SlideShare a Scribd company logo
1 of 26
Cost Reduction Initiative
Process Re-engineering




          Cost Reduction Initiative:
           Process Re-engineering

                             Prepared By: Manohar M. M. Iyer
                                       VAS2010XMBA15P005
Introduction
Cost Reduction Initiative
Process Re-engineering


          • Cost Reduction
                 – Reducing existing unit cost of the goods
                   manufactured or services rendered without
                   compromising on the quality
          • Process Re-engineering
                 – Analyzing the current sequence of related tasks
                   which make up a business activity and redesigning
                   the workflow to achieve increased efficiency and
                   effectiveness of the process.
                                                     Prepared By: Manohar M. M. Iyer
                                                               VAS2010XMBA15P005
Case Study
Cost Reduction Initiative
Process Re-engineering




           Duplicate Bill dispatch Process of a Telecom firm
   Disclaimer note:
   This study is taken from a real life challenge faced by me (Manohar) on around May 2004, while I was
   working with a telecom firm between 2003 & 2006. At that time, I was a Senior executive in the Offline
   Department, handling the unit for Legal & TRAI related communications.

   The Duplicate bill dispatch unit, another unit within offline department was faced with severe
   challenges. During that time , coincidently the operation manager, the process manager & the team
   leader for the Offline department were on unavoidable long leaves.

   As a senior member of the offline department, I took the responsibility of solving the crisis in the
   Duplicate bill dispatch unit.

   Most of the figures mentioned in the study are real practical figures. However, since this study is
   presented 6 years after the incident, few figures may vary.                 Prepared By: Manohar M. M. Iyer
                                                                                            VAS2010XMBA15P005
Cost Reduction Initiative
Process Re-engineering




                                  Facts
                            Case Study follows………




                                                    Prepared By: Manohar M. M. Iyer
                                                              VAS2010XMBA15P005
The activity
Cost Reduction Initiative
                                Duplicate Bill dispatch Unit
Process Re-engineering


          • Every month postpaid mobile users are sent hard
            copy of the usage bills as per their billing cycle.
          • Some users require duplicate copy of the bills.
          • Such users request for the same at the call centre.
          • Front office executives raise request Cases in CRM
            with SLA of 4 working days.
          • Back office executives
                 – Take the dump of such cases from the CRM.
                 – Open the relevant bills & shoot printouts.
                 – Stuff bills in envelopes , dispatch & Close the case in CRM.
                                                              Prepared By: Manohar M. M. Iyer
                                                                        VAS2010XMBA15P005
Challenges
Cost Reduction Initiative
                                 As on May 2004
Process Re-engineering


          • Queue of 34,000 backlog cases
          • Constant inflow of 2000 new cases per day .
          • Average time taken to log one case in CRM was 1.5
            minutes.
          • Only 9 back office executives to handle this queue
            with 8 man hours per person per day.
          • Average time taken to solve one case was 8 minutes.
          • Total productivity of the unit was closure of 540 cases
            per day .
                                                   Prepared By: Manohar M. M. Iyer
                                                             VAS2010XMBA15P005
Projections
Cost Reduction Initiative
Process Re-engineering


       • With the prevalent trend the projections of
         inefficiency were as follows:
                                     Average   Total               Minutes     Cases    Total
                            Opening                    Man minutes                               Closing
                Day                 New cases number               reqd Per closed per cases
                            balance                     per person                               balance
                                     per day of Agents               case     person   closed



               Day 1        34000     2000        9        480         8       60       540      35460

               Day 2        35460     2000        9        480         8       60       540      36920

               Day 3        36920     2000        9        480         8       60       540      38380

               Day 4        38380     2000        9        480         8       60       540      39840

               Day 5        39840     2000        9        480         8       60       540      41300

               Day 6        41300     2000        9        480         8       60       540      42760
                                                                                      Prepared By: Manohar M. M. Iyer
                                                                                                VAS2010XMBA15P005
Costs of Operation
Cost Reduction Initiative
Process Re-engineering

                                                         Average
                                                                   Man hours            Cost of      Total Cost
                                              Salary per Number                 Cost of
                  Cost Per seat Cost Per seat                       available           wages            of
    Cost Per seat                              person      of                   wages
                   Per hour in Per minute                          per day for           per         attending
    Per hour in $                                per     working               per hour
                       Rs.           Rs.                            work per            Minute       a Case Per
                                              month Rs. days per                  Rs.
                                                                     person               Rs.        minute Rs.
                                                         month
         2.5           120            2         7000       25          8         35         0.58         2.58


                                                  Total Cost          Average Stationery &
     Time taken to Time taken to Total time to                                             Total cost
                                                      of              Printing  Dispatch
    log per case in Solve per case Attend a case                                            per case
                                                 attending a          cost per  Cost per
        minutes       in minutes    in minutes                                                Rs.
                                                   Case Rs.           case Rs.  case Rs.
          1.5             8             9.5         24.54                1         30        55.54

      Every day 2000 new cases are created; i.e. Rs.1,11,083.33/- is required to process them

                                                                               Prepared By: Manohar M. M. Iyer
                                                                                         VAS2010XMBA15P005
Cost Reduction Initiative
Process Re-engineering




                            Operations analysis
                              Case Study follows………




                                                      Prepared By: Manohar M. M. Iyer
                                                                VAS2010XMBA15P005
Key Problem Areas
Cost Reduction Initiative
Process Re-engineering



       1. High inflow of requests
       2. High processing time
       3. Less Man power




                                          Prepared By: Manohar M. M. Iyer
                                                    VAS2010XMBA15P005
Root causes
Cost Reduction Initiative
Process Re-engineering


       1. High Inflow of requests
              –       The AHT target for the front office executives were reduced from 6
                      minutes to 4 minutes leading to lesser available time for customer
                      interaction and cases were created in CRM without proper probing.
              –       The process guidelines for front office executives emphasized on how
                      & where to create cases for Duplicate bill requests. Due emphasis on
                      when to create cases & probing were not given.
              –       Provision for FTRs were not available in the process.
              –       Alternative solutions for the customers were not built in the system.
              –       Customers are already sent Original copies of the bill. Scenarios on
                      why a customer will require a duplicate copy were not studied.



                                                                      Prepared By: Manohar M. M. Iyer
                                                                                VAS2010XMBA15P005
Root causes
Cost Reduction Initiative
Process Re-engineering


       2. High Processing Time
              –       Each Back office executive was taking dump individually from the
                      CRM and working on it.
              –       The existing CRM which was built using Java & Oracle was slow in
                      downloading the copies of the bills in PDF format from the billing
                      server. Each bill took on an average 4 minutes to open.
              –       Few back office executives were not using advance MS-Excel options
                      and Keyboard short cut keys for processing the cases.
              –       There were no dedicated Printer available for the duplicate billing unit.
                      The available printer was shared by the entire floor operations. This
                      affected the print wait time & the system resources.
              –       The executives were also involved in less intelligent tasks like collecting
                      the printouts, stuffing the bills in envelopes and Zone wise segregation
                      of mails, etc.
                                                                          Prepared By: Manohar M. M. Iyer
                                                                                    VAS2010XMBA15P005
Root causes
Cost Reduction Initiative
Process Re-engineering


       3. Less Man Power
              –       Duplicate billing unit was not treated as an individual unit.
              –       The basis of Man power requirement calculations, made for other back
                      office units, were replicated for the duplicate billing unit.
              –       The domino effect of a policy change in the front office operations
                      were not foreseen.




                                                                     Prepared By: Manohar M. M. Iyer
                                                                               VAS2010XMBA15P005
Cost Reduction Initiative
Process Re-engineering




                               Solutions
                            Case Study follows………




                                                    Prepared By: Manohar M. M. Iyer
                                                              VAS2010XMBA15P005
Reducing Inflow
Cost Reduction Initiative
Process Re-engineering

• Scenarios/ Actions to take:
       – Customer has not received Original bill
               • May be the customer is not aware of the 10 day wait period for receiving the bills
                 after bill generation - Inform the customer to wait.
               • Wrong Customer address in the system - Make corrections to avoid repeat request
                 from the customer in future.
               • Lost in transits - Check the trail & Inform the dispatch unit about the errors.
       – Customer has lost Original bill
               • Provide. Add a nominal charge for the second copy
       – Customer requires one more copy
               • Customer wants to submit a copy to his office & keep original for his records -
                 Customer should informed about the time taken for the delivery of duplicate copy
                 & the cost involved. Advise the customer to take photocopies.

                                                                           Prepared By: Manohar M. M. Iyer
                                                                                     VAS2010XMBA15P005
Reducing Inflow
Cost Reduction Initiative
Process Re-engineering

   • Alternative FTR options
           – Customer can walk into the nearest local customer service
             centre of the telecom firm and request for the same.
           – The soft copies of the bill can be sent as an email to the
             customer & print outs of the same can be taken.
           – The website of the telecom firm can have a provision from
             where customer can log in to his account & take printout of the
             bills.




                                                         Prepared By: Manohar M. M. Iyer
                                                                   VAS2010XMBA15P005
Improving Process time
Cost Reduction Initiative
Process Re-engineering



       1. Taking the dump from the CRM
              –      This task was taken over by the supervisor (Me), work sheets for each
                     individual back office executive were prepared & allocated to them.
                     This avoided replication of a case & increased the time available for the
                     back office executives.
       2. Direct access to the billing server (mirror view)
              –      Instead of viewing the bills from the CRM, a mirror view of the billing
                     server was created in coordination with the billing team & IT and the
                     link for the same was provided to the back office executives. This aided
                     the back office executives to access the bills in less than a minute.
       3. Training
              –      Back office executives were trained on using advance MS-Excel options
                     and Keyboard short cut keys.
                                                                        Prepared By: Manohar M. M. Iyer
                                                                                  VAS2010XMBA15P005
Improving Process time
Cost Reduction Initiative
Process Re-engineering



       4. Printer
              –      In coordination with the Administration & IT, all the existing printers in
                     the floor were reallocated to various departments & one dedicated
                     printer for the Duplicate billing unit was recognized. This reduced the
                     print wait time & provided more system resources.
       5. Less Intelligent tasks
              –      Less intelligent tasks like collecting the printouts, stuffing the bills in
                     envelopes and Zone wise segregation of mails, etc were allocated to
                     office boys (with lesser salaries) in the dispatch unit after due training.
                     This aided the back office executives to concentrate only on processing
                     the cases.



                                                                          Prepared By: Manohar M. M. Iyer
                                                                                    VAS2010XMBA15P005
Man power
                                       for existing challenge & BAU operations
Cost Reduction Initiative
Process Re-engineering

                –           The HR was educated on the operational differences between
                            Duplicate billing unit & other back office units
                –           Also the importance that how a policy change in the front office
                            operations can affect the back office operations was
                            demonstrated.
                –           To handle the existing challenges in the unit the HR was ready to
                            provide extra man power to the unit by way of new recruits.
                –           Instead of new recruits the HR was advised to allow an option to
                            existing workforce in other units to work on over time basis
                            before or after their regular shifts @ Rs.40/- per hour per person.
                            An average of 75 CSRs volunteered for 2 hours every day.
                –           The supervisor (me) took the onus of providing process training to
                            them.

                                                                           Prepared By: Manohar M. M. Iyer
                                                                                     VAS2010XMBA15P005
Cost Reduction Initiative
Process Re-engineering




                                 Results
                            Case Study follows………




                                                    Prepared By: Manohar M. M. Iyer
                                                              VAS2010XMBA15P005
Effects on the Inflow
Cost Reduction Initiative
Process Re-engineering


          • Repeat calls for the same request, from all those customers
            educated & habituated with alternative routes for obtaining
            the duplicate bills, were almost nil.
          • The CRM was constantly updated with corrected address of
            the customer leading to increase in receipts of original bills
          • New FTRs made available in the system
          • All this resulted in drastic reduction in the number of cases for
            Duplicate bills logged in the CRM. Within a month the daily
            inflow reduced by 50% on an average.



                                                           Prepared By: Manohar M. M. Iyer
                                                                     VAS2010XMBA15P005
Effects on Process Time
Cost Reduction Initiative
Process Re-engineering
          • The only task left for the back office executives were to Open the relevant
            bills & shoot printouts as the dump were readily provided to them & post
            printout tasks were handled by office boys.
          • The access time for opening the relevant bills was reduced by 3 minutes
            per case due to direct read access on the billing server .
          • More system time was available for shooting printouts, since the print
            wait time was reduced due to availability of a dedicated printer.
          • Also the executives were more skilled & quicker in processing the requests
            to the training provided on advance MS-excel options.
          • Due to all this the process time for the back office was reduced by 60%.
          • However due to inclusion of probing in the front office process, their
            process time increased by 1 minute per case.
          • The overall process time per case was reduced from 9.5 minutes to 5.7
            minutes.
                                                                  Prepared By: Manohar M. M. Iyer
                                                                            VAS2010XMBA15P005
Revised costs of Operation
Cost Reduction Initiative
Process Re-engineering

                                                         Average
                                                                   Man hours            Cost of      Total Cost
                                              Salary per Number                 Cost of
                  Cost Per seat Cost Per seat                       available           wages            of
    Cost Per seat                              person      of                   wages
                   Per hour in Per minute in                       per day for           per         attending
    Per hour in $                                per     working               per hour
                       Rs.      Minutes Rs.                         work per            Minute       a Case Per
                                              month Rs. days per                  Rs.
                                                                     person               Rs.        minute Rs.
                                                         month
         2.5           120            2         7000       25          8         35         0.58         2.58
                                                              Cost of
                                                             wages per
                                                  Total Cost                            Stationery
     Time taken to Time taken to Total time to               Minute of Average                     Total cost
                                                      of                                & Dispatch
    log per case in Solve per case Attend a case             office boy Printing cost               per case
                                                 attending a                             Cost per
        minutes       in minutes    in minutes                 @ Rs. per case Rs.                     Rs.
                                                   Case Rs.                              case Rs.
                                                             2000 per
                                                              month
          2.5             3.2           5.7         14.73       0.17          1             30          45.90

      If 2000 new cases are created everyday, Rs. 91,790.00/- is required to process them i.e.
      Rs. 19,293.33 lesser.
                                                                               Prepared By: Manohar M. M. Iyer
                                                                                         VAS2010XMBA15P005
Comparison of Costs
Cost Reduction Initiative
Process Re-engineering




                                                         After one   Difference
                                                Intial
                                                          month    saved per day

             Average cost to slove per case     55.54     45.90              9.65

           Number of cases created per day     2000.00   1000.00          1000.00

                        Total Cost per day    111083.33 45895.00         65188.33




                                                                   Prepared By: Manohar M. M. Iyer
                                                                             VAS2010XMBA15P005
Cost Reduction Initiative
Process Re-engineering



           Thus due to Cost reduction
            initiatives & the process
        reengineering the telecom firm
          started saving on an average
       Rs.65,188.33/- per day on the cost
         of operations of Duplicate bill
                  dispatch unit.
                                 Prepared By: Manohar M. M. Iyer
                                           VAS2010XMBA15P005
Cost Reduction Initiative
Process Re-engineering


      I thank one and all who have provided me with the opportunity to handle this
      responsibility and the knowledge & support to prepare this Presentation.

      Please feel free to forward your valuable feedback, comments, queries and
      suggestions related to this presentation at mumbai_man1977@yahoo.com

      Thank you,

      Warm regards,

      Manohar M. M. Iyer




                                                               Prepared By: Manohar M. M. Iyer
                                                                         VAS2010XMBA15P005

More Related Content

Viewers also liked

Cost Reduction Strategies:Focus and Techniques
Cost Reduction Strategies:Focus and TechniquesCost Reduction Strategies:Focus and Techniques
Cost Reduction Strategies:Focus and Techniques
Thomas Tanel
 

Viewers also liked (7)

Cost Engineering for Projects
Cost Engineering for ProjectsCost Engineering for Projects
Cost Engineering for Projects
 
Cost estimating and risk in complex projects
Cost estimating and risk in complex projectsCost estimating and risk in complex projects
Cost estimating and risk in complex projects
 
Ofer Yuval,Management Consulting,Operations,Strategy,Turnaround,Cost Reduction
Ofer Yuval,Management Consulting,Operations,Strategy,Turnaround,Cost ReductionOfer Yuval,Management Consulting,Operations,Strategy,Turnaround,Cost Reduction
Ofer Yuval,Management Consulting,Operations,Strategy,Turnaround,Cost Reduction
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Cost Reduction Plan
Cost  Reduction  PlanCost  Reduction  Plan
Cost Reduction Plan
 
Logistics Management
Logistics ManagementLogistics Management
Logistics Management
 
Cost Reduction Strategies:Focus and Techniques
Cost Reduction Strategies:Focus and TechniquesCost Reduction Strategies:Focus and Techniques
Cost Reduction Strategies:Focus and Techniques
 

Similar to Operations Management - Cost Reduction Process Re-engineering

Manufacturing & operations management
Manufacturing & operations managementManufacturing & operations management
Manufacturing & operations management
Vaibhav Govindjiwala
 
Naman shrivastava tata_project_report
Naman shrivastava tata_project_reportNaman shrivastava tata_project_report
Naman shrivastava tata_project_report
Naman Shrivastava
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
ijmech
 
Smart Case Study 001
Smart Case Study 001Smart Case Study 001
Smart Case Study 001
agbagb
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
Karina Islam
 

Similar to Operations Management - Cost Reduction Process Re-engineering (20)

Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industry
 
Manufacturing & operations management
Manufacturing & operations managementManufacturing & operations management
Manufacturing & operations management
 
Process Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained ResultsProcess Mapping for Improvement and Sustained Results
Process Mapping for Improvement and Sustained Results
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
 
Naman shrivastava tata_project_report
Naman shrivastava tata_project_reportNaman shrivastava tata_project_report
Naman shrivastava tata_project_report
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
Calculating the ROI of collaboration tools
Calculating the ROI of collaboration tools Calculating the ROI of collaboration tools
Calculating the ROI of collaboration tools
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Faster apps. faster time to market. faster mean time to repair
Faster apps. faster time to market. faster mean time to repairFaster apps. faster time to market. faster mean time to repair
Faster apps. faster time to market. faster mean time to repair
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
 
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
 
Smart Case Study 001
Smart Case Study 001Smart Case Study 001
Smart Case Study 001
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
Higher education IAM-seminar Turku 10.12.2009
Higher education IAM-seminar Turku 10.12.2009Higher education IAM-seminar Turku 10.12.2009
Higher education IAM-seminar Turku 10.12.2009
 
ABC (ACTIVITY BASED COSTING)
ABC (ACTIVITY BASED COSTING)ABC (ACTIVITY BASED COSTING)
ABC (ACTIVITY BASED COSTING)
 
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
WQD2011 - KAIZEN - SRF Oversear Ltd - Set up time reduction in loom during st...
 
Analytics in the Manufacturing industry
Analytics in the Manufacturing industryAnalytics in the Manufacturing industry
Analytics in the Manufacturing industry
 
Manufacturing Conference Workshop 3 - OEE and Energy
Manufacturing Conference Workshop 3 -  OEE and EnergyManufacturing Conference Workshop 3 -  OEE and Energy
Manufacturing Conference Workshop 3 - OEE and Energy
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 

More from Manohar Mani Manjula Iyer

More from Manohar Mani Manjula Iyer (11)

Operations management using bar codes - health care industry
Operations management using bar codes - health care industryOperations management using bar codes - health care industry
Operations management using bar codes - health care industry
 
Marketing assignment - Brand & Indian Consumer - XYLYS watches
Marketing  assignment - Brand & Indian Consumer - XYLYS watchesMarketing  assignment - Brand & Indian Consumer - XYLYS watches
Marketing assignment - Brand & Indian Consumer - XYLYS watches
 
Project Finance management assignment
Project Finance management assignmentProject Finance management assignment
Project Finance management assignment
 
Business Governance & Environment - World Trade Organization & TRIPS
Business Governance & Environment - World Trade Organization & TRIPSBusiness Governance & Environment - World Trade Organization & TRIPS
Business Governance & Environment - World Trade Organization & TRIPS
 
Management Information systems – Assignments
Management Information systems – AssignmentsManagement Information systems – Assignments
Management Information systems – Assignments
 
Human Behaviour in Organization - Self Assessment
Human Behaviour in Organization - Self AssessmentHuman Behaviour in Organization - Self Assessment
Human Behaviour in Organization - Self Assessment
 
Macro economics – Globalization
Macro economics – GlobalizationMacro economics – Globalization
Macro economics – Globalization
 
Financial Analysis of Annual Report – Akurti
Financial Analysis of Annual Report – AkurtiFinancial Analysis of Annual Report – Akurti
Financial Analysis of Annual Report – Akurti
 
Service Cost Management in Service industry - Mumbai-Pune Shivneri Bus
Service Cost Management in Service industry - Mumbai-Pune Shivneri BusService Cost Management in Service industry - Mumbai-Pune Shivneri Bus
Service Cost Management in Service industry - Mumbai-Pune Shivneri Bus
 
Strategy Management - ITC LTD
Strategy Management - ITC LTDStrategy Management - ITC LTD
Strategy Management - ITC LTD
 
Soft Skills - How to do a Presentation
Soft Skills - How to do a PresentationSoft Skills - How to do a Presentation
Soft Skills - How to do a Presentation
 

Recently uploaded

Call Girls Bommanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Bommanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Bommanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Bommanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
amitlee9823
 
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
ZurliaSoop
 
Internship Report].pdf iiwmoosmsosmshkssmk
Internship Report].pdf iiwmoosmsosmshkssmkInternship Report].pdf iiwmoosmsosmshkssmk
Internship Report].pdf iiwmoosmsosmshkssmk
SujalTamhane
 
Vip Mumbai Call Girls Ghatkopar Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Ghatkopar Call On 9920725232 With Body to body massage ...Vip Mumbai Call Girls Ghatkopar Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Ghatkopar Call On 9920725232 With Body to body massage ...
amitlee9823
 
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
amitlee9823
 
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
poojakaurpk09
 
Call Girls Devanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Devanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Devanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Devanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
amitlee9823
 
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
amitlee9823
 
Call Girls Brigade Road Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Brigade Road Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Brigade Road Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Brigade Road Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
amitlee9823
 
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
ssuserded2d4
 
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
amitlee9823
 

Recently uploaded (20)

TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...
TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...
TEST BANK For Evidence-Based Practice for Nurses Appraisal and Application of...
 
Solution Manual for First Course in Abstract Algebra A, 8th Edition by John B...
Solution Manual for First Course in Abstract Algebra A, 8th Edition by John B...Solution Manual for First Course in Abstract Algebra A, 8th Edition by John B...
Solution Manual for First Course in Abstract Algebra A, 8th Edition by John B...
 
Call Girls Bommanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Bommanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Bommanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Bommanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
Jual obat aborsi Jakarta ( 085657271886 )Cytote pil telat bulan penggugur kan...
 
Call Girls Alandi Road Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Alandi Road Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Alandi Road Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Alandi Road Call Me 7737669865 Budget Friendly No Advance Booking
 
Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)
Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)
Toxicokinetics studies.. (toxicokinetics evaluation in preclinical studies)
 
Internship Report].pdf iiwmoosmsosmshkssmk
Internship Report].pdf iiwmoosmsosmshkssmkInternship Report].pdf iiwmoosmsosmshkssmk
Internship Report].pdf iiwmoosmsosmshkssmk
 
Vip Mumbai Call Girls Ghatkopar Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Ghatkopar Call On 9920725232 With Body to body massage ...Vip Mumbai Call Girls Ghatkopar Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Ghatkopar Call On 9920725232 With Body to body massage ...
 
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Nandini Layout Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
Virgin Call Girls Delhi Service-oriented sexy call girls ☞ 9899900591 ☜ Rita ...
 
Personal Brand Exploration ppt.- Ronnie Jones
Personal Brand  Exploration ppt.- Ronnie JonesPersonal Brand  Exploration ppt.- Ronnie Jones
Personal Brand Exploration ppt.- Ronnie Jones
 
Call Girls Devanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Devanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service B...Call Girls Devanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
Call Girls Devanahalli Just Call 👗 7737669865 👗 Top Class Call Girl Service B...
 
Joshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptxJoshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptx
 
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
Call Girls Btm Layout Just Call 👗 7737669865 👗 Top Class Call Girl Service Ba...
 
Call Girls Brigade Road Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Brigade Road Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Brigade Road Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Brigade Road Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf0425-GDSC-TMU.pdf
 
Top Rated Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated  Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...Top Rated  Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
Top Rated Pune Call Girls Warje ⟟ 6297143586 ⟟ Call Me For Genuine Sex Servi...
 
CFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector ExperienceCFO_SB_Career History_Multi Sector Experience
CFO_SB_Career History_Multi Sector Experience
 
Dubai Call Girls Kiki O525547819 Call Girls Dubai Koko
Dubai Call Girls Kiki O525547819 Call Girls Dubai KokoDubai Call Girls Kiki O525547819 Call Girls Dubai Koko
Dubai Call Girls Kiki O525547819 Call Girls Dubai Koko
 
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Chikkabanavara Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 

Operations Management - Cost Reduction Process Re-engineering

  • 1. Cost Reduction Initiative Process Re-engineering Cost Reduction Initiative: Process Re-engineering Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 2. Introduction Cost Reduction Initiative Process Re-engineering • Cost Reduction – Reducing existing unit cost of the goods manufactured or services rendered without compromising on the quality • Process Re-engineering – Analyzing the current sequence of related tasks which make up a business activity and redesigning the workflow to achieve increased efficiency and effectiveness of the process. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 3. Case Study Cost Reduction Initiative Process Re-engineering Duplicate Bill dispatch Process of a Telecom firm Disclaimer note: This study is taken from a real life challenge faced by me (Manohar) on around May 2004, while I was working with a telecom firm between 2003 & 2006. At that time, I was a Senior executive in the Offline Department, handling the unit for Legal & TRAI related communications. The Duplicate bill dispatch unit, another unit within offline department was faced with severe challenges. During that time , coincidently the operation manager, the process manager & the team leader for the Offline department were on unavoidable long leaves. As a senior member of the offline department, I took the responsibility of solving the crisis in the Duplicate bill dispatch unit. Most of the figures mentioned in the study are real practical figures. However, since this study is presented 6 years after the incident, few figures may vary. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 4. Cost Reduction Initiative Process Re-engineering Facts Case Study follows……… Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 5. The activity Cost Reduction Initiative Duplicate Bill dispatch Unit Process Re-engineering • Every month postpaid mobile users are sent hard copy of the usage bills as per their billing cycle. • Some users require duplicate copy of the bills. • Such users request for the same at the call centre. • Front office executives raise request Cases in CRM with SLA of 4 working days. • Back office executives – Take the dump of such cases from the CRM. – Open the relevant bills & shoot printouts. – Stuff bills in envelopes , dispatch & Close the case in CRM. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 6. Challenges Cost Reduction Initiative As on May 2004 Process Re-engineering • Queue of 34,000 backlog cases • Constant inflow of 2000 new cases per day . • Average time taken to log one case in CRM was 1.5 minutes. • Only 9 back office executives to handle this queue with 8 man hours per person per day. • Average time taken to solve one case was 8 minutes. • Total productivity of the unit was closure of 540 cases per day . Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 7. Projections Cost Reduction Initiative Process Re-engineering • With the prevalent trend the projections of inefficiency were as follows: Average Total Minutes Cases Total Opening Man minutes Closing Day New cases number reqd Per closed per cases balance per person balance per day of Agents case person closed Day 1 34000 2000 9 480 8 60 540 35460 Day 2 35460 2000 9 480 8 60 540 36920 Day 3 36920 2000 9 480 8 60 540 38380 Day 4 38380 2000 9 480 8 60 540 39840 Day 5 39840 2000 9 480 8 60 540 41300 Day 6 41300 2000 9 480 8 60 540 42760 Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 8. Costs of Operation Cost Reduction Initiative Process Re-engineering Average Man hours Cost of Total Cost Salary per Number Cost of Cost Per seat Cost Per seat available wages of Cost Per seat person of wages Per hour in Per minute per day for per attending Per hour in $ per working per hour Rs. Rs. work per Minute a Case Per month Rs. days per Rs. person Rs. minute Rs. month 2.5 120 2 7000 25 8 35 0.58 2.58 Total Cost Average Stationery & Time taken to Time taken to Total time to Total cost of Printing Dispatch log per case in Solve per case Attend a case per case attending a cost per Cost per minutes in minutes in minutes Rs. Case Rs. case Rs. case Rs. 1.5 8 9.5 24.54 1 30 55.54 Every day 2000 new cases are created; i.e. Rs.1,11,083.33/- is required to process them Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 9. Cost Reduction Initiative Process Re-engineering Operations analysis Case Study follows……… Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 10. Key Problem Areas Cost Reduction Initiative Process Re-engineering 1. High inflow of requests 2. High processing time 3. Less Man power Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 11. Root causes Cost Reduction Initiative Process Re-engineering 1. High Inflow of requests – The AHT target for the front office executives were reduced from 6 minutes to 4 minutes leading to lesser available time for customer interaction and cases were created in CRM without proper probing. – The process guidelines for front office executives emphasized on how & where to create cases for Duplicate bill requests. Due emphasis on when to create cases & probing were not given. – Provision for FTRs were not available in the process. – Alternative solutions for the customers were not built in the system. – Customers are already sent Original copies of the bill. Scenarios on why a customer will require a duplicate copy were not studied. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 12. Root causes Cost Reduction Initiative Process Re-engineering 2. High Processing Time – Each Back office executive was taking dump individually from the CRM and working on it. – The existing CRM which was built using Java & Oracle was slow in downloading the copies of the bills in PDF format from the billing server. Each bill took on an average 4 minutes to open. – Few back office executives were not using advance MS-Excel options and Keyboard short cut keys for processing the cases. – There were no dedicated Printer available for the duplicate billing unit. The available printer was shared by the entire floor operations. This affected the print wait time & the system resources. – The executives were also involved in less intelligent tasks like collecting the printouts, stuffing the bills in envelopes and Zone wise segregation of mails, etc. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 13. Root causes Cost Reduction Initiative Process Re-engineering 3. Less Man Power – Duplicate billing unit was not treated as an individual unit. – The basis of Man power requirement calculations, made for other back office units, were replicated for the duplicate billing unit. – The domino effect of a policy change in the front office operations were not foreseen. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 14. Cost Reduction Initiative Process Re-engineering Solutions Case Study follows……… Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 15. Reducing Inflow Cost Reduction Initiative Process Re-engineering • Scenarios/ Actions to take: – Customer has not received Original bill • May be the customer is not aware of the 10 day wait period for receiving the bills after bill generation - Inform the customer to wait. • Wrong Customer address in the system - Make corrections to avoid repeat request from the customer in future. • Lost in transits - Check the trail & Inform the dispatch unit about the errors. – Customer has lost Original bill • Provide. Add a nominal charge for the second copy – Customer requires one more copy • Customer wants to submit a copy to his office & keep original for his records - Customer should informed about the time taken for the delivery of duplicate copy & the cost involved. Advise the customer to take photocopies. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 16. Reducing Inflow Cost Reduction Initiative Process Re-engineering • Alternative FTR options – Customer can walk into the nearest local customer service centre of the telecom firm and request for the same. – The soft copies of the bill can be sent as an email to the customer & print outs of the same can be taken. – The website of the telecom firm can have a provision from where customer can log in to his account & take printout of the bills. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 17. Improving Process time Cost Reduction Initiative Process Re-engineering 1. Taking the dump from the CRM – This task was taken over by the supervisor (Me), work sheets for each individual back office executive were prepared & allocated to them. This avoided replication of a case & increased the time available for the back office executives. 2. Direct access to the billing server (mirror view) – Instead of viewing the bills from the CRM, a mirror view of the billing server was created in coordination with the billing team & IT and the link for the same was provided to the back office executives. This aided the back office executives to access the bills in less than a minute. 3. Training – Back office executives were trained on using advance MS-Excel options and Keyboard short cut keys. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 18. Improving Process time Cost Reduction Initiative Process Re-engineering 4. Printer – In coordination with the Administration & IT, all the existing printers in the floor were reallocated to various departments & one dedicated printer for the Duplicate billing unit was recognized. This reduced the print wait time & provided more system resources. 5. Less Intelligent tasks – Less intelligent tasks like collecting the printouts, stuffing the bills in envelopes and Zone wise segregation of mails, etc were allocated to office boys (with lesser salaries) in the dispatch unit after due training. This aided the back office executives to concentrate only on processing the cases. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 19. Man power for existing challenge & BAU operations Cost Reduction Initiative Process Re-engineering – The HR was educated on the operational differences between Duplicate billing unit & other back office units – Also the importance that how a policy change in the front office operations can affect the back office operations was demonstrated. – To handle the existing challenges in the unit the HR was ready to provide extra man power to the unit by way of new recruits. – Instead of new recruits the HR was advised to allow an option to existing workforce in other units to work on over time basis before or after their regular shifts @ Rs.40/- per hour per person. An average of 75 CSRs volunteered for 2 hours every day. – The supervisor (me) took the onus of providing process training to them. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 20. Cost Reduction Initiative Process Re-engineering Results Case Study follows……… Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 21. Effects on the Inflow Cost Reduction Initiative Process Re-engineering • Repeat calls for the same request, from all those customers educated & habituated with alternative routes for obtaining the duplicate bills, were almost nil. • The CRM was constantly updated with corrected address of the customer leading to increase in receipts of original bills • New FTRs made available in the system • All this resulted in drastic reduction in the number of cases for Duplicate bills logged in the CRM. Within a month the daily inflow reduced by 50% on an average. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 22. Effects on Process Time Cost Reduction Initiative Process Re-engineering • The only task left for the back office executives were to Open the relevant bills & shoot printouts as the dump were readily provided to them & post printout tasks were handled by office boys. • The access time for opening the relevant bills was reduced by 3 minutes per case due to direct read access on the billing server . • More system time was available for shooting printouts, since the print wait time was reduced due to availability of a dedicated printer. • Also the executives were more skilled & quicker in processing the requests to the training provided on advance MS-excel options. • Due to all this the process time for the back office was reduced by 60%. • However due to inclusion of probing in the front office process, their process time increased by 1 minute per case. • The overall process time per case was reduced from 9.5 minutes to 5.7 minutes. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 23. Revised costs of Operation Cost Reduction Initiative Process Re-engineering Average Man hours Cost of Total Cost Salary per Number Cost of Cost Per seat Cost Per seat available wages of Cost Per seat person of wages Per hour in Per minute in per day for per attending Per hour in $ per working per hour Rs. Minutes Rs. work per Minute a Case Per month Rs. days per Rs. person Rs. minute Rs. month 2.5 120 2 7000 25 8 35 0.58 2.58 Cost of wages per Total Cost Stationery Time taken to Time taken to Total time to Minute of Average Total cost of & Dispatch log per case in Solve per case Attend a case office boy Printing cost per case attending a Cost per minutes in minutes in minutes @ Rs. per case Rs. Rs. Case Rs. case Rs. 2000 per month 2.5 3.2 5.7 14.73 0.17 1 30 45.90 If 2000 new cases are created everyday, Rs. 91,790.00/- is required to process them i.e. Rs. 19,293.33 lesser. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 24. Comparison of Costs Cost Reduction Initiative Process Re-engineering After one Difference Intial month saved per day Average cost to slove per case 55.54 45.90 9.65 Number of cases created per day 2000.00 1000.00 1000.00 Total Cost per day 111083.33 45895.00 65188.33 Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 25. Cost Reduction Initiative Process Re-engineering Thus due to Cost reduction initiatives & the process reengineering the telecom firm started saving on an average Rs.65,188.33/- per day on the cost of operations of Duplicate bill dispatch unit. Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005
  • 26. Cost Reduction Initiative Process Re-engineering I thank one and all who have provided me with the opportunity to handle this responsibility and the knowledge & support to prepare this Presentation. Please feel free to forward your valuable feedback, comments, queries and suggestions related to this presentation at mumbai_man1977@yahoo.com Thank you, Warm regards, Manohar M. M. Iyer Prepared By: Manohar M. M. Iyer VAS2010XMBA15P005