SlideShare a Scribd company logo
1 of 35
Value of an Integrated
Planning Approach for
Euclid, Ohio
EPA Policy Evolution since 2011
“A comprehensive and integrated
planning approach to a municipal
government’s CWA waste- and
storm-water obligations offers the
greatest opportunity for identifying
cost-effective and protective
solutions and implementing the
most important projects first.”
“The OW and the OECA are
committed to working with
interested communities and water
resource managers to successfully
incorporate green infrastructure
into NPDES permits, as well as
remedies designed to address
non-compliance with the CWA, to
better manage both stormwater
runoff and sewer overflows.”
Attachment A
Recent (2011) Examples of
Enforcement Actions with Green
Infrastructure
 Cincinnati, OH
 Cleveland, OH
 Kansas City, MO
 Louisville, KY
EPA’s Integrated Planning Framework can
refine the program, saving $ and extending
the compliance timeline
•MBR Upgrades
•Headworks
Upgrade
Ongoing
System
Improvements
•Cost Savings
through
regionalization
•Optimize CSO /
SSO Controls
•Add Green
Infrastructure
Integrated
Planning
Regionalization
Affordability
•Optimized
Storage
•Pro-Business GI
and Economic
Development
projects
Refined
Program
Pause
Point Extend Compliance Schedule
Address Affordability Concerns
Initial Review of Euclid Consent Decree
and Wet Weather Plan
 Euclid’s Control Levels are high and are not connected to
water quality standards
 Program Affordability is not aligned with best practices to
protect Euclid ratepayers
 Significant Schedule and Future Cost Risks of program
 Ensuring Regional Buy-in with rising compliance costs
 Ruling out Green Infrastructure (GI) is inconsistent with National
practice and EPA Policy
Euclid’s Control Levels are high and
cost/benefits not considered
 CSO Activation limit of 4 per year arbitrary in context of water
quality benefits
 Exceeds CSO Policy which allows 6 or more if benefits from fewer
activations cannot be cost justified
 Unclear if Euclid using Presumptive or Demonstrative Approach –
this could impact potential alternatives and costs
 No clear linkage of program investments to water quality benefits
 Lake Erie TMDL evolving and would likely change plan emphasis
and costs
 EPA Region 5 imposing “new” interpretation of CSO Policy
Program Affordability is not
aligned with best practices to
protect Euclid ratepayers
 Cost escalation changes affordability
of the CD driven plans
 Schedules and cash flow impacts
need to be more closely evaluated
 Plant work, CSO work, SSO work being
forced to overlapping timelines
 Huge cash flow needs in 2015-2018
creates unbalanced program
 May cause unanticipated rate stress
and loss of customer support
 At a minimum, Euclid needs more
time to comply
Cost Escalation - total program cost risk
0
20
40
60
80
100
120
140
160
180
Sep-11 Mar-12 Oct-12 Actual
?
Consent Decree Issues and
Opportunities: Penalty Avoidance
 Consent decree heavy on
penalty provisions for small
city
 More than NEORSD and
other large cities in some
cases
 Euclid should be careful
with penalty liability if
dispute resolution needed
to get CD plan and
schedule changes
 STIP risks can be reduced
City STIPS – Maximum Daily
Penalty
Euclid, Ohio $4,000/day after 60 days
Chicago MWRD $5,000/day after 60 days
St. Louis $4,000/day after 60 days
Cleveland (NEORSD) $2,000/day after 30 days
DeKalb $3,000/day after 120 days
Honolulu $2,000/day after 60 days
Kansas City $4,000/day after 60 days
HRSD $3,000/day after 60 days
Nashville $5,000/day after 6 months
Louisville $5,000/day after 120 days
Baton Rouge $10,000/day after 60 days
EPA now assessing STIPS in some
Regions
Rationale for considering an integrated
planning and program refinement phase
 Save Money
 Affordability picture has changed due to CSO/SSO and Separate
stormwater (MS4) issues need to be considered
 CD requires overlapping CSO/SSO and Plant work
 There is precedent - Other cities reopening CD negotiations based on
excessive costs and integrated planning opportunities
 Integrated plan can assess schedule impacts and balanced approach
 Adapting the program to enable Greener Communities; currently green
is at the back end of schedule, which does not help Euclid achieve
community improvements or benefits soon enough
 Plan would address increasing public opposition to program costs and
clarify program benefits
 Better program controls are necessary to enable more transparency in
terms of understanding of projects / budgets / value / status
Examples of Integrated and Adaptive
Wet-Weather Plans
 Louisville, KY
 Spokane, WA
 Cincinnati, OH
 Columbus, OH
 Akron, OH
 Lancaster, PA
 Onondaga County, NY
Louisville, KY
 Negotiated option to do integrated planning in multi phased CD
 Allowed prioritization of competing CSO, SSO, and stormwater expenditures
over extended timeline ($800 million program)
 Provided mechanism for substituting green projects if equal or better than
grey projects identified resulting in significant green projects and stronger
public support for rate increases
 Has innovative incentives to maximize private green investments
 Has resolved technical issues with EPA Region 4 to “measure” green project
performance and compare to grey projects
Spokane, WA
 Integrated Clean Water Plan utilizing the USEPA’s
Integrated Planning Framework focused on the
City’s goal of achieving a cleaner Spokane River
faster
 Developed of a CSO Plan Amendment that re-sized
CSO tanks and saved the City $120 million
 Evaluated applicability and cost-effectiveness of
pollutant reduction approaches (in addition to
discharge reduction) including Green Infrastructure
 Collaboration with Spokane area stakeholders and
the Washington State Department of Ecology was
essential for integrated planning success
 Re-prioritized projects based on removal of
pollutants, meeting water quality requirements, and
on other objectives important to the residents of
Spokane including economic development and
aesthetics
“We spent a year re-evaluating
our work to reduce combined
sewer overflows and stormwater
runoff going to the Spokane
River, along with plans to
improve treatment at our
wastewater facility. We
identified a path forward that
would reduce the cost by about
$150 million and vastly improve
the health of the river.” - David
Condon, Mayor, Spokane, WA
Cincinnati, OH
 Metropolitan Sewer District of Greater Cincinnati (MSDGC) entered into CD
in August, 2010
 Multi-billion dollar program comprised of wet weather, capacity assurance,
and asset management improvements
 Negotiated the opportunity to conduct a 3-year study to develop and
evaluate a cost competitive alternative to the default CD solution (tunnel)
 Program incorporates integrated planning approaches to address
Stormwater and wastewater issues while yielding enhanced economic,
environmental, and social benefits for community
 CH2M HILL professionals provided technical expertise to support MSDGC
Office of the Director (OOD) in the development of a sustainable
watershed evaluation planning process (SWEPP) aligned
with the USEPA Integrated Planning Framework that was
officially adopted in June 2012
St Francis bioinfiltration basin early success project
completed by MSDGC in Lick Run watershed
Columbus, OH
 Proactively addressing their stormwater challenge as part of their SSO
mitigation
 Have pilot program to implement GI to provide water quality treatment of
stormwater runoff in their sanitary sewer service area
 This pilot program also includes private property rehabilitation of service
laterals, which are thought to be a significant source of I/I in the sanitary
sewer system
 Columbus owes the EPA a report with monitoring and modeling based
findings on effectiveness and published cost effectiveness by September,
2015
Lancaster, PA
Integrated Plan that
provides the following
benefits:
 Lower Life Cycle Cost
 Community Impacts
(Triple Bottom Line)
 CSO Volume Reductions
 Water Quality
(Pollutant Load Reduction)
 Flood Risk Reduction
“The purpose of this analysis is to demonstrate
how accounting for the multiple benefits of
green infrastructure can provide a more
complete assessment of infrastructure and
community investments” US EPA
“CH2M HILL has been a tremendous partner throughout the
development and implementation of our regulatory compliance
program for an update to our long term control plan and MS4
programs and helping us meet our goals for the TMDL. We have
great local resources from the firm and we have also benefitted
from their global reach and experience.”
Charlotte Katzenmoyer, Director of Public Works,
City of Lancaster, PA
Onondaga County, NY
 Consent Judgment was agreed to clean up “America’s most
polluted lake” – but stakeholders were not satisfied with the
stipulated approach
 Prolonged public opposition increased cost and delayed
implementation
 New County Executive leadership convinced Judge to consider
Greener, Balanced approach; given 1 year pause to develop
new control plan
 Revised program moves Green Infrastructure to front of program,
implements a smarter gray program, Extended compliance
schedule by 5 years
 Saving over $20M+ in capital cost while reducing life cycle costs
even more; improves other community assets immediately
(roads, parking lots, roofing systems, vacant lots, parks, schools)
 Community sees the benefits to the lake, tributaries, and public
assets; able to appreciate why their sewer rates have increased
Euclid, Ohio
Next: Two - Step Revision Strategy
1. Develop consensus to proceed with a review and
update process
Work with City staff and legal counsel to identify benefits of
a refinement phase and integrated plan
2. Develop a road map
 Build technical, regulatory, and financial case to support
plan revision
 Build team (internal staff and external consultants)
 Develop strategy to negotiate and implement a revised
consent order and wet-weather plan
Integrated Plan Roadmap
 Affordability analysis / FCA requires more sophistication
 Review current investments being implemented at this time, specifically
those at the treatment facility/equalization storage
 Identify the gap remaining to satisfy all existing and imminent regulatory
requirements (point and non-point sources, MS4, TMDL, and others)
 Integrate GI solutions with existing/proposed gray infrastructure, as well as
identify where proposed gray infrastructure may be replaced with
equivalent green options
 Better utilization of planning tools such as geographic information systems
(GIS) and stormwater management model (SWMM)
 Evaluate CSO/SSO capture assumptions based on national experience
 Utilize modeling tools and the monitoring data effectively to support revised
program and build consensus with regulators and stakeholders
 Prioritize community opportunities/impacts
Questions ?
Onondaga County, NY
Original Consent Order planned to build four (4)
Regional Treatment Facilities (RTFs)
in neighborhoods and business districts
(1 of the 4 was built costing $79.1 million;
significantly over budget)
RTFs required large
conveyance
pipelines with
significant
community disruption
(over budget and
behind schedule)
Initial Projects Opposed by
Community Residents and Businesses
Onondaga County, NY ~ Balanced Approach
Syracuse becomes
one of first ten EPA
Green Cities
County Executive Mahoney Announces “Project 50!”
“Onondaga County will construct fifty distinct green
infrastructure projects to return rain water and snow
melt to the ground instead of our sewer system.”
Joanne M. Mahoney, State of the County Address,
March 1, 2011
Onondaga County, NY
Over 165 projects completed
100,000,000 gallons of runoff reduction
Onondaga County, NY
Benefits to County Facilities
OnCenter Convention Center
66,000 Square Foot Green Roof
New 30 year roof installed under CSO program;
study underway quantifying heating and cooling
benefits in addition to runoff reduction
Before
Onondaga County, NY
Green Streets Installed Adjacent To No-Standing Lanes
Add Aesthetic Value Without Impacting Traffic or Pedestrians
BEFORE: Stormwater enters catch
basins and is directly connected to
sewer
PROPOSED (Photo Simulation):
Stormwater is diverted to Green
Streets and only overflows to
sewer when necessary
AFTER (Actual Photo): Project
has been adopted* by local
business to pick up litter, weed,
and mulch (provided by County)
Adopt-A-GI Project program was created based on common Adopt-A-Highway format
Onondaga County, NY
Benefits to County Facilities
OnCenter Convention Center
290 Parking Space Surface Lot
(porous asphalt perimeter with subsurface
storage and infiltration system)
Lot had many potholes and significant cracking; resurfacing
paid for through CSO program. Improved safety through
smarter layout, LED lighting, as well as electric vehicle
charging station (separate funding source)
Before
Onondaga County, NY
Benefits to County Facilities
Surface Parking Lot next to
Everson Art Museum
Previously a puddle-ridden gravel lot, new
standard asphalt pavement drains to Bio-
retention designed to store, slowly infiltrate,
and provide evapotranspiration of runoff
due to poorly draining soils; large storm
events overflow to sewer
Vegetated
Bio-retention
System, including
90 new Trees
Before
Onondaga County, NY
Benefits to City Streets
Award
Winning
Water Street
Green
Gateway
Project
Completely new City Street (City paid for asphalt mill and
paving, County program paid for all other work)
Before
Onondaga County, NY
Benefits to City Streets – Typical Residential
Stone
Trench
New City Street
Storage and Infiltration Trench no longer visible
Onondaga County, NY
Benefits to City Streets
Otisco Street
Residential Green Street
with Bioswale
• New Curbs, asphalt,
and sidewalks
• Traffic Calming
(Bump Outs)
• Added green space
Onondaga County, NY
Benefits to City Commercial Districts
Westcott Street Commercial District
• New Curbs, Sidewalks, and Asphalt
• Improved Pedestrian Experience
Before
Onondaga County, NY
Benefits to City Streets
West Onondaga Street
Commercial District
Before
Onondaga County, NY
Benefits to City Streets
West Onondaga Street
Commercial District
• New Curbs, Sidewalk, Asphalt
• Improved Traffic Pattern
• Added Green Spaces Before
Onondaga County, NY
Addressing the Vacant Lot Challenge
701 Oswego
Street Vacant
Lot Project
The CSO Abatement Program has utilized
multiple vacant lots in the City to manage
stormwater runoff while investing in new curbs,
sidewalks, and putting these properties to
beneficial use as nurseries and gardens
Before
Onondaga County, NY
Utilizing Park Space
Leavenworth Park Bio-infiltration System
Project included new roadside granite curbs and
carriage walk; plantings compliment park setting
(County program has also resurfaced basketball courts,
parking lots, and supported other park amenities)
Spring
Summer Bloom
Onondaga County Green Improvement Fund
A Public Private Partnership Grant Program
Incentivizing GI on Private Property
 130 Applications Submitted (Mar 2014)
 59 Projects Completed
(27 in 2013)
 25 million gallons of
Stormwater Runoff captured
for $6.1 million
 21.5 million more gallons contracted
 Average rate = $0.25/gal for program
The County also has a program that has distributed over 1,000 free
Rain Barrels, and has planted over 2,500 street trees (8,500 planned)
Monroe Building
Green Roof

More Related Content

What's hot

2. Integrated Catchment Management - Vision
2. Integrated Catchment Management - Vision2. Integrated Catchment Management - Vision
2. Integrated Catchment Management - Vision
Environmental Protection Agency, Ireland
 
National Climate Assessment presentation at Hawaii Town Hall
National Climate Assessment presentation at Hawaii Town HallNational Climate Assessment presentation at Hawaii Town Hall
National Climate Assessment presentation at Hawaii Town Hall
Zena Grecni
 
21. Integrated Catchment Management - Recap
21. Integrated Catchment Management  - Recap21. Integrated Catchment Management  - Recap
21. Integrated Catchment Management - Recap
Environmental Protection Agency, Ireland
 
29. Integrated Catchment Management - Exercises Part 2
29. Integrated Catchment Management - Exercises Part 229. Integrated Catchment Management - Exercises Part 2
29. Integrated Catchment Management - Exercises Part 2
Environmental Protection Agency, Ireland
 
ACJ presentation
ACJ presentationACJ presentation
ACJ presentation
retzcanter
 

What's hot (20)

Steve Nadeau, Honigman, Sediment Cleanup and Great Lakes Legacy Act, Midwest ...
Steve Nadeau, Honigman, Sediment Cleanup and Great Lakes Legacy Act, Midwest ...Steve Nadeau, Honigman, Sediment Cleanup and Great Lakes Legacy Act, Midwest ...
Steve Nadeau, Honigman, Sediment Cleanup and Great Lakes Legacy Act, Midwest ...
 
2. Integrated Catchment Management - Vision
2. Integrated Catchment Management - Vision2. Integrated Catchment Management - Vision
2. Integrated Catchment Management - Vision
 
Implementing the PR&G at usda gollehon
Implementing the PR&G at usda   gollehonImplementing the PR&G at usda   gollehon
Implementing the PR&G at usda gollehon
 
3. Outcome of Characterisation to date - Jenny Deakin
3. Outcome of Characterisation to date - Jenny Deakin3. Outcome of Characterisation to date - Jenny Deakin
3. Outcome of Characterisation to date - Jenny Deakin
 
Lessons learned from green infrastructure project experience in developing co...
Lessons learned from green infrastructure project experience in developing co...Lessons learned from green infrastructure project experience in developing co...
Lessons learned from green infrastructure project experience in developing co...
 
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
 
Watershedplanwebinarv2
Watershedplanwebinarv2Watershedplanwebinarv2
Watershedplanwebinarv2
 
Olivia Lucas, Faegre Baker Daniels, John Iwanski, Trinity Consultants, Crash ...
Olivia Lucas, Faegre Baker Daniels, John Iwanski, Trinity Consultants, Crash ...Olivia Lucas, Faegre Baker Daniels, John Iwanski, Trinity Consultants, Crash ...
Olivia Lucas, Faegre Baker Daniels, John Iwanski, Trinity Consultants, Crash ...
 
National Climate Assessment presentation at Hawaii Town Hall
National Climate Assessment presentation at Hawaii Town HallNational Climate Assessment presentation at Hawaii Town Hall
National Climate Assessment presentation at Hawaii Town Hall
 
21. Integrated Catchment Management - Recap
21. Integrated Catchment Management  - Recap21. Integrated Catchment Management  - Recap
21. Integrated Catchment Management - Recap
 
29. Integrated Catchment Management - Exercises Part 2
29. Integrated Catchment Management - Exercises Part 229. Integrated Catchment Management - Exercises Part 2
29. Integrated Catchment Management - Exercises Part 2
 
Cc natural capital accounting wp_aw2_digital
Cc natural capital accounting wp_aw2_digitalCc natural capital accounting wp_aw2_digital
Cc natural capital accounting wp_aw2_digital
 
OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT OWLS 2013: ATLANTA SPOTLIGHT
OWLS 2013: ATLANTA SPOTLIGHT
 
Innovation for Local Watershed Management and Implementation
Innovation for Local Watershed Management and ImplementationInnovation for Local Watershed Management and Implementation
Innovation for Local Watershed Management and Implementation
 
1. Opening Remarks - Andy Fanning
1. Opening Remarks - Andy Fanning1. Opening Remarks - Andy Fanning
1. Opening Remarks - Andy Fanning
 
Climate Smart Resiliency Planning tool
Climate Smart Resiliency Planning toolClimate Smart Resiliency Planning tool
Climate Smart Resiliency Planning tool
 
Utah DEQ State of the Environment 2015
Utah DEQ State of the Environment 2015Utah DEQ State of the Environment 2015
Utah DEQ State of the Environment 2015
 
LaMP: Great Lakes Program Reporting
LaMP: Great Lakes Program ReportingLaMP: Great Lakes Program Reporting
LaMP: Great Lakes Program Reporting
 
Mehranian Solution to Pollution
Mehranian Solution to Pollution Mehranian Solution to Pollution
Mehranian Solution to Pollution
 
ACJ presentation
ACJ presentationACJ presentation
ACJ presentation
 

Similar to Euclid integrated planning opportunity rev12

2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web
Jennifer Dingman, PhD
 
2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation
jnett
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
Matt Meaker
 
CH2M-Smart-Cities-Social-Benefits-Danko-May2016
CH2M-Smart-Cities-Social-Benefits-Danko-May2016CH2M-Smart-Cities-Social-Benefits-Danko-May2016
CH2M-Smart-Cities-Social-Benefits-Danko-May2016
Joseph Danko
 
Choose clean water 060414
Choose clean water 060414Choose clean water 060414
Choose clean water 060414
Clean Water
 
Top-to-BottomSustainabilityAnalysis
Top-to-BottomSustainabilityAnalysisTop-to-BottomSustainabilityAnalysis
Top-to-BottomSustainabilityAnalysis
dwortman
 

Similar to Euclid integrated planning opportunity rev12 (20)

CH2M Hill: Euclid stormwater Integrated Planing
CH2M Hill: Euclid stormwater Integrated PlaningCH2M Hill: Euclid stormwater Integrated Planing
CH2M Hill: Euclid stormwater Integrated Planing
 
The State of Sustainability in Southern California
The State of Sustainability in Southern CaliforniaThe State of Sustainability in Southern California
The State of Sustainability in Southern California
 
Newcastle City Council - 14 Feb 2014 - Local perspectives on bluegreencities
Newcastle City Council - 14 Feb 2014 - Local perspectives on bluegreencitiesNewcastle City Council - 14 Feb 2014 - Local perspectives on bluegreencities
Newcastle City Council - 14 Feb 2014 - Local perspectives on bluegreencities
 
Creating Green Infrastructure
Creating Green Infrastructure  Creating Green Infrastructure
Creating Green Infrastructure
 
2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web
 
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
 
Integrated municipal stormwater and wastewater planning approach framework
Integrated municipal stormwater and wastewater planning approach frameworkIntegrated municipal stormwater and wastewater planning approach framework
Integrated municipal stormwater and wastewater planning approach framework
 
2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation2-6-06 TPWA Short Course Presentation
2-6-06 TPWA Short Course Presentation
 
P3 presentation - CCA.PPTX
P3 presentation - CCA.PPTXP3 presentation - CCA.PPTX
P3 presentation - CCA.PPTX
 
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
 
Climate Innovation Opportunity: Investing in Local Governments to Accelerate ...
Climate Innovation Opportunity: Investing in Local Governments to Accelerate ...Climate Innovation Opportunity: Investing in Local Governments to Accelerate ...
Climate Innovation Opportunity: Investing in Local Governments to Accelerate ...
 
The Toolbox for Clean Water Construction
The Toolbox for Clean Water ConstructionThe Toolbox for Clean Water Construction
The Toolbox for Clean Water Construction
 
CH2M-Smart-Cities-Social-Benefits-Danko-May2016
CH2M-Smart-Cities-Social-Benefits-Danko-May2016CH2M-Smart-Cities-Social-Benefits-Danko-May2016
CH2M-Smart-Cities-Social-Benefits-Danko-May2016
 
Climate smart planning: Kingston Waterfront Flooding Task Force
Climate smart planning: Kingston Waterfront Flooding Task ForceClimate smart planning: Kingston Waterfront Flooding Task Force
Climate smart planning: Kingston Waterfront Flooding Task Force
 
Green Collar Workforce Development Slide Show
Green Collar Workforce Development Slide ShowGreen Collar Workforce Development Slide Show
Green Collar Workforce Development Slide Show
 
Philadelphia Water Department, Green City Clean Waters Program
Philadelphia Water Department, Green City Clean Waters ProgramPhiladelphia Water Department, Green City Clean Waters Program
Philadelphia Water Department, Green City Clean Waters Program
 
Choose clean water 060414
Choose clean water 060414Choose clean water 060414
Choose clean water 060414
 
Wilson The Water Energy Nexus
Wilson The Water Energy NexusWilson The Water Energy Nexus
Wilson The Water Energy Nexus
 
Top-to-BottomSustainabilityAnalysis
Top-to-BottomSustainabilityAnalysisTop-to-BottomSustainabilityAnalysis
Top-to-BottomSustainabilityAnalysis
 
Laois presentation1
Laois presentation1Laois presentation1
Laois presentation1
 

Recently uploaded

Recently uploaded (20)

KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
 

Euclid integrated planning opportunity rev12

  • 1. Value of an Integrated Planning Approach for Euclid, Ohio
  • 2. EPA Policy Evolution since 2011 “A comprehensive and integrated planning approach to a municipal government’s CWA waste- and storm-water obligations offers the greatest opportunity for identifying cost-effective and protective solutions and implementing the most important projects first.” “The OW and the OECA are committed to working with interested communities and water resource managers to successfully incorporate green infrastructure into NPDES permits, as well as remedies designed to address non-compliance with the CWA, to better manage both stormwater runoff and sewer overflows.” Attachment A Recent (2011) Examples of Enforcement Actions with Green Infrastructure  Cincinnati, OH  Cleveland, OH  Kansas City, MO  Louisville, KY
  • 3. EPA’s Integrated Planning Framework can refine the program, saving $ and extending the compliance timeline •MBR Upgrades •Headworks Upgrade Ongoing System Improvements •Cost Savings through regionalization •Optimize CSO / SSO Controls •Add Green Infrastructure Integrated Planning Regionalization Affordability •Optimized Storage •Pro-Business GI and Economic Development projects Refined Program Pause Point Extend Compliance Schedule Address Affordability Concerns
  • 4. Initial Review of Euclid Consent Decree and Wet Weather Plan  Euclid’s Control Levels are high and are not connected to water quality standards  Program Affordability is not aligned with best practices to protect Euclid ratepayers  Significant Schedule and Future Cost Risks of program  Ensuring Regional Buy-in with rising compliance costs  Ruling out Green Infrastructure (GI) is inconsistent with National practice and EPA Policy
  • 5. Euclid’s Control Levels are high and cost/benefits not considered  CSO Activation limit of 4 per year arbitrary in context of water quality benefits  Exceeds CSO Policy which allows 6 or more if benefits from fewer activations cannot be cost justified  Unclear if Euclid using Presumptive or Demonstrative Approach – this could impact potential alternatives and costs  No clear linkage of program investments to water quality benefits  Lake Erie TMDL evolving and would likely change plan emphasis and costs  EPA Region 5 imposing “new” interpretation of CSO Policy
  • 6. Program Affordability is not aligned with best practices to protect Euclid ratepayers  Cost escalation changes affordability of the CD driven plans  Schedules and cash flow impacts need to be more closely evaluated  Plant work, CSO work, SSO work being forced to overlapping timelines  Huge cash flow needs in 2015-2018 creates unbalanced program  May cause unanticipated rate stress and loss of customer support  At a minimum, Euclid needs more time to comply
  • 7. Cost Escalation - total program cost risk 0 20 40 60 80 100 120 140 160 180 Sep-11 Mar-12 Oct-12 Actual ?
  • 8. Consent Decree Issues and Opportunities: Penalty Avoidance  Consent decree heavy on penalty provisions for small city  More than NEORSD and other large cities in some cases  Euclid should be careful with penalty liability if dispute resolution needed to get CD plan and schedule changes  STIP risks can be reduced City STIPS – Maximum Daily Penalty Euclid, Ohio $4,000/day after 60 days Chicago MWRD $5,000/day after 60 days St. Louis $4,000/day after 60 days Cleveland (NEORSD) $2,000/day after 30 days DeKalb $3,000/day after 120 days Honolulu $2,000/day after 60 days Kansas City $4,000/day after 60 days HRSD $3,000/day after 60 days Nashville $5,000/day after 6 months Louisville $5,000/day after 120 days Baton Rouge $10,000/day after 60 days EPA now assessing STIPS in some Regions
  • 9. Rationale for considering an integrated planning and program refinement phase  Save Money  Affordability picture has changed due to CSO/SSO and Separate stormwater (MS4) issues need to be considered  CD requires overlapping CSO/SSO and Plant work  There is precedent - Other cities reopening CD negotiations based on excessive costs and integrated planning opportunities  Integrated plan can assess schedule impacts and balanced approach  Adapting the program to enable Greener Communities; currently green is at the back end of schedule, which does not help Euclid achieve community improvements or benefits soon enough  Plan would address increasing public opposition to program costs and clarify program benefits  Better program controls are necessary to enable more transparency in terms of understanding of projects / budgets / value / status
  • 10. Examples of Integrated and Adaptive Wet-Weather Plans  Louisville, KY  Spokane, WA  Cincinnati, OH  Columbus, OH  Akron, OH  Lancaster, PA  Onondaga County, NY
  • 11. Louisville, KY  Negotiated option to do integrated planning in multi phased CD  Allowed prioritization of competing CSO, SSO, and stormwater expenditures over extended timeline ($800 million program)  Provided mechanism for substituting green projects if equal or better than grey projects identified resulting in significant green projects and stronger public support for rate increases  Has innovative incentives to maximize private green investments  Has resolved technical issues with EPA Region 4 to “measure” green project performance and compare to grey projects
  • 12. Spokane, WA  Integrated Clean Water Plan utilizing the USEPA’s Integrated Planning Framework focused on the City’s goal of achieving a cleaner Spokane River faster  Developed of a CSO Plan Amendment that re-sized CSO tanks and saved the City $120 million  Evaluated applicability and cost-effectiveness of pollutant reduction approaches (in addition to discharge reduction) including Green Infrastructure  Collaboration with Spokane area stakeholders and the Washington State Department of Ecology was essential for integrated planning success  Re-prioritized projects based on removal of pollutants, meeting water quality requirements, and on other objectives important to the residents of Spokane including economic development and aesthetics “We spent a year re-evaluating our work to reduce combined sewer overflows and stormwater runoff going to the Spokane River, along with plans to improve treatment at our wastewater facility. We identified a path forward that would reduce the cost by about $150 million and vastly improve the health of the river.” - David Condon, Mayor, Spokane, WA
  • 13. Cincinnati, OH  Metropolitan Sewer District of Greater Cincinnati (MSDGC) entered into CD in August, 2010  Multi-billion dollar program comprised of wet weather, capacity assurance, and asset management improvements  Negotiated the opportunity to conduct a 3-year study to develop and evaluate a cost competitive alternative to the default CD solution (tunnel)  Program incorporates integrated planning approaches to address Stormwater and wastewater issues while yielding enhanced economic, environmental, and social benefits for community  CH2M HILL professionals provided technical expertise to support MSDGC Office of the Director (OOD) in the development of a sustainable watershed evaluation planning process (SWEPP) aligned with the USEPA Integrated Planning Framework that was officially adopted in June 2012 St Francis bioinfiltration basin early success project completed by MSDGC in Lick Run watershed
  • 14. Columbus, OH  Proactively addressing their stormwater challenge as part of their SSO mitigation  Have pilot program to implement GI to provide water quality treatment of stormwater runoff in their sanitary sewer service area  This pilot program also includes private property rehabilitation of service laterals, which are thought to be a significant source of I/I in the sanitary sewer system  Columbus owes the EPA a report with monitoring and modeling based findings on effectiveness and published cost effectiveness by September, 2015
  • 15. Lancaster, PA Integrated Plan that provides the following benefits:  Lower Life Cycle Cost  Community Impacts (Triple Bottom Line)  CSO Volume Reductions  Water Quality (Pollutant Load Reduction)  Flood Risk Reduction “The purpose of this analysis is to demonstrate how accounting for the multiple benefits of green infrastructure can provide a more complete assessment of infrastructure and community investments” US EPA “CH2M HILL has been a tremendous partner throughout the development and implementation of our regulatory compliance program for an update to our long term control plan and MS4 programs and helping us meet our goals for the TMDL. We have great local resources from the firm and we have also benefitted from their global reach and experience.” Charlotte Katzenmoyer, Director of Public Works, City of Lancaster, PA
  • 16. Onondaga County, NY  Consent Judgment was agreed to clean up “America’s most polluted lake” – but stakeholders were not satisfied with the stipulated approach  Prolonged public opposition increased cost and delayed implementation  New County Executive leadership convinced Judge to consider Greener, Balanced approach; given 1 year pause to develop new control plan  Revised program moves Green Infrastructure to front of program, implements a smarter gray program, Extended compliance schedule by 5 years  Saving over $20M+ in capital cost while reducing life cycle costs even more; improves other community assets immediately (roads, parking lots, roofing systems, vacant lots, parks, schools)  Community sees the benefits to the lake, tributaries, and public assets; able to appreciate why their sewer rates have increased
  • 17. Euclid, Ohio Next: Two - Step Revision Strategy 1. Develop consensus to proceed with a review and update process Work with City staff and legal counsel to identify benefits of a refinement phase and integrated plan 2. Develop a road map  Build technical, regulatory, and financial case to support plan revision  Build team (internal staff and external consultants)  Develop strategy to negotiate and implement a revised consent order and wet-weather plan
  • 18. Integrated Plan Roadmap  Affordability analysis / FCA requires more sophistication  Review current investments being implemented at this time, specifically those at the treatment facility/equalization storage  Identify the gap remaining to satisfy all existing and imminent regulatory requirements (point and non-point sources, MS4, TMDL, and others)  Integrate GI solutions with existing/proposed gray infrastructure, as well as identify where proposed gray infrastructure may be replaced with equivalent green options  Better utilization of planning tools such as geographic information systems (GIS) and stormwater management model (SWMM)  Evaluate CSO/SSO capture assumptions based on national experience  Utilize modeling tools and the monitoring data effectively to support revised program and build consensus with regulators and stakeholders  Prioritize community opportunities/impacts
  • 20. Onondaga County, NY Original Consent Order planned to build four (4) Regional Treatment Facilities (RTFs) in neighborhoods and business districts (1 of the 4 was built costing $79.1 million; significantly over budget) RTFs required large conveyance pipelines with significant community disruption (over budget and behind schedule) Initial Projects Opposed by Community Residents and Businesses
  • 21. Onondaga County, NY ~ Balanced Approach Syracuse becomes one of first ten EPA Green Cities County Executive Mahoney Announces “Project 50!” “Onondaga County will construct fifty distinct green infrastructure projects to return rain water and snow melt to the ground instead of our sewer system.” Joanne M. Mahoney, State of the County Address, March 1, 2011
  • 22. Onondaga County, NY Over 165 projects completed 100,000,000 gallons of runoff reduction
  • 23. Onondaga County, NY Benefits to County Facilities OnCenter Convention Center 66,000 Square Foot Green Roof New 30 year roof installed under CSO program; study underway quantifying heating and cooling benefits in addition to runoff reduction Before
  • 24. Onondaga County, NY Green Streets Installed Adjacent To No-Standing Lanes Add Aesthetic Value Without Impacting Traffic or Pedestrians BEFORE: Stormwater enters catch basins and is directly connected to sewer PROPOSED (Photo Simulation): Stormwater is diverted to Green Streets and only overflows to sewer when necessary AFTER (Actual Photo): Project has been adopted* by local business to pick up litter, weed, and mulch (provided by County) Adopt-A-GI Project program was created based on common Adopt-A-Highway format
  • 25. Onondaga County, NY Benefits to County Facilities OnCenter Convention Center 290 Parking Space Surface Lot (porous asphalt perimeter with subsurface storage and infiltration system) Lot had many potholes and significant cracking; resurfacing paid for through CSO program. Improved safety through smarter layout, LED lighting, as well as electric vehicle charging station (separate funding source) Before
  • 26. Onondaga County, NY Benefits to County Facilities Surface Parking Lot next to Everson Art Museum Previously a puddle-ridden gravel lot, new standard asphalt pavement drains to Bio- retention designed to store, slowly infiltrate, and provide evapotranspiration of runoff due to poorly draining soils; large storm events overflow to sewer Vegetated Bio-retention System, including 90 new Trees Before
  • 27. Onondaga County, NY Benefits to City Streets Award Winning Water Street Green Gateway Project Completely new City Street (City paid for asphalt mill and paving, County program paid for all other work) Before
  • 28. Onondaga County, NY Benefits to City Streets – Typical Residential Stone Trench New City Street Storage and Infiltration Trench no longer visible
  • 29. Onondaga County, NY Benefits to City Streets Otisco Street Residential Green Street with Bioswale • New Curbs, asphalt, and sidewalks • Traffic Calming (Bump Outs) • Added green space
  • 30. Onondaga County, NY Benefits to City Commercial Districts Westcott Street Commercial District • New Curbs, Sidewalks, and Asphalt • Improved Pedestrian Experience Before
  • 31. Onondaga County, NY Benefits to City Streets West Onondaga Street Commercial District Before
  • 32. Onondaga County, NY Benefits to City Streets West Onondaga Street Commercial District • New Curbs, Sidewalk, Asphalt • Improved Traffic Pattern • Added Green Spaces Before
  • 33. Onondaga County, NY Addressing the Vacant Lot Challenge 701 Oswego Street Vacant Lot Project The CSO Abatement Program has utilized multiple vacant lots in the City to manage stormwater runoff while investing in new curbs, sidewalks, and putting these properties to beneficial use as nurseries and gardens Before
  • 34. Onondaga County, NY Utilizing Park Space Leavenworth Park Bio-infiltration System Project included new roadside granite curbs and carriage walk; plantings compliment park setting (County program has also resurfaced basketball courts, parking lots, and supported other park amenities) Spring Summer Bloom
  • 35. Onondaga County Green Improvement Fund A Public Private Partnership Grant Program Incentivizing GI on Private Property  130 Applications Submitted (Mar 2014)  59 Projects Completed (27 in 2013)  25 million gallons of Stormwater Runoff captured for $6.1 million  21.5 million more gallons contracted  Average rate = $0.25/gal for program The County also has a program that has distributed over 1,000 free Rain Barrels, and has planted over 2,500 street trees (8,500 planned) Monroe Building Green Roof