SlideShare a Scribd company logo
1 of 12
A
              MINI PROJECT REPORT
                       ON

              TRAFFIC LIGHT CONTROL
                        BY

                 PARTH.S.CHOLERA




 Department of Electronics and Tele-communication
                      2011-12



[Type text]                                   Page 1
CERTIFICATE
This is to certify that, the project TRAFFIC LIGHT
CONTROL
entitled a bonified record of project work submitted by
PARTH.S.CHOLERA, in partial fulfillment for degree in
EXTC of , Mumbai University during the year 2011-2012 under
my guidance and supervision.

DATE:
PLACE: Thane




     GUIDE                     HEAD OF DEPARTMENT
  (Prof.Pawar)                    (Prof. A.M.Deshpande)




External Examiner                            Principal

[Type text]                                              Page 2
(Dr.U.D.Kolekar)


              ACKNOWLEDGEMENT

     It is my great pleasure to acknowledge the assistance and
contribution of the individuals who co-operated us to complete
the project work successfully. First and foremost, I wish to
express my deep gratitude and thanks to Prof.A.M.Deshpande
Head of department of EXTC and our project guide Prof.Pawar,
for their enthusiastic guidance and helping in successful
completion of project work. They provided us their precious
time for valuable suggestions and encouragement throughout the
work. It is foe their patience, guidance and encouragement at all
time that this work has shaped up the way it is.

   A project is teamwork and reflects the contribution of many
people. A number people contributed their time and efforts in
making their project work a success. We would like to thank
everyone who contributed their time and efforts to help in
completing the project work.




PARTH.S.CHOLERA



[Type text]                                                 Page 3
TABLE OF CONTENTS

Sr. No.            Topic                      Page no.

1.                 Introduction                   5

2.                 Circuit Diagram                6


3.                 Pin Description                7


4.                 Working of Circuit             8


5.                 Component List                 9


6.                 Advantage & Disadvantage      10


7.                 Application                   11


8.                 Further Modification          11


9.                 Bibliography                  12




     [Type text]                                  Page 4
INTRODUCTION

       Traffic signals are used to control the flow of vehicles.In
the recent years, the need of transportation has gain immense
importance for logistics as well as for common human. This has
given rise to the number of vehicles on the road. Due to this
reason, traffic jams and road accidents are a common sight in
any busy city. Traffic Signals provide an easy, cheap, automatic
and justified solution to the road points where the vehicles may
turn to other directions e.g. roundabouts, culverts, busy walk
throughs etc.

      BASIC IDEA The project we have chosen is an 8-lane
traffic controller. The basic idea behind the design is to avoid
the collision of vehicles by providing appropriate signals to
different directions for a limited time slot, after which the next
waiting drivers will be given same treatment. In This way a
cycle will be established which will control the traffic.

     CONTROL SIGNALS The control signals are 3-lights.
Top light is Red(Stop), Middle light is Yellow(Wait)
Bottom light is Green(Go). STATES OF TRAFFIC FLOW
There are 8-lanes and at most two ways can be safely open. In
this way a minimum of 4-states are possible for which different
vehicles will pass through


[Type text]                                                     Page 5
CIRCUIT DIAGRAM




[Type text]                     Page 6
PIN DESCRIPTION




--------------------------------------------------------------
                        IC 555 TIMER




        [Type text]                                              Page 7
WORKING PRINCIPLE

      This circuit is self explanatory by its name, and can be
used to control traffic in public places, or to demonstrate traffic
rules in traffic-parks. IC2, which is heart of the circuit, is a
decade counter. In this counter for every pulse fed to pin-14,
potential keeps shifting from D1 to D9 in cyclic order. IC1 is
used as a pulse generator and generates pulses in regular
configurable intervals. These intervals can be changed by
varying VR1. The circuit is designed in such a way that out of
nine pulses, relay RL1 remains triggered for 4 pulses, relay RL2
for 1 pulse and relay RL3 for remaining 4 pulses. Since D1-D4
provide current to T1, T1 is on whenever there is potential on
any diode D1 to D4, which keeps relay RL1 triggered. Similarly
other diodes are responsible for RL2 and RL3 triggering. Red,
Yellow and Green lamps can be connected to the relays RL1,
RL2 and RL3 respectively to complete your mini traffic light
controller.




[Type text]                                                   Page 8
COMPONENT LIST

              555 timer IC
              4017 IC
              Capacitors (c1) – 100mFD/16V
              Resistors
              R1- 10K
              LEDS (green,yellow,red)
              POT (P1) – 100K
              DIODES – IN4007




[Type text]                                  Page 9
ADVANTAGE

       Reduction in normal recurring.
       Significantly enhanced operational tools congestion to
       effectively manage traffic incidents.
       It improved public transport service.
        Reduction in emergency response times and safer travel.
       Improve traffic guidance and traffic flow
       Reduce fuel consumption
       Increase safetyThey increase the traffic-handling capacity
       of the intersection
       Less cost




                 DISADVANTAGE

       Excessive delay may be caused.
       These unnecessary delay results in significant fuel waste
       and higher motorist costs.
       Disobedience of signals




[Type text]                                                   Page 10
APPLICATIONS
              Ramp metering.
              Timers.
              fire station or medical emergency entrance.
              at the entrance and exit of some car washes
              at the landing-stage of a ferry and aboard the ferry.




                   FUTURE SCOPE

       We can increase the efficency by using microprecessors
       (8086).
       We can use this as Remote traffic Controller.




[Type text]                                                      Page 11
BIBLOGRAPHY

       http://www.azdot.gov/highways/traffic/Signal.asp
       http://www.kpsec.com
       http://www/starmicromics .com/components/mics.html
       http://www.mctraffic.org/signal.htm
       http://en.wikipedia.org/wiki/555_timer_IC




[Type text]                                             Page 12

More Related Content

What's hot

Traffic light controller
Traffic light controllerTraffic light controller
Traffic light controller
nimmi_abes
 
Application of traffic light
Application of traffic lightApplication of traffic light
Application of traffic light
are you
 
4 Way traffic controll new
4 Way traffic controll new4 Way traffic controll new
4 Way traffic controll new
Mainak Nandi
 
STREET LIGHT THAT GLOWS ON DETECTING VEHICLE MOVEMENT
STREET LIGHT THAT GLOWS ON DETECTING VEHICLE MOVEMENTSTREET LIGHT THAT GLOWS ON DETECTING VEHICLE MOVEMENT
STREET LIGHT THAT GLOWS ON DETECTING VEHICLE MOVEMENT
m sivareddy
 

What's hot (20)

Traffic light controller
Traffic light controllerTraffic light controller
Traffic light controller
 
Density based traffic signal system
Density based traffic signal systemDensity based traffic signal system
Density based traffic signal system
 
Density based traffic signal control using microcontroller
Density based traffic signal control using microcontrollerDensity based traffic signal control using microcontroller
Density based traffic signal control using microcontroller
 
Smart street light system
Smart street light systemSmart street light system
Smart street light system
 
Speed Control of DC Motor using Microcontroller
Speed Control of DC Motor using MicrocontrollerSpeed Control of DC Motor using Microcontroller
Speed Control of DC Motor using Microcontroller
 
Traffic light control using atmega16 ppt
Traffic light control using atmega16 pptTraffic light control using atmega16 ppt
Traffic light control using atmega16 ppt
 
Automatic street light control using LDR.
Automatic street light control using LDR.Automatic street light control using LDR.
Automatic street light control using LDR.
 
Presentation of automatic street light
Presentation of automatic street lightPresentation of automatic street light
Presentation of automatic street light
 
OBSTACLE AVOIDING CAR
OBSTACLE AVOIDING CAROBSTACLE AVOIDING CAR
OBSTACLE AVOIDING CAR
 
Density based-traffic-light-control-system project-2 (3)
Density based-traffic-light-control-system project-2 (3)Density based-traffic-light-control-system project-2 (3)
Density based-traffic-light-control-system project-2 (3)
 
Smart Traffic Light Controller
Smart Traffic Light ControllerSmart Traffic Light Controller
Smart Traffic Light Controller
 
Application of traffic light
Application of traffic lightApplication of traffic light
Application of traffic light
 
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
AUTOMATIC RAILWAY GATE CONTROL SYSTEMAUTOMATIC RAILWAY GATE CONTROL SYSTEM
AUTOMATIC RAILWAY GATE CONTROL SYSTEM
 
Density based Traffic Light Controller
Density based Traffic Light ControllerDensity based Traffic Light Controller
Density based Traffic Light Controller
 
Automatic street light control using ldr PPT
Automatic street light control using ldr PPTAutomatic street light control using ldr PPT
Automatic street light control using ldr PPT
 
Automatic street light
Automatic street lightAutomatic street light
Automatic street light
 
4 Way traffic controll new
4 Way traffic controll new4 Way traffic controll new
4 Way traffic controll new
 
STREET LIGHT THAT GLOWS ON DETECTING VEHICLE MOVEMENT
STREET LIGHT THAT GLOWS ON DETECTING VEHICLE MOVEMENTSTREET LIGHT THAT GLOWS ON DETECTING VEHICLE MOVEMENT
STREET LIGHT THAT GLOWS ON DETECTING VEHICLE MOVEMENT
 
Electronics project presentation
Electronics project presentationElectronics project presentation
Electronics project presentation
 
automatic streetlight control using ldr ppt
automatic streetlight control using ldr pptautomatic streetlight control using ldr ppt
automatic streetlight control using ldr ppt
 

Similar to Traffic light controller

Industrial Training Report-II-DIMO
Industrial Training Report-II-DIMOIndustrial Training Report-II-DIMO
Industrial Training Report-II-DIMO
Thushan Sivalingam
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesa
Utsav Tripathy
 
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
xmumiao
 

Similar to Traffic light controller (20)

Clapswitch
ClapswitchClapswitch
Clapswitch
 
Clap switch
Clap switchClap switch
Clap switch
 
DLW Summer Training for ECE
DLW Summer Training for ECEDLW Summer Training for ECE
DLW Summer Training for ECE
 
IRJET- Traffic Congestion Overcome by Rotary Design
IRJET- Traffic Congestion Overcome by Rotary DesignIRJET- Traffic Congestion Overcome by Rotary Design
IRJET- Traffic Congestion Overcome by Rotary Design
 
Channelizing Traffic Flow by Reducing Delay at Intersection
Channelizing Traffic Flow by Reducing Delay at Intersection                  Channelizing Traffic Flow by Reducing Delay at Intersection
Channelizing Traffic Flow by Reducing Delay at Intersection
 
Traffic Light Controller Using Fpga
Traffic Light Controller Using FpgaTraffic Light Controller Using Fpga
Traffic Light Controller Using Fpga
 
LTE NETWORK OPTIMIZATION FOR URBAN AREA AT TAIZ CITY
LTE NETWORK OPTIMIZATION FOR  URBAN AREA AT TAIZ CITYLTE NETWORK OPTIMIZATION FOR  URBAN AREA AT TAIZ CITY
LTE NETWORK OPTIMIZATION FOR URBAN AREA AT TAIZ CITY
 
IRJET- Research on Designing of Automatic Reverse Wheel Locking Mechanism
IRJET-  	  Research on Designing of Automatic Reverse Wheel Locking MechanismIRJET-  	  Research on Designing of Automatic Reverse Wheel Locking Mechanism
IRJET- Research on Designing of Automatic Reverse Wheel Locking Mechanism
 
Low Cost Rail Crack Inspection System
Low Cost Rail Crack Inspection SystemLow Cost Rail Crack Inspection System
Low Cost Rail Crack Inspection System
 
Industrial Training Report-II-DIMO
Industrial Training Report-II-DIMOIndustrial Training Report-II-DIMO
Industrial Training Report-II-DIMO
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesa
 
Us Application
Us ApplicationUs Application
Us Application
 
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway CrossIRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
 
TBEA ENERGY (INDIA) PVT LTD
TBEA ENERGY (INDIA) PVT LTDTBEA ENERGY (INDIA) PVT LTD
TBEA ENERGY (INDIA) PVT LTD
 
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-FlopIRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
IRJET- Metastability Mitigation & Error Masking of High Speed Flip-Flop
 
Comparative Study of Delay Line Based Time to Digital Converter using FPGA
Comparative Study of Delay Line Based Time to Digital Converter using FPGAComparative Study of Delay Line Based Time to Digital Converter using FPGA
Comparative Study of Delay Line Based Time to Digital Converter using FPGA
 
Electricity generation using speed breaker
Electricity generation using speed breakerElectricity generation using speed breaker
Electricity generation using speed breaker
 
Smart parking
Smart parkingSmart parking
Smart parking
 
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
Identifying the Right Path Forward for Future Vehicle EE Architecture - Train...
 
H012636165
H012636165H012636165
H012636165
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 

Traffic light controller

  • 1. A MINI PROJECT REPORT ON TRAFFIC LIGHT CONTROL BY PARTH.S.CHOLERA Department of Electronics and Tele-communication 2011-12 [Type text] Page 1
  • 2. CERTIFICATE This is to certify that, the project TRAFFIC LIGHT CONTROL entitled a bonified record of project work submitted by PARTH.S.CHOLERA, in partial fulfillment for degree in EXTC of , Mumbai University during the year 2011-2012 under my guidance and supervision. DATE: PLACE: Thane GUIDE HEAD OF DEPARTMENT (Prof.Pawar) (Prof. A.M.Deshpande) External Examiner Principal [Type text] Page 2
  • 3. (Dr.U.D.Kolekar) ACKNOWLEDGEMENT It is my great pleasure to acknowledge the assistance and contribution of the individuals who co-operated us to complete the project work successfully. First and foremost, I wish to express my deep gratitude and thanks to Prof.A.M.Deshpande Head of department of EXTC and our project guide Prof.Pawar, for their enthusiastic guidance and helping in successful completion of project work. They provided us their precious time for valuable suggestions and encouragement throughout the work. It is foe their patience, guidance and encouragement at all time that this work has shaped up the way it is. A project is teamwork and reflects the contribution of many people. A number people contributed their time and efforts in making their project work a success. We would like to thank everyone who contributed their time and efforts to help in completing the project work. PARTH.S.CHOLERA [Type text] Page 3
  • 4. TABLE OF CONTENTS Sr. No. Topic Page no. 1. Introduction 5 2. Circuit Diagram 6 3. Pin Description 7 4. Working of Circuit 8 5. Component List 9 6. Advantage & Disadvantage 10 7. Application 11 8. Further Modification 11 9. Bibliography 12 [Type text] Page 4
  • 5. INTRODUCTION Traffic signals are used to control the flow of vehicles.In the recent years, the need of transportation has gain immense importance for logistics as well as for common human. This has given rise to the number of vehicles on the road. Due to this reason, traffic jams and road accidents are a common sight in any busy city. Traffic Signals provide an easy, cheap, automatic and justified solution to the road points where the vehicles may turn to other directions e.g. roundabouts, culverts, busy walk throughs etc. BASIC IDEA The project we have chosen is an 8-lane traffic controller. The basic idea behind the design is to avoid the collision of vehicles by providing appropriate signals to different directions for a limited time slot, after which the next waiting drivers will be given same treatment. In This way a cycle will be established which will control the traffic. CONTROL SIGNALS The control signals are 3-lights. Top light is Red(Stop), Middle light is Yellow(Wait) Bottom light is Green(Go). STATES OF TRAFFIC FLOW There are 8-lanes and at most two ways can be safely open. In this way a minimum of 4-states are possible for which different vehicles will pass through [Type text] Page 5
  • 8. WORKING PRINCIPLE This circuit is self explanatory by its name, and can be used to control traffic in public places, or to demonstrate traffic rules in traffic-parks. IC2, which is heart of the circuit, is a decade counter. In this counter for every pulse fed to pin-14, potential keeps shifting from D1 to D9 in cyclic order. IC1 is used as a pulse generator and generates pulses in regular configurable intervals. These intervals can be changed by varying VR1. The circuit is designed in such a way that out of nine pulses, relay RL1 remains triggered for 4 pulses, relay RL2 for 1 pulse and relay RL3 for remaining 4 pulses. Since D1-D4 provide current to T1, T1 is on whenever there is potential on any diode D1 to D4, which keeps relay RL1 triggered. Similarly other diodes are responsible for RL2 and RL3 triggering. Red, Yellow and Green lamps can be connected to the relays RL1, RL2 and RL3 respectively to complete your mini traffic light controller. [Type text] Page 8
  • 9. COMPONENT LIST 555 timer IC 4017 IC Capacitors (c1) – 100mFD/16V Resistors R1- 10K LEDS (green,yellow,red) POT (P1) – 100K DIODES – IN4007 [Type text] Page 9
  • 10. ADVANTAGE Reduction in normal recurring. Significantly enhanced operational tools congestion to effectively manage traffic incidents. It improved public transport service. Reduction in emergency response times and safer travel. Improve traffic guidance and traffic flow Reduce fuel consumption Increase safetyThey increase the traffic-handling capacity of the intersection Less cost DISADVANTAGE Excessive delay may be caused. These unnecessary delay results in significant fuel waste and higher motorist costs. Disobedience of signals [Type text] Page 10
  • 11. APPLICATIONS Ramp metering. Timers. fire station or medical emergency entrance. at the entrance and exit of some car washes at the landing-stage of a ferry and aboard the ferry. FUTURE SCOPE We can increase the efficency by using microprecessors (8086). We can use this as Remote traffic Controller. [Type text] Page 11
  • 12. BIBLOGRAPHY http://www.azdot.gov/highways/traffic/Signal.asp http://www.kpsec.com http://www/starmicromics .com/components/mics.html http://www.mctraffic.org/signal.htm http://en.wikipedia.org/wiki/555_timer_IC [Type text] Page 12