Eu India Grid Project Presentation Andy

570 views
521 views

Published on

EU-INDIA GRID

Published in: Automotive, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
570
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Eu India Grid Project Presentation Andy

  1. 1. The EU-IndiaGrid Project Joining European and Indian grids for e-science CO2e CER 10 BnT / Year INV 210+1750 Bn$ RoI 7,000 Bn$/Yr DOUBLE SPEED,1/3 FUEL/HP ::TRANSPORT 1/3 FUEL / MW :: POWER PLANT
  2. 2. CO2e CER 10 BnT/Yr <ul><li>GLOBAL FUEL USED </li></ul><ul><li>12 MnT OIL ; 3 MnT COAL = 15 MnT/Day </li></ul><ul><li>GLOBAL CO2e 12*2.9+3*2.33=41.8 MnT/Day </li></ul><ul><li>NOW 41.8*360= 15,048 MnT/Year </li></ul><ul><li>ANDY FUEL 12*1/3+3*1/3= 5.0 MnT/Day </li></ul><ul><li>ANDY CO2e 4*2.9+1*2.33= 13.93 MnT/Day </li></ul><ul><li>NEW 13.93*360=5,016 MnT/Year. </li></ul><ul><li>CER = 15,048-5,016= 10.0 BnT/Yr </li></ul><ul><li>FUEL SAVED 8*750$+2*200$=6.40 Bn$/Day </li></ul>
  3. 3. Eu-Indiagrid Project Goals <ul><li>INVESTMENT: CAP 210; WC 1750 Bn$ </li></ul><ul><li>RETURN 7,000 ; Exp 3500 Bn$/Yr </li></ul><ul><li>CDM = 10*25= 250 Bn$/Yr 0.7/Day </li></ul><ul><li>FUEL SAVED = 6.4 Bn$/Day </li></ul><ul><li>WORK 7000-3500=3500 10/Day </li></ul><ul><li>NET SAVED=0.7+6.4+10=16.1 Bn$/Day </li></ul>
  4. 4. CO2e POLLUTION <ul><li>CAR 2 T 100 HP 100 kph 10 L/Hr 10 kmpl </li></ul><ul><li>NOW gm/km </li></ul><ul><li>= 2325*Lit/km=2325/kmpl 232.50g </li></ul><ul><li>NEW gm/Ton-km </li></ul><ul><li>= 2325*Lit/Ton-km=2325/Ton-kmpl 116.25g </li></ul><ul><li>ANDY gm/Hour </li></ul><ul><li>= 2325*Lit/Hour 23.25 kg </li></ul><ul><li>BEST </li></ul>
  5. 5. Project Effort <ul><li>BUDGET: Venture Fund </li></ul><ul><ul><li>1960 k-EUR total fund </li></ul></ul><ul><ul><li>1750 k-EUR from European Commission </li></ul></ul><ul><li>Person months </li></ul><ul><ul><li>353.3 PM total </li></ul></ul><ul><ul><li>226.4 PM funded from European Commission </li></ul></ul><ul><li>Job: Truck-1; 500 T 660 knots FERRY-1 </li></ul><ul><li>Project start: October 2009 </li></ul><ul><li>Duration: 24 months </li></ul>
  6. 6. SCIENTIFIC AREA 1.6 Mn$ / MW 100 Bn$ 25 Bn$ 100 Bn$ 100 000MW CER 336 MnT / yr PowerPlant 1/3 Fuel/HP Energy (energy efficiency) 0.4 Mn$ 3.0 Mn$ 5.0 Mn$ 1,600 1,000 4,400 400 250 1,100 70 Bn$ 30 Bn$ 110Bn$ 200 kph 600 kph 330 knot Automotive Rail Ship Transport 1/6 Fuel / HP 10 Mn$ 7,000 Bn$ 1,750 Bn$ 210 Bn$ 10 BnT/Yr 250 Bn$/Yr CER CDM CleanDevelopment Mechanism Climate Change V C Fund Return WC Cap New Type Scientific Area
  7. 7. ANDY DESIGN Automotive CAR 2 T DIESEL Nor Asp 15,000 7.7 kg 30 3.33 100 600 100 ANDY DT 4 T 13,000 7.7 kg 60 3.33 200 600 100 ANDY DS 2 T 11,000 3.8 kg 60 1.67 100 300 50 ANDY SS 2 T 13,000 23 kg 20 10 200 1800 100 ANDY BEARING 12,000 23kg/hr 10 10 100 1800 100 NORMAL 2 T Cost $ CO2e kmpl Fuel L/hr SPEED Vol cc HP DESIGN
  8. 8. ALL Saved 942 Mn$ 570 Mn 83.87Mn 288 Mn 1000 Mn$ 1000 MW PP VLCC 100,000 T at 330 knots = 2.0 MnT at 16.5 knots 330/16.5=20 7.52 Bn$ 6 Bn 83.25 Mn 1.44 Bn 250 Mn$ 100,000 T VLCC 45.23 Mn$ 30 Mn 837.5 K 14.4 Mn 2 Mn$ 500 P Ferry 85.23 Mn$ 70 Mn 837.5 K 14.4 Mn 3 Mn$ 1000 T Ship 85.40 Mn$ 60 Mn 1395 K 24 Mn 5 Mn$ 2000 P Rail 271,000 $ 144,000 6975 $ 120,000 $ 60,000$ 40 P Truck TOTAL/Yr WORK CDM FUEL SAVED COST Pass / T VEHICLE
  9. 9. COAL POWER PLANT <ul><li>CAPACITY 1250 MW COST 1250 Mn$ </li></ul><ul><li>FUEL 100 kg/MWh vs 300 kg </li></ul><ul><li>CO2e 1680 T/MW/Yr vs 5040 T </li></ul><ul><li>FUEL TYPE-ALL S,L,G. PPR $1/10 kwh </li></ul><ul><li>ENGINE: 6 m Dia,120 cm Thk 1.4 Mn HP </li></ul><ul><li>NO BOILER , NO TURBINE </li></ul><ul><li>CER 1250*[5040-1680]= 4.2 MnT/Yr 3360T/MW/Yr </li></ul><ul><li>INC = 1250*1000/10*7200= 900 Mn$/Yr </li></ul><ul><li>EXP = 180+20=200 Mn$ NET 900-200 = 700 Mn$ </li></ul><ul><li>CDM = 4.2*25$/T= 105 Mn$/Yr </li></ul><ul><li>FUEL SAVED =0.2*200$*7200*1250= 360 Mn$/Yr </li></ul><ul><li>NET 700+105+360= 1165 Mn$/Yr </li></ul><ul><li>RoI = 1165/1250= 93.2 % </li></ul>
  10. 10. ROYALTY <ul><li>CENTERS 1 10 . </li></ul><ul><li>INV……………...100 Bn$ 1000 </li></ul><ul><li>ROYALTY……. 3.0 Bn$ 30 </li></ul><ul><li>PROFIT……….. 824 Bn$ 8240 </li></ul><ul><li>RoI……………… 800 % 800 % </li></ul><ul><li>CER……………….1 BnT/Yr 10 </li></ul>
  11. 11. CONTACT <ul><li>M ANDY APPAN M E [Prod] </li></ul><ul><li>44 Years EXPERT DESIGNER Mb.91098404 63337 </li></ul><ul><li>Double Speed, 6x kmpl, 1/6 CO2e for SAME Ton-HP </li></ul><ul><li>360 kmpl BIKE, 60 kmpl CAR, 30 kmpl TRUCK </li></ul><ul><li>600 kmph RAIL 35 % HP for Same Passengers, </li></ul><ul><li>330,660 knots Ship,Ferry,VLCC-1/3 FUEL for Ton-HP </li></ul><ul><li>Chennai-Singapore Ferry 4 hrs Fare $40 Airfare $120 </li></ul><ul><li>[1] Inv 1 Mn$ Return 2 % pm + 10 % at Year end </li></ul><ul><li>[2] Inv 1 Mn$ Return 200 % at Second Year end </li></ul>

×