'First TIme" 4 man crew installed 4,800 SF under roof area in 6 days. Included interior walls, beams and exterior porch beams and columns. No wood beams, no wood posts, all poured the same day. Floor trusses were installed and sheeted before the pour,why? because we can . . AND this speeds up the installation process.