned 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 53. cable Northwind - Jan De Nul 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 54. cable Northwind - Jan De Nul 2/ LOGISTIC OPERATIONS ARRIVAL & STORAGE OF MAIN PARTS
  • 55. presenting blade to nacelle 2/ LOGISTIC OPERATIONS Alstom turbine & BLADES ‘in bunny’
  • 56. ready for assembly 2/ LOGISTIC OPERATIONS Alstom turbine & BLADES ‘in bunny’
  • 57. almost there 2/ LOGISTIC OPERATIONS Alstom turbine & BLADES ‘in bunny’
  • 58. proud of achievement 2/ LOGISTIC OPERATIONS Alstom turbine & BLADES ‘in bunny’
  • 59. Neptune & Goliath in the port 2/ LOGISTIC OPERATIONS LOADING OF PLATFORMS
  • 60. Neptune & Bold Tern in the port 2/ LOGISTIC OPERATIONS LOADING OF PLATFORMS
  • 61. hub with blades on Neptune 2/ LOGISTIC OPERATIONS LOADING OF PLATFORMS
  • 62. positioning in between spuds & towers 2/ LOGISTIC OPERATIONS LOADING OF PLATFORMS
  • 63. Haliade 150 loaded on Bold Tern in floating position 2/ LOGISTIC OPERATIONS LOADING OF PLATFORMS
  • 64. Haliade 150 loaded on Bold Tern in floating position 2/ LOGISTIC OPERATIONS LOADING OF PLATFORMS Alstom
  • 65. ready to go to sea 2/ LOGISTIC OPERATIONS SAILING OUT OF LOADED PLATFORM
  • 66. passing harbour walls heads 2/ LOGISTIC OPERATIONS SAILING OUT OF LOADED PLATFORM
  • 67. Bolf Tern sailing out with Haliade 150 2/ LOGISTIC OPERATIONS SAILING OUT OF LOADED PLATFORM
  • 68. © C-Power N.V., fotograaf Tom D’Haenens Deme platforms at work 2/ LOGISTIC OPERATIONS INSTALLATION AT SEA
  • 69. Bold Tern at work 2/ LOGISTIC OPERATIONS INSTALLATION AT SEA © Alstom
  • 70. office, warehouse & sanitary accomodation on site technical support & service companies in immediate vicinity 3 telescopic crane companies within 1 km (< 400T, < 130 m) Falck training center on site
  • 71. 3/ WIND ENERGY CLUSTER SITE OVERVIEW
  • 72. along the quay MHI Vestas - Alstom - Parkwind - Geosea 3/ WIND ENERGY CLUSTER NEW & RENOVATED BUILDINGS
  • 73. 3/ WIND ENERGY CLUSTERwith direct access to the quay NEW & RENOVATED BUILDINGS Falck – Cofely Senvion – OWA - Technum - Flidar - Ecoast
  • 74. 3/ WIND ENERGY CLUSTERheli port Quay INFRASTRUCTURE - O&M
  • 75. 3 pontoons and 1 fixed crane for service vessels 3/ WIND ENERGY CLUSTER Quay INFRASTRUCTURE - O&M
  • 76. 3 pontoons and 1 fixed crane for service vessels 3/ WIND ENERGY CLUSTER Quay INFRASTRUCTURE - O&M
  • 77. 3000 movements a year 3/ WIND ENERGY CLUSTER SERVICE VESSELS - O&M
  • 78. online ‘Ensor’ booking system 3/ WIND ENERGY CLUSTER SERVICE VESSELS - PONTOONS
  • 79. MRCC: Maritime Rescue & Coordination Centre 3/ WIND ENERGY CLUSTER PRIORITY FOR OFFSHORE WIND VESSELS
  • 80. MRCC: Maritime Rescue & Coordination Centre 3/ WIND ENERGY CLUSTER PRIORITY FOR OFFSHORE WIND VESSELS
  • 81. 4/ TO SUMMARIZE OSTEND, HOMEBASE FOR ...
  • 83. GENERAL PORT OF OOSTENDE Slijkensesteenweg 2 BE 8400 Oostende T +32 59 34 07 11 F + 32 59 34 07 10 www.portofoostende.be info@portofoostende.be REBO Slijkensesteenweg 2 BE 8400 Oostende T +32 59 34 07 11 www.reboostende.be COMMERCIAL SERVICES Jan Allaert Commercial Manager jan.allaert@portofoostende.be HARBOUR SERVICES Mario Calbert Harbour Master mario.calbert@portofoostende.be Emmanuël Timmermans business development manager e.timmermans@reboostende.be CONTACT