2. Installation ProcessInstallation Process
Ship and install support equipmentShip and install support equipment
Position equipment in designatedPosition equipment in designated
locationslocations
Reassemble computer systemReassemble computer system
Verify system startup and stabilizationVerify system startup and stabilization
Verify system on-site qualityVerify system on-site quality
Prepare system operationsPrepare system operations
3. Site EvaluationSite Evaluation
Considerations for site selection:Considerations for site selection:
Electrical power qualityElectrical power quality
Air qualityAir quality
Cooling water qualityCooling water quality
Vibration sourcesVibration sources
Structural strength of computer room floorStructural strength of computer room floor
4. Computer Room DesignComputer Room Design
Computer room design considers:Computer room design considers:
Personnel safety and securityPersonnel safety and security
Air quality and positive air pressureAir quality and positive air pressure
Future computer equipment plansFuture computer equipment plans
Seismic vibrationSeismic vibration
Raised flooring capabilityRaised flooring capability
Sound reduction and proper lightingSound reduction and proper lighting
capabilitycapability
Handicapped personnel accessHandicapped personnel access
5. Computer Room EnvironmentComputer Room Environment
Computer equipment is designed to operateComputer equipment is designed to operate
within specific ranges of air quality,within specific ranges of air quality,
temperatures, and relative humidity levelstemperatures, and relative humidity levels
Temperature: 60Temperature: 60 °F to 83 °F (16 °C to 28 °C)°F to 83 °F (16 °C to 28 °C)
Humidity 35% to 65% relative humidityHumidity 35% to 65% relative humidity
Dewpoint 60Dewpoint 60 °F (16 °C)°F (16 °C)
Air quality: One fresh air change per hourAir quality: One fresh air change per hour
6. Support Equipment RoomSupport Equipment Room
EnvironmentEnvironment
Support equipment consists of motorSupport equipment consists of motor
generator units and refrigeration control unitsgenerator units and refrigeration control units
Temperature: 65Temperature: 65 °F to 95 °F (18 °C to 35 °C)°F to 95 °F (18 °C to 35 °C)
Humidity 30% to 80% relative humidityHumidity 30% to 80% relative humidity
A clean, dirt- and dust-free environmentA clean, dirt- and dust-free environment
Located as close as possible to computerLocated as close as possible to computer
roomroom
7. Electrical RequirementsElectrical Requirements
Computer equipment requires a protectiveComputer equipment requires a protective
power safety-ground systempower safety-ground system
Computer equipment requires a signalComputer equipment requires a signal
reference gridreference grid
Customer provides and installs all powerCustomer provides and installs all power
wiring, circuit breakers, and circuit breakerwiring, circuit breakers, and circuit breaker
panelspanels
8. Dielectric-cooling SystemsDielectric-cooling Systems
Dielectric coolant:Dielectric coolant:
Is inert liquidIs inert liquid
Has insulating and non-corroding propertiesHas insulating and non-corroding properties
Has large capacity for absorbing heat fromHas large capacity for absorbing heat from
integrated circuit modules and powerintegrated circuit modules and power
suppliessupplies
9. Cooling Water SupplyCooling Water Supply
System requires clean, adequate source ofSystem requires clean, adequate source of
water for cooling purposeswater for cooling purposes
Closed-loop cooling water supply isClosed-loop cooling water supply is
generally requiredgenerally required
Open system water supply may not complyOpen system water supply may not comply
with water system requirementswith water system requirements
Water supply temperature should range fromWater supply temperature should range from
4040 °F to 70 °F°F to 70 °F
10. Equipment Separation LimitsEquipment Separation Limits
General requirements for arranging computerGeneral requirements for arranging computer
system equipment must consider thesystem equipment must consider the
following:following:
Personnel safetyPersonnel safety
Maximum system performanceMaximum system performance
Satisfactory system installationSatisfactory system installation
Satisfactory operator and maintenanceSatisfactory operator and maintenance
accessaccess
11. Floor PreparationFloor Preparation
Computer room floor must:Computer room floor must:
Be raised floor and be static-dissipativeBe raised floor and be static-dissipative
Provide signal reference grid for computerProvide signal reference grid for computer
systemsystem
Provide space for power cables, signalProvide space for power cables, signal
cables, coolant piping, and air flowcables, coolant piping, and air flow
Provide minimum clearance of 18 inchesProvide minimum clearance of 18 inches
(46 cm)(46 cm)
12. ReferenceReference
Cray Research, Inc. (1993). Site PlanningCray Research, Inc. (1993). Site Planning
and preparation. Publication numberand preparation. Publication number
HR-04036HR-04036