SlideShare a Scribd company logo
1 of 4
Download to read offline
SEE WHY CONSTRUCTION PROFESSIONALS PREFER
ASTA POWERPROJECT
Asta Powerproject: The power behind successful projects
www.astadev.com
Using the wrong tool
for the job can be
frustrating. when it
comes to running your
projects, you can rely
on Asta Powerproject
as it is specifically
developed for
construction, to
reduce the stress
See what schedulers throughout the world say about why they
prefer Asta Powerproject to other software:
“Asta Powerproject has a ‘drag and drop’
functionality that makes it much easier to use
than P6. It also has all the power and functionality
we need to run even our most complex projects
and is much more cost effective with its shared
licencing options.”
Bill Jack Daniel, Saunders Construction
“We like to use Asta Powerproject because it’s
credible and looks more professional than MS
Project and less confusing than Primavera.”
Martin Long, Buro Four
“We were looking to move away from MS
Project as it was proving too expensive and
found the flexibility of Asta’s approach much
more suited to our ways of collaborative
working. The Project teams welcomed a
software change as they felt it was superior
and more user friendly than other
solutions.”
Clive Bassett, Beard
“We compared Asta Powerproject with other
programmes like Primavera, and decided
that this would better fit our needs…mostly
because it is so much more user-friendly
and cost-efficient”
Gavin Clegg
North Midland Construction
SEE WHY CONSTRUCTION PROFESSIONALS
PREFER ASTA POWERPROJECT
www.astadev.com
EASIER TO CREATE TASKS
“Asta Powerproject, has become the
standard because traditionally a lot of
the higher-end project management
software on the market needs a
very careful coding process and a
very long-winded period of
preparation before you can actually
start planning. With Asta
Powerproject you can start pretty
much within an hour of getting an
understanding of how the software
works because the interface is so intuitive
and crucially, it offers the same, if not more
power, than many of the competing higher-
end products.”
Phil Solomon, Mace
MULTI-USER, ENTERPRISE WIDE
ACCESS TO UP-TO-DATE
PROJECT DATA
“The multi-user application is extremely
useful as it allows different members
of the project team to access the
most up-to-date data at the
same time.”
Kevin Balaam, Atkins Highways
& Transportation
“Using Asta Powerproject meant
that our planners could work
on the project in unison,
regardless of their
location, have the same
visibility across the programme
and get an accurate view
of updates and progress to all areas.”
Mick Davis, BAM
“When we were using P6 there was a
big time-lag. We never really had an up-
to-date programme because the
information was always based on
engineer updates from a week or even
up to a month before. Any issues arising
could add a few days more delay. The
information was never accurate – but
now, the master programme effectively
updates itself”
Steve Allan, Banora Point Upgrade
Alliance
SUPERIOR PRESENTATION
“What Asta Powerproject is particularly
good at is presentation, which is exactly
what you need for good reports. With a
very small amount of effort, the user can
easily produce a very presentable and
professional-looking report. I have
worked for other contractors and seen
other programmes, but none have been
as presentable as Powerproject.”
Ian Birch, HJ Martin
“Asta Powerproject is undoubtedly
helpful to us in winning contracts, it
means we can produce better
quality information than we could
with MS Project. We can enhance it
by using histograms to give clients the
cashflow forecasts that they want – it’s
simple to do using the software and
clients like it, it gives them more
information and more
confidence in us.”
Robin Percy, J Breheny
“I think the secret
ingredient of Asta Powerproject
is that it is produced by planners for
planners. It remains a project
management/planners tool with the
capability to produce output at whatever
level of understanding is required.
Other software available often fails
to produce output that can
easily be read and
understood.”
Andrew Pearce,
Balfour Beatty Construction
▲▲
▲
SEE WHY CONSTRUCTION PROFESSIONALS
PREFER ASTA POWERPROJECT
www.astadev.com
EASY INTEGRATION WITH
OTHER SOFTWARE FOR
SIMPLE COMMUNICATION
With other planning tools:
“Our operational partner was using
Primavera 6, but we were able to
interface directly with them using Asta’s
built-in conversion files (XER). The
whole process underlined the real
beauty of Asta Powerproject – its ease of
use and its excellent format of
presentation.”
Mick Davis, BAM
With ERP systems:
“We have managed to integrate
hundreds of projects and align SAP data
with our programme data with a few
clicks of the mouse.”
Gavin Clegg,
North Midland Construction
With 4D modelling for BIM “Using
Asta Powerproject with our software
gives us 4D BIM scheduling
animation that makes it easy for
audiences, the owners, trades,
teams, contractors, and so on, to
see just how the building will
come together.”
Martin Long, Buro Four
“We have found that Asta
Powerproject is easiest to use in
conjunction with 4D modelling
software”
Koenraad Nys, D Studio
MORE POWERFUL
NAVIGATION FEATURES
“I love the way you can move around
quickly. Whereas in MS Project you must
create summary bars to group activities, in
Asta Powerproject it lifts them all into a
single window so you can see exactly what
you need. It makes it really easy to break
the job into different areas, and you never
have to scroll through page after page of
activities to find something. If you have two
areas you want to compare and see how
they interface, you just click ‘Control’ at the
same time and they both appear side by
side. The visual navigation capability of Asta
Powerproject is one of its very best
features.”
Steve Allan, Project Manager for
Earthworks, Banora Point Upgrade
Alliance
TEST DIFFERENT SCENARIOS
WITH CONFIDENCE
“ Asta Powerproject has a powerful “what-if”
functionality which allows us to be
innovative and overcome technical
challenges, even when a technique has not
been used before. Everything can be risk
assessed.”
Rob Owen, Director, Mace
BETTER PROTECTION AGAINST
LITIGATION FROM DELAY
“Asta Powerproject provides us with a
documented story of how the project is
performing and acts as a delay
management tool.”
Kevin Taylor, Senior Contracts Manager,
J Breheny
“We had not come
across Asta Powerproject
before and were assessing a
couple of other tools including
Primavera and MS Project. We
chose Asta Powerproject ultimately
because it was more user-friendly
compared to the other tools we were
looking at, and because of how
we could use it as a
management tool.”
Matt O’Grady, Hansen Yuncken
▲
▲▲▲
SEE WHY CONSTRUCTION PROFESSIONALS
PREFER ASTA POWERPROJECT
PLUS ASTA GIVES YOU:
FLEXIBLE LICENCING
“Asta’s shared licencing model makes it
much more economical than other
software such as MS Project for which
you need to buy a full licence for every
user. We were looking to move away from
MS Project as it was proving too
expensive and found the flexibility of
Asta’s approach much more suited to our
ways of collaborative working. ”
Clive Bassett, Financial Director,
Beard
Asta Development plc
Kingston House, Goodsons Mews, Wellington Street,
Thame, Oxfordshire OX9 3BX United Kingdom
E: enquiries@astadev.com
T: +44 (0)1844 261700
F: +44 (0)1844 261314
Windows®, MS Project® and Microsoft Excel® are registered trademarks of Microsoft Corp.
Oracle Primavera® is a registered trademark of Oracle Corporation.
©2013 Asta Development plc
Asta Powerproject is a registered trademark of Asta Development plc.
All trademarks recognised. E & OE.
www.astadev.com
▲
“We were looking for
something that would compete with Oracle
Primavera. We looked at other software solu¬tions
but nothing really came across that would be powerful
enough to replace Oracle Primavera. Then one of our
customers introduced me to Asta Powerproject and we were
very impressed with what it could do. Under further
examination I came to believe that its capabilities
actually exceed those of
Oracle Primavera”
▲
PROGRESS MONITORING PUTS YOU
IN CONTROL
“The software compares what was planned
with actual progress. It plots a line that shows
whether the programme is behind or ahead of
schedule, from that we can see which items
have fallen behind and take the appropriate
action, in time.”
Phil Williams, Wates
SCALABLE FOR LARGER
PROJECTS
“Asta Powerproject has proved to be an
excellent tool because of its ability to produce
fully integrated, logic linked programmes of
several thousand activities that are easily to
understand, backed up with cost and resource
data as required.”
Bob Davis, Carillion
FILTERING FOR EASIER MANAGING
OF SUB-CONTRACTORS
“Asta Powerproject is also particularly good at
modularising projects. The master programme
can be broken down into work packages, and
they can be filtered. We can filter out
whichever aspects we need to, for example,
concrete or cladding, which gives you more
manageable projects rather than one large
programme. This is obviously useful for
subcontractors who do not need to see
everyone else’s tasks, but can be provided
with a succinct programme of their own
works.”
Ray Ferguson, GRAHAM Construction
SIMPLER PRINTING
“A unique thing with Asta Powerproject is
having multiple activities on the same line, so
it is easy to see what is going on and easy to
produce summary print outs. On large
complex projects like I work on to do the same
in Primavera without this would be complex
and take lots of pages to print”
Michael Powell-Brett,
Powell Brett Associates
SUPPORT YOU CAN RELY ON
“Our repeated choice of Asta as provider of
project management software is in the
knowledge that we have complete in-house
support and a continually developed
product”
Martin Buckthorpe, David Johns
Associates Consultants Ltd
“My experience with the team at Asta,
whether help or sales is always a pleasure-
polite, considerate knowledgeable and
efficient all of which are lacking in Oracle’s
offering of Primavera P6.
Gwion Evans, Planner
Russell Chappe, Focus Project Management
▲▲▲▲

More Related Content

More from Cisco

Project Management Diploma with Instructors
Project Management Diploma with InstructorsProject Management Diploma with Instructors
Project Management Diploma with Instructors
Cisco
 
CMCS Reference Letters
CMCS Reference LettersCMCS Reference Letters
CMCS Reference Letters
Cisco
 
GPM: PRiSM Practitioner
GPM: PRiSM Practitioner GPM: PRiSM Practitioner
GPM: PRiSM Practitioner
Cisco
 
CMCS Website Training Experience 2013
CMCS Website Training Experience 2013CMCS Website Training Experience 2013
CMCS Website Training Experience 2013
Cisco
 
Our Awards and Achievements
Our Awards and AchievementsOur Awards and Achievements
Our Awards and Achievements
Cisco
 
Our Partners
Our PartnersOur Partners
Our Partners
Cisco
 
CMCS PMO Solution
CMCS PMO SolutionCMCS PMO Solution
CMCS PMO Solution
Cisco
 
Can You Afford Not To Manage Your Project's Contracts?
Can You Afford Not To Manage Your Project's Contracts?Can You Afford Not To Manage Your Project's Contracts?
Can You Afford Not To Manage Your Project's Contracts?
Cisco
 
Our 2,000+ Clients
Our 2,000+ ClientsOur 2,000+ Clients
Our 2,000+ Clients
Cisco
 
TILOS: World Pipelines Article
TILOS: World Pipelines ArticleTILOS: World Pipelines Article
TILOS: World Pipelines Article
Cisco
 
Acumen Fuse: Datasheet
Acumen Fuse: DatasheetAcumen Fuse: Datasheet
Acumen Fuse: Datasheet
Cisco
 
Acumen Risk: Data Sheet
Acumen Risk: Data SheetAcumen Risk: Data Sheet
Acumen Risk: Data Sheet
Cisco
 
Acumen Fuse: Metrics
Acumen Fuse: MetricsAcumen Fuse: Metrics
Acumen Fuse: Metrics
Cisco
 
Acumen Fuse: Enterprise Project Analysis Datasheet
Acumen Fuse: Enterprise Project Analysis DatasheetAcumen Fuse: Enterprise Project Analysis Datasheet
Acumen Fuse: Enterprise Project Analysis Datasheet
Cisco
 
Nomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewNomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product Overview
Cisco
 
Nomitech: CostOs Oil & Gas Estimating
Nomitech: CostOs Oil & Gas EstimatingNomitech: CostOs Oil & Gas Estimating
Nomitech: CostOs Oil & Gas Estimating
Cisco
 
Nomitech: Lycopodium Case Study
Nomitech: Lycopodium Case StudyNomitech: Lycopodium Case Study
Nomitech: Lycopodium Case Study
Cisco
 
Nomitech: CostOs Construction Estimating
Nomitech: CostOs Construction EstimatingNomitech: CostOs Construction Estimating
Nomitech: CostOs Construction Estimating
Cisco
 

More from Cisco (20)

Project Management Diploma with Instructors
Project Management Diploma with InstructorsProject Management Diploma with Instructors
Project Management Diploma with Instructors
 
CMCS Reference Letters
CMCS Reference LettersCMCS Reference Letters
CMCS Reference Letters
 
GPM: PRiSM Practitioner
GPM: PRiSM Practitioner GPM: PRiSM Practitioner
GPM: PRiSM Practitioner
 
CMCS Website Training Experience 2013
CMCS Website Training Experience 2013CMCS Website Training Experience 2013
CMCS Website Training Experience 2013
 
Our Awards and Achievements
Our Awards and AchievementsOur Awards and Achievements
Our Awards and Achievements
 
Our Partners
Our PartnersOur Partners
Our Partners
 
CMCS PMO Solution
CMCS PMO SolutionCMCS PMO Solution
CMCS PMO Solution
 
Can You Afford Not To Manage Your Project's Contracts?
Can You Afford Not To Manage Your Project's Contracts?Can You Afford Not To Manage Your Project's Contracts?
Can You Afford Not To Manage Your Project's Contracts?
 
Our 2,000+ Clients
Our 2,000+ ClientsOur 2,000+ Clients
Our 2,000+ Clients
 
Asta Powerproject: Business Case
Asta Powerproject: Business CaseAsta Powerproject: Business Case
Asta Powerproject: Business Case
 
TILOS: World Pipelines Article
TILOS: World Pipelines ArticleTILOS: World Pipelines Article
TILOS: World Pipelines Article
 
CoSign Digital Signatures: General Presentation
CoSign Digital Signatures: General Presentation CoSign Digital Signatures: General Presentation
CoSign Digital Signatures: General Presentation
 
Acumen Fuse: Datasheet
Acumen Fuse: DatasheetAcumen Fuse: Datasheet
Acumen Fuse: Datasheet
 
Acumen Risk: Data Sheet
Acumen Risk: Data SheetAcumen Risk: Data Sheet
Acumen Risk: Data Sheet
 
Acumen Fuse: Metrics
Acumen Fuse: MetricsAcumen Fuse: Metrics
Acumen Fuse: Metrics
 
Acumen Fuse: Enterprise Project Analysis Datasheet
Acumen Fuse: Enterprise Project Analysis DatasheetAcumen Fuse: Enterprise Project Analysis Datasheet
Acumen Fuse: Enterprise Project Analysis Datasheet
 
Nomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewNomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product Overview
 
Nomitech: CostOs Oil & Gas Estimating
Nomitech: CostOs Oil & Gas EstimatingNomitech: CostOs Oil & Gas Estimating
Nomitech: CostOs Oil & Gas Estimating
 
Nomitech: Lycopodium Case Study
Nomitech: Lycopodium Case StudyNomitech: Lycopodium Case Study
Nomitech: Lycopodium Case Study
 
Nomitech: CostOs Construction Estimating
Nomitech: CostOs Construction EstimatingNomitech: CostOs Construction Estimating
Nomitech: CostOs Construction Estimating
 

Recently uploaded

Recently uploaded (20)

Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 

Asta Powerproject: The Power Behind Successful Projects

  • 1. SEE WHY CONSTRUCTION PROFESSIONALS PREFER ASTA POWERPROJECT Asta Powerproject: The power behind successful projects www.astadev.com Using the wrong tool for the job can be frustrating. when it comes to running your projects, you can rely on Asta Powerproject as it is specifically developed for construction, to reduce the stress See what schedulers throughout the world say about why they prefer Asta Powerproject to other software: “Asta Powerproject has a ‘drag and drop’ functionality that makes it much easier to use than P6. It also has all the power and functionality we need to run even our most complex projects and is much more cost effective with its shared licencing options.” Bill Jack Daniel, Saunders Construction “We like to use Asta Powerproject because it’s credible and looks more professional than MS Project and less confusing than Primavera.” Martin Long, Buro Four “We were looking to move away from MS Project as it was proving too expensive and found the flexibility of Asta’s approach much more suited to our ways of collaborative working. The Project teams welcomed a software change as they felt it was superior and more user friendly than other solutions.” Clive Bassett, Beard “We compared Asta Powerproject with other programmes like Primavera, and decided that this would better fit our needs…mostly because it is so much more user-friendly and cost-efficient” Gavin Clegg North Midland Construction
  • 2. SEE WHY CONSTRUCTION PROFESSIONALS PREFER ASTA POWERPROJECT www.astadev.com EASIER TO CREATE TASKS “Asta Powerproject, has become the standard because traditionally a lot of the higher-end project management software on the market needs a very careful coding process and a very long-winded period of preparation before you can actually start planning. With Asta Powerproject you can start pretty much within an hour of getting an understanding of how the software works because the interface is so intuitive and crucially, it offers the same, if not more power, than many of the competing higher- end products.” Phil Solomon, Mace MULTI-USER, ENTERPRISE WIDE ACCESS TO UP-TO-DATE PROJECT DATA “The multi-user application is extremely useful as it allows different members of the project team to access the most up-to-date data at the same time.” Kevin Balaam, Atkins Highways & Transportation “Using Asta Powerproject meant that our planners could work on the project in unison, regardless of their location, have the same visibility across the programme and get an accurate view of updates and progress to all areas.” Mick Davis, BAM “When we were using P6 there was a big time-lag. We never really had an up- to-date programme because the information was always based on engineer updates from a week or even up to a month before. Any issues arising could add a few days more delay. The information was never accurate – but now, the master programme effectively updates itself” Steve Allan, Banora Point Upgrade Alliance SUPERIOR PRESENTATION “What Asta Powerproject is particularly good at is presentation, which is exactly what you need for good reports. With a very small amount of effort, the user can easily produce a very presentable and professional-looking report. I have worked for other contractors and seen other programmes, but none have been as presentable as Powerproject.” Ian Birch, HJ Martin “Asta Powerproject is undoubtedly helpful to us in winning contracts, it means we can produce better quality information than we could with MS Project. We can enhance it by using histograms to give clients the cashflow forecasts that they want – it’s simple to do using the software and clients like it, it gives them more information and more confidence in us.” Robin Percy, J Breheny “I think the secret ingredient of Asta Powerproject is that it is produced by planners for planners. It remains a project management/planners tool with the capability to produce output at whatever level of understanding is required. Other software available often fails to produce output that can easily be read and understood.” Andrew Pearce, Balfour Beatty Construction ▲▲ ▲
  • 3. SEE WHY CONSTRUCTION PROFESSIONALS PREFER ASTA POWERPROJECT www.astadev.com EASY INTEGRATION WITH OTHER SOFTWARE FOR SIMPLE COMMUNICATION With other planning tools: “Our operational partner was using Primavera 6, but we were able to interface directly with them using Asta’s built-in conversion files (XER). The whole process underlined the real beauty of Asta Powerproject – its ease of use and its excellent format of presentation.” Mick Davis, BAM With ERP systems: “We have managed to integrate hundreds of projects and align SAP data with our programme data with a few clicks of the mouse.” Gavin Clegg, North Midland Construction With 4D modelling for BIM “Using Asta Powerproject with our software gives us 4D BIM scheduling animation that makes it easy for audiences, the owners, trades, teams, contractors, and so on, to see just how the building will come together.” Martin Long, Buro Four “We have found that Asta Powerproject is easiest to use in conjunction with 4D modelling software” Koenraad Nys, D Studio MORE POWERFUL NAVIGATION FEATURES “I love the way you can move around quickly. Whereas in MS Project you must create summary bars to group activities, in Asta Powerproject it lifts them all into a single window so you can see exactly what you need. It makes it really easy to break the job into different areas, and you never have to scroll through page after page of activities to find something. If you have two areas you want to compare and see how they interface, you just click ‘Control’ at the same time and they both appear side by side. The visual navigation capability of Asta Powerproject is one of its very best features.” Steve Allan, Project Manager for Earthworks, Banora Point Upgrade Alliance TEST DIFFERENT SCENARIOS WITH CONFIDENCE “ Asta Powerproject has a powerful “what-if” functionality which allows us to be innovative and overcome technical challenges, even when a technique has not been used before. Everything can be risk assessed.” Rob Owen, Director, Mace BETTER PROTECTION AGAINST LITIGATION FROM DELAY “Asta Powerproject provides us with a documented story of how the project is performing and acts as a delay management tool.” Kevin Taylor, Senior Contracts Manager, J Breheny “We had not come across Asta Powerproject before and were assessing a couple of other tools including Primavera and MS Project. We chose Asta Powerproject ultimately because it was more user-friendly compared to the other tools we were looking at, and because of how we could use it as a management tool.” Matt O’Grady, Hansen Yuncken ▲ ▲▲▲
  • 4. SEE WHY CONSTRUCTION PROFESSIONALS PREFER ASTA POWERPROJECT PLUS ASTA GIVES YOU: FLEXIBLE LICENCING “Asta’s shared licencing model makes it much more economical than other software such as MS Project for which you need to buy a full licence for every user. We were looking to move away from MS Project as it was proving too expensive and found the flexibility of Asta’s approach much more suited to our ways of collaborative working. ” Clive Bassett, Financial Director, Beard Asta Development plc Kingston House, Goodsons Mews, Wellington Street, Thame, Oxfordshire OX9 3BX United Kingdom E: enquiries@astadev.com T: +44 (0)1844 261700 F: +44 (0)1844 261314 Windows®, MS Project® and Microsoft Excel® are registered trademarks of Microsoft Corp. Oracle Primavera® is a registered trademark of Oracle Corporation. ©2013 Asta Development plc Asta Powerproject is a registered trademark of Asta Development plc. All trademarks recognised. E & OE. www.astadev.com ▲ “We were looking for something that would compete with Oracle Primavera. We looked at other software solu¬tions but nothing really came across that would be powerful enough to replace Oracle Primavera. Then one of our customers introduced me to Asta Powerproject and we were very impressed with what it could do. Under further examination I came to believe that its capabilities actually exceed those of Oracle Primavera” ▲ PROGRESS MONITORING PUTS YOU IN CONTROL “The software compares what was planned with actual progress. It plots a line that shows whether the programme is behind or ahead of schedule, from that we can see which items have fallen behind and take the appropriate action, in time.” Phil Williams, Wates SCALABLE FOR LARGER PROJECTS “Asta Powerproject has proved to be an excellent tool because of its ability to produce fully integrated, logic linked programmes of several thousand activities that are easily to understand, backed up with cost and resource data as required.” Bob Davis, Carillion FILTERING FOR EASIER MANAGING OF SUB-CONTRACTORS “Asta Powerproject is also particularly good at modularising projects. The master programme can be broken down into work packages, and they can be filtered. We can filter out whichever aspects we need to, for example, concrete or cladding, which gives you more manageable projects rather than one large programme. This is obviously useful for subcontractors who do not need to see everyone else’s tasks, but can be provided with a succinct programme of their own works.” Ray Ferguson, GRAHAM Construction SIMPLER PRINTING “A unique thing with Asta Powerproject is having multiple activities on the same line, so it is easy to see what is going on and easy to produce summary print outs. On large complex projects like I work on to do the same in Primavera without this would be complex and take lots of pages to print” Michael Powell-Brett, Powell Brett Associates SUPPORT YOU CAN RELY ON “Our repeated choice of Asta as provider of project management software is in the knowledge that we have complete in-house support and a continually developed product” Martin Buckthorpe, David Johns Associates Consultants Ltd “My experience with the team at Asta, whether help or sales is always a pleasure- polite, considerate knowledgeable and efficient all of which are lacking in Oracle’s offering of Primavera P6. Gwion Evans, Planner Russell Chappe, Focus Project Management ▲▲▲▲