0
Working with Concept Design 95 Ltd   Mar 2010 – Sep 2010
Working with Concept Design 95 Ltd   Mar 2010 – Sep 2010
Working with Concept Design 95 Ltd   Apr 2010 – Jul 2010
Working with Concept Design 95 Ltd   Feb 2010 – Apr 2010
Freelance   Oct 2008 – Oct 2010
Freelance   Oct 2008 – Oct 2010
Freelance   Oct 2008 – Oct 2010
Freelance   Oct 2008– Oct 2010
Freelance   Jun 2009 – Feb 2010
Working with Cleardesigns   Jun 2007 – Mar 2008
Working with Cleardesigns   Jun 2007 – Mar 2008
Working with Cleardesigns   Jun 2007 – Mar 2008
Front Elevation (East )          Side Elevation (North )   Rear Elevation (West )           Side Elevation (South )       ...
Mar 2006 – Jun 2007Working with Derrick Wade Waters                                               £ 1.5 m
Mar 2006 – Jun 2007Working with Derrick Wade Waters                                               £ 1.5 m
Working with Derrick Wade Waters   Mar 2006 – Jun 2007
CAD Drawing and colored in Freehand    COLOR PRESENTATION Working with Peter Robins Associate     Nov 2001 – Apr 2002 Side...
PRELIMINARY IDEAS(Hand made Drawing)                                        SIDE PLAN                                     ...
Working with Peter Robins Associate   Nov 2001 – Apr 2002
Residential &                                                       Yacht Club                                            ...
Preliminary                                                                                      Ideas                    ...
N                                                   2                                                              1 Total...
N                                                   May 1995 – Feb. 2000Working with Hausmann Projectos y ConstruccionesLa...
3                                                   1 Presentation of                                                     ...
Conference       room refurbishment    with direct     dimmed    spotlights  towards the table to allow  taking noteswhile...
1                                                 Construction                                               1 Ceiling str...
Reception desk                                                   View of the Reception Area                            Int...
N                 Plan - GF                 Internal View                Lateral Section                                  ...
Portafolio sds   v2
Upcoming SlideShare
Loading in...5
×

Portafolio sds v2

357

Published on

Published in: Career
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
357
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Portafolio sds v2"

  1. 1. Working with Concept Design 95 Ltd Mar 2010 – Sep 2010
  2. 2. Working with Concept Design 95 Ltd Mar 2010 – Sep 2010
  3. 3. Working with Concept Design 95 Ltd Apr 2010 – Jul 2010
  4. 4. Working with Concept Design 95 Ltd Feb 2010 – Apr 2010
  5. 5. Freelance Oct 2008 – Oct 2010
  6. 6. Freelance Oct 2008 – Oct 2010
  7. 7. Freelance Oct 2008 – Oct 2010
  8. 8. Freelance Oct 2008– Oct 2010
  9. 9. Freelance Jun 2009 – Feb 2010
  10. 10. Working with Cleardesigns Jun 2007 – Mar 2008
  11. 11. Working with Cleardesigns Jun 2007 – Mar 2008
  12. 12. Working with Cleardesigns Jun 2007 – Mar 2008
  13. 13. Front Elevation (East ) Side Elevation (North ) Rear Elevation (West ) Side Elevation (South ) Mar 2006 – Jun 2007Working with Derrick Wade Waters £ 1.5 m
  14. 14. Mar 2006 – Jun 2007Working with Derrick Wade Waters £ 1.5 m
  15. 15. Mar 2006 – Jun 2007Working with Derrick Wade Waters £ 1.5 m
  16. 16. Working with Derrick Wade Waters Mar 2006 – Jun 2007
  17. 17. CAD Drawing and colored in Freehand COLOR PRESENTATION Working with Peter Robins Associate Nov 2001 – Apr 2002 Side Area: 158 m2 - Area: 78 m2 £ 200,000
  18. 18. PRELIMINARY IDEAS(Hand made Drawing) SIDE PLAN EXISTING PLAN & ELEVATIONS CAD Drawing Working with Peter Robins Associate Nov 2001 – Apr 2002
  19. 19. Working with Peter Robins Associate Nov 2001 – Apr 2002
  20. 20. Residential & Yacht Club Project. A luxury 90 apartments with hotel services in Venezuela’s Puerto La Cruz tourist area, in a circular peninsula connected by a long neck of land with golf course, nice canals and views around it. The form of this building is conic and semicircular in a slope position outside and inside. Construction work is near completion. May 1995 – Feb. 2000Working with Hausmann Projectos y Construcciones May 1995 – Feb 2000
  21. 21. Preliminary Ideas 1 Form: Half circle, conic 2 Form: stepped 1 terraces or pyramid 16 3 Shape and structure of Apartments 12 14 4 Pre-dimensioning of 15 Apartments 13 5 Terraces apart., and internal stairs 6 Apart. façade and 2 external division 7 Lifts and public stairs 8 Apart. façade 9 Terrace garden and structure 10 Interior division of the apart. 11 11 Interior division of the apart. 12 Swimming pool 5 13 Watchman’s booth 14 Ceiling of the 3 lobby area (Canvas) 15 Ceiling of the lobby area, arched roof 16 Detail the end of 7 9 the lobby area Preliminary Ideas 4 6 8 10 (arched) May 1995 – Feb. 2000Working with Hausmann Projectos y Construcciones May 1995 – Feb 2000
  22. 22. N 2 1 Total Plan 2 Lateral Section 3 South Façade1CAD Drawing 3 May 1995 – Feb. 2000Working with Hausmann Projectos y Construcciones May 1995 – Feb 2000Land area: 12,448 sqm Const. Area: 11,453 sqm
  23. 23. N May 1995 – Feb. 2000Working with Hausmann Projectos y ConstruccionesLand area: 12,448 sqm
  24. 24. 3 1 Presentation of the Apartments 2 Different Views 3 Pictures of model 1 1 2 2 May 1995 – Feb. 2000Working with Hausmann Projectos y ConstruccionesLand area: 12,448 sqm
  25. 25. Conference room refurbishment with direct dimmed spotlights towards the table to allow taking noteswhile using anslide projector, plus indirect lightning for general use. Views of the Conference Room PLAN SECTION May 1995 – Feb. 2000Freelance May 1999 – Jul 1999 Refurb. Area: 82 m2
  26. 26. 1 Construction 1 Ceiling structure 2 Ceiling and TV corner structures 9 3 Door structure 11 10 from corridor 2 8 4 Dry walls 5 Corridor from the other side 6 Lights installations 7 Air conditioning ducts finishing 8 Door frame 9 Glass shelf installation and 3 4 5 6 door finishing 10 Carpet and 7 wooden platform 11 The Meeting Room (Jun. 1999) May 1995 – Feb. 2000 May 1999 – Jul 1999Freelance Refurb area: 82 m2
  27. 27. Reception desk View of the Reception Area Interior view Front View Plan Photo of the finished Reception Area May 1995 – Feb. 2000Freelance May 1999 – Jul 1999 Refurb. Area: 82 m2
  28. 28. N Plan - GF Internal View Lateral Section Front and back Views Internal View Transversal Section May 1995 – Feb. 2000Freelance Aug 1998 – Nov 1998 Const. Area: 450 sqm
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×