3. Root of the Problem
Jalan Duta
Lebuhraya Mahameru
Jalan Tun Razak
SUNDAY STAR
10 APRIL 2011
All Rights Reserved
3
4. Root of the Problem
STAR METRO
5 AUGUST 2014
All Rights Reserved
4
5. Root of the Problem
KL
CPA
Jalan Kuching
Jalan Cheras
Jalan Ampang & AKLEH
MEX
Besraya/ KL-Seremban
Expressway
Federal Highway
Sprint Highway
Jalan Puchong
Jalan Kepong
NKVE
Intense Concentration of Traffic Volume Demand Into KL
All Rights Reserved
5
6. Current Ring and Radial Roads
MRR 2
MRR 1
IRR
Root of the Problem
All Rights Reserved
6
7. Root of the Problem
Total Traffic Volume Demand:
159,000 pcu/hr
MRR 2
All Rights Reserved
7
8. Root of the Problem
Total Traffic Volume Demand:
111,000 pcu/hr
MRR 1
第一中环路流量
Total Traffic Volume Demand:
111,000 pcu/hr
MRR 1
All Rights Reserved
8
9. Root of the Problem
Current Traffic Demand Entering / Leaving KL CPA via MRR 1 = 111,000 vph
(a) At LOS “C” (1,000 vph/lane)
Total Lanes Required = 111,000/1,000
= 111 lanes
(b) At LOS “E” (2,000 vph/lane)
Total Lanes Required = 111,000/2,000
= 55 lanes
(c) At LOS “F” (2,200 vph/lane)
Total Lanes Required = 111,000/2,200
= 50 lanes
All Rights Reserved
9
10. 1
12
2 1
3
3
5
4
5
6
7
6
8
7
8
9
10
4
2 Lane Roads
1. Jalan Dewan Bahasa
2. Jalan Sungai Besi
3. Jalan Kia Peng
4. Jalan Yap Kwan Seng
5. Jalan Raja Muda Abdul Aziz
6.Jalan Tun Ismail
7.Jalan Sultan Salahuddin
8. Jalan Parlimen
3 Lane Roads
1.Jalan Loke Yew
2. Jalan Pudu
3.Jalan Bukit Bintang
4.Jalan Ampang
5.AKLEH
6.Jalan Pahang
7.Jalan Ipoh
8.Jalan Kuching
9.Jalan Damansara
10.Jalan Syed Putra
4 Lanes Road
1.Jalan Davis (4 lanes)
Current Radial Arterials into the City
All radial roads jammed because they are operating at LOS “F” Total = 50 lanes
Root of the Problem
All Rights Reserved
10
11. MRT & LRT
MRT 1
MRT 2
MRT 1 & 2 will be completed in 2017 & 2022 respectively
All Rights Reserved
11
12. 5.5%
p.a.
growth
MRT & LRT AND THEIR CAPACITIES
5.5%
p.a.
growth
Person Trips/Day
6,800,000
Public 18%
1,200,000
Private 82%
5,600,000
Bus : 600,000
(50%)
Rail : 600,000
247.6 km (50%)
LRT– 400,000
KTM– 120,000
KL Monorail –
80,000
Car – 4,300,000
(77%)
M/C– 1,300,000
(23%)
Year2011
KLJ-
225,000
AMG-
175,000
Occ 1.4
3.0 million cars
Person Trips/Day
9,400,000
Public 25%
2,400,000
Private 75%
7,000,000
Bus/BRT : 800,000
(33%)
Rail : 1,600,000
(67%)
LRT/MRT–
1,200,000
KTM– 240,000
KL Monorail –
160,000
Car – 5,400,000
(77%)
M/C– 1,600,000
(23%)
Year2017
KLJ-
400,000
AMG-
350,000
MRT-
450,000
Occ 1.4 3.9 million cars
Person Trips/Day
11,000,000
Public 30%
3,300,000
Private 70%
7,700,000
Bus/BRT :
1,100,000 (33%)
Rail : 2,200,000
(67%)
LRT/MRT–
1,720,000
KTM– 300,000
KL Monorail –
180,000
Car – 5,900,000
(77%)
M/C– 1,800,000
(23%)
Year2020
KLJ-
450,000
AMG-
350,000
MRT+LRT
920,000
4.2 million carsOcc 1.4
Population 6.5 mil
Population 7.4 mil
Population 8.6 mil
All Rights Reserved 12
13. Solution: A New City Bypass with
Integrated Park & Ride
MRR2
MRR1
SPRINT
LDP
DUKE 2
MRR2
DUKE 1
DUKE 3
All Rights Reserved
13
14. Integrated Park & Ride Facilities will be operated
under the ICM or Intercept, Collect and Move
Model
ICM model involves constructing Park & Ride
facilities alongside high capacity roads such as
expressways and highways where they intersect
urban rail lines and stations.
Integrated Park & Ride :
Intercept, Collect and Move (ICM) Model
All Rights Reserved
14
15. Types of Park & Ride Facilities
Below Elevated Expressway
Above the Expressway
Alongside Expressway
Different Types of Park & Ride Facilities :
All Rights Reserved
15
16. Below the Expressway
Types of Park & Ride Facilities
All Rights Reserved
16
17. Above the Expressway
Types of Park & Ride Facilities
All Rights Reserved
17
18. Alongside the Expressway
Types of Park & Ride Facilities
All Rights Reserved
18
19. Kelana Jaya Line
Ampang Line
Proposed LRT3
KTM Line
MRT1 (Sg. Buloh-Kajang)
Proposed MRT2
Proposed MRT2 (Circle)
Each Park and Ride
Station to cater for
2,000 car parks =
46,000 car parks
Total Park & Ride Facilities (Phase 1)
MRR2KL CITY BYPASS
MRR2 = 13 P&R
KL City Bypass = 10 P&R
All Rights Reserved
19
20. How Does it Work
Total Number of
Cars Parked in the
Park & Rides
Facilities =
46,000 cars
110,000 Cars
Remaining cars
entering the city =
65,000 cars
Reduction of 42%!
All Rights Reserved
20
21. First Integrated Park & Ride Facility
SEGAR, the first integrated Park & Ride facility
being constructed shall have the following features:
2 levels of covered car park below the toll canopy structure
with linked walkway connecting to the KTM commuter
station and integrated with Rest and Service Area;
Direct connection to convenient shopping to ensure car
park remains lively and safe, even past midnight;
The Integrated Park & Ride complex will have direct
linkages to local roads;
A TOD project which embraces the Blue Ocean strategy,
utilizing land that would otherwise not effectively used.
All Rights Reserved
21
22. TOLL CANOPY
(P&R below)
KTM Commuter Station
Integrated Park & Ride Facility with Direct Connection With KTM Commuter Station
SEGAR Concept
All Rights Reserved
22
23. Supervision Building
Toll Canopy Toll Canopy
Toll Canopy
SEGAR Concept
Elevation View of SEGAR Integrated Park & Ride Facility
All Rights Reserved
23
24. Integrated With Rest & Service Area and Hyper Mart
SEGAR Concept
All Rights Reserved
24
29. KL City Bypass provides easy, efficient and congestion
free passages to the Integrated Park & Ride Facilities;
KL City Bypass can become the new city limit;
Integrated Park & Ride Facilities encourage motorists to
switch from self-drive to ICM Modal;
Congestion Charges could further compel the use of
public transports;
Commercial Developments within the Integrated Park &
Ride Facilities could cross subsidize Parking Rates and
make these facilities lively even at night.
Conclusion
All Rights Reserved
29
30. Investing in Integrated Park & Rides Facilities:
» Remove street parkings in the City;
» Allow developers to construct less car parks and
channeled the money saved into construction of
more Park & Ride facilities;
Less congestion = less fatigue and stress
Less congestion = less carbon emission
SMARTER CITY!!
Conclusion
All Rights Reserved
30