1. L3 CMP Games Design
Robot Dreams Schedule
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
w/b Collate any Decide on any
12.03.12 research and art missing
work already artwork/reference
done for the material and
character design begin collecting it.
pack.
w/b
19.03.12
w/b All art work and Begin
26.03.12 reference work on
collected, begin shoes of
planning of 3D model
model
w/b
12.04.12
w/b Shoes modelled Begin
09.04.12 and surfaced. work on
legs of
model
w/b Finish and surface
16.04.12 model of legs
2. Monday Tuesday Wednesday Thursday Friday Saturday Sunday
w/b Begin work on
23.04.12 torso
w/b Finish and Begin
30.04.12 surface torso of arms of
model model
w/b Finish and Begin
07.05.12 surface arms of head of
model model
w/b Finish head of Move Shoot
14.05.12 model entire images of
model to model in
layout layout
and
texture
w/b Write Deadline
21.05.12 evaluation
of project.
Harry’s lesson
Other lessons
Study time