Bangor Maine Waterfront Park Updated 2010

3,926 views
3,808 views

Published on

Presentation of the Bangor Maine waterfront park masterplan by Shadley Assoc.

Published in: Real Estate, Travel, Sports
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
3,926
On SlideShare
0
From Embeds
0
Number of Embeds
28
Actions
Shares
0
Downloads
26
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Bangor Maine Waterfront Park Updated 2010

  1. 1. Bangor Waterfront Park Waterfront Park March 17, 2010 Prepared By: City of Bangor & Shadley Associates, P.C. Shadley Associates, P.C.
  2. 2. Bangor Waterfront Park Presentation Agenda •Summary of Waterfront Master Plan and completed work •Waterfront Park Master Plan •Phase I Work •Next Steps Shadley Associates, P.C.
  3. 3. Bangor Waterfront Park Waterfront Master Plan And Completed Work Shadley Associates, P.C.
  4. 4. Bangor Waterfront Park Shadley Associates, P.C.
  5. 5. Bangor Waterfront Park Open Space Railroad Street Improvements, 2003 Improvements, 2004 Phase I Park Improvements, 2009 - 2010 Coal Tar Remediation, 2009 Water’s Edge Front Street Improvements, 2005 Improvements, 2003 Shadley Associates, P.C. Built Work
  6. 6. Bangor Waterfront Park Shadley Associates, P.C.
  7. 7. Bangor Waterfront Park Shadley Associates, P.C.
  8. 8. Bangor Waterfront Park Shadley Associates, P.C.
  9. 9. Bangor Waterfront Park Waterfront Park Waterfront Park Area Shadley Associates, P.C.
  10. 10. Bangor Waterfront Park Park Program Summary of Program Elements: 14 Acre Linear Park • Open green space • Jogging and walking trails • Bike trails • Strong connections with other destinations • Spaces for events, performances and open-air markets (supported by utilities) • Cross-country skiing • Ice skating • Parking • Playground: Tot Lot and Water Play • Picnic Spaces • Noteworthy Design / Visually Distinct • Lighting and Planting Shadley Associates, P.C.
  11. 11. Bangor Waterfront Park Connections with the Shadley Associates, Surrounding Community P.C.
  12. 12. Bangor Waterfront Park Shadley Associates, Final Park Master Plan P.C.
  13. 13. Bangor Waterfront Park Railroad Street Parking Lot Fencing and planting along with drainage chambers, lights RR Right of Way Trail connection to Dutton Street with lights Multiuse trails and grading for amphitheater Compass Rose Waterfront Parking Lot with drainage chambers, lights and access drive Phase I Park Under Shadley Associates, Construction, 2009 - P.C.
  14. 14. Bangor Waterfront Park Stormwater Treatment as approved by the DEP Shadley Associates, P.C.
  15. 15. Bangor Waterfront Park Waterfront Park Existing Conditions Looking north from hotel December 2008 Shadley Associates, P.C.
  16. 16. Bangor Waterfront Park Shadley Associates, May 2009 P.C.
  17. 17. Bangor Waterfront Park June 2009 Subsurface Shadley Associates, P.C. drainage
  18. 18. Bangor Waterfront Park July 2009 Subsurface Shadley Associates, Treatment Chambers P.C.
  19. 19. Bangor Waterfront Park August 2009 Extensive earthwork operations Shadley Associates, P.C.
  20. 20. Bangor Waterfront Park Shadley Associates, P.C. September – October 2009: Paving & Curbing
  21. 21. Bangor Waterfront Park Area to be loamed and seeded, and later planted Shadley Associates, P.C. Coal Tar Remediation, Fall 2009
  22. 22. Bangor Waterfront Park Construction work to be completed this Spring: - Dutton Street end: paving, lights, rain gardens - Amphitheater grading and multi-use trails - Finish paving, including Compass Rose - Planting, seeding and rain gardens - Car top boat access Shadley Associates, P.C.
  23. 23. Bangor Waterfront Park 8’ Boat Access on Master Plan - Future Car top boat access Shadley Associates, P.C. Boat Access on Current Construction
  24. 24. Bangor Waterfront Park Work Remaining to Complete the Park Master Plan Shadley Associates, P.C.
  25. 25. Bangor Waterfront Park Shadley Associates, P.C.
  26. 26. Bangor Waterfront Park Area 1 – East of Waterfront Parking Lot: • New Building • Wet and Dry Playgrounds • Shoreline Walkway and Restoration THIS AREA HAS 90% COMPLETE DRAWINGS AND SPECIFICATIONS Shadley Associates, P.C.
  27. 27. Bangor Waterfront Park New Building: • Public Restrooms • Equipment Room to both Equipment replace existing building and Restrooms to house the sprayground equipment Shadley Associates, P.C.
  28. 28. Bangor Waterfront Park Shadley Associates, Dry Playground P.C.
  29. 29. Bangor Waterfront Park Shadley Associates, Wet Playground P.C.
  30. 30. Bangor Waterfront Park Shadley Associates, Wet Playground Recirculating Equipment P.C.
  31. 31. Bangor Waterfront Park Shadley Associates, P.C.
  32. 32. Bangor Waterfront Park Area 2 – Waterfront Lot to South of Amphitheater: • Green Space for Passive Recreation • Finished Amphitheater • Shade Shelters, Walkways, Rain Gardens, Planting THIS AREA HAS BEEN DEVELOPED TO THE MASTER PLAN LEVEL Shadley Associates, P.C.
  33. 33. Bangor Waterfront Park Shadley Associates, P.C.
  34. 34. Bangor Waterfront Park Area 3 – South of Amphitheater to Pike Industries: • Great Lawn • Butterfly Garden •Walkway to Dutton Street THIS AREA HAS BEEN DEVELOPED TO THE MASTER PLAN LEVEL Shadley Associates, P.C.
  35. 35. Bangor Waterfront Park Area 3: Area 2: Area 1: • Construction Cost • Construction Cost • Construction Cost Estimate: $675,000 Estimate: $1,350,000 Estimate: $1,770,700 Total Estimated Construction Cost: $3,795,700 Plus Fees, Expenses and Permit Shadley Associates, Amendment Applications P.C.
  36. 36. Bangor Waterfront Park Shadley Associates, P.C.

×