The document describes the maritime access and logistics operations at the REBO terminal in the Port of Ostend, Belgium. It highlights the port's outstanding geographical location with excellent and immediate access to open sea and no locks. It provides details on the maritime infrastructure including quay walls that can accommodate vessels up to 200 meters, dredged depths of up to 8 meters, and ro-ro pontoons. The document also summarizes the logistic operations that have been conducted at the terminal including loading of foundations, arrival and storage of turbine components, and loading of offshore wind installation vessels. It notes the heavy lift capacity and dedicated areas for wind farm logistics.
3. WHY PORT OF OOSTENDE?
1/ MARITIME ACCESS
outstanding geographical location
excellent & immediate access to open sea
no locks
priority to offshore wind vessels
127 ha available in the port of Oostende for renewable energy activities
quays with a capacity able to handle from 4T/m2
to 20 T/m2
15 Ha of terminal surfaces (with heavy lift capacity) and with capacity for extension
>
>
>
>
>
>
6. WHY PORT OF OOSTENDE?
MultitechCMI
Falck
Fabricom
Multitech
grindbed
new
H
20T/m²
Alstom
Parkwind
Senvion
GeoSea
ReboB
Flansea
C-Power
VISSERIJDOK
ZEEWEZENDOK
HALVE
M
AAN
HAVENGEUL
ary
lex
Vestas
OOSTENDE
ZEEBRUGGE
ZONES RESERVED
FOR WIND FARMS
29 km
Thorntonbank
Blighbank
Lodewijkbank
NORTHER: 350 MW
TOTAL: 2 120 MW
C-POWER: 325 MW
RENTEL: 288 - 312 MW
NORTHWIND: 216 MW
SEASTAR: 246 - 432 MW
BELWIND: 330 MW
449 -
490 MW
MERMAID
NORTHWESTERN II
72 x
41-62 x
24 x
36-78 x
49-73 x
20 x
55 x
30 x
NORTH SEA
connection to Oostende
connection to Zeebrugge
future Stevin connection
operational ongoing in preparation
1/ MARITIME ACCESS
WHY PORT OF OOSTENDE?
29 KM
7. WHY REBO?
zone km from
coast
WIND FARM STATUS TURBINE TYPE # TOTAL MW SHARE HOLDERS
1 22 Norther in preparation not know yet 350 MW Eneco + Elicio (ex. Electrawinds) (PMV)
2 29 C-Power operational Senvion 5 MW 6 30 MW EDF - Socofé - Nuhma - Marguerite fund - Deme
operational Senvion 6.15 MW 48 295.2 MW
3 Rentel in preparation not know yet 288 - 312 MW Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port -
Elicio (ex. Electrawinds) (PMV) )
4 43 Northwind ongoing Vestas 3 MW 72 216 MW Parkwind (Colruyt - PMV - Korys) - Sumitomo - Aspiravi - WE Power
5 Seastar in preparation not know yet 246 - 432 MW Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port -
Elicio (ex. Electrawinds) (PMV) )
6 55 Belwind I operational Vestas 3 MW 55 165 MW Parkwind (Colruyt - PMV - Korys) - Sumitomo
ongoing Alstom Haliade 6 MW 1 6 MW Alstom Wind (100%)
Belwind II 2015 not know yet 165 MW Parkwind (Colruyt - PMV - Korys) - Sumitomo
7 Northwestern II in preparation not know yet
449 - 490 MW
8 Mermaid in preparation not know yet Otary (Aspiravi - P@S - Deme - SRIW - Socofé - Nuhma - Rent a Port -
Elicio (ex. Electrawinds) (PMV) ) - Electrabel
total 2 120 MW
15%
15%
15%
15%
40%
8. office
pontoon
grindbed
H
20T/m²
B
C-Power
crew changes
& refueling
VLOTDOK
VISSERIJDOK
ZEEWEZENDOK
HALVE
M
AAN
HAVENGEUL
HOUTDOK
ZWAAIDOK
geoXYZ
marine services
OOSTENDE
ZEEBRUGGE
29 km
Thorntonbank
Blighbank
Lodewijkbank
NORTHER: 350 MW
TOTAL: 2 120 MW
C-POWER: 325 MW
RENTEL: 288 - 312 MW
NORTHWIND: 216 MW
72 x
41-62 x
24 x
36-78 x
49-73 x
20 x
55 x
30 x
NORTH SEA
Multitech
MultitechCMI
Falck
Fabricom
Energynew
Alstom
Parkwind
GeoSea
Rebo terminal
sanitarycomplex
Vestas
Senvion
Halve maan
- site prepared for offshore
wind works
- surface: 5 ha
- quay length: 100 m
- quay capacity: 10 T/m²
- draught: -8 LAT
Zeewezendok
- site prepared for offshore
wind works
- surface: 15 ha
- quay length: 600 m
- quay capacity:
4 T/m² to 20 T/m²
- draught: - 8m LAT
Vlotdok
- site prepared for
berthing & refueling
- length: 800 m
berthing places
RENEWEABLE ENERGY SITES
assembly & storage area
with direct access to open
sea
offices & storage
assembly & storage
area behind the locks
1/ MARITIME ACCESS
9. +/- 1 hour sailing
pilotage
- for vessels with a LOA of 80 M or +
- 24 hrs from Wandelaar pilot
- tugs available
GEOGRAPHICAL POSITION
1/ MARITIME ACCESS
10. VHF 65
Traffic centre
Wandelaar
(VHF 09
Port
Control)
0
2
5
0
51°
14'
0
56'
51°14,62'N
Dem
ey-
sluis
(VHF
10)
56'
2°55'
51°
14'
5,1m
4,2m
2
F.G.14m10M
Vlotdok
8m
8m
G
2°56,52'E
1,1m
8m
m250
0
9,9m
0
5
9,9m
7,4m
2
Fl.G.5s
2
G
2°54,72'E
2°55'
2,6m
Voorhaven
m250
Gebaggerdediepten(zienota)
Dredgeddepths(seenote)
51°13,37'N
6,2m
Obscd
OH
1:15000 (51°20')
OOSTENDE
Vism
ijn
3,1m
MRCC
5,1m
Q.Y
F
F.G
Tijdok
F.R
6,5m
5,5m
Port Control
5,4m
Zeewezen-
2,1m
dok
Visserijdok
Visserijsluis
Fl(3)10s65m27M
Vuurtorendok
3,7m
3,7m
(VHF 20)
Iso.4s38m4M
Iso.4s48m4M
5,1mMontgomerydok
2,6m
5,7m
Q.Y
5,1m
Tide gauge
R
Mercator
R
3,1m
OH2
Q.R
R
143°
Q.G
Q.Y
G
O6
O5
OH7
Wk
Bell4s
SS (Traffic)
8m
dokken
Radar Tr Surveillance Station
Fl(3)G.10s
(VHF14)
8m
OH6
OH8
G
Q.R
Q.R
G
Q.R
OH1
Mercatorsluis
Fl.G.5s
R
APPROACH FROM OPEN SEA TO PORT
alignment 143° indicated
by leading lights
new construction of 2 moles
> access of vessels up to
200 m length
> entrance = 130 m wide at -8.4 m TAW
> broadens out 5 cables
inside the entrance
> to a turning basin with
a diameter of 300m
1 - 2
3.
4.
2
3
4
1/ MARITIME ACCESS
1
11. 270 m
130 m
300 m
APPROACH FROM OPEN SEA TO PORT
1/ MARITIME ACCESS
13. WIDENING EASTERN SHORE - 2015
> the last phase of the new harbour entrance project
> removing the current slope and dolphins on the
eastern side of the approach to the turning basin
> result: widening the channel by 50 m
50 m clearance
to new shore
removal of the
dolphins
1/ MARITIME ACCESS
14. 603
103
APPROACH FROM OPEN SEA TO PORT
Neptune
length overall (LOA) 60 m
breadth 38 m
maximum draft 3.9 m
accommodation 60 p
1/ MARITIME ACCESS
15. Pacfic Osprey
length overall (LOA) 160.9 m
breadth 49 m
minimum draft 5.5 m
maximum draft 6 m
accommodation 111 p
49
APPROACH FROM OPEN SEA TO PORT
603
103
1/ MARITIME ACCESS
29. heavy lift capacity up to 20 T/m2
heavy load bearing quays
dedicated pontoons
30. 127 ha dedicated areas for wind farm logistics
15 Ha of terminal surfaces with heavy lift capacity up to 20 T/m2
heavy load bearing quays
dedicated pontoons, mooring facilities for workboats, tugboats, crew vessels
>
>
>
>
WHY REBO?
2/ LOGISTIC OPERATIONS
31. foundations
construction & loading of 6 Gravity Base Foundations (GBF)
site ‘Halve Maan’ - unit weight: 2700 tons
2/ LOGISTIC OPERATIONS
32. GBF - preparation for loading with Rambiz floating crane
foundations
2/ LOGISTIC OPERATIONS
33. GBF - move on SPMT
foundations
2/ LOGISTIC OPERATIONS
40. arrival of Sarens 1250T shore crane - arrival of Intonation 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
41. arrival of Sarens 1250 T shore crane - unloading of ship 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
42. nacelles, 4 hubs, 8 tower sections - pontoon manoeuvering
pontoon manoeuvering
2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
harbour tug Ensor in assistance
pontoon moored at quay
43. blades arrival - by road (night transport only) (63.5 m long)
truck turning in to harbour area
2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
44. blades arrival - by road (night transport only) (63.5 m long)
back of the truck
2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
45. blades arrive by ship - ship moored 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
46. blades arrive by ship - unloading blades 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
47. blades shipped by ferry - transport waiting 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
48. blades shipped by ferry - entering ferry
ARRIVAL & STORAGE OF MAIN PARTS
2/ LOGISTIC OPERATIONS
49. arrival & unloading of Alstom haliade (420 T)
arrival on pontoon square onto quay
ARRIVAL & STORAGE OF MAIN PARTS
2/ LOGISTIC OPERATIONS
50. arrival & unloading of Alstom haliade (420 T)
moved by SPMT on quayside
2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
51. arrival & unloading of Alstom haliade (420 T)
off it comes
ARRIVAL & STORAGE OF MAIN PARTS
2/ LOGISTIC OPERATIONS
52. arrival & unloading of Alstom haliade (420 T)
ready positioned
2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
53. cable Northwind - Jan De Nul 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
54. cable Northwind - Jan De Nul 2/ LOGISTIC OPERATIONS
ARRIVAL & STORAGE OF MAIN PARTS
70. office, warehouse & sanitary accomodation on site
technical support & service companies in immediate vicinity
3 telescopic crane companies within 1 km (< 400T, < 130 m)
Falck training center on site
83. GENERAL
PORT OF OOSTENDE
Slijkensesteenweg 2
BE 8400 Oostende
T +32 59 34 07 11
F + 32 59 34 07 10
www.portofoostende.be
info@portofoostende.be
REBO
Slijkensesteenweg 2
BE 8400 Oostende
T +32 59 34 07 11
www.reboostende.be
COMMERCIAL SERVICES
Jan Allaert
Commercial Manager
jan.allaert@portofoostende.be
HARBOUR SERVICES
Mario Calbert
Harbour Master
mario.calbert@portofoostende.be
Emmanuël Timmermans
business development manager
e.timmermans@reboostende.be
CONTACT