SlideShare a Scribd company logo
1 of 6
Download to read offline
CURRICULUM VITAE
PERSONAL DATE :
Name : Nur alamsyah
Place / Date of Birth : Jakarta, April 30, 1970
Gender : Male
Religion : Moslem
Marital Status : Married
Nationality : Indonesia
Address : KP . Sindang Karsa Rt :004 / 06 No:164
Kel . Sukamaju baru
: Tapos – Depok
Pos Code : 16955
Phone :Mobile: 62-81802917851
Home : 62-21 87745178
---------------------------------------------------------------------------------------------------------
FORMAL EDUCATION
Elementary School Negeri Tugu VI 1977 – 1984
Junior High School Negeri 184 Jakarta 1984 – 1987
Senior Technical High School Jakarta 1987 – 1990
Jakarta Engineering School Oil & Gas 1991 For Electrical / Instrument
NON FORMAL EDUCATION
Jakarta Engineering School Oil & Gas 1995 For AutoCAD operator 2D
Bina Karyanindotama Engineering 2003 For AutoCAD operator 2D / 3D Civil Architecture
Training course Bentley Institute
- Auto Plant
- Pro Steel
April,11 – Present LIPOTECH PROJECT ENGINEERING PTE LTD
CARRIER SUMMARY
Engineering Consultant
As . Electrical Senior designer
July,06 – April,11 PT . META EPSI ENGINEERING
Engineering Contractor
As . Electrical Senior designer
Feb, 04 – July,06 PT . DIAGRAM TRIPROPORSI
Engineering Consultant
As . Electrical Designer
July, 00 – Jan,04 PT.CHARLIES LESTARI SENTOSA
Project Division
As . Electrical Senior drafter
July, 90 – May,00 PT.ARGHA KARYA PRIMA IND. Tbk
Engineering Department
As . Electrical Drafter
As . Foreman Technician Electrical (Maintenance)
DETAIL WORK EXPERIENCE
LIPOTECH PROJECT ENGINEERING PTE LTD
Engineering Consultant
At Menara Karya Building
19th Floor Unit G-H, Jl. HR Rasuna Said
Blok X-5 Kav.1-2 Jakarta 12950. Indonesia
Periode : April,11 - Present
Project : Plam Oil Repineri
Location : Marunda – Jakarta ( Indonesia )
Owner : PT. SMART Tbk
Position : As Electrical,Mechanical Senior Designer
Job Description :
As Electrical
• Design Overall one line Diagram
• Design LV Switchgear One line Diagram
• Design Cable trench layout sub station
• Design Lighting ,receptacle, alarm and air conditioning control room
• Design Lighting Panel General Arrangement
• Design Typical Installation Lighting Pole
• Design Indoor & Out Door Lighting Plan Layout
As Mechanical & Piping
• Design & Drawing PFD
• Design & Drawing P&ID
• Design & Drawing Isometric
• Design & Drawing Piping Route
PT . META EPSI ENGINEERING
Engineering Contractor
At META EPSI Building
Jl. D.I Panjaitan Kav 2
Jakarta – Timur 13220
Periode : July,09 – April,11
Project : PLTU GORONTALO 2 X 25 MW
Location : Gorontalo – Sulawesi ( Indonesia )
Owner : PT. PLN ( Persero )
Position : As Electrical Senior Designer
Job Description
• Design General layout switchyard sub station
• Design Single line diagram 150 kV sub station
• Design Ear thing Grid layout switchyard
• Design Cable trench layout sub station
• Design Equipment Installation Layout & Civil Work Guide
• Design Lighting ,receptacle, alarm and air conditioning control room
• Design Small Distribution Panel
• Design Lighting Panel General Arrangement
• Design Typical Installation Lighting Pole
• Design Indoor Lighting Plan Layout
Periode : April,08 – July,09
Project : Steam Station Control Retrofit
Location : Duri – Riau (Sumatra – Indonesia)
Owner : PT. CHEVRON PACIFIC INDONESIA
Position : As Electrical Senior Designer
Job Description
• Design Overall one line Diagram
• Design LV Switchgear One line Diagram
• Design Cable trench layout sub station
• Design Lighting ,receptacle, alarm and air conditioning control room
• Design Lighting Panel General Arrangement
• Design Typical Installation Lighting Pole
• Design Indoor Lighting Plan Layout
Periode : Nov,07 – April,08
Project : Plam Oil Mill and ancillary Service Cap. 30 ton per hour
Location : Mamuju – Sulawesi (Indonesia)
Owner : PT. SURYARAYA LESTARI
Position : As Electrical Senior Designer
Job Description
• Design Support (Cable ladder, Panel, Lighting, Receptacle)
Inst./Elect.
• Design Routing Tray Cable ladder (Inst/Elect.)
• Design Routing Cable Power
• Design Lighting (street, out door, in door)
• Instrument fire alarm, Smoke detector, Push Bottom fire alarm
• Design Routing Cable Under Ground, Duct Bank Cable.
Periode : July,06 – Nov,07
Project : Pipe line Rewulu-Teras Include Depot teras
Location : Rewulu - Teras
Owner : PT. PERTAMINA ( Persero)
Position : As Electrical Senior Designer
Job Assigment :
• Design Overall One Line Diagram
• Design LV Switchgear One Line Diagram
• Design Equipment Installation Layout & Civil Work Guide
• Design Cabling Connection Diagram
• Design Small Distribution Panel
• Design Lighting Panel General Arrangement
• Design Typical Installation Lighting Pole
• Design Indoor Lighting Plan Layout
PT . DIAGRAM TRIPROPORSI
Engineering Consultant
At Agnesia Building 1st
Floor
Jl. Pemuda No.73B – Rawamangun
Jakarta – Timur 13220
Periode : Jan,05 – April,06
Project : Depapre port and Marine Project
For Depapre Government city
Location : At Jayapura – Irian Jaya (Indonesia)
Owner : Lokal Government Jayapura
Position : As Electrical Designer
Job Assignments :
• Design Support (Cable ladder, Panel, Lighting, Receptacle)
Inst./Elect.
• Design Routing Tray Cable ladder (Inst/Elect.)
• Design Routing Cable Power
• Design Lighting (street, out door, in door)
• Instrument fire alarm, Smoke detector, Push Button fire alarm
• Design Routing Cable Under Ground, Duct Bank Cable.
Periode : Feb,04 – Jan,05
Project : Palaran port and Marine Project
For Samarinda Government city
Location : Samarinda – Kalimantan timur (Indonesia)
Owner : Lokal Government Samarinda - Kaltim
Position : As Electrical Designer
Job Assignments :
• Design Support (Cable ladder, Panel, Lighting, Receptacle)
Inst./Elect.
• Design Routing Tray Cable ladder (Inst/Elect.)
• Design Routing Cable Power
• Design Lighting (street, out door, in door)
• Instrument fire alarm, Smoke detector, Push Buttom fire alarm
• Design Routing Cable Under Ground, Duct Bank Cable.
PT.CHARLIES LESTARI SENTOSA
Jl. H. Agus Salim No.22-23
Jakarta - Pusat 10340
Periode : March,00 – Nov,04
Project : Building Ramayana dept store
Location : Jakarta ,Baturaja – Lampung , Batam , Palembang
Owner : PT. RAMAYANA. DEPT
Position : As . Electrical Senior drafter
Job Assignments:
• Prepare Drawing Single line Diagram Low Voltage
• Prepare Drawing Detail panel power LVAC
• Prepare Drawing Detail Panel, Lighting and Receptacle
• Prepare Drawing cable Lighting
• Prepare Drawing routing cable for receptacle
• Prepare Drawing routing cable for air conditioning
• Prepare Drawing tray cable ladder
PT.ARGHA KARYA PRIMA IND. Tbk
Jl. Pahlawan ,Desa karang asem barat
Citeureup – Bogor 16810
Periode : March,97 – Nov,00
Project : Expansions Factory
Location : Citeureup – Bogor ( Indonesia )
Owner : PT.ARGHA KARYA PRIMA IND. Tbk
Position : As . Electrical drafter
Job Assignments:
• Prepare Drawing Site Plan Line Power
• Prepare Drawing Panel, Lighting and Receptacle
• Prepare Drawing Single Line Diagram
• Prepare Drawing Control Panel Layout
• Prepare Drawing Lighting Layout
• Prepare Drawing Cable Layout
Periode : May,90 – August,96
Position : As . Foreman Technician (Engineering Maintenance)
Job Assignments :
• Check PLC Program Microcontroller Digital input and Output
• Check and Repair Panel Control Machine
• Check and Repair Interlock Machine
• Check and Repair Module Control Machine Motor DC
• Check and Repair Control Motor AC
• Check and Repair Refrigerator System Chiller, Fan Coil & AHU
• Check and Repair Temperature Control Heating Up Boiler & Heater
• Check and Repair Pump Motor Water Motor & Oil
• Check and Repair Alarm System

More Related Content

What's hot (17)

Magazine 02
Magazine 02Magazine 02
Magazine 02
 
Tachmid_CV__
Tachmid_CV__Tachmid_CV__
Tachmid_CV__
 
ICI PROJECT 2 Magazine
ICI PROJECT 2 MagazineICI PROJECT 2 Magazine
ICI PROJECT 2 Magazine
 
CURRICULUM VITAE 2015 no.sign
CURRICULUM VITAE 2015 no.signCURRICULUM VITAE 2015 no.sign
CURRICULUM VITAE 2015 no.sign
 
Shankar Das Resume
Shankar Das ResumeShankar Das Resume
Shankar Das Resume
 
shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1shimul_c.v_2_NEW_1
shimul_c.v_2_NEW_1
 
CV. Syech Rieffan MB
CV. Syech Rieffan MBCV. Syech Rieffan MB
CV. Syech Rieffan MB
 
Ajay Surendran
Ajay SurendranAjay Surendran
Ajay Surendran
 
MY RESUME (1)
MY RESUME (1)MY RESUME (1)
MY RESUME (1)
 
Naren resume
Naren resumeNaren resume
Naren resume
 
Muthukrishnan resume
Muthukrishnan resumeMuthukrishnan resume
Muthukrishnan resume
 
RESUME ARUN BERA
RESUME ARUN BERARESUME ARUN BERA
RESUME ARUN BERA
 
CV - 16032016
CV - 16032016CV - 16032016
CV - 16032016
 
CV Aldy_Maret 2015
CV Aldy_Maret 2015CV Aldy_Maret 2015
CV Aldy_Maret 2015
 
cv of Ahsan
cv of Ahsancv of Ahsan
cv of Ahsan
 
shimul_c.v_2_NEW 1
shimul_c.v_2_NEW 1shimul_c.v_2_NEW 1
shimul_c.v_2_NEW 1
 
My_CV_Fariang Sirait (1)
My_CV_Fariang Sirait (1)My_CV_Fariang Sirait (1)
My_CV_Fariang Sirait (1)
 

Similar to CV (20)

CV Achmad Zaelani
CV Achmad ZaelaniCV Achmad Zaelani
CV Achmad Zaelani
 
CV_Poliarco,Romeo
CV_Poliarco,RomeoCV_Poliarco,Romeo
CV_Poliarco,Romeo
 
Curicculum Vitae Mardianto
Curicculum Vitae MardiantoCuricculum Vitae Mardianto
Curicculum Vitae Mardianto
 
CV Eko Fuji SM
CV Eko Fuji SMCV Eko Fuji SM
CV Eko Fuji SM
 
CV-Gusryan Zari Khamsya
CV-Gusryan Zari KhamsyaCV-Gusryan Zari Khamsya
CV-Gusryan Zari Khamsya
 
CV Ibnu Ismoko
CV Ibnu IsmokoCV Ibnu Ismoko
CV Ibnu Ismoko
 
CV Kitjuk Harijanto
CV Kitjuk HarijantoCV Kitjuk Harijanto
CV Kitjuk Harijanto
 
CV_Rachmad Arif
CV_Rachmad ArifCV_Rachmad Arif
CV_Rachmad Arif
 
Raghu New Resume
Raghu New ResumeRaghu New Resume
Raghu New Resume
 
Company profile pt. denki engineering
Company profile pt. denki engineeringCompany profile pt. denki engineering
Company profile pt. denki engineering
 
CURRICULUM VITAE complete
CURRICULUM VITAE completeCURRICULUM VITAE complete
CURRICULUM VITAE complete
 
cv Syukur Anton Nugroho
cv  Syukur Anton Nugrohocv  Syukur Anton Nugroho
cv Syukur Anton Nugroho
 
CV.Tambos Sijabat
CV.Tambos SijabatCV.Tambos Sijabat
CV.Tambos Sijabat
 
GERARDO A. QUIZON CV
GERARDO A. QUIZON CVGERARDO A. QUIZON CV
GERARDO A. QUIZON CV
 
Resume
ResumeResume
Resume
 
Aldrin 2014
Aldrin 2014Aldrin 2014
Aldrin 2014
 
CV
CVCV
CV
 
My CV.
My CV.My CV.
My CV.
 
CURRICULUM VITE
CURRICULUM VITECURRICULUM VITE
CURRICULUM VITE
 
Aditia Wardana-CV
Aditia Wardana-CVAditia Wardana-CV
Aditia Wardana-CV
 

CV

  • 1. CURRICULUM VITAE PERSONAL DATE : Name : Nur alamsyah Place / Date of Birth : Jakarta, April 30, 1970 Gender : Male Religion : Moslem Marital Status : Married Nationality : Indonesia Address : KP . Sindang Karsa Rt :004 / 06 No:164 Kel . Sukamaju baru : Tapos – Depok Pos Code : 16955 Phone :Mobile: 62-81802917851 Home : 62-21 87745178 --------------------------------------------------------------------------------------------------------- FORMAL EDUCATION Elementary School Negeri Tugu VI 1977 – 1984 Junior High School Negeri 184 Jakarta 1984 – 1987 Senior Technical High School Jakarta 1987 – 1990 Jakarta Engineering School Oil & Gas 1991 For Electrical / Instrument NON FORMAL EDUCATION Jakarta Engineering School Oil & Gas 1995 For AutoCAD operator 2D Bina Karyanindotama Engineering 2003 For AutoCAD operator 2D / 3D Civil Architecture Training course Bentley Institute - Auto Plant - Pro Steel
  • 2. April,11 – Present LIPOTECH PROJECT ENGINEERING PTE LTD CARRIER SUMMARY Engineering Consultant As . Electrical Senior designer July,06 – April,11 PT . META EPSI ENGINEERING Engineering Contractor As . Electrical Senior designer Feb, 04 – July,06 PT . DIAGRAM TRIPROPORSI Engineering Consultant As . Electrical Designer July, 00 – Jan,04 PT.CHARLIES LESTARI SENTOSA Project Division As . Electrical Senior drafter July, 90 – May,00 PT.ARGHA KARYA PRIMA IND. Tbk Engineering Department As . Electrical Drafter As . Foreman Technician Electrical (Maintenance) DETAIL WORK EXPERIENCE LIPOTECH PROJECT ENGINEERING PTE LTD Engineering Consultant At Menara Karya Building 19th Floor Unit G-H, Jl. HR Rasuna Said Blok X-5 Kav.1-2 Jakarta 12950. Indonesia Periode : April,11 - Present Project : Plam Oil Repineri Location : Marunda – Jakarta ( Indonesia ) Owner : PT. SMART Tbk Position : As Electrical,Mechanical Senior Designer Job Description : As Electrical • Design Overall one line Diagram • Design LV Switchgear One line Diagram • Design Cable trench layout sub station • Design Lighting ,receptacle, alarm and air conditioning control room • Design Lighting Panel General Arrangement • Design Typical Installation Lighting Pole • Design Indoor & Out Door Lighting Plan Layout
  • 3. As Mechanical & Piping • Design & Drawing PFD • Design & Drawing P&ID • Design & Drawing Isometric • Design & Drawing Piping Route PT . META EPSI ENGINEERING Engineering Contractor At META EPSI Building Jl. D.I Panjaitan Kav 2 Jakarta – Timur 13220 Periode : July,09 – April,11 Project : PLTU GORONTALO 2 X 25 MW Location : Gorontalo – Sulawesi ( Indonesia ) Owner : PT. PLN ( Persero ) Position : As Electrical Senior Designer Job Description • Design General layout switchyard sub station • Design Single line diagram 150 kV sub station • Design Ear thing Grid layout switchyard • Design Cable trench layout sub station • Design Equipment Installation Layout & Civil Work Guide • Design Lighting ,receptacle, alarm and air conditioning control room • Design Small Distribution Panel • Design Lighting Panel General Arrangement • Design Typical Installation Lighting Pole • Design Indoor Lighting Plan Layout Periode : April,08 – July,09 Project : Steam Station Control Retrofit Location : Duri – Riau (Sumatra – Indonesia) Owner : PT. CHEVRON PACIFIC INDONESIA Position : As Electrical Senior Designer Job Description • Design Overall one line Diagram • Design LV Switchgear One line Diagram • Design Cable trench layout sub station • Design Lighting ,receptacle, alarm and air conditioning control room • Design Lighting Panel General Arrangement • Design Typical Installation Lighting Pole • Design Indoor Lighting Plan Layout
  • 4. Periode : Nov,07 – April,08 Project : Plam Oil Mill and ancillary Service Cap. 30 ton per hour Location : Mamuju – Sulawesi (Indonesia) Owner : PT. SURYARAYA LESTARI Position : As Electrical Senior Designer Job Description • Design Support (Cable ladder, Panel, Lighting, Receptacle) Inst./Elect. • Design Routing Tray Cable ladder (Inst/Elect.) • Design Routing Cable Power • Design Lighting (street, out door, in door) • Instrument fire alarm, Smoke detector, Push Bottom fire alarm • Design Routing Cable Under Ground, Duct Bank Cable. Periode : July,06 – Nov,07 Project : Pipe line Rewulu-Teras Include Depot teras Location : Rewulu - Teras Owner : PT. PERTAMINA ( Persero) Position : As Electrical Senior Designer Job Assigment : • Design Overall One Line Diagram • Design LV Switchgear One Line Diagram • Design Equipment Installation Layout & Civil Work Guide • Design Cabling Connection Diagram • Design Small Distribution Panel • Design Lighting Panel General Arrangement • Design Typical Installation Lighting Pole • Design Indoor Lighting Plan Layout PT . DIAGRAM TRIPROPORSI Engineering Consultant At Agnesia Building 1st Floor Jl. Pemuda No.73B – Rawamangun Jakarta – Timur 13220 Periode : Jan,05 – April,06 Project : Depapre port and Marine Project For Depapre Government city Location : At Jayapura – Irian Jaya (Indonesia) Owner : Lokal Government Jayapura Position : As Electrical Designer
  • 5. Job Assignments : • Design Support (Cable ladder, Panel, Lighting, Receptacle) Inst./Elect. • Design Routing Tray Cable ladder (Inst/Elect.) • Design Routing Cable Power • Design Lighting (street, out door, in door) • Instrument fire alarm, Smoke detector, Push Button fire alarm • Design Routing Cable Under Ground, Duct Bank Cable. Periode : Feb,04 – Jan,05 Project : Palaran port and Marine Project For Samarinda Government city Location : Samarinda – Kalimantan timur (Indonesia) Owner : Lokal Government Samarinda - Kaltim Position : As Electrical Designer Job Assignments : • Design Support (Cable ladder, Panel, Lighting, Receptacle) Inst./Elect. • Design Routing Tray Cable ladder (Inst/Elect.) • Design Routing Cable Power • Design Lighting (street, out door, in door) • Instrument fire alarm, Smoke detector, Push Buttom fire alarm • Design Routing Cable Under Ground, Duct Bank Cable. PT.CHARLIES LESTARI SENTOSA Jl. H. Agus Salim No.22-23 Jakarta - Pusat 10340 Periode : March,00 – Nov,04 Project : Building Ramayana dept store Location : Jakarta ,Baturaja – Lampung , Batam , Palembang Owner : PT. RAMAYANA. DEPT Position : As . Electrical Senior drafter
  • 6. Job Assignments: • Prepare Drawing Single line Diagram Low Voltage • Prepare Drawing Detail panel power LVAC • Prepare Drawing Detail Panel, Lighting and Receptacle • Prepare Drawing cable Lighting • Prepare Drawing routing cable for receptacle • Prepare Drawing routing cable for air conditioning • Prepare Drawing tray cable ladder PT.ARGHA KARYA PRIMA IND. Tbk Jl. Pahlawan ,Desa karang asem barat Citeureup – Bogor 16810 Periode : March,97 – Nov,00 Project : Expansions Factory Location : Citeureup – Bogor ( Indonesia ) Owner : PT.ARGHA KARYA PRIMA IND. Tbk Position : As . Electrical drafter Job Assignments: • Prepare Drawing Site Plan Line Power • Prepare Drawing Panel, Lighting and Receptacle • Prepare Drawing Single Line Diagram • Prepare Drawing Control Panel Layout • Prepare Drawing Lighting Layout • Prepare Drawing Cable Layout Periode : May,90 – August,96 Position : As . Foreman Technician (Engineering Maintenance) Job Assignments : • Check PLC Program Microcontroller Digital input and Output • Check and Repair Panel Control Machine • Check and Repair Interlock Machine • Check and Repair Module Control Machine Motor DC • Check and Repair Control Motor AC • Check and Repair Refrigerator System Chiller, Fan Coil & AHU • Check and Repair Temperature Control Heating Up Boiler & Heater • Check and Repair Pump Motor Water Motor & Oil • Check and Repair Alarm System