CASE STUDY ON AS
     RUN BOILER ENERGY
     AUDIT AND REPORTING

 D PAWAN KUMAR & R VIRENDRA
NATIONAL PRODUCTIVITY COUNCIL,
              INDIA
        (16 January 2012)
OBJECTIVES
Efficiency of Boiler

   As run Boiler efficiency, at three representative load
    setting over 9 trials
   Assessment of Boiler Loss Profile and Heat rate during
    trial conditions
   Assessment of Heat Exchangers Effectiveness of Heat
    Exchangers such as Air Preheaters, Economisers,
    Condensers etc
INSTRUMENTS REQUIRED
   Flue gas analysers
   Portable temperature indicator
   On-line instruments of boiler control room.
   Facilities of the chemistry lab or outside lab for coal /
    ash / water analysis. (coal proximate or ultimate
    analysis, un-burnt in bottom and fly ash, TDS, pH of
    feed water / blow-down / condensate.
   Power analyser for power measurement of ID fan, FD
    fan, ESP, crushers, BFP (boiler feed water pump) cool
    handling plant/ash handling plant, etc.
METHODOLOGY
   Boiler Efficiency trials are normally conducted at three
    representative typical load ranges namely, 100% of NCR, 80% of
    NCR and 60% of NCR

   Performance assessment chosen is the indirect method of heat
    loss and Boiler Efficiency calculation, drawn from Indian Standard
    (IS-8753/1977) and the deployed relations are presented as follows

   During the Boiler trials, following key parameters are monitored as
    Power Generation, Coal Consumption, GCV of Coal, Total Air Flow,
    Mill rejects, GCV of Mill rejects, Combustibles in bottom ash,
    Bottom ash Quantity, Combustibles in ECO/APH ash, ECO/APH
    ash Quantity, Combustibles in Fly ash, Fly ash Quantity, Flue gas
    analysis APH outlet for %CO2, %O2 and temperature, Ambient air
    dbt, wbt and RH%, P.A. (Proximate Analysis) of coal, V.A. (Ultimate
    Analysis) of coal, various flows, pressure and temperature in
    steam, water, air, flue gas path, power measurement at key
    auxiliaries.
BASIS FOR HEAT LOSS CALCULATIONS:
BOILER PARAMETERS
   THE LIST OF NEARLY 136 BOILER PARAMETERS
    MONITORED AND THE CORRESPONDING
    TRASNDUCER REFERENCES VIS-À-VIS THE DAS
    SYSTEM ARE ALSO TO BE REPORTED.


DESIGN OPERATING PARAMETERS
(Reference values) are also to be reported
   Design Flow, Temperatures and Pressures for
    Steam, Water, Fuel & air and Flue gas along with
    Pressure drops as relevant are also reported.
    Design heat balance is also reported as reference
    basis.
Present case is of a 200 MW boiler
   AS RUN AUDIT FINDINGS
   PLANT ROAD
    Available data is for 100%, 80%, 60% NCR.
   The three typical load ranges at which the
    Boiler Performance could be assessed was
         Load Setting
                                  No of
                                  Trials
       a) > 90% of NCR              6
       b) > 80% of NCR              1
       c) > 70% of NCR              2
                         Total:     9
KEY BOILER TRIAL FINDINGS

   The Key Boiler trial findings in respect of Auxiliary
    Consumption, Feeder wise Coal Consumption,
    Coal GCV, DM Water Consumption, Power
    Generation, Specific Coal Consumption and
    Overall Heat Rate are presented in the following
    tables.
SUMMARY OF KEY BOILER TRIAL FINDINGS

S.N
      O     PARAMETERS       UNITS   TRIAL 1     TRIAL 2   TRIAL 3   TRIAL 4   TRIAL 5   TRIAL 6   TRIAL 7   TRIAL 8   TRIAL 9
      .



 1        DATE




                                                   1445-     0915-     1015-     1500-     1915-     1430-     1430-     1430-
 2        DURATION            HRS    0900-1300        18        13        14        19        13        18        18        18
                                                      45        15        15        00        15        30        30        30


 3        TORAL DURATION      HRS         4.00      4.00      4.00      3.75      3.50      3.75      3.00      3.00      3.00

          TOTAL
 4                           MWH        776.40    779.70    768.00    570.50    531.00    701.00    499.00    545.00    542.00
              GENERATION


          TOTAL AUXILIARY
 5                           MWH         26.15     26.23     26.04     18.35     16.75     26.75     16.70     17.40     18.40
              CONSUMN.-1


          TOTAL AUXILIARY
 6                           MWH         27.05     27.07     27.21     24.50     22.60     25.27     16.30     16.80     17.60
              CONSUMN.-2


          TOTAL AUXILIARY
              CONSUMN.
 7                           MWH         53.20     53.30     53.25     42.85     39.35     52.02     33.00     34.20     36.00
              (ITEM5+ITEM6
              )


          COAL FEEDER-A
 8                            MT         81.70     97.90     87.80     97.50     91.20         -     63.90     68.80    67. 50
              CONSUMN.
COAL FEEDER-B
9                      MT      96.30    95.90    97.80    94.60    88.10    91.60    65.50    66.90   65.'00
         CONSUMN.




     COAL FEEDER-C
10                     MT          -        -    95.40        -        -    93.50    66.50    70.90    73.20
         CONSUMN.




     COAL FEEDER-D
11                     MT      89.00    90.90    89.90    94.60    85.40    88.80    60.00    56.70    59.80
         CONSUMN.




     COAL FEEDER-E
12                     MT      89.40    90.90        -        -        -    85.80        -        -        -
         CONSUMN.




     COAL FEEDER-F
13                     MT      90.20    93.30    91.60    95.40    87.60    91.30    66.10    72.50    72:50
         CONSUMN.




     OM WATER
14                     MT      40.85    35.80    40.85    30.80    28.55    37.05    37.35    33.05    29.30
         CONSUMN.



                              4597.0   4090.0   4450.0   3986.0   4018.0   3863.0   3502.0   3955.0   3973.0
15   G CVOFCOAL      KCAUKG
                                   0        0        0        0        0        0        0        0        0




     SUMMARY :
AVERAGE POWER                                                        151   186   166   181   180
16                          MW       194.10    194.93   192.00    152.13
      GENERATION                                                           .71   .93   .33   .67   .67




                                                                           75.   93.   83.   90.   90.
17    % OF NCR              %         97.05     97.46    96.00     76.07
                                                                            86    47    17    83    33


      AUXILIARY                                                            11.   13.   11.   11.   12.
 18                         MW        13.30     13.33    13.31     11.43
      CONSUMN.                                                              24    87    00    40    00


      % AUXILIARY                                                          7.4   7.4   6.6   6.2   6.6
19                          %          6.85      6.84     6.93      7.51
      CONSUMN.                                                               1     2     1     8     4



      COAL                                                                 100   120   107   111   112
20                         MT/HR      11.65    117.23   115.63    101.89
      CONSUMN.RATE                                                         .66   .27   .33   .93   .67



      OM WATER                                                             8.1   9.8   12.   11.   9.7
21                         MTIHR      10.21      8.95    10.21      8.21
      CONSUMN. RATE                                                          6     8    45    02     7


      OM WATER                                                             0.0   0.0   0.0   0.0   0.0
22                        KGIKWH       0.05      0.05     0.05      0.05
      CONSUMN.                                                               5     5     7     6     5


                                                                           0.6   0.6   0.6   0.6   0,6
23    SP. COAL CONSUMN.   KGIKWH       0.58      0.60     0.60      0.67
                                                                             6     4     5     2     2


                                                                           266   248   225   243   247
      OV ERALL HEAT
24                        KCAUKWH   2644.28   2549.67     9.85   2669.68   5.8   5.3   9.8   6.8   7.6
      RATE
                                                                             0     3     1     6     3
KEY PARAMETERS DURING TRIALS
VIS-A-VIS DESIGN
   The key Boiler parameters, pertinent to Thermal
    Efficiency, namely the MW Generation (Load),
    Coal Consumption, GCV of Coal, Total Air Flow,
    Mill Rejects, GCV of Mill Rejects, Combustibles
    in Bottom Ash, Fly Ash, Flue Gas Anal1ysis at
    APH Out, Ambient conditions, Proximate
    Analysis of Coal, alongside the design values,
    are reported as under.
BOILER PERFORMANCE EVALUATION: SUMMARY OF KEY PARAMETERS DURING BOILER TRIALS



S
                                                                                                                                              Trial
.         Operating Parameters      U nit   Design     Trial 1    Trial 2    Trial 3    Trial 4    Trial 5   Trial 6    Trial 7    Trial 8
                                                                                                                                               9
N
o



1.   POWER GENERATION               MW        200.00     194.07     194.95     191.98     153.33   153.15      185.92     166.30     181.67   180.67


2.   % OF NCR                        %        100.00      97.04      97.48      95.99      76.67     76.58      92.96      83.15      90.84    90.34


3.   COAL CONSUMPTION               TPH       103.00     117.94     116.55     118.18     104.11   103.11      123.04     107.26    111 .90   112.67


                                                                                                   16795.                                     16607.
4.   G C V OF COAL                 KJ/KG    17974.00   19215.46   17096.20   18601.00   16661.48             16147.34   14638.36   16531.90
                                                                                                      24                                         14


5.   TOTAL AIR FLOW                 TPH       725.40     773.92     769.30     738.56     706.29   691.94      743.79     598.50     615.40   703.00


6    MILL REJECTS                  KG/HR      339.90     389.20     384.62     389.99     343.56   340.26      406.03     353.96     369.27   371.81


                                                                                                   2500.0                                     1800.0
7.   G C V OF MILL REJECTS         KCAUKG    1800.00    2610.00    2660.00    2550.00    2420.00              2150.00    1860.00    1880.00
                                                                                                        0                                          0


8.   COMB. IN BOTTOM ASH             %          2.01       5.10       5.00       4.10       3.70      2.59       3.60       2.50       2.65     2.25


                                                                                                   33766.                                     33766.
9.   C V OF CARBON                 KJ/KG    33766.04   33766.04   33766.04   33766.04   33766.04             33766.04   33766.04   33766.04
                                                                                                      04                                         04



1
     BOTTOM ASH QTY. (Dry basis)   KG/KG        0.05       0.04       0.04       0.04       0.05      0.05       0.05       0.06       0.05     0.05
0.
1
1   COMB. IN ECO/APH ASH            %         0.23     5.00     4.00     2.10     1.00     1.22      2.35     1.38     1.70    1.20
.


1
2   ECO/APH ASH QTY. (Dry basis)   KG/KG      0.04     0.03     0.04     0.03     0.04     0.04      0.04     0.05     0.04    0.04
.


1
3   COMB. IN FLY ASH                %      0.46        3.45     2.00     3.30     1.30   1.49     2.40        1.04     1.20    0.70
.


1
4   FLY ASH QTY. (Dry basis)       KG/KG   0.23        0.17     0.21     0.19     0.24   0.24     0.24        0.29     0.24    0.24
.



1
5   FLUE GAS ANAL YSIS (APH OUT)
.




    CARBON DIOX!DE (CO2)            %        15.00    15.20    14.79    15.00    13.18    12.68     14.26    15.70    16.10   15.97




    OXYGEN (02)                     %         4.00     3.80     4.21     4.00     5.82     6:32      4.74     3.30     2.90    3.03




                                                                                          147.0                               152.5
    TEMPERATURE                    DEGC     138.00   132.50   148.06   142.00   133.65             135.50   144.60   151:80
                                                                                              0                                   0
1
     6
    AMBIENT CONDITIONS
     .



    DRY BULB TEMP                  DEGC      28.00     34.00     34.00     34.00     34.00    34.00      34.00     40.00     40.00   40.00




    WET BULB TEMP                  DEGC       0.00




    RELATIVE HUMIDITY               %         0.00                                                                 52.00     52.00   61.50




    MOISTURE LOAD (/100)#          KG/KG      2.50      2.50      2.50      2.50      2.50     2.50       2.50      2.50      2.50    2.50



1
     7
    PROXIMA TE ANAL YSIS OF COAL
     .



    FIXED. CARBON                   %        32.54      8.14     33.29     37.12     32.11    32.44      30.71     24.17     30.57   30.85




    VOLATILE MATTER                 %        21.46     24.05     24.10     23.11     22.34    22.43      22.53     24.21     24.84   24.35




    TOTAL MOISTURE                  %        10.00    13.'60     13.85     12.70     12:65    12.40      13.00     11.66     10.68   11.25




    ASH                             %        32.00     24.21     28.76     27.00     32.90    32.73      33.76     39.96     33.91   33.51



                                                                                                                                     3973.
                                   KCAUK                                                     4018.0
    G C V OF COAL                          4300.00   4597.00   4090.00   4450.00   3986.00             3863.00   3502.00   3955.00        0
                                       G                                                           0
                                                                                                                                          0
1
     8
    ULTIMATE ANALYSIS OF COAL
     .




    CARBON (C)                  %   45.00   49.08   44.07   47.71   42.81   43.16   41.53   37.16   42.45   42.60




    HYDROGEN (H)                %    2.82    3.18    2.99    3.09    2.91    2.93    2.88    2.91    3.03    3.02




    MINERAL MATTER              %   32.00   24.21   28.76   27.00   32.90   32.73   33.76   39.96   33.91   33.51




    NITROGEN (N)                %    0.95    1.81    1.81    1.82    1.83    1.83    1.83    1.81    1.80    1.81




    SULPHUR (S)                 %    0.38    0.38    0.38    0.38    0.38    0.38    0.38    0.38    0.38    0.38




    MOISTURE (H2O)              %   10.00   13.60   13.85   12.70   12.65   12.40   13.00   11.66   10.68   11.25




    OXYGEN (02) [Balance]       %    8.85    7.74    8.13    7.31    6.51    6.57    6.62    6.12    7.74    7.44
BOILER HEAT LOSSES PROFILE

S.
          Operating Parameters    Unit     Design    Trial1   Trial2    Trial3   Trial4   Trial5   Trial6   Trial7   Trial8   Trial9
N
o

                                                     5411.5             5249.0   4141.5   4134.4   4744.3   3749.6   4418.7   4469.
A.   HEAT INPUT TO BOILER        KCal/Hr   4422.88            4756.66
                                                          4                  7        1        5        1        6        0      69

     HEAT LOSSES IN THE
B.
     SYSTEM :


     i)   UNBURNTS IN ASH



          BOTTOM ASH               %          0.19     0.33      0.44     0.31     0.38     0.26     0.39     0.35     0.28    0.24



          ECO/APH ASH              %          0.02     0.27      0.28     0.13     0.08     0.10     0.21     0.16     0.15    0.10



          FLY ASH                  %          0.20     1.06      0.82     1.17     0.62     0.71     1.22     0.69     0.60    0.34


     ii) SENSIBLE HEAT IN
                                   %          4.67     4.15      5.00     4.64     4.91     5.79     4.59     4.27     4.51    4.59
     FLUE GAS

     iii) MOISTURE IN FLUE
                                   %          5.20     5.73      6.28     5.71     6.09     6.08     6.29     6.74     6.01    6.06
     GAS
iv)   MOISTURE IN
                          %         0.20    0.16     0.21    0.17    0.19     0.21    0.18    0.19    0.17   0.20
           COMB. AIR




     v)    RADIATION &
                           &        0.85    0.85     0.85    0.85    0.95     0.95    0.85    1.25    1.25   1.25
           UNACCOUNT




                                                                                                             12.7
     TOTAL LOSSES         %        11.33   12.54    13.88   12.97   13.22    14.10   13.73   13.65   12.98
                                                                                                                 7




     BOILER EFFICIENCY
C                                                                                                            87.2
          (100 - TOTAL    %        88.67   87.46    86.12   87.03   86.78    85.90   86.27   86.35   87.02
     .                                                                                                           3
          LOSSES)


D                                                                                                            16.8
     EXCESS AIR           %        23.53   22.09    25.07   23.53   38.34    43.05   29.15   18.64   16.02
     .                                                                                                           6


                                                                                                             2473
                         KCal/k            2788.            2734.   2701.            2551.   2254.   2432.
                                  2211.4           2439.9                   2699.6                               .
E.   OVERALL HEAT RATE        W               4                1       0                 8      7       2
                                       4                4                        1                              9
                              h               5                7       4                 0      6       7
                                                                                                                5
STATEMENT OF BOILER
EFFICIENCY
   A Comprehensive Statement of as run
    Boiler Thermal Efficiency presenting the
    Boiler Load, Heat Balance, Thermal
    Efficiency and Overall Heat Rate for the
    nine trials conducted is presented in
    following tables:'
SUMMARY STATEMENT OF BOILER EFFICIENCY



                                            Desi
S.N              Parameters         Units          Trial 1   Trial 2   Trial 3   Trial 4   Trial 5   Trial 6   Trial 7   Trial 8   Trial 9
                                             gn
 o




 1    DATE




                                                   0900-     1445-     0915-     1015-     1500-     1915-     1430-     1430-     1430-
 2    DURATION                      HRS
                                                   1300      1845      1315      1415      1900      1315      1830      1830      1830



 3    POWER GENERATION              MW       200   194.07    194.95    191.98    153.33    153.15    185.92     166.3    181.67    180.67

 4    % LOAD                         %       100    97.04     97.48     95.99     76.67     76.58     92.96     83.15      90.84    90.34


                                   KCAUK
 5    G C V OF COAL                         4300     4597      4090      4450      3986      4018      3863      3502      3955      3973
                                     G


 6    FLUE GAS TEMP. AFTER APH     DEGC      138    132.5    148.06        142   133.65        147    135.5     144.6      151.8    152.5


                                            23.5
 7    % EXCESS AIR                   %              22.09     25.07     23.53     38.34     43.05     29.15     18.64      16.02    16.86
                                               3
8    HEAT LOSSES IN THE SYSTEM



     i)     UNBURNTS IN ASH



            BOTTOM ASH                   %       0.19        0.33      0.44      0.31      0.38      0.26      0.39     0.35      0.28      0.24



            ECO/APH ASH                  %       0.02        0.27      0.28      0.13      0.08       0.1      0.21     0.16      0.15       0.1



            FLY ASH                      %        0.2        1.06      0.82      1.17      0.62      0.71      1.22     0.69       0.6      0.34



     ii)    SENSIBLE HEAT IN FLUE GAS    %       4.67        4.15      5.00      4.64      4.91      5.79      4.59     4.27      4.51      4.59


     iii)   MOISTURE & HYDROGEN IN
                                         %        5.2        5.73      6.28      5.71      6.09      6.08      6.29     6.74      6.01      6.06
            FUEL


     iv)    MOISTURE IN COMB. AIR        %        0.2        0.16      0.21      0.17     O 19       0.21      0.18     0.19      0.17       0.2



     v)     RADIATION & UNACCOUNTED      %       0.85        0.85      0.85      0.85      0.85      0.85      0.85     1.25      1.25      1.25



                                                 11.3
               TOTAL LOSSES              %                  12.54     13.88     12.97     13.22     14.10     13.73    13.65     12.98     12.77
                                                        3

                                                 88.6
9    BOILER EFFICIENCY                   %                  87.46     86.12     87.03     86.78     85.90     86.27    86.35     87.02     87.23
                                                        7

                                                 2211
                                        KCal/k
                                                        .                                                             2254.7
10   OVERALL HEAT RATE                       W            2788.45   2439.94   2734.17   2701.04   2699.61   2551.80            2432.27   2473.95
                                                        4                                                                  6
                                             h
                                                        4
DISCUSSION:
   The Controllable losses, include Sensible
    heat lost in Dry flue gases & Unburnts in
    Carbon (in Fly ash, Bottom ash and
    Economiser / APH hopper ash) account for
    5.08% of Overall Input heat to Boiler or
    44.80% of the Total Heat losses. The losses
    due to Radiation, Moisture & Hydrogen in
    Coal and Moisture in Combustion air account
    for the uncontrollable losses.
Trial findings indicate the range of total losses to be as under
                         Total losses in Boiler

                                     Range (%)                   Average (%)

        Unit data    12.54 to 14.1                                  13.32

          Design                                      11.33




       Share of controllable losses in total


                                      Range (%)                   Average (%)



         Unit data                                5.27 to 6.86       6.00


            Design                                       5.08
SENSIBLE HEAT LOSS IN DRY
FLUE GASES
Heat losses in Dry flue gases, are characteristically influenced
by Excess Air Quantity and Exit Flue Gas Temperature, which
in turn, are variant with, Coal Quality (GCV, Fineness, Ash
content) and Air In leaks. The profile of Sensible heat in Dry
flue gases during trials is summarized as under.



           % loss due to sensible heat in dry flue gases

                           Range (%)              Average (%)

        Unit data                  4.15 to 5.79      4.74
          Design                       4.67
VARIATION OF SENSIBLE HEAT LOSSES IN DRY FLUE GAS



S
 .   Item Reference        Unit     Design    T1     T2     T3      T4     T5      T6      T7      T8      T9
N
o.




1    G C V of Coal        Kcal Kg    4300    4597    4090   4450   3986    4018   3563    3502    3955    3973


     % of excess air
2                           %        23.5    22.1    25.1   23.5   38.3    43.1   29.1    18.6     16     16.9
     level


     FGT at APH
3
     outlet
                            °C       138     132.5   148    142    133.6   147    135.5   144.6   151.8   152.5




     % loss due to S.H.
4                           %        4.67    4.15     5     4.64   4.91    5.79   4.59    4.27    4.51    4.59
     in DFG
EXCESS AIR
   Excess air is crucial factor in Boiler Thermal
    efficiency. Excess Air levels depends to a large
    extent on variants like, GCV of Coal, Ash Content,
    Fineness of Pulverized Coal, Moisture in Coal and
    Air In leaks especially before and after APH.

        The Excess Air quantity admitted to Boiler
        during the trials was seen to vary as under.

                           Range (%)             Average (%)

            Unit data           16.00 to 43.10      25.90
              Design                   23.50
EXIT FLUE GAS TEMPERATURE
   The flue gas temperature after Air pre heater is
    a key Factor affecting Boiler Efficiency



                         Range (%)               Average (%)

         Unit data              132.5 to 152.5      143.1
           Design                    138.0
INLEAK AIR
     In leak Air, especially in the Air Preheated Flue gas
      path, has the detrimental effects of reducing heat
      Transfer Effectiveness of APH, shifting the draft
      levels in the Flue gas path and increasing ID Fan
      duty in terms of Capacity

                   % In leak Range Across 
                                              % In leak Range from 
                                                 APH to ID Fan in
                             APH


       Unit data              4.73 to 16.94       9.41 to 21.40



Continuous upkeep of APH Seals, Monitoring and Strict control of
Inleak Air is recommended, to minimize the Inleak Air quantities and
losses thereof
AIR PROFILE IN FLUE GAS PATH AND AIR INLEAK ASSESSMENT

S.
                      Item Reference                        Unit    T1       T2       T3       T4       T5       T6       T7      T8      T9
N
o.

1    O2 APH-A in                                             %      2.68     3.50     3.55     5.50    6.18      3.05     2.25    2.96   3.00

2    O2 APH-B in                                             %      2.08     2.18     2.28     4.58    4.95      2.10     2.85    2.83   3.06

3    O2 APH-A out                                            %      4.18     4.85     4.53     6.20    688       5.65     327     3.96   4.10

4    O2 APH-B out                                            %      3.43     3.58     3.48     5.45    5.78      3.93     4.12    3.76   4.03

5    O2 ID Fan-A in                                          %      5.65     6.25     5.83     7.48    7.45      6.25     5.47    5.96   5.83

6    O2 ID Fan-B in                                          %      5.10     4.75     4.98     6.65    6.73      5.20     6.05    5.80   5.66

                                                                                                                                  116.   116.6
7    Total air level at APH-A in (Theoretical +Inleak)       %     114.60   120.00   120.34   135.48   141.65   116.99   112.00
                                                                                                                                   41      7

                                                                                                                                  115.   117.0
8    Total air level at APH -B in (Theoretical +Inleak)      %     110.96   111.55   112.15   127.85   130.84   111.11   115.70
                                                                                                                                   58      6

                                                                                                                                  123.   124.2
9    Total air level at APH-A in (Theoretical +Inleak)       %     124.81   130.03   127.47   141.89   148.67   136.81   118.44    24      6

                                                                                                                                  121.   123.7
10   Total air level at APH-B in (Theoretical +Inleak)       %     119.49   120.52   119.83   135.05   137.93   122.99   124.41    81      5

                                                                                                                                  139.   138.4
11   Total air level at ID Fan-A in (Theoretical +Inleak)    %     136.81   142.37   138.39   155.27   154.98   142.37   135.22    63      3

                                                                                                                                  138.   136.9
12   Total air level at ID Fan-A in (Theoretical +Inleak)    %     132.08   129.23   131.05   146.34   147.11   132.91   140.47
                                                                                                                                   16      0

13   Inleak Across APH-A (wrt APH-A in)                      %      8.92     8.36     5.92     4.73     4.96    16.94     5.75    5.87   6.51
14   Inleak Across APH-B (wrt APH-B in)                      %      7.68     8.03     6.85     5.63     5.42    10.69     7.52    5.39   5.72

                                                                                                                                  19.9
15   Inleak After APH-A (wrt APH-A in)                       %     19.38    18.64    14.99    14.60     9.41    21.69    20.73           18.66
                                                                                                                                   5

                                                                                                                                  19.5
16   Inleak After APH-B (wrt. APH-B in)                      %     19.03    15.85    16.85    14.46    12.43    19.62    21.40           16.95
                                                                                                                                   4
COAL QUALITY
   The GCV of Coal, against the design
    requirement of 4300 Kcal/Kg was seen
    to range from 3502 to 4597Kcal/Kg as
    under, during the trial period


                              Range (%)

                 Unit data    3502 to 4597
                   Design        4300
Ash % in Coal
   Increase of Ash Content leads to Increased un
    burnts, Loss due to Sensible heat in ash,
    Increased Soot blowing frequency, Increased
    mill load for same useful output

                       % Ash in Coal

                       Range (%)           Average (%)

        Unit data     24.21 to 39.96          31.90
          Design                   32.00
M & H LOSSES IN FLUE GASES
S.
     N
     o Item Reference          Unit     Design        T1       T2       T3      T4        T5      T6      T7     T8         T9
     .


                                                                                                         144.0   151.      152.
1     FGT APH out               O
                                    C      138        132.5   148.06   142     133.65   147      135.5
                                                                                                             6       8         5

                                                                                                                           240.
      Heat loss in flue                                                                          242.9
2                             KCal/Kg     223.6      263.4    256.85   254.1   242.74   244.29           236.0   237.          7
      gases due to M&H                                                                               8
                                                                                                                               6

                                                                                                                           11.2
3     M in Coal                 %          10        13.6     13.85     12.7   12.65     12.4     13     11.66   10.6
                                                                                                                               5

4     H in Coal                 %         2.82       3.18      2.99     3.09    2.91     2.93    2.88    2.91    3.03      3.02

                                                                                                                 395
5     GCV of Coal             KCal/Kg     4300       45.97    4090     4450    3986      4018    3863    3502              3973
                                                                                                                       5

      Loss due to
6     M & H in Coal             %          5.2       5.73      6.28     5.71    6.09     6.08    6.29    6.74    6.01      6.06


      Corrected loss due to
7
      M & H in Coal
                                %       Ref (5.20)     5.48    5.83     5.49    5.62     5.73    5.84    6.13    5.66      5.71
COAL FINENESS
   Against the design Coal Fineness requirement of 70%
    passing through 200 mesh, the decreased fineness is
    known to affect the Boiler Efficiency detrimentally
    through Increased Excess Air requirements as well as
    Higher percent Unburnts in Ash.

         Unit data         Fineness rejects    48 to 63 %
                            across 200 mesh




It is our considered opinion that improvements in Mill operations
towards achieving rated Coal Fineness should be a prime area of
concern. The results would be manifest as reduced Excess Air
Losses and Reduced Unburned in Ash Loss.
HEAT LOSS DUE TO UNBURNTS
IN ASH
       Heat loss due to un burnts in ash is a
        manifestation of fuel Combustion efficiency and
        is known to depend upon operational factors like
        % Ash, Fineness of Coal, Excess Air level, Wind
        box Pressure, Primary & Secondary Air
        Distribution and Hot Air temperature, condition of
        burners, as also Ash fusion temperatures
                  Percentage Loss Due to Unburnts in Ash

                             Range (%)             Average (%)

           Unit data         0.68 to 1.82                  1.29
             Design                         0.41
FD AIR FLOW & PA/SA DISTRIBUTION
FD Air constitutes one of the influencing factors on Combustion Efficiency. The FD Air
flow, Air to Coal ratio, Primary Air flow, Primary Air to Secondary Air ratios and Primary
Air to Coal ratio during all the Boiler trials are assessed, vis-a-vis the design values for
the Boiler and the findings indicate satisfactory performance levels in all these respects.
The findings are presented in following tables.

                                          F.D. AIR FLOW INDICATORS


   S
   .                               Desi
   N     Item Reference    Unit            T1      T2      T3      T4      T5      T6      T7      T8     T9
                                    gn
   o
   .




                                   725.
   1   Total Air Flow      TPH      4     773.9   769.3   738.5   726.3   691.4   743.8   598.5   615.4   703


       Total Air to Coal
   2   Ration              Kg/Kg    7     6.56     6.6    6.25    6.78      6.7    6      5.58     5.5    6.24
A,B,D,    ABC             A,B,                     A.B
                                          A,B,D,                                             A,B.C            A,B,C,
                                                        E       D    AB,D        D BC,D,E                C,
3   Mills Run                      5           E                                                 0                 D
                                                        ,        ,       F        ,    ,F                D,
                                              ,F                                                 F                 F
                                                        F       F                F                        F




                                                                                     246.3
4   Primary Air Flow      TPH     216.2   232.9    233.5     241     198     201             229     222      229.3
                                                                                         5


                                                                     508.    490.
5   Secondary Air Flow    TPH     509.2    541     535.8    497.5                    497.5   369.4   393.4    473.7
                                                                         3       4



6   Primary Air Flow       %      29.8    30.1     30.4      32.6    28.1    29.1     33        38    36      32.6



7   Secondary Air Flow     %      70.2    69.9     69.6     . 67.4   "71.9   70.9     67        62    64      67.4




    Primary Air to Coal
8
         Ratio
                          Kg/Kg   2.09    1.97       2       2.04    1.9     1.95     2      2.13    1.98     2.03
WIND BOX PRESSURE
   Wind Box pressure is known to be one of the
    key factors affecting Combustion Efficiency. Trial
    findings indicate the actual Wind Box pressure to
    be less than 50 mmWC as against 160 mmWC
    design value.
   Significant power savings potential exists in FD
    Fans by incorporating Variable speed drives, etc
SECONDARY AIR
TEMPERATURE
   Combustion Efficiency is closely linked with temperature of
    Secondary Air and effects of temperature drop (Secondary
    Combustion Air) are normally manifest as commensurate
    rise in % Unburnts in Ash.




                           Range (OC)           Average (OC)


          Unit data       210.9 to 240.0           225.0

            Design                      263.0
The Secondary Air temperature being lower
from design value is expected to effect

   Mill performance in terms of Moisture removal and
    final Coal Output Fineness
   Unburnts in Ash
    The main influencing factor for low Secondary Air temperature
    is felt to be the lower Flue Gas temperature at APH inlet as
    shown below

                               Range (OC)              Average (OC)

                Data                  241.0 to 290.0      270.0
              Design                        337.0
Focus areas for improvement are felt
to be
 Wind Box pressure
 APH Effectiveness (Inleak Air at APH
  inlet)
 Coal Mill performance
Thank you

More Related Content

What's hot

FIre Fighting Elite Fire hydraulic Calculation As per NFPA Standard
FIre Fighting Elite Fire hydraulic Calculation As per NFPA StandardFIre Fighting Elite Fire hydraulic Calculation As per NFPA Standard
FIre Fighting Elite Fire hydraulic Calculation As per NFPA Standardsureshvsvg
 
New holland sb65 braud service repair manual
New holland sb65 braud service repair manualNew holland sb65 braud service repair manual
New holland sb65 braud service repair manualfujsjefksekmem
 
B121116
B121116B121116
B121116irjes
 
1_Wheatstone Summer_30Dec2010
1_Wheatstone Summer_30Dec20101_Wheatstone Summer_30Dec2010
1_Wheatstone Summer_30Dec2010CangTo Cheah
 
kale amd khandale ic engine (1).pdf
kale amd khandale ic engine (1).pdfkale amd khandale ic engine (1).pdf
kale amd khandale ic engine (1).pdfShyam Mishra
 
TRG SERIE ERGIT _ ENGLISH
TRG SERIE ERGIT _ ENGLISHTRG SERIE ERGIT _ ENGLISH
TRG SERIE ERGIT _ ENGLISHantoniocarraro
 
Kubota d1005 e3 bg diesel engine service repair manual
Kubota d1005 e3 bg diesel engine service repair manualKubota d1005 e3 bg diesel engine service repair manual
Kubota d1005 e3 bg diesel engine service repair manualfusjjfksekmme
 
3c oil injection system
3c oil injection system3c oil injection system
3c oil injection systemjpriley485
 
Haynes Manuals Citroen Xsara English
Haynes Manuals Citroen Xsara EnglishHaynes Manuals Citroen Xsara English
Haynes Manuals Citroen Xsara Englishguest7469d1
 
Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...Dmitry Kuraev
 
Claas celtis 456 426 ra (type a07) tractor service repair manual
Claas celtis 456 426 ra (type a07) tractor service repair manualClaas celtis 456 426 ra (type a07) tractor service repair manual
Claas celtis 456 426 ra (type a07) tractor service repair manualfjsjjekdkme
 

What's hot (17)

C11
C11C11
C11
 
Atego2628 k
Atego2628 kAtego2628 k
Atego2628 k
 
FIre Fighting Elite Fire hydraulic Calculation As per NFPA Standard
FIre Fighting Elite Fire hydraulic Calculation As per NFPA StandardFIre Fighting Elite Fire hydraulic Calculation As per NFPA Standard
FIre Fighting Elite Fire hydraulic Calculation As per NFPA Standard
 
Manual de taller kia sorento
Manual de taller kia sorento Manual de taller kia sorento
Manual de taller kia sorento
 
6 ltaa8.9 g2(英文版)
6 ltaa8.9 g2(英文版)6 ltaa8.9 g2(英文版)
6 ltaa8.9 g2(英文版)
 
New holland sb65 braud service repair manual
New holland sb65 braud service repair manualNew holland sb65 braud service repair manual
New holland sb65 braud service repair manual
 
B121116
B121116B121116
B121116
 
1_Wheatstone Summer_30Dec2010
1_Wheatstone Summer_30Dec20101_Wheatstone Summer_30Dec2010
1_Wheatstone Summer_30Dec2010
 
kale amd khandale ic engine (1).pdf
kale amd khandale ic engine (1).pdfkale amd khandale ic engine (1).pdf
kale amd khandale ic engine (1).pdf
 
2011 ram chassis cab specifications e brochure
2011 ram chassis cab specifications e brochure2011 ram chassis cab specifications e brochure
2011 ram chassis cab specifications e brochure
 
TRG SERIE ERGIT _ ENGLISH
TRG SERIE ERGIT _ ENGLISHTRG SERIE ERGIT _ ENGLISH
TRG SERIE ERGIT _ ENGLISH
 
Kubota d1005 e3 bg diesel engine service repair manual
Kubota d1005 e3 bg diesel engine service repair manualKubota d1005 e3 bg diesel engine service repair manual
Kubota d1005 e3 bg diesel engine service repair manual
 
3c oil injection system
3c oil injection system3c oil injection system
3c oil injection system
 
Haynes Manuals Citroen Xsara English
Haynes Manuals Citroen Xsara EnglishHaynes Manuals Citroen Xsara English
Haynes Manuals Citroen Xsara English
 
Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...Effective decisions for the complicated well market on the basis of submersib...
Effective decisions for the complicated well market on the basis of submersib...
 
Claas celtis 456 426 ra (type a07) tractor service repair manual
Claas celtis 456 426 ra (type a07) tractor service repair manualClaas celtis 456 426 ra (type a07) tractor service repair manual
Claas celtis 456 426 ra (type a07) tractor service repair manual
 
Overhead set (obc)
Overhead set (obc)Overhead set (obc)
Overhead set (obc)
 

Viewers also liked

Applied thermodynamics for engineering technologists
Applied thermodynamics for engineering technologistsApplied thermodynamics for engineering technologists
Applied thermodynamics for engineering technologistsTanveer Hussain
 
Antepartum hemorrhage
Antepartum hemorrhageAntepartum hemorrhage
Antepartum hemorrhageSnigdha Gupta
 
Energy performance assessment of boilers
Energy performance assessment of boilersEnergy performance assessment of boilers
Energy performance assessment of boilersUtsav Jain
 

Viewers also liked (6)

4.1 boiler
4.1 boiler4.1 boiler
4.1 boiler
 
4 ch1
4 ch14 ch1
4 ch1
 
Dry heat losses in boiler
Dry heat losses in boilerDry heat losses in boiler
Dry heat losses in boiler
 
Applied thermodynamics for engineering technologists
Applied thermodynamics for engineering technologistsApplied thermodynamics for engineering technologists
Applied thermodynamics for engineering technologists
 
Antepartum hemorrhage
Antepartum hemorrhageAntepartum hemorrhage
Antepartum hemorrhage
 
Energy performance assessment of boilers
Energy performance assessment of boilersEnergy performance assessment of boilers
Energy performance assessment of boilers
 

Similar to Boiler ea case study 16 jan 2012 varanasi

Balance de flotacion por el metodo computacional
Balance de flotacion por el metodo computacionalBalance de flotacion por el metodo computacional
Balance de flotacion por el metodo computacionalJavier Garcia Rodriguez
 
Training presentation
Training presentation Training presentation
Training presentation Keyur Patel
 
Calendario valorizado sistema de recreacion amotape
Calendario valorizado  sistema de recreacion amotapeCalendario valorizado  sistema de recreacion amotape
Calendario valorizado sistema de recreacion amotapeEdikson Soto
 
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation DiagramsShakeel Vakkil
 
Review W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxReview W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxssuserb71d4d
 
13 ta data sheet - flypartsguy.com - 10.2018
13 ta   data sheet - flypartsguy.com - 10.201813 ta   data sheet - flypartsguy.com - 10.2018
13 ta data sheet - flypartsguy.com - 10.2018FrankEasel
 
ANNUAL REPORT 2015
ANNUAL REPORT 2015ANNUAL REPORT 2015
ANNUAL REPORT 2015Eko Untung
 
Dimethyl Ether Production
Dimethyl Ether ProductionDimethyl Ether Production
Dimethyl Ether ProductionAziz Albattah
 
Santee Cooper Laydown Yard Project
Santee Cooper Laydown Yard ProjectSantee Cooper Laydown Yard Project
Santee Cooper Laydown Yard ProjectTJ Griffin
 
Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineSafdar Ali
 

Similar to Boiler ea case study 16 jan 2012 varanasi (20)

Balance de flotacion por el metodo computacional
Balance de flotacion por el metodo computacionalBalance de flotacion por el metodo computacional
Balance de flotacion por el metodo computacional
 
Cogeneration power plant
Cogeneration power plantCogeneration power plant
Cogeneration power plant
 
13 b shukla
13 b shukla13 b shukla
13 b shukla
 
Consumi petrolio 2012_03
Consumi petrolio 2012_03Consumi petrolio 2012_03
Consumi petrolio 2012_03
 
Training presentation
Training presentation Training presentation
Training presentation
 
Consumi petrolio 2012_06
Consumi petrolio 2012_06Consumi petrolio 2012_06
Consumi petrolio 2012_06
 
Calendario valorizado sistema de recreacion amotape
Calendario valorizado  sistema de recreacion amotapeCalendario valorizado  sistema de recreacion amotape
Calendario valorizado sistema de recreacion amotape
 
Consumi petrolio 2012_09
Consumi petrolio 2012_09Consumi petrolio 2012_09
Consumi petrolio 2012_09
 
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
 
Review W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptxReview W 26 & Plan Week 27 2022_MUM.pptx
Review W 26 & Plan Week 27 2022_MUM.pptx
 
13 ta data sheet - flypartsguy.com - 10.2018
13 ta   data sheet - flypartsguy.com - 10.201813 ta   data sheet - flypartsguy.com - 10.2018
13 ta data sheet - flypartsguy.com - 10.2018
 
ANNUAL REPORT 2015
ANNUAL REPORT 2015ANNUAL REPORT 2015
ANNUAL REPORT 2015
 
Final-report
Final-reportFinal-report
Final-report
 
Dimethyl Ether Production
Dimethyl Ether ProductionDimethyl Ether Production
Dimethyl Ether Production
 
Gas producer plant
Gas producer plantGas producer plant
Gas producer plant
 
Consumi petrolio 2012_04
Consumi petrolio 2012_04Consumi petrolio 2012_04
Consumi petrolio 2012_04
 
Consumi petrolio 2012_08
Consumi petrolio 2012_08Consumi petrolio 2012_08
Consumi petrolio 2012_08
 
Santee Cooper Laydown Yard Project
Santee Cooper Laydown Yard ProjectSantee Cooper Laydown Yard Project
Santee Cooper Laydown Yard Project
 
Analysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mineAnalysing shovel dumper productivity for coal mine
Analysing shovel dumper productivity for coal mine
 
Bjs green belt ppt
Bjs green belt pptBjs green belt ppt
Bjs green belt ppt
 

More from D.Pawan Kumar

Indian energy efficiency scene..a macro perspective.
Indian energy efficiency scene..a macro perspective.Indian energy efficiency scene..a macro perspective.
Indian energy efficiency scene..a macro perspective.D.Pawan Kumar
 
Roadmap for distribution loss reduction.. a step by step approach
Roadmap  for distribution loss reduction.. a step by step approachRoadmap  for distribution loss reduction.. a step by step approach
Roadmap for distribution loss reduction.. a step by step approachD.Pawan Kumar
 
Water conservation opportunities.
Water conservation opportunities.Water conservation opportunities.
Water conservation opportunities.D.Pawan Kumar
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projectsD.Pawan Kumar
 
Cogeneration: regional experiences
Cogeneration: regional experiencesCogeneration: regional experiences
Cogeneration: regional experiencesD.Pawan Kumar
 
Energy efficient technology procurement
Energy efficient technology  procurementEnergy efficient technology  procurement
Energy efficient technology procurementD.Pawan Kumar
 
Ea of cw, ct & cond. system
Ea of cw, ct & cond. systemEa of cw, ct & cond. system
Ea of cw, ct & cond. systemD.Pawan Kumar
 
Training manual on energy efficiency for SMEs
Training manual on energy efficiency for SMEsTraining manual on energy efficiency for SMEs
Training manual on energy efficiency for SMEsD.Pawan Kumar
 
Electricity demand side management and end use efficiency
Electricity demand side management and end use efficiencyElectricity demand side management and end use efficiency
Electricity demand side management and end use efficiencyD.Pawan Kumar
 
As run energy efficiency of cooling towers
As run energy efficiency of cooling towersAs run energy efficiency of cooling towers
As run energy efficiency of cooling towersD.Pawan Kumar
 
Focus areas in economic operation of DG sets
Focus areas in economic operation of DG setsFocus areas in economic operation of DG sets
Focus areas in economic operation of DG setsD.Pawan Kumar
 
Hrsg & turbine as run energy efficiency assessment
Hrsg  & turbine as run energy efficiency assessmentHrsg  & turbine as run energy efficiency assessment
Hrsg & turbine as run energy efficiency assessmentD.Pawan Kumar
 
How to conduct energy audit
How to conduct energy auditHow to conduct energy audit
How to conduct energy auditD.Pawan Kumar
 
Desirable as run information system for energy efficiency of utility clas...
Desirable as run information system  for energy efficiency  of  utility  clas...Desirable as run information system  for energy efficiency  of  utility  clas...
Desirable as run information system for energy efficiency of utility clas...D.Pawan Kumar
 
As run boiler performance assessment for energy efficiency
As run boiler performance assessment for energy efficiencyAs run boiler performance assessment for energy efficiency
As run boiler performance assessment for energy efficiencyD.Pawan Kumar
 
Energy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans pptEnergy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans pptD.Pawan Kumar
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildingsD.Pawan Kumar
 
Compressed air and refrigeration system
Compressed air and refrigeration systemCompressed air and refrigeration system
Compressed air and refrigeration systemD.Pawan Kumar
 

More from D.Pawan Kumar (19)

Indian energy efficiency scene..a macro perspective.
Indian energy efficiency scene..a macro perspective.Indian energy efficiency scene..a macro perspective.
Indian energy efficiency scene..a macro perspective.
 
Roadmap for distribution loss reduction.. a step by step approach
Roadmap  for distribution loss reduction.. a step by step approachRoadmap  for distribution loss reduction.. a step by step approach
Roadmap for distribution loss reduction.. a step by step approach
 
Water conservation opportunities.
Water conservation opportunities.Water conservation opportunities.
Water conservation opportunities.
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projects
 
Cogeneration: regional experiences
Cogeneration: regional experiencesCogeneration: regional experiences
Cogeneration: regional experiences
 
Energy efficient technology procurement
Energy efficient technology  procurementEnergy efficient technology  procurement
Energy efficient technology procurement
 
Ea of cw, ct & cond. system
Ea of cw, ct & cond. systemEa of cw, ct & cond. system
Ea of cw, ct & cond. system
 
Ee opportunities
Ee opportunities Ee opportunities
Ee opportunities
 
Training manual on energy efficiency for SMEs
Training manual on energy efficiency for SMEsTraining manual on energy efficiency for SMEs
Training manual on energy efficiency for SMEs
 
Electricity demand side management and end use efficiency
Electricity demand side management and end use efficiencyElectricity demand side management and end use efficiency
Electricity demand side management and end use efficiency
 
As run energy efficiency of cooling towers
As run energy efficiency of cooling towersAs run energy efficiency of cooling towers
As run energy efficiency of cooling towers
 
Focus areas in economic operation of DG sets
Focus areas in economic operation of DG setsFocus areas in economic operation of DG sets
Focus areas in economic operation of DG sets
 
Hrsg & turbine as run energy efficiency assessment
Hrsg  & turbine as run energy efficiency assessmentHrsg  & turbine as run energy efficiency assessment
Hrsg & turbine as run energy efficiency assessment
 
How to conduct energy audit
How to conduct energy auditHow to conduct energy audit
How to conduct energy audit
 
Desirable as run information system for energy efficiency of utility clas...
Desirable as run information system  for energy efficiency  of  utility  clas...Desirable as run information system  for energy efficiency  of  utility  clas...
Desirable as run information system for energy efficiency of utility clas...
 
As run boiler performance assessment for energy efficiency
As run boiler performance assessment for energy efficiencyAs run boiler performance assessment for energy efficiency
As run boiler performance assessment for energy efficiency
 
Energy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans pptEnergy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans ppt
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
 
Compressed air and refrigeration system
Compressed air and refrigeration systemCompressed air and refrigeration system
Compressed air and refrigeration system
 

Boiler ea case study 16 jan 2012 varanasi

  • 1. CASE STUDY ON AS RUN BOILER ENERGY AUDIT AND REPORTING D PAWAN KUMAR & R VIRENDRA NATIONAL PRODUCTIVITY COUNCIL, INDIA (16 January 2012)
  • 2. OBJECTIVES Efficiency of Boiler  As run Boiler efficiency, at three representative load setting over 9 trials  Assessment of Boiler Loss Profile and Heat rate during trial conditions  Assessment of Heat Exchangers Effectiveness of Heat Exchangers such as Air Preheaters, Economisers, Condensers etc
  • 3. INSTRUMENTS REQUIRED  Flue gas analysers  Portable temperature indicator  On-line instruments of boiler control room.  Facilities of the chemistry lab or outside lab for coal / ash / water analysis. (coal proximate or ultimate analysis, un-burnt in bottom and fly ash, TDS, pH of feed water / blow-down / condensate.  Power analyser for power measurement of ID fan, FD fan, ESP, crushers, BFP (boiler feed water pump) cool handling plant/ash handling plant, etc.
  • 4. METHODOLOGY  Boiler Efficiency trials are normally conducted at three representative typical load ranges namely, 100% of NCR, 80% of NCR and 60% of NCR  Performance assessment chosen is the indirect method of heat loss and Boiler Efficiency calculation, drawn from Indian Standard (IS-8753/1977) and the deployed relations are presented as follows  During the Boiler trials, following key parameters are monitored as Power Generation, Coal Consumption, GCV of Coal, Total Air Flow, Mill rejects, GCV of Mill rejects, Combustibles in bottom ash, Bottom ash Quantity, Combustibles in ECO/APH ash, ECO/APH ash Quantity, Combustibles in Fly ash, Fly ash Quantity, Flue gas analysis APH outlet for %CO2, %O2 and temperature, Ambient air dbt, wbt and RH%, P.A. (Proximate Analysis) of coal, V.A. (Ultimate Analysis) of coal, various flows, pressure and temperature in steam, water, air, flue gas path, power measurement at key auxiliaries.
  • 5. BASIS FOR HEAT LOSS CALCULATIONS:
  • 6.
  • 7. BOILER PARAMETERS  THE LIST OF NEARLY 136 BOILER PARAMETERS MONITORED AND THE CORRESPONDING TRASNDUCER REFERENCES VIS-À-VIS THE DAS SYSTEM ARE ALSO TO BE REPORTED. DESIGN OPERATING PARAMETERS (Reference values) are also to be reported  Design Flow, Temperatures and Pressures for Steam, Water, Fuel & air and Flue gas along with Pressure drops as relevant are also reported. Design heat balance is also reported as reference basis.
  • 8. Present case is of a 200 MW boiler  AS RUN AUDIT FINDINGS  PLANT ROAD Available data is for 100%, 80%, 60% NCR.  The three typical load ranges at which the Boiler Performance could be assessed was Load Setting No of Trials a) > 90% of NCR 6 b) > 80% of NCR 1 c) > 70% of NCR 2 Total: 9
  • 9. KEY BOILER TRIAL FINDINGS  The Key Boiler trial findings in respect of Auxiliary Consumption, Feeder wise Coal Consumption, Coal GCV, DM Water Consumption, Power Generation, Specific Coal Consumption and Overall Heat Rate are presented in the following tables.
  • 10. SUMMARY OF KEY BOILER TRIAL FINDINGS S.N O PARAMETERS UNITS TRIAL 1 TRIAL 2 TRIAL 3 TRIAL 4 TRIAL 5 TRIAL 6 TRIAL 7 TRIAL 8 TRIAL 9 . 1 DATE 1445- 0915- 1015- 1500- 1915- 1430- 1430- 1430- 2 DURATION HRS 0900-1300 18 13 14 19 13 18 18 18 45 15 15 00 15 30 30 30 3 TORAL DURATION HRS 4.00 4.00 4.00 3.75 3.50 3.75 3.00 3.00 3.00 TOTAL 4 MWH 776.40 779.70 768.00 570.50 531.00 701.00 499.00 545.00 542.00 GENERATION TOTAL AUXILIARY 5 MWH 26.15 26.23 26.04 18.35 16.75 26.75 16.70 17.40 18.40 CONSUMN.-1 TOTAL AUXILIARY 6 MWH 27.05 27.07 27.21 24.50 22.60 25.27 16.30 16.80 17.60 CONSUMN.-2 TOTAL AUXILIARY CONSUMN. 7 MWH 53.20 53.30 53.25 42.85 39.35 52.02 33.00 34.20 36.00 (ITEM5+ITEM6 ) COAL FEEDER-A 8 MT 81.70 97.90 87.80 97.50 91.20 - 63.90 68.80 67. 50 CONSUMN.
  • 11. COAL FEEDER-B 9 MT 96.30 95.90 97.80 94.60 88.10 91.60 65.50 66.90 65.'00 CONSUMN. COAL FEEDER-C 10 MT - - 95.40 - - 93.50 66.50 70.90 73.20 CONSUMN. COAL FEEDER-D 11 MT 89.00 90.90 89.90 94.60 85.40 88.80 60.00 56.70 59.80 CONSUMN. COAL FEEDER-E 12 MT 89.40 90.90 - - - 85.80 - - - CONSUMN. COAL FEEDER-F 13 MT 90.20 93.30 91.60 95.40 87.60 91.30 66.10 72.50 72:50 CONSUMN. OM WATER 14 MT 40.85 35.80 40.85 30.80 28.55 37.05 37.35 33.05 29.30 CONSUMN. 4597.0 4090.0 4450.0 3986.0 4018.0 3863.0 3502.0 3955.0 3973.0 15 G CVOFCOAL KCAUKG 0 0 0 0 0 0 0 0 0 SUMMARY :
  • 12. AVERAGE POWER 151 186 166 181 180 16 MW 194.10 194.93 192.00 152.13 GENERATION .71 .93 .33 .67 .67 75. 93. 83. 90. 90. 17 % OF NCR % 97.05 97.46 96.00 76.07 86 47 17 83 33 AUXILIARY 11. 13. 11. 11. 12. 18 MW 13.30 13.33 13.31 11.43 CONSUMN. 24 87 00 40 00 % AUXILIARY 7.4 7.4 6.6 6.2 6.6 19 % 6.85 6.84 6.93 7.51 CONSUMN. 1 2 1 8 4 COAL 100 120 107 111 112 20 MT/HR 11.65 117.23 115.63 101.89 CONSUMN.RATE .66 .27 .33 .93 .67 OM WATER 8.1 9.8 12. 11. 9.7 21 MTIHR 10.21 8.95 10.21 8.21 CONSUMN. RATE 6 8 45 02 7 OM WATER 0.0 0.0 0.0 0.0 0.0 22 KGIKWH 0.05 0.05 0.05 0.05 CONSUMN. 5 5 7 6 5 0.6 0.6 0.6 0.6 0,6 23 SP. COAL CONSUMN. KGIKWH 0.58 0.60 0.60 0.67 6 4 5 2 2 266 248 225 243 247 OV ERALL HEAT 24 KCAUKWH 2644.28 2549.67 9.85 2669.68 5.8 5.3 9.8 6.8 7.6 RATE 0 3 1 6 3
  • 13. KEY PARAMETERS DURING TRIALS VIS-A-VIS DESIGN  The key Boiler parameters, pertinent to Thermal Efficiency, namely the MW Generation (Load), Coal Consumption, GCV of Coal, Total Air Flow, Mill Rejects, GCV of Mill Rejects, Combustibles in Bottom Ash, Fly Ash, Flue Gas Anal1ysis at APH Out, Ambient conditions, Proximate Analysis of Coal, alongside the design values, are reported as under.
  • 14. BOILER PERFORMANCE EVALUATION: SUMMARY OF KEY PARAMETERS DURING BOILER TRIALS S Trial . Operating Parameters U nit Design Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Trial 6 Trial 7 Trial 8 9 N o 1. POWER GENERATION MW 200.00 194.07 194.95 191.98 153.33 153.15 185.92 166.30 181.67 180.67 2. % OF NCR % 100.00 97.04 97.48 95.99 76.67 76.58 92.96 83.15 90.84 90.34 3. COAL CONSUMPTION TPH 103.00 117.94 116.55 118.18 104.11 103.11 123.04 107.26 111 .90 112.67 16795. 16607. 4. G C V OF COAL KJ/KG 17974.00 19215.46 17096.20 18601.00 16661.48 16147.34 14638.36 16531.90 24 14 5. TOTAL AIR FLOW TPH 725.40 773.92 769.30 738.56 706.29 691.94 743.79 598.50 615.40 703.00 6 MILL REJECTS KG/HR 339.90 389.20 384.62 389.99 343.56 340.26 406.03 353.96 369.27 371.81 2500.0 1800.0 7. G C V OF MILL REJECTS KCAUKG 1800.00 2610.00 2660.00 2550.00 2420.00 2150.00 1860.00 1880.00 0 0 8. COMB. IN BOTTOM ASH % 2.01 5.10 5.00 4.10 3.70 2.59 3.60 2.50 2.65 2.25 33766. 33766. 9. C V OF CARBON KJ/KG 33766.04 33766.04 33766.04 33766.04 33766.04 33766.04 33766.04 33766.04 04 04 1 BOTTOM ASH QTY. (Dry basis) KG/KG 0.05 0.04 0.04 0.04 0.05 0.05 0.05 0.06 0.05 0.05 0.
  • 15. 1 1 COMB. IN ECO/APH ASH % 0.23 5.00 4.00 2.10 1.00 1.22 2.35 1.38 1.70 1.20 . 1 2 ECO/APH ASH QTY. (Dry basis) KG/KG 0.04 0.03 0.04 0.03 0.04 0.04 0.04 0.05 0.04 0.04 . 1 3 COMB. IN FLY ASH % 0.46 3.45 2.00 3.30 1.30 1.49 2.40 1.04 1.20 0.70 . 1 4 FLY ASH QTY. (Dry basis) KG/KG 0.23 0.17 0.21 0.19 0.24 0.24 0.24 0.29 0.24 0.24 . 1 5 FLUE GAS ANAL YSIS (APH OUT) . CARBON DIOX!DE (CO2) % 15.00 15.20 14.79 15.00 13.18 12.68 14.26 15.70 16.10 15.97 OXYGEN (02) % 4.00 3.80 4.21 4.00 5.82 6:32 4.74 3.30 2.90 3.03 147.0 152.5 TEMPERATURE DEGC 138.00 132.50 148.06 142.00 133.65 135.50 144.60 151:80 0 0
  • 16. 1 6 AMBIENT CONDITIONS . DRY BULB TEMP DEGC 28.00 34.00 34.00 34.00 34.00 34.00 34.00 40.00 40.00 40.00 WET BULB TEMP DEGC 0.00 RELATIVE HUMIDITY % 0.00 52.00 52.00 61.50 MOISTURE LOAD (/100)# KG/KG 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 1 7 PROXIMA TE ANAL YSIS OF COAL . FIXED. CARBON % 32.54 8.14 33.29 37.12 32.11 32.44 30.71 24.17 30.57 30.85 VOLATILE MATTER % 21.46 24.05 24.10 23.11 22.34 22.43 22.53 24.21 24.84 24.35 TOTAL MOISTURE % 10.00 13.'60 13.85 12.70 12:65 12.40 13.00 11.66 10.68 11.25 ASH % 32.00 24.21 28.76 27.00 32.90 32.73 33.76 39.96 33.91 33.51 3973. KCAUK 4018.0 G C V OF COAL 4300.00 4597.00 4090.00 4450.00 3986.00 3863.00 3502.00 3955.00 0 G 0 0
  • 17. 1 8 ULTIMATE ANALYSIS OF COAL . CARBON (C) % 45.00 49.08 44.07 47.71 42.81 43.16 41.53 37.16 42.45 42.60 HYDROGEN (H) % 2.82 3.18 2.99 3.09 2.91 2.93 2.88 2.91 3.03 3.02 MINERAL MATTER % 32.00 24.21 28.76 27.00 32.90 32.73 33.76 39.96 33.91 33.51 NITROGEN (N) % 0.95 1.81 1.81 1.82 1.83 1.83 1.83 1.81 1.80 1.81 SULPHUR (S) % 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 MOISTURE (H2O) % 10.00 13.60 13.85 12.70 12.65 12.40 13.00 11.66 10.68 11.25 OXYGEN (02) [Balance] % 8.85 7.74 8.13 7.31 6.51 6.57 6.62 6.12 7.74 7.44
  • 18. BOILER HEAT LOSSES PROFILE S. Operating Parameters Unit Design Trial1 Trial2 Trial3 Trial4 Trial5 Trial6 Trial7 Trial8 Trial9 N o 5411.5 5249.0 4141.5 4134.4 4744.3 3749.6 4418.7 4469. A. HEAT INPUT TO BOILER KCal/Hr 4422.88 4756.66 4 7 1 5 1 6 0 69 HEAT LOSSES IN THE B. SYSTEM : i) UNBURNTS IN ASH BOTTOM ASH % 0.19 0.33 0.44 0.31 0.38 0.26 0.39 0.35 0.28 0.24 ECO/APH ASH % 0.02 0.27 0.28 0.13 0.08 0.10 0.21 0.16 0.15 0.10 FLY ASH % 0.20 1.06 0.82 1.17 0.62 0.71 1.22 0.69 0.60 0.34 ii) SENSIBLE HEAT IN % 4.67 4.15 5.00 4.64 4.91 5.79 4.59 4.27 4.51 4.59 FLUE GAS iii) MOISTURE IN FLUE % 5.20 5.73 6.28 5.71 6.09 6.08 6.29 6.74 6.01 6.06 GAS
  • 19. iv) MOISTURE IN % 0.20 0.16 0.21 0.17 0.19 0.21 0.18 0.19 0.17 0.20 COMB. AIR v) RADIATION & & 0.85 0.85 0.85 0.85 0.95 0.95 0.85 1.25 1.25 1.25 UNACCOUNT 12.7 TOTAL LOSSES % 11.33 12.54 13.88 12.97 13.22 14.10 13.73 13.65 12.98 7 BOILER EFFICIENCY C 87.2 (100 - TOTAL % 88.67 87.46 86.12 87.03 86.78 85.90 86.27 86.35 87.02 . 3 LOSSES) D 16.8 EXCESS AIR % 23.53 22.09 25.07 23.53 38.34 43.05 29.15 18.64 16.02 . 6 2473 KCal/k 2788. 2734. 2701. 2551. 2254. 2432. 2211.4 2439.9 2699.6 . E. OVERALL HEAT RATE W 4 1 0 8 7 2 4 4 1 9 h 5 7 4 0 6 7 5
  • 20. STATEMENT OF BOILER EFFICIENCY  A Comprehensive Statement of as run Boiler Thermal Efficiency presenting the Boiler Load, Heat Balance, Thermal Efficiency and Overall Heat Rate for the nine trials conducted is presented in following tables:'
  • 21. SUMMARY STATEMENT OF BOILER EFFICIENCY Desi S.N Parameters Units Trial 1 Trial 2 Trial 3 Trial 4 Trial 5 Trial 6 Trial 7 Trial 8 Trial 9 gn o 1 DATE 0900- 1445- 0915- 1015- 1500- 1915- 1430- 1430- 1430- 2 DURATION HRS 1300 1845 1315 1415 1900 1315 1830 1830 1830 3 POWER GENERATION MW 200 194.07 194.95 191.98 153.33 153.15 185.92 166.3 181.67 180.67 4 % LOAD % 100 97.04 97.48 95.99 76.67 76.58 92.96 83.15 90.84 90.34 KCAUK 5 G C V OF COAL 4300 4597 4090 4450 3986 4018 3863 3502 3955 3973 G 6 FLUE GAS TEMP. AFTER APH DEGC 138 132.5 148.06 142 133.65 147 135.5 144.6 151.8 152.5 23.5 7 % EXCESS AIR % 22.09 25.07 23.53 38.34 43.05 29.15 18.64 16.02 16.86 3
  • 22. 8 HEAT LOSSES IN THE SYSTEM i) UNBURNTS IN ASH BOTTOM ASH % 0.19 0.33 0.44 0.31 0.38 0.26 0.39 0.35 0.28 0.24 ECO/APH ASH % 0.02 0.27 0.28 0.13 0.08 0.1 0.21 0.16 0.15 0.1 FLY ASH % 0.2 1.06 0.82 1.17 0.62 0.71 1.22 0.69 0.6 0.34 ii) SENSIBLE HEAT IN FLUE GAS % 4.67 4.15 5.00 4.64 4.91 5.79 4.59 4.27 4.51 4.59 iii) MOISTURE & HYDROGEN IN % 5.2 5.73 6.28 5.71 6.09 6.08 6.29 6.74 6.01 6.06 FUEL iv) MOISTURE IN COMB. AIR % 0.2 0.16 0.21 0.17 O 19 0.21 0.18 0.19 0.17 0.2 v) RADIATION & UNACCOUNTED % 0.85 0.85 0.85 0.85 0.85 0.85 0.85 1.25 1.25 1.25 11.3 TOTAL LOSSES % 12.54 13.88 12.97 13.22 14.10 13.73 13.65 12.98 12.77 3 88.6 9 BOILER EFFICIENCY % 87.46 86.12 87.03 86.78 85.90 86.27 86.35 87.02 87.23 7 2211 KCal/k . 2254.7 10 OVERALL HEAT RATE W 2788.45 2439.94 2734.17 2701.04 2699.61 2551.80 2432.27 2473.95 4 6 h 4
  • 23. DISCUSSION:  The Controllable losses, include Sensible heat lost in Dry flue gases & Unburnts in Carbon (in Fly ash, Bottom ash and Economiser / APH hopper ash) account for 5.08% of Overall Input heat to Boiler or 44.80% of the Total Heat losses. The losses due to Radiation, Moisture & Hydrogen in Coal and Moisture in Combustion air account for the uncontrollable losses.
  • 24. Trial findings indicate the range of total losses to be as under Total losses in Boiler   Range (%) Average (%)  Unit data 12.54 to 14.1 13.32 Design 11.33 Share of controllable losses in total Range (%) Average (%)  Unit data 5.27 to 6.86 6.00 Design 5.08
  • 25. SENSIBLE HEAT LOSS IN DRY FLUE GASES Heat losses in Dry flue gases, are characteristically influenced by Excess Air Quantity and Exit Flue Gas Temperature, which in turn, are variant with, Coal Quality (GCV, Fineness, Ash content) and Air In leaks. The profile of Sensible heat in Dry flue gases during trials is summarized as under. % loss due to sensible heat in dry flue gases   Range (%) Average (%)  Unit data 4.15 to 5.79 4.74 Design 4.67
  • 26. VARIATION OF SENSIBLE HEAT LOSSES IN DRY FLUE GAS S . Item Reference Unit Design T1 T2 T3 T4 T5 T6 T7 T8 T9 N o. 1 G C V of Coal Kcal Kg 4300 4597 4090 4450 3986 4018 3563 3502 3955 3973 % of excess air 2 % 23.5 22.1 25.1 23.5 38.3 43.1 29.1 18.6 16 16.9 level FGT at APH 3 outlet °C 138 132.5 148 142 133.6 147 135.5 144.6 151.8 152.5 % loss due to S.H. 4 % 4.67 4.15 5 4.64 4.91 5.79 4.59 4.27 4.51 4.59 in DFG
  • 27. EXCESS AIR  Excess air is crucial factor in Boiler Thermal efficiency. Excess Air levels depends to a large extent on variants like, GCV of Coal, Ash Content, Fineness of Pulverized Coal, Moisture in Coal and Air In leaks especially before and after APH. The Excess Air quantity admitted to Boiler during the trials was seen to vary as under.   Range (%) Average (%)  Unit data 16.00 to 43.10 25.90 Design 23.50
  • 28. EXIT FLUE GAS TEMPERATURE  The flue gas temperature after Air pre heater is a key Factor affecting Boiler Efficiency Range (%) Average (%)  Unit data 132.5 to 152.5 143.1 Design 138.0
  • 29. INLEAK AIR  In leak Air, especially in the Air Preheated Flue gas path, has the detrimental effects of reducing heat Transfer Effectiveness of APH, shifting the draft levels in the Flue gas path and increasing ID Fan duty in terms of Capacity % In leak Range Across  % In leak Range from  APH to ID Fan in APH  Unit data 4.73 to 16.94 9.41 to 21.40 Continuous upkeep of APH Seals, Monitoring and Strict control of Inleak Air is recommended, to minimize the Inleak Air quantities and losses thereof
  • 30. AIR PROFILE IN FLUE GAS PATH AND AIR INLEAK ASSESSMENT S. Item Reference Unit T1 T2 T3 T4 T5 T6 T7 T8 T9 N o. 1 O2 APH-A in % 2.68 3.50 3.55 5.50 6.18 3.05 2.25 2.96 3.00 2 O2 APH-B in % 2.08 2.18 2.28 4.58 4.95 2.10 2.85 2.83 3.06 3 O2 APH-A out % 4.18 4.85 4.53 6.20 688 5.65 327 3.96 4.10 4 O2 APH-B out % 3.43 3.58 3.48 5.45 5.78 3.93 4.12 3.76 4.03 5 O2 ID Fan-A in % 5.65 6.25 5.83 7.48 7.45 6.25 5.47 5.96 5.83 6 O2 ID Fan-B in % 5.10 4.75 4.98 6.65 6.73 5.20 6.05 5.80 5.66 116. 116.6 7 Total air level at APH-A in (Theoretical +Inleak) % 114.60 120.00 120.34 135.48 141.65 116.99 112.00 41 7 115. 117.0 8 Total air level at APH -B in (Theoretical +Inleak) % 110.96 111.55 112.15 127.85 130.84 111.11 115.70 58 6 123. 124.2 9 Total air level at APH-A in (Theoretical +Inleak) % 124.81 130.03 127.47 141.89 148.67 136.81 118.44 24 6 121. 123.7 10 Total air level at APH-B in (Theoretical +Inleak) % 119.49 120.52 119.83 135.05 137.93 122.99 124.41 81 5 139. 138.4 11 Total air level at ID Fan-A in (Theoretical +Inleak) % 136.81 142.37 138.39 155.27 154.98 142.37 135.22 63 3 138. 136.9 12 Total air level at ID Fan-A in (Theoretical +Inleak) % 132.08 129.23 131.05 146.34 147.11 132.91 140.47 16 0 13 Inleak Across APH-A (wrt APH-A in) % 8.92 8.36 5.92 4.73 4.96 16.94 5.75 5.87 6.51 14 Inleak Across APH-B (wrt APH-B in) % 7.68 8.03 6.85 5.63 5.42 10.69 7.52 5.39 5.72 19.9 15 Inleak After APH-A (wrt APH-A in) % 19.38 18.64 14.99 14.60 9.41 21.69 20.73 18.66 5 19.5 16 Inleak After APH-B (wrt. APH-B in) % 19.03 15.85 16.85 14.46 12.43 19.62 21.40 16.95 4
  • 31.
  • 32. COAL QUALITY  The GCV of Coal, against the design requirement of 4300 Kcal/Kg was seen to range from 3502 to 4597Kcal/Kg as under, during the trial period Range (%) Unit data 3502 to 4597 Design 4300
  • 33. Ash % in Coal  Increase of Ash Content leads to Increased un burnts, Loss due to Sensible heat in ash, Increased Soot blowing frequency, Increased mill load for same useful output % Ash in Coal Range (%) Average (%)  Unit data 24.21 to 39.96 31.90 Design 32.00
  • 34. M & H LOSSES IN FLUE GASES S. N o Item Reference Unit Design T1 T2 T3 T4 T5 T6 T7 T8 T9 . 144.0 151. 152. 1 FGT APH out O C 138 132.5 148.06 142 133.65 147 135.5 6 8 5 240. Heat loss in flue 242.9 2 KCal/Kg 223.6 263.4 256.85 254.1 242.74 244.29 236.0 237. 7 gases due to M&H 8 6 11.2 3 M in Coal % 10 13.6 13.85 12.7 12.65 12.4 13 11.66 10.6 5 4 H in Coal % 2.82 3.18 2.99 3.09 2.91 2.93 2.88 2.91 3.03 3.02 395 5 GCV of Coal KCal/Kg 4300 45.97 4090 4450 3986 4018 3863 3502 3973 5 Loss due to 6 M & H in Coal % 5.2 5.73 6.28 5.71 6.09 6.08 6.29 6.74 6.01 6.06 Corrected loss due to 7 M & H in Coal % Ref (5.20) 5.48 5.83 5.49 5.62 5.73 5.84 6.13 5.66 5.71
  • 35. COAL FINENESS  Against the design Coal Fineness requirement of 70% passing through 200 mesh, the decreased fineness is known to affect the Boiler Efficiency detrimentally through Increased Excess Air requirements as well as Higher percent Unburnts in Ash. Unit data Fineness rejects  48 to 63 % across 200 mesh It is our considered opinion that improvements in Mill operations towards achieving rated Coal Fineness should be a prime area of concern. The results would be manifest as reduced Excess Air Losses and Reduced Unburned in Ash Loss.
  • 36. HEAT LOSS DUE TO UNBURNTS IN ASH  Heat loss due to un burnts in ash is a manifestation of fuel Combustion efficiency and is known to depend upon operational factors like % Ash, Fineness of Coal, Excess Air level, Wind box Pressure, Primary & Secondary Air Distribution and Hot Air temperature, condition of burners, as also Ash fusion temperatures   Percentage Loss Due to Unburnts in Ash   Range (%) Average (%)  Unit data 0.68 to 1.82 1.29 Design 0.41
  • 37. FD AIR FLOW & PA/SA DISTRIBUTION FD Air constitutes one of the influencing factors on Combustion Efficiency. The FD Air flow, Air to Coal ratio, Primary Air flow, Primary Air to Secondary Air ratios and Primary Air to Coal ratio during all the Boiler trials are assessed, vis-a-vis the design values for the Boiler and the findings indicate satisfactory performance levels in all these respects. The findings are presented in following tables. F.D. AIR FLOW INDICATORS S . Desi N Item Reference Unit T1 T2 T3 T4 T5 T6 T7 T8 T9 gn o . 725. 1 Total Air Flow TPH 4 773.9 769.3 738.5 726.3 691.4 743.8 598.5 615.4 703 Total Air to Coal 2 Ration Kg/Kg 7 6.56 6.6 6.25 6.78 6.7 6 5.58 5.5 6.24
  • 38. A,B,D, ABC A,B, A.B A,B,D, A,B.C A,B,C, E D AB,D D BC,D,E C, 3 Mills Run 5 E 0 D , , F , ,F D, ,F F F F F F F 246.3 4 Primary Air Flow TPH 216.2 232.9 233.5 241 198 201 229 222 229.3 5 508. 490. 5 Secondary Air Flow TPH 509.2 541 535.8 497.5 497.5 369.4 393.4 473.7 3 4 6 Primary Air Flow % 29.8 30.1 30.4 32.6 28.1 29.1 33 38 36 32.6 7 Secondary Air Flow % 70.2 69.9 69.6 . 67.4 "71.9 70.9 67 62 64 67.4 Primary Air to Coal 8 Ratio Kg/Kg 2.09 1.97 2 2.04 1.9 1.95 2 2.13 1.98 2.03
  • 39. WIND BOX PRESSURE  Wind Box pressure is known to be one of the key factors affecting Combustion Efficiency. Trial findings indicate the actual Wind Box pressure to be less than 50 mmWC as against 160 mmWC design value.  Significant power savings potential exists in FD Fans by incorporating Variable speed drives, etc
  • 40. SECONDARY AIR TEMPERATURE  Combustion Efficiency is closely linked with temperature of Secondary Air and effects of temperature drop (Secondary Combustion Air) are normally manifest as commensurate rise in % Unburnts in Ash.   Range (OC) Average (OC)  Unit data 210.9 to 240.0 225.0 Design 263.0
  • 41. The Secondary Air temperature being lower from design value is expected to effect  Mill performance in terms of Moisture removal and final Coal Output Fineness  Unburnts in Ash The main influencing factor for low Secondary Air temperature is felt to be the lower Flue Gas temperature at APH inlet as shown below   Range (OC) Average (OC)  Data 241.0 to 290.0 270.0 Design 337.0
  • 42. Focus areas for improvement are felt to be  Wind Box pressure  APH Effectiveness (Inleak Air at APH inlet)  Coal Mill performance