martynwatkinson@dassolar.co.uk

Project Name:                            Leigh Farm                                                                              18/06/2012
Variant Reference:                       49.5 kWp
Designer:                                MGW




                   22               198 x Suntech Power                 3 x SMA Solar Technology AG
                                    STP250S-20/Wd (2012) 250 W          Sunny Tripower 15000TL
           3
                                      20°;   30°                        15.0kW




                                                    Location:                                                  Fairfield
                                        Climate Data Record:                                     Fairfield (1981-2000)
                                                  PV Output:                                                     49.50 kWp
                                Gross/Active PV Surface Area:                                          322.12 / 321.69 m²



                                     PV Array Irradiation:                                                         337,332      kWh
                        Energy Produced by PV Array (AC):                                                           45,358      kWh
                                            Grid Feed-in:                                                           45,358      kWh
                          Yield Reduction Due to Shading:                                                                1      %



                                                  System Efficiency:                                                   13.4     %
                                                 Performance Ratio:                                                    87.3     %
                                                 Inverter Efficiency:                                                  95.8     %
                                                 PV Array Efficiency:                                                  14.0     %
                                               Specific Annual Yield:                                                 915.1     kWh/kWp
                                             CO2 Emissions Avoided:                                                  40,133     kg/a


The results are determined by a mathematical model calculation. The actual yields of the photovoltaic system
can deviate from these values due to fluctuations in the weather, the efficiency of modules and inverters, and other factors.
The System Diagram above does not represent and cannot replace a full technical drawing of the solar system.




PV*SOL Expert 5.5 (R2)                                                                                                                    1
DAS Technology L t d
2 Hamilton P l a c e
NG18 5 F A
Designer: Martyn Watkinson
martynwatkinson@dassolar.co.uk

Project Name:                    Leigh Farm                                                         18/06/2012
Variant Reference:               49.5 kWp
Designer:                        MGW




System in Grid Connected Operation
Location:               Fairfield                       PV Output:                         49.50 kWp
Climate Data Record:   Fairfield                        Gross/Active PV Surface Area:      322.1 m² / 321.7
                                                                                           m²
Number of Arrays:            1

Array 1: System 1
Output:                      49.50 kW                   Ground Reflection:                 20.0 %
Gross/Active Solar           322.1 m² / 321.7 m²        Output Losses due to...
Surface Area:
PV Module                    198 x                      deviation from AM 1.5:             1.0 %
Manufacturer:                Suntech Power              deviation from Manufacturer's      2.0 %
                                                        Specification:
Model:                       STP250S-20/Wd (2012)       in Diodes:                         0.5 %
Nominal Output:              250 W                      due to Pollution:                  0.0 %
Power Rating Deviation:      0%                         Inverter                           3x
Efficiency (STC):            15.4 %                     Manufacturer:                      SMA Solar
                                                                                           Technology AG
No. of Modules in Series:    22                         Model:                             Sunny Tripower
                                                                                           15000TL
MPP Voltage (STC):           675 V                      Output:                            15.00 kW
Orientation:                 30.0 °                     European Efficiency:               97.9 %
Inclination:                 20.0 °                     No. of MPP Trackers:               1
Mount:                       with Ventilation           MPP Tracking:                      150 V To 800 V
Shade:                       Yes


Simulation Results for Total System
 Irradiation onto Horizontal:             312,332 kWh    Own Use:                            61.1 kWh
 PV Array Irradiation:                    337,332 kWh    Energy Produced by PV Array:        47,274 kWh
 Irradiation minus Reflection:            328,056 kWh    System Efficiency:                  13.4 %
 Irradiation without Shade:               346,048 kWh    Performance Ratio:                  87.3 %
 Energy from Inverter (AC):               45,358 kWh     Final Yield:                        2.5 h/d
 Consumption Requirement:                 0 kWh          Specific Annual Yield:              915 kWh/kWp
 Energy from Grid:                        61 kWh         Array Efficiency:                   14.0 %




         6,000

         5,000

         4,000
   kWh




         3,000

         2,000

         1,000

             0
                     Jan    Feb     Mar     Apr   May   Jun      Jul   Aug     Sep   Oct    Nov     Dec

                                          Energy from Inverter (AC) 45,358 kWh



PV*SOL Expert 5.5 (R2)                                                                                        2
DAS Technology L t d
2 Hamilton P l a c e
NG18 5 F A
Designer: Martyn Watkinson
martynwatkinson@dassolar.co.uk

Project Name:            Leigh Farm   18/06/2012
Variant Reference:       49.5 kWp
Designer:                MGW




PV*SOL Expert 5.5 (R2)                        3
DAS Technology L t d
2 Hamilton P l a c e
NG18 5 F A
Designer: Martyn Watkinson
martynwatkinson@dassolar.co.uk

Project Name:                                   Leigh Farm                                                                18/06/2012
Variant Reference:                              49.5 kWp
Designer:                                       MGW




                                                 Economic Efficiency Calculation

System Data
PV Output: 49.50 kWp
System Operating Start: 01/08/2012                                            Total Degradation: 15.00 %

Electricity Feed-in
 Grid Concept:                                                                Full Feed-in
 For the First 20 Years:                                                      0.1520 £/kWh
 Thereafter:                                                                  0.1520 £/kWh

Basic Economic Efficiency Parameters
 Assessment Period:                                                           25 Years
 Interest on Capital:                                                         0.00 %
 All entries without sales tax

Income and expenditure
 Investments:                                                                 63,000.00 £
 Other Income/Savings:                                                        2,212.00 £/a
 Incoming subsidies:                                                          685.95 £
 Feed-in Payment Received in First Year:                                      6,894.47 £/a


Results According to Net Present Value Method
  Net Present Value:                                                          256,829.46 £
  Payback Period:                                                             6.3 Years
  Yield:                                                                      15.3 %
  Electricity Production Costs:                                               0.05 £/kWh




                                                             Cash Balance (Accrued Cash Flow)
                                       250,000

                                       200,000
                     Cash Values [£]




                                       150,000

                                       100,000

                                        50,000

                                            0

                                       -50,000
                                                   2    4      6    8    10    12      14   16   18   20   22   24   26
                                                                                    Years




PV*SOL Expert 5.5 (R2)                                                                                                            4
DAS Technology L t d
2 Hamilton P l a c e
NG18 5 F A
Designer: Martyn Watkinson
martynwatkinson@dassolar.co.uk

Project Name:              Leigh Farm                                       18/06/2012
Variant Reference:         49.5 kWp
Designer:                  MGW




Detailed List of all Payments Received and Made

   Investments
   Position                             Service Life [a]   Inflation [%]    Amount[£]
   Investments                                26            0.00            63,000.00

   Incoming subsidies
   Position                                                                 Amount[£]
   Incoming subsidies                                                         685.95

   Other Income/Savings
   Position                                                Inflation [%]   Amount[£]/a
   Other Income/Savings                                    3.00              2,212.00

   Income from Export to utility grid
   Position                                                Inflation [%]   Amount[£]/a
   Income from Export to utility grid                      3.00              6,894.47




PV*SOL Expert 5.5 (R2)                                                               5
DAS Technology L t d
2 Hamilton P l a c e
NG18 5 F A
Designer: Martyn Watkinson
martynwatkinson@dassolar.co.uk

Project Name:             Leigh Farm                        18/06/2012
Variant Reference:        49.5 kWp
Designer:                 MGW




                         System Visualization Screenshots
Environment




Screenshot2


Module Coverage




Screenshot5


Module Configuration




PV*SOL Expert 5.5 (R2)                                              6
DAS Technology L t d
2 Hamilton P l a c e
NG18 5 F A
Designer: Martyn Watkinson
martynwatkinson@dassolar.co.uk

Project Name:            Leigh Farm   18/06/2012
Variant Reference:       49.5 kWp
Designer:                MGW




Screenshot7




PV*SOL Expert 5.5 (R2)                        7

More Related Content

What's hot

Design and performance analysis of 500 KWp on-grid solar PV system
Design and performance analysis of 500 KWp on-grid solar PV systemDesign and performance analysis of 500 KWp on-grid solar PV system
Design and performance analysis of 500 KWp on-grid solar PV systemAmroSadulQuddus
 
Performance analysis of mono crystalline silicon technology with different or...
Performance analysis of mono crystalline silicon technology with different or...Performance analysis of mono crystalline silicon technology with different or...
Performance analysis of mono crystalline silicon technology with different or...Gaurav Kumar Sharma
 
Parthenon Broadgroup5thpower&Coolinglondon Ppt
Parthenon Broadgroup5thpower&Coolinglondon PptParthenon Broadgroup5thpower&Coolinglondon Ppt
Parthenon Broadgroup5thpower&Coolinglondon Pptkevinburton
 
ReGenX Concentric 8 Multi-function Tricoil Intelectual Property Presentation
ReGenX Concentric 8 Multi-function Tricoil Intelectual Property PresentationReGenX Concentric 8 Multi-function Tricoil Intelectual Property Presentation
ReGenX Concentric 8 Multi-function Tricoil Intelectual Property PresentationThane Heins
 
10 pv system_design
10 pv system_design10 pv system_design
10 pv system_designmemoaden
 
Energy innovation
Energy innovationEnergy innovation
Energy innovationNitesh Jha
 
Paineis Solares InstalaçAo
Paineis Solares InstalaçAoPaineis Solares InstalaçAo
Paineis Solares InstalaçAocentauro
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1Murugappa Group
 
Photovoltaics notes from a designer, builder and inspector
Photovoltaics notes from a designer, builder and inspectorPhotovoltaics notes from a designer, builder and inspector
Photovoltaics notes from a designer, builder and inspectorjrusmisel
 
Design & estimation of rooftop grid tied solar pv system
Design & estimation of rooftop grid tied solar pv systemDesign & estimation of rooftop grid tied solar pv system
Design & estimation of rooftop grid tied solar pv systemSabrina Chowdhury
 
Webinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsystWebinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsystsolpowerpeople
 
Cybo energy battery-less-off-grid-solar-system-design-guide-jan-2021
Cybo energy battery-less-off-grid-solar-system-design-guide-jan-2021Cybo energy battery-less-off-grid-solar-system-design-guide-jan-2021
Cybo energy battery-less-off-grid-solar-system-design-guide-jan-2021ManuelMartinez603
 
ממירי העתיד - מעבר ל-99% נצילות
ממירי העתיד - מעבר ל-99% נצילותממירי העתיד - מעבר ל-99% נצילות
ממירי העתיד - מעבר ל-99% נצילותTashtiot media
 

What's hot (20)

Design and performance analysis of 500 KWp on-grid solar PV system
Design and performance analysis of 500 KWp on-grid solar PV systemDesign and performance analysis of 500 KWp on-grid solar PV system
Design and performance analysis of 500 KWp on-grid solar PV system
 
Performance analysis of mono crystalline silicon technology with different or...
Performance analysis of mono crystalline silicon technology with different or...Performance analysis of mono crystalline silicon technology with different or...
Performance analysis of mono crystalline silicon technology with different or...
 
Parthenon Broadgroup5thpower&Coolinglondon Ppt
Parthenon Broadgroup5thpower&Coolinglondon PptParthenon Broadgroup5thpower&Coolinglondon Ppt
Parthenon Broadgroup5thpower&Coolinglondon Ppt
 
ReGenX Concentric 8 Multi-function Tricoil Intelectual Property Presentation
ReGenX Concentric 8 Multi-function Tricoil Intelectual Property PresentationReGenX Concentric 8 Multi-function Tricoil Intelectual Property Presentation
ReGenX Concentric 8 Multi-function Tricoil Intelectual Property Presentation
 
10 pv system_design
10 pv system_design10 pv system_design
10 pv system_design
 
Energy innovation
Energy innovationEnergy innovation
Energy innovation
 
Www.litepaksystems.com
Www.litepaksystems.comWww.litepaksystems.com
Www.litepaksystems.com
 
Paineis Solares InstalaçAo
Paineis Solares InstalaçAoPaineis Solares InstalaçAo
Paineis Solares InstalaçAo
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1
 
Solar Project Acquisitions
Solar Project AcquisitionsSolar Project Acquisitions
Solar Project Acquisitions
 
BrighSourceEnergy 2010
BrighSourceEnergy 2010BrighSourceEnergy 2010
BrighSourceEnergy 2010
 
Photovoltaics notes from a designer, builder and inspector
Photovoltaics notes from a designer, builder and inspectorPhotovoltaics notes from a designer, builder and inspector
Photovoltaics notes from a designer, builder and inspector
 
Sedona Energy Labs
Sedona Energy LabsSedona Energy Labs
Sedona Energy Labs
 
Cmp0200 ieee
Cmp0200 ieeeCmp0200 ieee
Cmp0200 ieee
 
Design & estimation of rooftop grid tied solar pv system
Design & estimation of rooftop grid tied solar pv systemDesign & estimation of rooftop grid tied solar pv system
Design & estimation of rooftop grid tied solar pv system
 
Webinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsystWebinar 02 demonstration of pv system design pvsyst
Webinar 02 demonstration of pv system design pvsyst
 
Cybo energy battery-less-off-grid-solar-system-design-guide-jan-2021
Cybo energy battery-less-off-grid-solar-system-design-guide-jan-2021Cybo energy battery-less-off-grid-solar-system-design-guide-jan-2021
Cybo energy battery-less-off-grid-solar-system-design-guide-jan-2021
 
Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...
Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...
Law of Creation of Energy and the History of US Patented ReGenX Generator Inn...
 
ממירי העתיד - מעבר ל-99% נצילות
ממירי העתיד - מעבר ל-99% נצילותממירי העתיד - מעבר ל-99% נצילות
ממירי העתיד - מעבר ל-99% נצילות
 
Solar street light
Solar street lightSolar street light
Solar street light
 

Viewers also liked

Que puedes hacer tu para cuidar nuestro
Que puedes hacer tu para cuidar nuestroQue puedes hacer tu para cuidar nuestro
Que puedes hacer tu para cuidar nuestroIETISD Marinilla
 
Claves para afrontar el futuro
Claves para afrontar el futuroClaves para afrontar el futuro
Claves para afrontar el futuroFernando Weyler
 
Jornada Especial para Agentes de Viajes Corporativos
Jornada Especial para Agentes de Viajes CorporativosJornada Especial para Agentes de Viajes Corporativos
Jornada Especial para Agentes de Viajes CorporativosVelentis
 
E everything - putting it all together
E everything - putting it all togetherE everything - putting it all together
E everything - putting it all togetherStephen Rhind-Tutt
 
Presentatie Studentles Ontstaan Van Islam[1]
Presentatie Studentles Ontstaan Van Islam[1]Presentatie Studentles Ontstaan Van Islam[1]
Presentatie Studentles Ontstaan Van Islam[1]guestad99e4
 

Viewers also liked (8)

Que puedes hacer tu para cuidar nuestro
Que puedes hacer tu para cuidar nuestroQue puedes hacer tu para cuidar nuestro
Que puedes hacer tu para cuidar nuestro
 
Cloud Computing
 Cloud Computing Cloud Computing
Cloud Computing
 
Claves para afrontar el futuro
Claves para afrontar el futuroClaves para afrontar el futuro
Claves para afrontar el futuro
 
Que es literatura
Que es literaturaQue es literatura
Que es literatura
 
Nutrexpa
NutrexpaNutrexpa
Nutrexpa
 
Jornada Especial para Agentes de Viajes Corporativos
Jornada Especial para Agentes de Viajes CorporativosJornada Especial para Agentes de Viajes Corporativos
Jornada Especial para Agentes de Viajes Corporativos
 
E everything - putting it all together
E everything - putting it all togetherE everything - putting it all together
E everything - putting it all together
 
Presentatie Studentles Ontstaan Van Islam[1]
Presentatie Studentles Ontstaan Van Islam[1]Presentatie Studentles Ontstaan Van Islam[1]
Presentatie Studentles Ontstaan Van Islam[1]
 

Similar to 49.5 k w

Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010Tuong Do
 
25 KWp SOLAR POWER PLANT IN BIET
25 KWp SOLAR POWER PLANT IN BIET25 KWp SOLAR POWER PLANT IN BIET
25 KWp SOLAR POWER PLANT IN BIETsuraj chowdhury
 
Performance analysis of stand alone ( roof top ) PV system.
Performance analysis of stand alone ( roof top ) PV system.Performance analysis of stand alone ( roof top ) PV system.
Performance analysis of stand alone ( roof top ) PV system.Chandra Mohan Mishra
 
wbt260-b250ul mkt
wbt260-b250ul mktwbt260-b250ul mkt
wbt260-b250ul mktSales Dept
 
wbt260-b250ul mkt
wbt260-b250ul mktwbt260-b250ul mkt
wbt260-b250ul mktSales Dept
 
1kw 265invt
1kw 265invt1kw 265invt
1kw 265invtdungsp4
 
Solar_IT_03_101.pdf
Solar_IT_03_101.pdfSolar_IT_03_101.pdf
Solar_IT_03_101.pdfAntyMouda
 
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...JLanka Technologies (Pvt) Limited
 
HYBRID SOLAR-WIND CHARGING STATION FOR ELECTRIC VEHICLES AND ITS SIMULATION
HYBRID SOLAR-WIND CHARGING STATION FOR ELECTRIC VEHICLES AND ITS SIMULATIONHYBRID SOLAR-WIND CHARGING STATION FOR ELECTRIC VEHICLES AND ITS SIMULATION
HYBRID SOLAR-WIND CHARGING STATION FOR ELECTRIC VEHICLES AND ITS SIMULATIONIRJET Journal
 
Photovoltaics Case Study
Photovoltaics Case StudyPhotovoltaics Case Study
Photovoltaics Case StudyLeonardo ENERGY
 
IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...
IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...
IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...IRJET Journal
 
סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית
 סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית
סולאראדג' - תכנון מערכות סולאריות לתשואה מירביתTashtiot media
 
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module You Be the Judge: A Ratings Tool for Selecting the Best Solar Module
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module Rick Borry
 
IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...
IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...
IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...IRJET Journal
 
Solar generation for APC
Solar generation for APC Solar generation for APC
Solar generation for APC Molla Morshad
 

Similar to 49.5 k w (20)

Pv Solar Grid Connect Solar Design
Pv Solar Grid Connect Solar DesignPv Solar Grid Connect Solar Design
Pv Solar Grid Connect Solar Design
 
Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010
 
25 KWp SOLAR POWER PLANT IN BIET
25 KWp SOLAR POWER PLANT IN BIET25 KWp SOLAR POWER PLANT IN BIET
25 KWp SOLAR POWER PLANT IN BIET
 
Solar Barge
Solar BargeSolar Barge
Solar Barge
 
Performance analysis of stand alone ( roof top ) PV system.
Performance analysis of stand alone ( roof top ) PV system.Performance analysis of stand alone ( roof top ) PV system.
Performance analysis of stand alone ( roof top ) PV system.
 
wbt260-b250ul mkt
wbt260-b250ul mktwbt260-b250ul mkt
wbt260-b250ul mkt
 
wbt260-b250ul mkt
wbt260-b250ul mktwbt260-b250ul mkt
wbt260-b250ul mkt
 
1kw 265invt
1kw 265invt1kw 265invt
1kw 265invt
 
Solar_IT_03_101.pdf
Solar_IT_03_101.pdfSolar_IT_03_101.pdf
Solar_IT_03_101.pdf
 
How much energy really gets lost from Partial Shading?
 How much energy really gets lost from Partial Shading? How much energy really gets lost from Partial Shading?
How much energy really gets lost from Partial Shading?
 
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
Optimizing Commercial Solar PV Systems : How much energy lost from Partial Sh...
 
HYBRID SOLAR-WIND CHARGING STATION FOR ELECTRIC VEHICLES AND ITS SIMULATION
HYBRID SOLAR-WIND CHARGING STATION FOR ELECTRIC VEHICLES AND ITS SIMULATIONHYBRID SOLAR-WIND CHARGING STATION FOR ELECTRIC VEHICLES AND ITS SIMULATION
HYBRID SOLAR-WIND CHARGING STATION FOR ELECTRIC VEHICLES AND ITS SIMULATION
 
Photovoltaics Case Study
Photovoltaics Case StudyPhotovoltaics Case Study
Photovoltaics Case Study
 
IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...
IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...
IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...
 
סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית
 סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית
סולאראדג' - תכנון מערכות סולאריות לתשואה מירבית
 
04 eisenberg b solar
04 eisenberg b solar04 eisenberg b solar
04 eisenberg b solar
 
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module You Be the Judge: A Ratings Tool for Selecting the Best Solar Module
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module
 
IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...
IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...
IRJET- Improved Transformerless Inverter with Common Mode Leakage Current Eli...
 
Maximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSECMaximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSEC
 
Solar generation for APC
Solar generation for APC Solar generation for APC
Solar generation for APC
 

49.5 k w

  • 1. DAS Technology L t d 2 Hamilton P l a c e NG18 5 F A Designer: Martyn Watkinson martynwatkinson@dassolar.co.uk Project Name: Leigh Farm 18/06/2012 Variant Reference: 49.5 kWp Designer: MGW 22 198 x Suntech Power 3 x SMA Solar Technology AG STP250S-20/Wd (2012) 250 W Sunny Tripower 15000TL 3 20°; 30° 15.0kW Location: Fairfield Climate Data Record: Fairfield (1981-2000) PV Output: 49.50 kWp Gross/Active PV Surface Area: 322.12 / 321.69 m² PV Array Irradiation: 337,332 kWh Energy Produced by PV Array (AC): 45,358 kWh Grid Feed-in: 45,358 kWh Yield Reduction Due to Shading: 1 % System Efficiency: 13.4 % Performance Ratio: 87.3 % Inverter Efficiency: 95.8 % PV Array Efficiency: 14.0 % Specific Annual Yield: 915.1 kWh/kWp CO2 Emissions Avoided: 40,133 kg/a The results are determined by a mathematical model calculation. The actual yields of the photovoltaic system can deviate from these values due to fluctuations in the weather, the efficiency of modules and inverters, and other factors. The System Diagram above does not represent and cannot replace a full technical drawing of the solar system. PV*SOL Expert 5.5 (R2) 1
  • 2. DAS Technology L t d 2 Hamilton P l a c e NG18 5 F A Designer: Martyn Watkinson martynwatkinson@dassolar.co.uk Project Name: Leigh Farm 18/06/2012 Variant Reference: 49.5 kWp Designer: MGW System in Grid Connected Operation Location: Fairfield PV Output: 49.50 kWp Climate Data Record: Fairfield Gross/Active PV Surface Area: 322.1 m² / 321.7 m² Number of Arrays: 1 Array 1: System 1 Output: 49.50 kW Ground Reflection: 20.0 % Gross/Active Solar 322.1 m² / 321.7 m² Output Losses due to... Surface Area: PV Module 198 x deviation from AM 1.5: 1.0 % Manufacturer: Suntech Power deviation from Manufacturer's 2.0 % Specification: Model: STP250S-20/Wd (2012) in Diodes: 0.5 % Nominal Output: 250 W due to Pollution: 0.0 % Power Rating Deviation: 0% Inverter 3x Efficiency (STC): 15.4 % Manufacturer: SMA Solar Technology AG No. of Modules in Series: 22 Model: Sunny Tripower 15000TL MPP Voltage (STC): 675 V Output: 15.00 kW Orientation: 30.0 ° European Efficiency: 97.9 % Inclination: 20.0 ° No. of MPP Trackers: 1 Mount: with Ventilation MPP Tracking: 150 V To 800 V Shade: Yes Simulation Results for Total System Irradiation onto Horizontal: 312,332 kWh Own Use: 61.1 kWh PV Array Irradiation: 337,332 kWh Energy Produced by PV Array: 47,274 kWh Irradiation minus Reflection: 328,056 kWh System Efficiency: 13.4 % Irradiation without Shade: 346,048 kWh Performance Ratio: 87.3 % Energy from Inverter (AC): 45,358 kWh Final Yield: 2.5 h/d Consumption Requirement: 0 kWh Specific Annual Yield: 915 kWh/kWp Energy from Grid: 61 kWh Array Efficiency: 14.0 % 6,000 5,000 4,000 kWh 3,000 2,000 1,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Energy from Inverter (AC) 45,358 kWh PV*SOL Expert 5.5 (R2) 2
  • 3. DAS Technology L t d 2 Hamilton P l a c e NG18 5 F A Designer: Martyn Watkinson martynwatkinson@dassolar.co.uk Project Name: Leigh Farm 18/06/2012 Variant Reference: 49.5 kWp Designer: MGW PV*SOL Expert 5.5 (R2) 3
  • 4. DAS Technology L t d 2 Hamilton P l a c e NG18 5 F A Designer: Martyn Watkinson martynwatkinson@dassolar.co.uk Project Name: Leigh Farm 18/06/2012 Variant Reference: 49.5 kWp Designer: MGW Economic Efficiency Calculation System Data PV Output: 49.50 kWp System Operating Start: 01/08/2012 Total Degradation: 15.00 % Electricity Feed-in Grid Concept: Full Feed-in For the First 20 Years: 0.1520 £/kWh Thereafter: 0.1520 £/kWh Basic Economic Efficiency Parameters Assessment Period: 25 Years Interest on Capital: 0.00 % All entries without sales tax Income and expenditure Investments: 63,000.00 £ Other Income/Savings: 2,212.00 £/a Incoming subsidies: 685.95 £ Feed-in Payment Received in First Year: 6,894.47 £/a Results According to Net Present Value Method Net Present Value: 256,829.46 £ Payback Period: 6.3 Years Yield: 15.3 % Electricity Production Costs: 0.05 £/kWh Cash Balance (Accrued Cash Flow) 250,000 200,000 Cash Values [£] 150,000 100,000 50,000 0 -50,000 2 4 6 8 10 12 14 16 18 20 22 24 26 Years PV*SOL Expert 5.5 (R2) 4
  • 5. DAS Technology L t d 2 Hamilton P l a c e NG18 5 F A Designer: Martyn Watkinson martynwatkinson@dassolar.co.uk Project Name: Leigh Farm 18/06/2012 Variant Reference: 49.5 kWp Designer: MGW Detailed List of all Payments Received and Made Investments Position Service Life [a] Inflation [%] Amount[£] Investments 26 0.00 63,000.00 Incoming subsidies Position Amount[£] Incoming subsidies 685.95 Other Income/Savings Position Inflation [%] Amount[£]/a Other Income/Savings 3.00 2,212.00 Income from Export to utility grid Position Inflation [%] Amount[£]/a Income from Export to utility grid 3.00 6,894.47 PV*SOL Expert 5.5 (R2) 5
  • 6. DAS Technology L t d 2 Hamilton P l a c e NG18 5 F A Designer: Martyn Watkinson martynwatkinson@dassolar.co.uk Project Name: Leigh Farm 18/06/2012 Variant Reference: 49.5 kWp Designer: MGW System Visualization Screenshots Environment Screenshot2 Module Coverage Screenshot5 Module Configuration PV*SOL Expert 5.5 (R2) 6
  • 7. DAS Technology L t d 2 Hamilton P l a c e NG18 5 F A Designer: Martyn Watkinson martynwatkinson@dassolar.co.uk Project Name: Leigh Farm 18/06/2012 Variant Reference: 49.5 kWp Designer: MGW Screenshot7 PV*SOL Expert 5.5 (R2) 7