www.fefi.in
Protection net Flexible connection inlet side
Filter Vibration dampers Protection net Damper Flexible connection outlet side
Vibration dampers Supports Inlet governor Inlet nozzle
KM 311 fans.
E. CONCLUSION
Fan design parameters are clearly indicated in the technical datasheet supplied with every fan. They
must be noted carefully when planning an installa on. It is possible to retrofit fans and achieve
significant power savings which eventually impact the revenues of the company by reducing
maintenance costs as well. Customer has expressed sa sfac on with the results and plans further
interven ons to op mise plant performance and profitability.
EXISTING FAN DETAILS:
Fan Model : Proprietary
Air Volume : 2,200 cmh
Sta c Pressure : 2900 pa
Fan Speed : 3000 rpm
Type of Drive : Direct
Electrical Motor : 4 kw
Medium Handling : Air with traces of dust
Electrical Connec ons : DOL
NEW FAN DETAILS:
Fan Model : KM 311 R4A LG90
Air Volume : 2,160 cmh
Sta c Pressure : 1310 pa
Fan Speed : 2850 rpm
Type of Drive : Direct
Electrical Motor : 2.2 kw
Medium Handling : Air with traces of dust
Electrical Connec ons : DOL
D. RESULTS
S.NO PARAMETER
MODEL
INSTALLED KW
QUANTITY 2 2
AMPS CONSUMPTION 6
5 KW CONSUMPTION PER DAY
6 KW CONSUMPTION PER YEAR
OLD FAN
xxx
4
177.2
63781.0
NEW FAN
KM 311 R4A
2.2
2.4
57.6
20736
1
3
4
2
A. ISSUE
Customer wanted to op mise power consump on in the factory . They requested for a site audit in
areas of high power consump on.
C. ACTION
The customer decided to take up retrofit of two fans to assess the savings in power as well as
op mise machine performance which were crea ng high suc on pressure and consuming almost
full load current for the actual requirement of Air Volume and Suc on pressure. Customer was
presented with the data and a life cycle cost analysis for a retrofit installa on that would be aligned
with the machine working condi ons. Customer agreed with the solu on offered and installed two
B. OBSERVATION
Customer was provided observa on data, fan performance data, vibra on report and bearing
condi on report along with sugges ons.
All small fans connected to compactors with 4kw motor installed running without problem, except
the ones fixed for lapformer suc on. It was observed fans installed for lapformer machine were
drawing high current and crea ng much more pressure and controlling this heavy suc on was
difficult. controlling,Even a er the fans were drawing 4kw.
TYPE OF RESOURCE : Retrofi ng Case Study
APPLICATION : 56000 spindles tex le mill in Maharashtra
FAN MANAGEMENT PLAN
FAN MANAGEMENT PLAN
Our FAN MANAGEMENT PLAN (FMP) has been carefully developed to provide a superior level
of service and reliability. Our fundamental understanding of fans developed during the design
and construc on phase is illustrated in the FMP.
The aim of FMP is to reduce costs by improving efficiency. It creates equipment history
on which is based plans for retrofits and spare parts purchases thus avoiding unplanned
stoppages.
THREE LEVELS OF FAN MANAGEMENT
Our knowledge, experience and exper se in fan construc on and opera on coupled with our
commitment to the Indian market makes the FMP the best tool to op mise ownership costs.
Site Audit Module Predic ve Maintenance Module Life Cycle Costs Module
Ferrari Eastern Fans India
Private Limited
+91 22 24468333 / fefispo@fefi.in
+91 80 28410011 / fefiblr@fefi.in
Ferrari Eastern Fans India
Private Limited
+91 22 24468333 / fefispo@fefi.in
+91 80 28410011 / fefiblr@fefi.in

More Related Content

What's hot

Automatic mine ventilation control system
Automatic mine ventilation control systemAutomatic mine ventilation control system
Automatic mine ventilation control systemAleksey Kashnikov
 
Trg trc014-en vav systems air conditioning
Trg trc014-en vav systems air conditioningTrg trc014-en vav systems air conditioning
Trg trc014-en vav systems air conditioningVoVi Phap Danh
 
Maintenance of Fans, Blowers and Fluidizers
Maintenance of Fans, Blowers and FluidizersMaintenance of Fans, Blowers and Fluidizers
Maintenance of Fans, Blowers and FluidizersDanial Sohail
 
Thermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine bladeThermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine bladeeSAT Publishing House
 
Neural networks for mine ventilation control systems
Neural networks for mine ventilation control systemsNeural networks for mine ventilation control systems
Neural networks for mine ventilation control systemsAleksey Kashnikov
 

What's hot (8)

Automatic mine ventilation control system
Automatic mine ventilation control systemAutomatic mine ventilation control system
Automatic mine ventilation control system
 
Cf
CfCf
Cf
 
GenDesign
GenDesignGenDesign
GenDesign
 
Comparison between vrv vrf brands & suppliers @ uae market-July 2017-by g...
Comparison between vrv vrf brands & suppliers @ uae market-July 2017-by g...Comparison between vrv vrf brands & suppliers @ uae market-July 2017-by g...
Comparison between vrv vrf brands & suppliers @ uae market-July 2017-by g...
 
Trg trc014-en vav systems air conditioning
Trg trc014-en vav systems air conditioningTrg trc014-en vav systems air conditioning
Trg trc014-en vav systems air conditioning
 
Maintenance of Fans, Blowers and Fluidizers
Maintenance of Fans, Blowers and FluidizersMaintenance of Fans, Blowers and Fluidizers
Maintenance of Fans, Blowers and Fluidizers
 
Thermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine bladeThermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine blade
 
Neural networks for mine ventilation control systems
Neural networks for mine ventilation control systemsNeural networks for mine ventilation control systems
Neural networks for mine ventilation control systems
 

Similar to General-Production

Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Maya FRP Fan Special Features presentation
Maya FRP Fan Special Features presentationMaya FRP Fan Special Features presentation
Maya FRP Fan Special Features presentationAnkitChaurasia65
 
Wisco Gardner Denver & Products
Wisco Gardner Denver & Products Wisco Gardner Denver & Products
Wisco Gardner Denver & Products bpage1971
 
Performance optimization of Forced Draft Fan of BBGS Unit # 1
Performance optimization of Forced Draft Fan of BBGS Unit # 1Performance optimization of Forced Draft Fan of BBGS Unit # 1
Performance optimization of Forced Draft Fan of BBGS Unit # 1Saikat Halder
 
Helen McHugh, Head of Sustainable Technology at ebm-papst - Retrofitting Case...
Helen McHugh, Head of Sustainable Technology at ebm-papst - Retrofitting Case...Helen McHugh, Head of Sustainable Technology at ebm-papst - Retrofitting Case...
Helen McHugh, Head of Sustainable Technology at ebm-papst - Retrofitting Case...Global Business Events
 
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)davidpdx
 
CFX ANALYSIS OF AN IMPELLER BLADE DESIGN OF CENTRIFUGAL COMPRESSOR
CFX ANALYSIS OF AN IMPELLER BLADE DESIGN OF CENTRIFUGAL COMPRESSORCFX ANALYSIS OF AN IMPELLER BLADE DESIGN OF CENTRIFUGAL COMPRESSOR
CFX ANALYSIS OF AN IMPELLER BLADE DESIGN OF CENTRIFUGAL COMPRESSORIRJET Journal
 
Innovative compressed air case studies
Innovative compressed air case studiesInnovative compressed air case studies
Innovative compressed air case studiesZondits
 
Development of Software for Sizing of Axial Flow Fans -- Zeus Numerix
Development of Software for Sizing of Axial Flow Fans -- Zeus NumerixDevelopment of Software for Sizing of Axial Flow Fans -- Zeus Numerix
Development of Software for Sizing of Axial Flow Fans -- Zeus NumerixAbhishek Jain
 
Reduce your buildings energy consumption - Helen McHugh (ebm papst) - Energy ...
Reduce your buildings energy consumption - Helen McHugh (ebm papst) - Energy ...Reduce your buildings energy consumption - Helen McHugh (ebm papst) - Energy ...
Reduce your buildings energy consumption - Helen McHugh (ebm papst) - Energy ...Protectionandmanagement
 
Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)Henry Hollands
 
Deabb 1904 13 en variable speed drive final
Deabb 1904 13 en variable speed drive finalDeabb 1904 13 en variable speed drive final
Deabb 1904 13 en variable speed drive finalClinton Clarence
 
IRJET- Review Paper on the Control System of the Air Handling Units
IRJET- Review Paper on the Control System of the Air Handling UnitsIRJET- Review Paper on the Control System of the Air Handling Units
IRJET- Review Paper on the Control System of the Air Handling UnitsIRJET Journal
 
IRJET- Review Paper on the Control System of the Air Handling Units
IRJET- Review Paper on the Control System of the Air Handling UnitsIRJET- Review Paper on the Control System of the Air Handling Units
IRJET- Review Paper on the Control System of the Air Handling UnitsIRJET Journal
 
2010 Energy Presentation
2010 Energy Presentation2010 Energy Presentation
2010 Energy PresentationTinaAllen
 
2010 Energy Presentation
2010 Energy Presentation2010 Energy Presentation
2010 Energy Presentationguest9176b3
 
2010 Energy Audit Presentation
2010 Energy Audit Presentation2010 Energy Audit Presentation
2010 Energy Audit Presentationcbocci
 
Reverse Cycle Air Conditioning Brochure
Reverse Cycle Air Conditioning BrochureReverse Cycle Air Conditioning Brochure
Reverse Cycle Air Conditioning BrochureInfinitiAir
 

Similar to General-Production (20)

Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Maya FRP Fan Special Features presentation
Maya FRP Fan Special Features presentationMaya FRP Fan Special Features presentation
Maya FRP Fan Special Features presentation
 
Wisco Gardner Denver & Products
Wisco Gardner Denver & Products Wisco Gardner Denver & Products
Wisco Gardner Denver & Products
 
Performance optimization of Forced Draft Fan of BBGS Unit # 1
Performance optimization of Forced Draft Fan of BBGS Unit # 1Performance optimization of Forced Draft Fan of BBGS Unit # 1
Performance optimization of Forced Draft Fan of BBGS Unit # 1
 
Helen McHugh, Head of Sustainable Technology at ebm-papst - Retrofitting Case...
Helen McHugh, Head of Sustainable Technology at ebm-papst - Retrofitting Case...Helen McHugh, Head of Sustainable Technology at ebm-papst - Retrofitting Case...
Helen McHugh, Head of Sustainable Technology at ebm-papst - Retrofitting Case...
 
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)
Sutter Hospital: Vane-Axial Conversion to Huntair FANWALL Technology(R)
 
CFX ANALYSIS OF AN IMPELLER BLADE DESIGN OF CENTRIFUGAL COMPRESSOR
CFX ANALYSIS OF AN IMPELLER BLADE DESIGN OF CENTRIFUGAL COMPRESSORCFX ANALYSIS OF AN IMPELLER BLADE DESIGN OF CENTRIFUGAL COMPRESSOR
CFX ANALYSIS OF AN IMPELLER BLADE DESIGN OF CENTRIFUGAL COMPRESSOR
 
Innovative compressed air case studies
Innovative compressed air case studiesInnovative compressed air case studies
Innovative compressed air case studies
 
Development of Software for Sizing of Axial Flow Fans -- Zeus Numerix
Development of Software for Sizing of Axial Flow Fans -- Zeus NumerixDevelopment of Software for Sizing of Axial Flow Fans -- Zeus Numerix
Development of Software for Sizing of Axial Flow Fans -- Zeus Numerix
 
Reduce your buildings energy consumption - Helen McHugh (ebm papst) - Energy ...
Reduce your buildings energy consumption - Helen McHugh (ebm papst) - Energy ...Reduce your buildings energy consumption - Helen McHugh (ebm papst) - Energy ...
Reduce your buildings energy consumption - Helen McHugh (ebm papst) - Energy ...
 
Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)Super inverter epcen08 114-catalogues_english (2)
Super inverter epcen08 114-catalogues_english (2)
 
Sullivan.spmt 75 250k w
Sullivan.spmt 75  250k wSullivan.spmt 75  250k w
Sullivan.spmt 75 250k w
 
Deabb 1904 13 en variable speed drive final
Deabb 1904 13 en variable speed drive finalDeabb 1904 13 en variable speed drive final
Deabb 1904 13 en variable speed drive final
 
IRJET- Review Paper on the Control System of the Air Handling Units
IRJET- Review Paper on the Control System of the Air Handling UnitsIRJET- Review Paper on the Control System of the Air Handling Units
IRJET- Review Paper on the Control System of the Air Handling Units
 
IRJET- Review Paper on the Control System of the Air Handling Units
IRJET- Review Paper on the Control System of the Air Handling UnitsIRJET- Review Paper on the Control System of the Air Handling Units
IRJET- Review Paper on the Control System of the Air Handling Units
 
2010 Energy Presentation
2010 Energy Presentation2010 Energy Presentation
2010 Energy Presentation
 
2010 Energy Presentation
2010 Energy Presentation2010 Energy Presentation
2010 Energy Presentation
 
2010 Energy Audit Presentation
2010 Energy Audit Presentation2010 Energy Audit Presentation
2010 Energy Audit Presentation
 
Reverse Cycle Air Conditioning Brochure
Reverse Cycle Air Conditioning BrochureReverse Cycle Air Conditioning Brochure
Reverse Cycle Air Conditioning Brochure
 
Catalog_Compactfans_US_en.pdf
Catalog_Compactfans_US_en.pdfCatalog_Compactfans_US_en.pdf
Catalog_Compactfans_US_en.pdf
 

More from ferrari-eastern (13)

6 page ferrari eastern brochure
6 page ferrari eastern brochure6 page ferrari eastern brochure
6 page ferrari eastern brochure
 
Marine-Engg-Fans
Marine-Engg-FansMarine-Engg-Fans
Marine-Engg-Fans
 
Autochennai
AutochennaiAutochennai
Autochennai
 
General Products Brochure
General Products BrochureGeneral Products Brochure
General Products Brochure
 
Textile Brochure
Textile BrochureTextile Brochure
Textile Brochure
 
ERP Brochure
ERP BrochureERP Brochure
ERP Brochure
 
Its Ferrari for Swedish Steel
Its Ferrari for Swedish SteelIts Ferrari for Swedish Steel
Its Ferrari for Swedish Steel
 
Fereec qnaire
Fereec qnaireFereec qnaire
Fereec qnaire
 
Annexure 2 warranty
Annexure 2 warrantyAnnexure 2 warranty
Annexure 2 warranty
 
General concepts
General conceptsGeneral concepts
General concepts
 
FVI Cases
FVI CasesFVI Cases
FVI Cases
 
Fefi belt-direct-drives
Fefi belt-direct-drivesFefi belt-direct-drives
Fefi belt-direct-drives
 
Fire fans
Fire fansFire fans
Fire fans
 

Recently uploaded

2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Recently uploaded (20)

2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 

General-Production

  • 2.
  • 3.
  • 4. Protection net Flexible connection inlet side
  • 5. Filter Vibration dampers Protection net Damper Flexible connection outlet side Vibration dampers Supports Inlet governor Inlet nozzle
  • 6. KM 311 fans. E. CONCLUSION Fan design parameters are clearly indicated in the technical datasheet supplied with every fan. They must be noted carefully when planning an installa on. It is possible to retrofit fans and achieve significant power savings which eventually impact the revenues of the company by reducing maintenance costs as well. Customer has expressed sa sfac on with the results and plans further interven ons to op mise plant performance and profitability. EXISTING FAN DETAILS: Fan Model : Proprietary Air Volume : 2,200 cmh Sta c Pressure : 2900 pa Fan Speed : 3000 rpm Type of Drive : Direct Electrical Motor : 4 kw Medium Handling : Air with traces of dust Electrical Connec ons : DOL NEW FAN DETAILS: Fan Model : KM 311 R4A LG90 Air Volume : 2,160 cmh Sta c Pressure : 1310 pa Fan Speed : 2850 rpm Type of Drive : Direct Electrical Motor : 2.2 kw Medium Handling : Air with traces of dust Electrical Connec ons : DOL D. RESULTS S.NO PARAMETER MODEL INSTALLED KW QUANTITY 2 2 AMPS CONSUMPTION 6 5 KW CONSUMPTION PER DAY 6 KW CONSUMPTION PER YEAR OLD FAN xxx 4 177.2 63781.0 NEW FAN KM 311 R4A 2.2 2.4 57.6 20736 1 3 4 2 A. ISSUE Customer wanted to op mise power consump on in the factory . They requested for a site audit in areas of high power consump on. C. ACTION The customer decided to take up retrofit of two fans to assess the savings in power as well as op mise machine performance which were crea ng high suc on pressure and consuming almost full load current for the actual requirement of Air Volume and Suc on pressure. Customer was presented with the data and a life cycle cost analysis for a retrofit installa on that would be aligned with the machine working condi ons. Customer agreed with the solu on offered and installed two B. OBSERVATION Customer was provided observa on data, fan performance data, vibra on report and bearing condi on report along with sugges ons. All small fans connected to compactors with 4kw motor installed running without problem, except the ones fixed for lapformer suc on. It was observed fans installed for lapformer machine were drawing high current and crea ng much more pressure and controlling this heavy suc on was difficult. controlling,Even a er the fans were drawing 4kw. TYPE OF RESOURCE : Retrofi ng Case Study APPLICATION : 56000 spindles tex le mill in Maharashtra FAN MANAGEMENT PLAN
  • 7. FAN MANAGEMENT PLAN Our FAN MANAGEMENT PLAN (FMP) has been carefully developed to provide a superior level of service and reliability. Our fundamental understanding of fans developed during the design and construc on phase is illustrated in the FMP. The aim of FMP is to reduce costs by improving efficiency. It creates equipment history on which is based plans for retrofits and spare parts purchases thus avoiding unplanned stoppages. THREE LEVELS OF FAN MANAGEMENT Our knowledge, experience and exper se in fan construc on and opera on coupled with our commitment to the Indian market makes the FMP the best tool to op mise ownership costs. Site Audit Module Predic ve Maintenance Module Life Cycle Costs Module
  • 8. Ferrari Eastern Fans India Private Limited +91 22 24468333 / fefispo@fefi.in +91 80 28410011 / fefiblr@fefi.in Ferrari Eastern Fans India Private Limited +91 22 24468333 / fefispo@fefi.in +91 80 28410011 / fefiblr@fefi.in