SlideShare a Scribd company logo
1 of 8
Download to read offline
PLANNING AND DESIGN
PORTFOLIO
MATT LINDLEY
OCTOBER 2016
QUALITIES, CHARACTER AND VALUES
PROBLEM SOLVER
PLANNING & DESIGN PORTFOLIO MATT LINDLEY
OPEN
INNOVATIVE
HONEST
PASSIONATE
PROFESSIONAL
FLEXIBLE
NEGOTIATOR
COMMUNICATION
CONSISTENT
CREATIVELISTENER
COLLABORATIVE
LOGICAL
COMMITTED
LISTENER
KIND
CARING
NATURAL LEADER
COACH
PRESENT
LOYAL PERSERVANCE
SKILLED
TEAM PLAYER
FUN
INTEGRITY
ORGANISED
STRATEGIC
FRANKSTON PROJECT
CLIENT: FRANKSTON  CITY  COUNCIL
ROLE:   STRATEGIC  PLANNER/MANAGER
TEAM: 2  PLANNING  AND  ECONOMIC/CONSULTANTS
PURPOSE:  TO  IDENTIFY  A  SHARED  VISION    FOR  THE  FUTURE  OF  THE  
CITY.
DISCIPLINE:  PLANNING,  DESIGN,  COMMUNITY  ENGAGEMENT
HIGHLIGHTS:  
• DESIGNING  BRIEF  AND  GAINING  STATE  FUNDING
• FOCUS  GROUP  MEETINGS
• FRANKSTON  CONVENTION
• POSITIONING  POSSIBILITIES
• DESIGN  GUIDELINES
• ACTION  PLAN  (20YR)
COST:  $150K  1YEAR
PLANNING & DESIGN PORTFOLIO MATT LINDLEY
METRICS  :  FIRST  2  YEARS
• DESIGN  GUIDELINES  IN  PLANNING  SCHEME
• FORESHORE  REVITALISATION,  LIFESAVING  CLUB,  YACHT  CLUB,  
CREEK  LANDSCAPE  UPGRADES  COMMENCED
• $200M  SHOPPING  CENTRE  INVESTMENT
INFRASTRUCTURE
PLANNING
CLIENT: MAROOCHY  SHIRE  COUNCIL
ROLE:   COORDINATOR  INFRASTRUCTURE  PLANNING.
TEAM:     11    PLANNING,  ENGINEERING,  FINANCE/CONSULTANTS
PURPOSE:   TO  PLAN  AND  COST  25  YEARS  OF  TRUNK  COMMUNITY  
INFRASTRUCTURE  FOR  THE  SHIRE
DISCIPLINE:  PLANNING,  ENGINEERING,  FINANCE,  CORPORATE  GOVERNANCE,  
COMMUNITY  ENGAGEMENT
HIGHLIGHTS:  
• CREATING  COMMUNITY  INFRASTRUCTURE  PLANS  FOR  PARKS,  BIKEWAYS,  
COMMUNITY  LAND,  ROADS,  STORMWATER  AND  WATER  &  SEWER
• DEVELOPING  POPULATION,  LANDUSE,  ROAD,  WATER  &  SEWER,  FLOOD  AND  
FINANCIAL  MODELS
• IMPLEMENTING  AN  INFRASTRUCTURE  CHARGES  POLICY  AND  PRIORITY  
INFRASTRUCTURE  PLAN
COST: $10M  OVER  3  YEARS
PLANNING & DESIGN PORTFOLIO MATT LINDLEY
METRICS:
• 1  BILLION  $  INFRASTRUCTURE  PLANNED
• INFRASTRUCTURE  CHARGES  RECOVER  45%  COST
• PRIORITISED  CAPITAL  WORKS  PROGRAM
• $17M  IN  CHARGES  COLLECTED  PRIOR  TO  IMPLEMENTATION
• COMMUNITY  BENEFIT  THROUGH  FACILITY  PLANNING  
BIRTINYA AND KAWANA
TOWN CENTRE
CONCEPT FRAMEWORK
Project
140808
Bokarina Beach Master Plan
Aerial Perspective
Drawing Checked CM Scale NTS @ A3
UD 08a Approved PS Date 22/10/2014
CLIENT: STOCKLAND
ROLE:   REGIONAL  PLANNING  AND  DESIGN  MANAGER
TEAM:     5    PLANNING  AND  DESIGN/  CONSULTANTS
PURPOSE:  TO  DEVELOP  A  CONCEPT  PLAN  TO  ENGAGE  WITH  KEY  
STAKEHOLDERS
DISCIPLINE:  PLANNING,  DESIGN,  COLLABORATION  
HIGHLIGHTS:  
• FACILITATING  INTERNAL  VISION  WORKSHOP
• CONTRIBUTING  TO  CREATING  A  GREAT  PLACE
• PLANNING  AND  DESIGNING  A  CONNECTED  COMMUNITY  WHERE  
PEOPLE  CAN  LIVE  AND  WORK
• DEVELOPING  AND  INTEGRATING  INNOVATIVE  PRODUCT  TYPES
• ENSURING  FINANCIAL  VIABILITY
COST: $90K  1  YEAR
PLANNING & DESIGN PORTFOLIO MATT LINDLEY
METRICS:
• DEVELOPABLE  AREA  90  HECTARES
• 2200  APARTMENTS
• 780  DWELLING  OF  VARIOUS  TYPES
• 30  HECTARE  PUBLIC  REALM,  PARKS,BIKEWAYS  &  COMMUNITY  
• 175K  GFA  TOWN  CENTRE  AND  COMMERCIAL  HOSPITAL  SUPPORT
• 1100  BED  PUBLIC  AND  PRIVATE  HOSPITAL
AURA TOWN CENTRE
PLANNING APPLICATION
CLIENT: STOCKLAND
ROLE: PROJECT  MANAGER.
TEAM: PLANNING,  DESIGN,  ARCHITECTURE,    FLOOD,  STORMWATER,  
ENVIRONMENT,    ACOUSTIC,  CIVIL,    TRANSPORT,  SOCIAL  PLANNING.
PURPOSE: TO  SELECT  AND  MANAGE  CONSULTANT  TEAM  THROUGH  APPLICATION  
PREPARATION  AND  APPROVAL  PROCESS
DISCIPLINE:   PLANNING,  DESIGN,  ENGINEERING,  ENVIRONMENTAL,  
INFRASTRUCTURE,  NEGOTIATION  
HIGHLIGHTS:  
• LEADING  APPLICATION  PREPARATION  BASED  ON  STAKEHOLDER  
ENGAGEMENT  AND  EXPERT  ADVICE
• COORDINATING  DISCPLINES  TO  ACHIEVE  PLANNED  VISION  
• NEGOTIATING  OUTCOMES  WITH  STATE  AND  COUNCIL,  TOWN  CENTRE  
DESIGN,  STORMWATER,  TRAFFIC.
• SOLVING  DESIGN  CHALLENGES  
• DRAFT  APPROVAL  CONDITIONS
COST: $2.5M  OVER  4  YEARS
PLANNING & DESIGN PORTFOLIO MATT LINDLEY
METRICS:
• 450  HECTARES
• 4800  DWELLINGS  (2847  APARTMENTS  AND  1953  DWELLINGS)
• 145K  GFA  COMMERCIAL  INCLUDING  90K  GFA  TOWN  CENTRE
• TWO  SCHOOLS
• TRANSIT  STATION,  RAIL,  ARTERIAL  ROADS
• PARKS,  CONSERVATION,  COMMUNITY  FACILITIES,  CIVIL  BUILDINGS
ROCHEDALE TOWN CENTRE
PLANNING APPLICATION
Rochedale
Master plan - indicative aerial image looking north east
01/08/16
M
iles
Platting
R
oad
North South Road
Gardner Road
CLIENT: COLES  
ROLE: PROJECT  MANAGER.
TEAM: PLANNING,DESIGN,  ARCHITECTURE,    FLOOD  ,STORMWATER,  
ENVIRONMENT,    ACOUSTIC,    CIVIL,  TRANSPORT,  LEGAL.
PURPOSE: TO  SELECT  AND  MANAGE  CONSULTANT  TEAM  THROUGH  APPLICATION  
PREPARATION  AND  APPROVAL  PROCESS
DISCIPLINE:   PLANNING,  DESIGN,  ENGINEERING,  ENVIRONMENTAL,  
INFRASTRUCTURE,  NEGOTIATION.  
HIGHLIGHTS:  
• LEADING  APPLICATION  AND  INFRASTRUCTURE  NEGOTIATIONS  WITH  
BRISBANE  CITY  COUNCIL  
• COORDINATING  DISCPLINES  TO  ACHIEVE  COST  EFFECTIVE  OUTCOMES  FOR  
CLIENT  
• ENGAGEMENT  OF  COUNCIL  &  COMMUNITY  STAKEHOLDERS,  CHURCH,  SEWER,  
SUBMISSIONS
• SOLVING  DESIGN  CHALLENGES  
• PLANNING,  INFRASTRUCTURE  AGREEMENT  AND,  ROL  APPROVALS  
COST: $550K  OVER  2  YEARS PLANNING & DESIGN PORTFOLIO MATT LINDLEY
METRICS:
• 18K  GFA  TOWN  CENTRE  –STAGE  1  8K  GFA
• 2K  PUBLIC  SQUARE  – COMMUNITY  BUILDING
• CHURCH  RELOCATION
• MAJOR  INFRASTRUCTURE  UPGRADES
OTHER PROJECTS
STOCKLAND DWG LGA
CABOOLTURE WEST 1500 MBRC
PARADISE  WATERS 1200 ICC/EDQ
PALLARA 900 BCC
NORTH  LAKES  NORTHERN  PCNT 560 MBRC
NORTH  SHORE  MODE 45 TCC
BRIGHTWATER 1000 SCRC
AURA    -­ BUSINESS &  INDUSTRY 450/60K EDQ
AURA  – WESTERN  DETENTION EDQ
KAWANA COMMUNITY  
DEVELOPMENT  STRATEGY
SCRC
HOSPITAL  CONTRACT QLD/SCRC
PLANNING & DESIGN PORTFOLIO MATT LINDLEY
COLES GFA LGA
ORMEAU  TOWN  CENTRE 10000 GCC
SIPPY DOWNS   8400 SCRC
ANDEGROVE 5000 MCC
BREMER COLES  XPRESS 500 ICC
NOOSA BOWLS  CLUB  – MIXED  USE NSC

More Related Content

What's hot

Singapore city- Town Planning
Singapore city- Town Planning Singapore city- Town Planning
Singapore city- Town Planning Andhra University
 
Mundus Conceptual Plan Final Report for HRCA Backcountry Wilderness Area
Mundus Conceptual Plan Final Report for HRCA Backcountry Wilderness AreaMundus Conceptual Plan Final Report for HRCA Backcountry Wilderness Area
Mundus Conceptual Plan Final Report for HRCA Backcountry Wilderness AreaHRCA
 
Planning of a housing scheme
Planning of a housing schemePlanning of a housing scheme
Planning of a housing schemeKU Leuven
 
Ppt Grasset Mc Gill2011 Vff
Ppt Grasset Mc Gill2011 VffPpt Grasset Mc Gill2011 Vff
Ppt Grasset Mc Gill2011 VffPMalo
 
Urban design Maraza New Town, Beira Mozambique
Urban design Maraza New Town, Beira Mozambique Urban design Maraza New Town, Beira Mozambique
Urban design Maraza New Town, Beira Mozambique Wissing-ES
 
[Makati Urban Redevlopment Presentation : Makati City, Philipines]
[Makati Urban Redevlopment Presentation : Makati City, Philipines][Makati Urban Redevlopment Presentation : Makati City, Philipines]
[Makati Urban Redevlopment Presentation : Makati City, Philipines]shrdcinfo
 
Land Use and Legibility- Urban Design Terminology
Land Use and Legibility- Urban Design TerminologyLand Use and Legibility- Urban Design Terminology
Land Use and Legibility- Urban Design TerminologyGrace Henry
 

What's hot (9)

Singapore city- Town Planning
Singapore city- Town Planning Singapore city- Town Planning
Singapore city- Town Planning
 
PRESENTATION.FINAL
PRESENTATION.FINALPRESENTATION.FINAL
PRESENTATION.FINAL
 
Mundus Conceptual Plan Final Report for HRCA Backcountry Wilderness Area
Mundus Conceptual Plan Final Report for HRCA Backcountry Wilderness AreaMundus Conceptual Plan Final Report for HRCA Backcountry Wilderness Area
Mundus Conceptual Plan Final Report for HRCA Backcountry Wilderness Area
 
Planning of a housing scheme
Planning of a housing schemePlanning of a housing scheme
Planning of a housing scheme
 
Ppt Grasset Mc Gill2011 Vff
Ppt Grasset Mc Gill2011 VffPpt Grasset Mc Gill2011 Vff
Ppt Grasset Mc Gill2011 Vff
 
Urban design Maraza New Town, Beira Mozambique
Urban design Maraza New Town, Beira Mozambique Urban design Maraza New Town, Beira Mozambique
Urban design Maraza New Town, Beira Mozambique
 
[Makati Urban Redevlopment Presentation : Makati City, Philipines]
[Makati Urban Redevlopment Presentation : Makati City, Philipines][Makati Urban Redevlopment Presentation : Makati City, Philipines]
[Makati Urban Redevlopment Presentation : Makati City, Philipines]
 
Planning Surveys
Planning SurveysPlanning Surveys
Planning Surveys
 
Land Use and Legibility- Urban Design Terminology
Land Use and Legibility- Urban Design TerminologyLand Use and Legibility- Urban Design Terminology
Land Use and Legibility- Urban Design Terminology
 

Similar to Project Examples

ResumeMatthewLindley060315
ResumeMatthewLindley060315ResumeMatthewLindley060315
ResumeMatthewLindley060315Matt Lindley
 
GRESB Sustainable Urban Areas and Infrastructure
GRESB Sustainable Urban Areas and InfrastructureGRESB Sustainable Urban Areas and Infrastructure
GRESB Sustainable Urban Areas and InfrastructureGRESB
 
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_EmailMODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_EmailRhonan OBrien
 
Good design the fundamentals
Good design   the fundamentalsGood design   the fundamentals
Good design the fundamentalsGraeme Moore
 
Firm Brochure for The Cecil Group
Firm Brochure for The Cecil GroupFirm Brochure for The Cecil Group
Firm Brochure for The Cecil GroupThe Cecil Group
 
60% draft las vegas final report march_8_2016_low res
60% draft las vegas final report march_8_2016_low res60% draft las vegas final report march_8_2016_low res
60% draft las vegas final report march_8_2016_low resDarin Dinsmore
 
Emily Lange resume 2020 website
Emily Lange resume 2020 websiteEmily Lange resume 2020 website
Emily Lange resume 2020 websiteEmily Lange
 
Gt adit dpz pres
Gt adit dpz presGt adit dpz pres
Gt adit dpz presaditbrasil
 
From Vision to Reality Storrs Center
From Vision to Reality Storrs CenterFrom Vision to Reality Storrs Center
From Vision to Reality Storrs Centersneapa
 
International Centre for Local & Regional Development Conference - Planning ...
International Centre for Local & Regional Development Conference  - Planning ...International Centre for Local & Regional Development Conference  - Planning ...
International Centre for Local & Regional Development Conference - Planning ...Alice Charles
 
ESP Portfolio 2012 Final (3)
ESP Portfolio 2012 Final (3)ESP Portfolio 2012 Final (3)
ESP Portfolio 2012 Final (3)SCOTT WHALLEY
 
Portfolio Girish Ravikumar
Portfolio   Girish RavikumarPortfolio   Girish Ravikumar
Portfolio Girish RavikumarGirish Ravikumar
 
Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015Kim Fowler, MCIP, RPP
 
Presentación ppp casa paulista ingles
Presentación ppp casa paulista inglesPresentación ppp casa paulista ingles
Presentación ppp casa paulista inglesEraikune
 
F4 friday getting tactical in the creative capital with pop up providence
F4 friday   getting tactical in the creative capital with pop up providenceF4 friday   getting tactical in the creative capital with pop up providence
F4 friday getting tactical in the creative capital with pop up providencePlanning_1
 
New Town Development Strategies Jan 2015 - Day 2
New Town Development Strategies Jan 2015  - Day 2New Town Development Strategies Jan 2015  - Day 2
New Town Development Strategies Jan 2015 - Day 2Ian Butter
 

Similar to Project Examples (20)

ResumeMatthewLindley060315
ResumeMatthewLindley060315ResumeMatthewLindley060315
ResumeMatthewLindley060315
 
GRESB Sustainable Urban Areas and Infrastructure
GRESB Sustainable Urban Areas and InfrastructureGRESB Sustainable Urban Areas and Infrastructure
GRESB Sustainable Urban Areas and Infrastructure
 
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_EmailMODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
MODE_Sector-Brochure_UrbanDesign&MasterPlanning_V2_Email
 
Public Service by Creative Circle, Nagpur
Public Service by Creative Circle, NagpurPublic Service by Creative Circle, Nagpur
Public Service by Creative Circle, Nagpur
 
Good design the fundamentals
Good design   the fundamentalsGood design   the fundamentals
Good design the fundamentals
 
Firm Brochure for The Cecil Group
Firm Brochure for The Cecil GroupFirm Brochure for The Cecil Group
Firm Brochure for The Cecil Group
 
60% draft las vegas final report march_8_2016_low res
60% draft las vegas final report march_8_2016_low res60% draft las vegas final report march_8_2016_low res
60% draft las vegas final report march_8_2016_low res
 
ATDC Design Portfolio
ATDC Design PortfolioATDC Design Portfolio
ATDC Design Portfolio
 
Emily Lange resume 2020 website
Emily Lange resume 2020 websiteEmily Lange resume 2020 website
Emily Lange resume 2020 website
 
Gt adit dpz pres
Gt adit dpz presGt adit dpz pres
Gt adit dpz pres
 
From Vision to Reality Storrs Center
From Vision to Reality Storrs CenterFrom Vision to Reality Storrs Center
From Vision to Reality Storrs Center
 
International Centre for Local & Regional Development Conference - Planning ...
International Centre for Local & Regional Development Conference  - Planning ...International Centre for Local & Regional Development Conference  - Planning ...
International Centre for Local & Regional Development Conference - Planning ...
 
ESP Portfolio 2012 Final (3)
ESP Portfolio 2012 Final (3)ESP Portfolio 2012 Final (3)
ESP Portfolio 2012 Final (3)
 
Rocky River Master Plan presentation
Rocky River Master Plan presentationRocky River Master Plan presentation
Rocky River Master Plan presentation
 
Portfolio Girish Ravikumar
Portfolio   Girish RavikumarPortfolio   Girish Ravikumar
Portfolio Girish Ravikumar
 
kobendorfresume2016
kobendorfresume2016kobendorfresume2016
kobendorfresume2016
 
Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015
 
Presentación ppp casa paulista ingles
Presentación ppp casa paulista inglesPresentación ppp casa paulista ingles
Presentación ppp casa paulista ingles
 
F4 friday getting tactical in the creative capital with pop up providence
F4 friday   getting tactical in the creative capital with pop up providenceF4 friday   getting tactical in the creative capital with pop up providence
F4 friday getting tactical in the creative capital with pop up providence
 
New Town Development Strategies Jan 2015 - Day 2
New Town Development Strategies Jan 2015  - Day 2New Town Development Strategies Jan 2015  - Day 2
New Town Development Strategies Jan 2015 - Day 2
 

Project Examples

  • 1. PLANNING AND DESIGN PORTFOLIO MATT LINDLEY OCTOBER 2016
  • 2. QUALITIES, CHARACTER AND VALUES PROBLEM SOLVER PLANNING & DESIGN PORTFOLIO MATT LINDLEY OPEN INNOVATIVE HONEST PASSIONATE PROFESSIONAL FLEXIBLE NEGOTIATOR COMMUNICATION CONSISTENT CREATIVELISTENER COLLABORATIVE LOGICAL COMMITTED LISTENER KIND CARING NATURAL LEADER COACH PRESENT LOYAL PERSERVANCE SKILLED TEAM PLAYER FUN INTEGRITY ORGANISED STRATEGIC
  • 3. FRANKSTON PROJECT CLIENT: FRANKSTON  CITY  COUNCIL ROLE:   STRATEGIC  PLANNER/MANAGER TEAM: 2  PLANNING  AND  ECONOMIC/CONSULTANTS PURPOSE:  TO  IDENTIFY  A  SHARED  VISION    FOR  THE  FUTURE  OF  THE   CITY. DISCIPLINE:  PLANNING,  DESIGN,  COMMUNITY  ENGAGEMENT HIGHLIGHTS:   • DESIGNING  BRIEF  AND  GAINING  STATE  FUNDING • FOCUS  GROUP  MEETINGS • FRANKSTON  CONVENTION • POSITIONING  POSSIBILITIES • DESIGN  GUIDELINES • ACTION  PLAN  (20YR) COST:  $150K  1YEAR PLANNING & DESIGN PORTFOLIO MATT LINDLEY METRICS  :  FIRST  2  YEARS • DESIGN  GUIDELINES  IN  PLANNING  SCHEME • FORESHORE  REVITALISATION,  LIFESAVING  CLUB,  YACHT  CLUB,   CREEK  LANDSCAPE  UPGRADES  COMMENCED • $200M  SHOPPING  CENTRE  INVESTMENT
  • 4. INFRASTRUCTURE PLANNING CLIENT: MAROOCHY  SHIRE  COUNCIL ROLE:   COORDINATOR  INFRASTRUCTURE  PLANNING. TEAM:     11    PLANNING,  ENGINEERING,  FINANCE/CONSULTANTS PURPOSE:   TO  PLAN  AND  COST  25  YEARS  OF  TRUNK  COMMUNITY   INFRASTRUCTURE  FOR  THE  SHIRE DISCIPLINE:  PLANNING,  ENGINEERING,  FINANCE,  CORPORATE  GOVERNANCE,   COMMUNITY  ENGAGEMENT HIGHLIGHTS:   • CREATING  COMMUNITY  INFRASTRUCTURE  PLANS  FOR  PARKS,  BIKEWAYS,   COMMUNITY  LAND,  ROADS,  STORMWATER  AND  WATER  &  SEWER • DEVELOPING  POPULATION,  LANDUSE,  ROAD,  WATER  &  SEWER,  FLOOD  AND   FINANCIAL  MODELS • IMPLEMENTING  AN  INFRASTRUCTURE  CHARGES  POLICY  AND  PRIORITY   INFRASTRUCTURE  PLAN COST: $10M  OVER  3  YEARS PLANNING & DESIGN PORTFOLIO MATT LINDLEY METRICS: • 1  BILLION  $  INFRASTRUCTURE  PLANNED • INFRASTRUCTURE  CHARGES  RECOVER  45%  COST • PRIORITISED  CAPITAL  WORKS  PROGRAM • $17M  IN  CHARGES  COLLECTED  PRIOR  TO  IMPLEMENTATION • COMMUNITY  BENEFIT  THROUGH  FACILITY  PLANNING  
  • 5. BIRTINYA AND KAWANA TOWN CENTRE CONCEPT FRAMEWORK Project 140808 Bokarina Beach Master Plan Aerial Perspective Drawing Checked CM Scale NTS @ A3 UD 08a Approved PS Date 22/10/2014 CLIENT: STOCKLAND ROLE:   REGIONAL  PLANNING  AND  DESIGN  MANAGER TEAM:     5    PLANNING  AND  DESIGN/  CONSULTANTS PURPOSE:  TO  DEVELOP  A  CONCEPT  PLAN  TO  ENGAGE  WITH  KEY   STAKEHOLDERS DISCIPLINE:  PLANNING,  DESIGN,  COLLABORATION   HIGHLIGHTS:   • FACILITATING  INTERNAL  VISION  WORKSHOP • CONTRIBUTING  TO  CREATING  A  GREAT  PLACE • PLANNING  AND  DESIGNING  A  CONNECTED  COMMUNITY  WHERE   PEOPLE  CAN  LIVE  AND  WORK • DEVELOPING  AND  INTEGRATING  INNOVATIVE  PRODUCT  TYPES • ENSURING  FINANCIAL  VIABILITY COST: $90K  1  YEAR PLANNING & DESIGN PORTFOLIO MATT LINDLEY METRICS: • DEVELOPABLE  AREA  90  HECTARES • 2200  APARTMENTS • 780  DWELLING  OF  VARIOUS  TYPES • 30  HECTARE  PUBLIC  REALM,  PARKS,BIKEWAYS  &  COMMUNITY   • 175K  GFA  TOWN  CENTRE  AND  COMMERCIAL  HOSPITAL  SUPPORT • 1100  BED  PUBLIC  AND  PRIVATE  HOSPITAL
  • 6. AURA TOWN CENTRE PLANNING APPLICATION CLIENT: STOCKLAND ROLE: PROJECT  MANAGER. TEAM: PLANNING,  DESIGN,  ARCHITECTURE,    FLOOD,  STORMWATER,   ENVIRONMENT,    ACOUSTIC,  CIVIL,    TRANSPORT,  SOCIAL  PLANNING. PURPOSE: TO  SELECT  AND  MANAGE  CONSULTANT  TEAM  THROUGH  APPLICATION   PREPARATION  AND  APPROVAL  PROCESS DISCIPLINE:   PLANNING,  DESIGN,  ENGINEERING,  ENVIRONMENTAL,   INFRASTRUCTURE,  NEGOTIATION   HIGHLIGHTS:   • LEADING  APPLICATION  PREPARATION  BASED  ON  STAKEHOLDER   ENGAGEMENT  AND  EXPERT  ADVICE • COORDINATING  DISCPLINES  TO  ACHIEVE  PLANNED  VISION   • NEGOTIATING  OUTCOMES  WITH  STATE  AND  COUNCIL,  TOWN  CENTRE   DESIGN,  STORMWATER,  TRAFFIC. • SOLVING  DESIGN  CHALLENGES   • DRAFT  APPROVAL  CONDITIONS COST: $2.5M  OVER  4  YEARS PLANNING & DESIGN PORTFOLIO MATT LINDLEY METRICS: • 450  HECTARES • 4800  DWELLINGS  (2847  APARTMENTS  AND  1953  DWELLINGS) • 145K  GFA  COMMERCIAL  INCLUDING  90K  GFA  TOWN  CENTRE • TWO  SCHOOLS • TRANSIT  STATION,  RAIL,  ARTERIAL  ROADS • PARKS,  CONSERVATION,  COMMUNITY  FACILITIES,  CIVIL  BUILDINGS
  • 7. ROCHEDALE TOWN CENTRE PLANNING APPLICATION Rochedale Master plan - indicative aerial image looking north east 01/08/16 M iles Platting R oad North South Road Gardner Road CLIENT: COLES   ROLE: PROJECT  MANAGER. TEAM: PLANNING,DESIGN,  ARCHITECTURE,    FLOOD  ,STORMWATER,   ENVIRONMENT,    ACOUSTIC,    CIVIL,  TRANSPORT,  LEGAL. PURPOSE: TO  SELECT  AND  MANAGE  CONSULTANT  TEAM  THROUGH  APPLICATION   PREPARATION  AND  APPROVAL  PROCESS DISCIPLINE:   PLANNING,  DESIGN,  ENGINEERING,  ENVIRONMENTAL,   INFRASTRUCTURE,  NEGOTIATION.   HIGHLIGHTS:   • LEADING  APPLICATION  AND  INFRASTRUCTURE  NEGOTIATIONS  WITH   BRISBANE  CITY  COUNCIL   • COORDINATING  DISCPLINES  TO  ACHIEVE  COST  EFFECTIVE  OUTCOMES  FOR   CLIENT   • ENGAGEMENT  OF  COUNCIL  &  COMMUNITY  STAKEHOLDERS,  CHURCH,  SEWER,   SUBMISSIONS • SOLVING  DESIGN  CHALLENGES   • PLANNING,  INFRASTRUCTURE  AGREEMENT  AND,  ROL  APPROVALS   COST: $550K  OVER  2  YEARS PLANNING & DESIGN PORTFOLIO MATT LINDLEY METRICS: • 18K  GFA  TOWN  CENTRE  –STAGE  1  8K  GFA • 2K  PUBLIC  SQUARE  – COMMUNITY  BUILDING • CHURCH  RELOCATION • MAJOR  INFRASTRUCTURE  UPGRADES
  • 8. OTHER PROJECTS STOCKLAND DWG LGA CABOOLTURE WEST 1500 MBRC PARADISE  WATERS 1200 ICC/EDQ PALLARA 900 BCC NORTH  LAKES  NORTHERN  PCNT 560 MBRC NORTH  SHORE  MODE 45 TCC BRIGHTWATER 1000 SCRC AURA    -­ BUSINESS &  INDUSTRY 450/60K EDQ AURA  – WESTERN  DETENTION EDQ KAWANA COMMUNITY   DEVELOPMENT  STRATEGY SCRC HOSPITAL  CONTRACT QLD/SCRC PLANNING & DESIGN PORTFOLIO MATT LINDLEY COLES GFA LGA ORMEAU  TOWN  CENTRE 10000 GCC SIPPY DOWNS   8400 SCRC ANDEGROVE 5000 MCC BREMER COLES  XPRESS 500 ICC NOOSA BOWLS  CLUB  – MIXED  USE NSC