2. Use Case Collaborative
Product Development
Impact
Store Store
Engineers Engineers
Main Development Facility, San Jose
5 Locations Outside of
Main Campus doing
development, localization, Build
Test (QA/QC) Store Systems
Remote Sites Code
Store
Replicated to Main Signiant
Development Campus
Build Environment CDM
Automatically
Data Replicated Over WAN Engineers
– 1.3-1.5TB/Day
Automatically Engineers Engineers Engineers
Reduction In Labor
Status Console for Store
Users Store
Engineers Engineers
Automated Processes Signiant Agents
Copyright 2010 Signiant Inc 2 | Proprietary and Confidential
Editor's Notes
ChallengePopulate on-line store with many files, large and small with different formats from many different sources.Content needs to be “live” at release date.SolutionEmbed Signiant CTE product into application distributed to vendorsResultsAccelerated transfer of large files.Automation of jobs to manage transfer of many files reducing labor cost.Management of bandwidth ensures timely delivery.Email confirmation eliminates doubt about delivery.Security features prevents piracy and early leakage.