7. YOUR DRILLING ENGINEERS
NEED A PARTNER
“You lose the personal relationship with the major companies.
They are globally minded and don’t value the personal
relationship as much. They can also charge more.”
- Chase, Chesapeake Energy
8. MOTORS
• 3 1/2" to 9 5/8" mud motors
• Bit-to-bend options for any application
• Manufacture and service our own motors
• Hard rubber & even wall rubber
• Adjustable & fixed bend housings
• High mean-time-between failure
9. MEASUREMENT WHILE DRILLING
• Fusion Dual Telemetry (Pulse & EM)
• High temperature retrievable pulse tool
• Electromagnetic (EM) tool
• Gamma & Focal Gamma
• Resistivity
10. CATHEDRAL PERFORMANCE
WHEN IT ABSOLUTELY
NEEDS TO BE DONE RIGHT
• Daily footage
• Curve drilling hours
• One run curve vertical
• One run curve/lateral
• MWD performance
14. IF GIVEN THE OPPORTUNITY, CATHEDRAL
WILL PROVIDE YOU WITH…
Experienced Personnel Footage Pricing
Horizontal & Directional Measurement While Drilling
Drilling Motors (119 Systems in North America)
(700 in North America)
Unprecedented
Well Planning Customer Service
15. DRILLING WELLS ACCURATELY, SAFELY, AND EFFICIENTLY.
THAT’S WHAT WE DO, AND NO ONE DOES IT BETTER.
THANK YOU.