SlideShare a Scribd company logo
1 of 31
Overview of HALT and HASS: A
Paradigm Shift in Reliability Testing
Kirk Gray, Principal Consultant
Accelerated Reliability Solutions, L.L.C.
Email: kirk@acceleratedreliabilitysolutions.com
Phone: 512-554-3111
Central Texas Electronics Association
Electronics Design, Manufacturing & Test Symposium
2
NTSB chairman Deborah Hersman
“The design and certification assessment and the assumptions
that were made were not born out by what we saw,” …speaking
about the battery fires in Boston and Japan. “We had two events
in two weeks on two separate aircraft. The fleet has less than
100,000 hours and [Boeing] did not expect in their assessment to
see a smoke event in but less than 1 in every 10,000,000 hours.”
From NTSB
Website
From NTSB
Website
3
The U.S. Food and Drug Administration today
issued a proposed order aimed at helping
manufacturers improve the quality and reliability
of automated external defibrillators
FDA has received approximately 45,000 adverse
event reports between 2005 and 2012 associated
with the failure of these devices
4
Electronics Reliability Prediction
Fundamental mismatch of time scales
5
Wear out IS NOT a significant cause of un-reliability for
vast majority of (non-mechanical) electronics
assemblies
Hazard rate
Time
7 to 30 years?
Technology
Obsolescence
Wear out
Use period 5-7 years
The Life Cycle Bathtub Curve
Costs and Reliability Development
6
Most of the costs of unreliability occur in the first
several months or years
Hazard rate
Time
7 to 15 years?
Technology
Obsolescence
$$$$$
Warranty Returns
Perception of poor quality
Lost future sales!
Prediction-Modeling
of wear out
There is a Drain in the Bathtub Curve
7
$$$
$$$ $???
(ex. Power
generation systems)
Basis for HALT
8
A chain is only as strong as its weakest
link.
Fundamental Basis for HALT
9
Fastest way to find a weak link is find the
strength and stress limit…
Pull until it breaks
HALT
10
 HALT – Highly Accelerated Life Test
 Controlled Stepped Stress test to empirical
operational and sometimes destruct limits
 A methodology and significant reliability
paradigm shift – not a type of stress or type of
chamber
 A discovery process, - a Stimulation not a
Simulation process
The Base HALT process
Continue until operating & destruct limits
of UUT are found or until test equipment
limits are reached.
Level of Applied Stress Stimuli
(vibration or thermal)
Time (hour:minute)
Step A
Step B
Step C
Step D
0:00 0:10 0:20 0:30
Thermal Steps: typically +10ºC and -10ºC
Vibration steps: typically 5-10 Grms
cold
11
The Base HALT process
Continue until operating & destruct limits
of UUT are found or until test equipment
limits are reached.
Level of Applied Stress Stimuli
(vibration or thermal)
Time (hour:minute)
Step A
Step B
Step C
Step D
0:00 0:10 0:20 0:30
Thermal Steps: typically +10ºC and -10ºC
Vibration steps: typically 5-10 Grms
Heat
12
The Base HALT process
Continue until operating & destruct limits
of UUT are found or until test equipment
limits are reached.
Level of Applied Stress Stimuli
(vibration or thermal)
Time (hour:minute)
Step A
Step B
Step C
Step D
0:00 0:10 0:20 0:30
Thermal Steps: typically +10ºC and -10ºC
Vibration steps: typically 5-10 Grms
vibration
13
After finding limits with each single stress, try thermal
cycling, combinations of stress
Outputs of HALT
14
1) List of potential failure mechanisms, weaknesses
and the relevance to field failures.
2) Opportunity to increase reliability “tolerance” at
lowest costs when done early.
3) Safe limits and stress boundaries to create a cost
effective HASS processes.
HALT IS
15
 Deterministic- find weak links by stressing to inherent limits
 Based on fundamental limits (strength) of standard electronics
and - not end-use environmental conditions
 Done while products are powered and functionally monitored
during stress application
 Not a quantifiable “life” test - no stress test for systems can
accelerate all fatigue or chemical degradation mechanisms at
equivalent field rates
Common Responses to HALT Discoveries
16
 “Of course it failed, you took it above specifications”
 “It will never see that stress level in use”
 “It wasn’t designed for that vibration level”
 “If you wanted it to operate in those conditions we
would have designed it for those conditions”
Why many companies claiming to do “HALT” only do
the first part – find limits but do nothing to improve
them
HALT/HASS
IS NOT to develop products to survive extreme
conditions or environments
17
HALT vs. HASS Stress Levels
18
Stress Level
(example temperature)
UpperDesignSpec
UpperOperatingLimit
UpperStrengthLimit
LowerDesignSpec
LowerOperatingLimit
LowerStrengthLimit(rare)
HALT
HASS
TypicalUse
Level of Applied
Stress Stimuli
Time (hour:minute)
Upper operation
thermal limit
Lower
Operation
thermal Limit
0:00 0:10 0:20 0:30
Vibration level
vib
temperature
Temperature level
• Rapid thermal cycling (up to 60ºC/minute) – two to five thermal cycles
• Combined with multi-axis vibration – vary intensity during application
• Other stresses (power cycling, voltage margining, frequency margining)
HASS and HASA Process Parameters
19
Vibration level
UDL
The Stress Strength Model
20
In assemblies and structures there is a load
Load = cumulative life-cycle fatigue (aging) from normal use
Strength = the material fatigue life of electronic materials
As Long as Load < Strength no failures occur
Stress/Strength
Load Strength
# of field units
The Stress Strength Model
21
 For multiple units - results distribution around the
nominal values
Variations in end-use stresses for the most part are uncontrolled
Variations in assembly strength
Also applies to thermal and electrical stress/strength
Stress Strength
Load= cumulative
fatigue from use
Strength= assembly
fatigue strength
# of field units
High
Fatigue
Low
Fatigue Low
Strength
High
strength
Stress/Strength Diagram and Failures
22
If Stress < Strength, no failures occur
 As fatigue damage (aging) accumulates, the mean of
the strength shifts left
 Field failures occur when the two distributions overlap -
the weakest units are subjected to the highest life cycle
stresses
Stress Strength
cumulative
fatigue
damage
# of units
Strength
Low
Fatigue
High
Fatigue
High
strength
Low
Strength
Stress/Strength Diagram and Failures
23
If Stress < Strength, no failures occur
 As fatigue damage (aging) accumulates, the mean of
the strength shifts left
 Field failures occur when the two distributions overlap -
the weakest units are subjected to the highest life cycle
stresses
Stress Strength
cumulative
fatigue
damage
# of units
Field
Failures Strength
Low
Fatigue
High
Fatigue
Develop Tolerance of Variations
24
New Path to Optimal Reliability:
 Find the functional margins by testing to absolute operational limits
(thermal OTP defeated)
 Improve margins by finding the limiting component(s) and determining
if and how the margin can be improved
 Small changes can result in large margin gains
Stress Strength
#offieldunits
Greatest tolerance for
Manufacturing variationMaximize Functional margin
=
Thermal Stress to Skew Parametrics
25
 Marginal designs may not be observable until a
sufficient number of units are in the field
 The field is a costly place to find these marginal
conditions
Parametric
timing value
Parametric timing
value
#units
#units
100 100,000
Limited samples During development Mass Production variation
Parameter
Specification
Lower op
limit
Upper op
limit
Lower op
limit
Upper op
limit
Parameter
Specification
Marginal
operation
regions
1,000
Timing Skewing from Thermal Stress
26
Applying thermal stress stimulates a timing shift
Parametric
timing value
units
100
Parameter
Specification
Lower op
limit
Upper op
limit
Cold
• Thermal Step Stress and cycling provides a much
higher probability of detecting low incidence rate issues
• Cold speeds up signal propagation
Timing Skewing from Thermal Stress
27
Applying thermal stress stimulates a timing shift
Parametric
timing value
units
100
Parameter
Specification
Lower op
limit
Upper op
limit
HOT
• Thermal Step Stress and cycling provides a much
higher probability of detecting low incidence rate issues
• Heat slows down signal propagation
Power supply HALT and HASS Success
28
A worldwide leader in the development and
marketing of power conversion and control
system solutions was looking for methods to
reduce warranty returns.
The Company makes power supplies and
subsystems used in Capital Equipment for thin film
applications
Company’s First HALT and HASS Results
29
Results after HALT To HASS on the a shipping power
supply unit (6KW) DC production
 Manufacturing testing for reliability cycle time was
reduced from 4 days of “burn-in” to a HASS
process lasting 40 minutes per 2 units.
 Warranty returns were reduced 90% - from 5.0% to
0.5% - within months after introduction of design
change and HASS
21st Century path to optimizing
electronics reliability
30
 Design using good design practices and lessons learned
 Test to empirical operational limits and sometimes
destruct
 Determine root causes of limits
 Understand the physics of failure or limit
 Remove or improve weak links – to make robust products
 Apply combined safe stresses to make shortest
screening (HASS/HASA) processes
 Improve screens - Find best discriminators to observe
failures in manufacturing capability or process control
31
Relevant Quote
“A new scientific truth does not triumph by
convincing its opponents and making
them see the light, but rather because its
opponents eventually die, and a new
generation grows up that is familiar with
it”
-Max Planck, Scientific Autobiography

More Related Content

Similar to CTEA Test Symposium Presentation: Overview of HALT and HASS: A Major Paradigm Shift

Applied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M TurnerApplied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M TurnerMark Turner CRP
 
What is HALT?
What is HALT?What is HALT?
What is HALT?cjfinch9
 
Chakresh Tiwari Philips report
Chakresh Tiwari Philips reportChakresh Tiwari Philips report
Chakresh Tiwari Philips reportpranav kapoor
 
High Performance SSD Memory Application with Compressible TIM- Based On Phase...
High Performance SSD Memory Application with Compressible TIM- Based On Phase...High Performance SSD Memory Application with Compressible TIM- Based On Phase...
High Performance SSD Memory Application with Compressible TIM- Based On Phase...Honeywell Electronic Materials
 
PACCAR Investigation of Glass Fiber Reinforced Nylon 6/6 for Automotive Appli...
PACCAR Investigation of Glass Fiber Reinforced Nylon 6/6 for Automotive Appli...PACCAR Investigation of Glass Fiber Reinforced Nylon 6/6 for Automotive Appli...
PACCAR Investigation of Glass Fiber Reinforced Nylon 6/6 for Automotive Appli...Andrew Hollcraft
 
2017 Accelerated Testing: ALT, HALT and MEOST
2017   Accelerated Testing: ALT, HALT and MEOST2017   Accelerated Testing: ALT, HALT and MEOST
2017 Accelerated Testing: ALT, HALT and MEOSTJan Eite Bullema
 
Memcon Model 933 a-life-cycle-test-system
Memcon Model 933 a-life-cycle-test-systemMemcon Model 933 a-life-cycle-test-system
Memcon Model 933 a-life-cycle-test-systemPhil Heft
 
912pressurerelief abb
912pressurerelief abb912pressurerelief abb
912pressurerelief abbHamdan Yusoff
 
DOE Applications in Process Chemistry Presentation
DOE Applications in Process Chemistry PresentationDOE Applications in Process Chemistry Presentation
DOE Applications in Process Chemistry Presentationsaweissman
 
Heatron parallel prototyping white paper
Heatron parallel prototyping white paperHeatron parallel prototyping white paper
Heatron parallel prototyping white paperKathleen Wolfe
 
Isa saint-louis-exceptional-opportunities-short-course-day-1
Isa saint-louis-exceptional-opportunities-short-course-day-1Isa saint-louis-exceptional-opportunities-short-course-day-1
Isa saint-louis-exceptional-opportunities-short-course-day-1Jim Cahill
 
Early detection of defects and energy cost reduction through combined burn in...
Early detection of defects and energy cost reduction through combined burn in...Early detection of defects and energy cost reduction through combined burn in...
Early detection of defects and energy cost reduction through combined burn in...Alexander Decker
 

Similar to CTEA Test Symposium Presentation: Overview of HALT and HASS: A Major Paradigm Shift (20)

Applied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M TurnerApplied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M Turner
 
2007 Introduction MEOST
2007 Introduction MEOST2007 Introduction MEOST
2007 Introduction MEOST
 
What is HALT?
What is HALT?What is HALT?
What is HALT?
 
Chakresh Tiwari Philips report
Chakresh Tiwari Philips reportChakresh Tiwari Philips report
Chakresh Tiwari Philips report
 
High Performance SSD Memory Application with Compressible TIM- Based On Phase...
High Performance SSD Memory Application with Compressible TIM- Based On Phase...High Performance SSD Memory Application with Compressible TIM- Based On Phase...
High Performance SSD Memory Application with Compressible TIM- Based On Phase...
 
PACCAR Investigation of Glass Fiber Reinforced Nylon 6/6 for Automotive Appli...
PACCAR Investigation of Glass Fiber Reinforced Nylon 6/6 for Automotive Appli...PACCAR Investigation of Glass Fiber Reinforced Nylon 6/6 for Automotive Appli...
PACCAR Investigation of Glass Fiber Reinforced Nylon 6/6 for Automotive Appli...
 
shock theory ppt.pptx
shock theory ppt.pptxshock theory ppt.pptx
shock theory ppt.pptx
 
Article lior yosef
Article  lior yosefArticle  lior yosef
Article lior yosef
 
2017 Accelerated Testing: ALT, HALT and MEOST
2017   Accelerated Testing: ALT, HALT and MEOST2017   Accelerated Testing: ALT, HALT and MEOST
2017 Accelerated Testing: ALT, HALT and MEOST
 
Reliability Testing
Reliability TestingReliability Testing
Reliability Testing
 
Memcon Model 933 a-life-cycle-test-system
Memcon Model 933 a-life-cycle-test-systemMemcon Model 933 a-life-cycle-test-system
Memcon Model 933 a-life-cycle-test-system
 
912pressurerelief abb
912pressurerelief abb912pressurerelief abb
912pressurerelief abb
 
LCsimulator
LCsimulatorLCsimulator
LCsimulator
 
DOE Applications in Process Chemistry Presentation
DOE Applications in Process Chemistry PresentationDOE Applications in Process Chemistry Presentation
DOE Applications in Process Chemistry Presentation
 
Heatron parallel prototyping white paper
Heatron parallel prototyping white paperHeatron parallel prototyping white paper
Heatron parallel prototyping white paper
 
Mtbf vicor
Mtbf vicorMtbf vicor
Mtbf vicor
 
Highly accelerated stress screening
Highly accelerated stress screeningHighly accelerated stress screening
Highly accelerated stress screening
 
Isa saint-louis-exceptional-opportunities-short-course-day-1
Isa saint-louis-exceptional-opportunities-short-course-day-1Isa saint-louis-exceptional-opportunities-short-course-day-1
Isa saint-louis-exceptional-opportunities-short-course-day-1
 
Proa presentation
Proa presentationProa presentation
Proa presentation
 
Early detection of defects and energy cost reduction through combined burn in...
Early detection of defects and energy cost reduction through combined burn in...Early detection of defects and energy cost reduction through combined burn in...
Early detection of defects and energy cost reduction through combined burn in...
 

Recently uploaded

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Zilliz
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 

Recently uploaded (20)

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 

CTEA Test Symposium Presentation: Overview of HALT and HASS: A Major Paradigm Shift

  • 1. Overview of HALT and HASS: A Paradigm Shift in Reliability Testing Kirk Gray, Principal Consultant Accelerated Reliability Solutions, L.L.C. Email: kirk@acceleratedreliabilitysolutions.com Phone: 512-554-3111 Central Texas Electronics Association Electronics Design, Manufacturing & Test Symposium
  • 2. 2 NTSB chairman Deborah Hersman “The design and certification assessment and the assumptions that were made were not born out by what we saw,” …speaking about the battery fires in Boston and Japan. “We had two events in two weeks on two separate aircraft. The fleet has less than 100,000 hours and [Boeing] did not expect in their assessment to see a smoke event in but less than 1 in every 10,000,000 hours.” From NTSB Website From NTSB Website
  • 3. 3 The U.S. Food and Drug Administration today issued a proposed order aimed at helping manufacturers improve the quality and reliability of automated external defibrillators FDA has received approximately 45,000 adverse event reports between 2005 and 2012 associated with the failure of these devices
  • 5. Fundamental mismatch of time scales 5 Wear out IS NOT a significant cause of un-reliability for vast majority of (non-mechanical) electronics assemblies Hazard rate Time 7 to 30 years? Technology Obsolescence Wear out Use period 5-7 years The Life Cycle Bathtub Curve
  • 6. Costs and Reliability Development 6 Most of the costs of unreliability occur in the first several months or years Hazard rate Time 7 to 15 years? Technology Obsolescence $$$$$ Warranty Returns Perception of poor quality Lost future sales! Prediction-Modeling of wear out
  • 7. There is a Drain in the Bathtub Curve 7 $$$ $$$ $??? (ex. Power generation systems)
  • 8. Basis for HALT 8 A chain is only as strong as its weakest link.
  • 9. Fundamental Basis for HALT 9 Fastest way to find a weak link is find the strength and stress limit… Pull until it breaks
  • 10. HALT 10  HALT – Highly Accelerated Life Test  Controlled Stepped Stress test to empirical operational and sometimes destruct limits  A methodology and significant reliability paradigm shift – not a type of stress or type of chamber  A discovery process, - a Stimulation not a Simulation process
  • 11. The Base HALT process Continue until operating & destruct limits of UUT are found or until test equipment limits are reached. Level of Applied Stress Stimuli (vibration or thermal) Time (hour:minute) Step A Step B Step C Step D 0:00 0:10 0:20 0:30 Thermal Steps: typically +10ºC and -10ºC Vibration steps: typically 5-10 Grms cold 11
  • 12. The Base HALT process Continue until operating & destruct limits of UUT are found or until test equipment limits are reached. Level of Applied Stress Stimuli (vibration or thermal) Time (hour:minute) Step A Step B Step C Step D 0:00 0:10 0:20 0:30 Thermal Steps: typically +10ºC and -10ºC Vibration steps: typically 5-10 Grms Heat 12
  • 13. The Base HALT process Continue until operating & destruct limits of UUT are found or until test equipment limits are reached. Level of Applied Stress Stimuli (vibration or thermal) Time (hour:minute) Step A Step B Step C Step D 0:00 0:10 0:20 0:30 Thermal Steps: typically +10ºC and -10ºC Vibration steps: typically 5-10 Grms vibration 13 After finding limits with each single stress, try thermal cycling, combinations of stress
  • 14. Outputs of HALT 14 1) List of potential failure mechanisms, weaknesses and the relevance to field failures. 2) Opportunity to increase reliability “tolerance” at lowest costs when done early. 3) Safe limits and stress boundaries to create a cost effective HASS processes.
  • 15. HALT IS 15  Deterministic- find weak links by stressing to inherent limits  Based on fundamental limits (strength) of standard electronics and - not end-use environmental conditions  Done while products are powered and functionally monitored during stress application  Not a quantifiable “life” test - no stress test for systems can accelerate all fatigue or chemical degradation mechanisms at equivalent field rates
  • 16. Common Responses to HALT Discoveries 16  “Of course it failed, you took it above specifications”  “It will never see that stress level in use”  “It wasn’t designed for that vibration level”  “If you wanted it to operate in those conditions we would have designed it for those conditions” Why many companies claiming to do “HALT” only do the first part – find limits but do nothing to improve them
  • 17. HALT/HASS IS NOT to develop products to survive extreme conditions or environments 17
  • 18. HALT vs. HASS Stress Levels 18 Stress Level (example temperature) UpperDesignSpec UpperOperatingLimit UpperStrengthLimit LowerDesignSpec LowerOperatingLimit LowerStrengthLimit(rare) HALT HASS TypicalUse
  • 19. Level of Applied Stress Stimuli Time (hour:minute) Upper operation thermal limit Lower Operation thermal Limit 0:00 0:10 0:20 0:30 Vibration level vib temperature Temperature level • Rapid thermal cycling (up to 60ºC/minute) – two to five thermal cycles • Combined with multi-axis vibration – vary intensity during application • Other stresses (power cycling, voltage margining, frequency margining) HASS and HASA Process Parameters 19 Vibration level UDL
  • 20. The Stress Strength Model 20 In assemblies and structures there is a load Load = cumulative life-cycle fatigue (aging) from normal use Strength = the material fatigue life of electronic materials As Long as Load < Strength no failures occur Stress/Strength Load Strength # of field units
  • 21. The Stress Strength Model 21  For multiple units - results distribution around the nominal values Variations in end-use stresses for the most part are uncontrolled Variations in assembly strength Also applies to thermal and electrical stress/strength Stress Strength Load= cumulative fatigue from use Strength= assembly fatigue strength # of field units High Fatigue Low Fatigue Low Strength High strength
  • 22. Stress/Strength Diagram and Failures 22 If Stress < Strength, no failures occur  As fatigue damage (aging) accumulates, the mean of the strength shifts left  Field failures occur when the two distributions overlap - the weakest units are subjected to the highest life cycle stresses Stress Strength cumulative fatigue damage # of units Strength Low Fatigue High Fatigue High strength Low Strength
  • 23. Stress/Strength Diagram and Failures 23 If Stress < Strength, no failures occur  As fatigue damage (aging) accumulates, the mean of the strength shifts left  Field failures occur when the two distributions overlap - the weakest units are subjected to the highest life cycle stresses Stress Strength cumulative fatigue damage # of units Field Failures Strength Low Fatigue High Fatigue
  • 24. Develop Tolerance of Variations 24 New Path to Optimal Reliability:  Find the functional margins by testing to absolute operational limits (thermal OTP defeated)  Improve margins by finding the limiting component(s) and determining if and how the margin can be improved  Small changes can result in large margin gains Stress Strength #offieldunits Greatest tolerance for Manufacturing variationMaximize Functional margin =
  • 25. Thermal Stress to Skew Parametrics 25  Marginal designs may not be observable until a sufficient number of units are in the field  The field is a costly place to find these marginal conditions Parametric timing value Parametric timing value #units #units 100 100,000 Limited samples During development Mass Production variation Parameter Specification Lower op limit Upper op limit Lower op limit Upper op limit Parameter Specification Marginal operation regions 1,000
  • 26. Timing Skewing from Thermal Stress 26 Applying thermal stress stimulates a timing shift Parametric timing value units 100 Parameter Specification Lower op limit Upper op limit Cold • Thermal Step Stress and cycling provides a much higher probability of detecting low incidence rate issues • Cold speeds up signal propagation
  • 27. Timing Skewing from Thermal Stress 27 Applying thermal stress stimulates a timing shift Parametric timing value units 100 Parameter Specification Lower op limit Upper op limit HOT • Thermal Step Stress and cycling provides a much higher probability of detecting low incidence rate issues • Heat slows down signal propagation
  • 28. Power supply HALT and HASS Success 28 A worldwide leader in the development and marketing of power conversion and control system solutions was looking for methods to reduce warranty returns. The Company makes power supplies and subsystems used in Capital Equipment for thin film applications
  • 29. Company’s First HALT and HASS Results 29 Results after HALT To HASS on the a shipping power supply unit (6KW) DC production  Manufacturing testing for reliability cycle time was reduced from 4 days of “burn-in” to a HASS process lasting 40 minutes per 2 units.  Warranty returns were reduced 90% - from 5.0% to 0.5% - within months after introduction of design change and HASS
  • 30. 21st Century path to optimizing electronics reliability 30  Design using good design practices and lessons learned  Test to empirical operational limits and sometimes destruct  Determine root causes of limits  Understand the physics of failure or limit  Remove or improve weak links – to make robust products  Apply combined safe stresses to make shortest screening (HASS/HASA) processes  Improve screens - Find best discriminators to observe failures in manufacturing capability or process control
  • 31. 31 Relevant Quote “A new scientific truth does not triumph by convincing its opponents and making them see the light, but rather because its opponents eventually die, and a new generation grows up that is familiar with it” -Max Planck, Scientific Autobiography

Editor's Notes

  1. Modeling can be useful and an important tool for LIMITED applications – such a Finite Element Analysis – especially in mechanical wear, hinges, bearings, Single BGA – but many if not most have more than one stress driverComponent failure doesn’t always result in systems failure ….Mention the 26 capacitors in a system that was defective but only 5 locations cause hard failures of the system…Variation of manufacturing quality, excursions, and errors or abuse are the cause of the vast majority of failures before technological obsolesence
  2. Modeling can be useful and an important tool for LIMITED applications – such a Finite Element Analysis – especially in mechanical wear, hinges, bearings, Single BGA – but many if not most have more than one stress driverComponent failure doesn’t always result in systems failure ….Mention the 26 capacitors in a system that was defective but only 5 locations cause hard failures of the system…Variation of manufacturing quality, excursions, and errors or abuse are the cause of the vast majority of failures before technological obsolesence
  3. Old AdageChain is only as strong as weakest LengthElectronics systems are only as robust as the weakest componentLike a chain – most electronics systems have significant strength - won’t know until you find the limit – In thermal its mostly OPERATIONAL LIMITS ONLY – no need to go beyond operation - dangerous If limits are found, you can use the “stress Capability” as a benchmark of materials and system strength to test underNot testing beyond Spec – may not find “weak link” before it’s a field reliability problem
  4. Old AdageChain is only as strong as weakest LengthElectronics systems are only as robust as the weakest componentLike a chain – most electronics systems have significant strength - won’t know until you find the limit – In thermal its mostly OPERATIONAL LIMITS ONLY – no need to go beyond operation - dangerous If limits are found, you can use the “stress Capability” as a benchmark of materials and system strength to test underNot testing beyond Spec – may not find “weak link” before it’s a field reliability problem
  5. Since we know that thermal stimulation can skew the timing,We also know that there will be SOME variation in the timing parametrics of critical components in quantity production – how much will it vary in the future or if a second source of that component is Substituted during the systems production life
  6. The challenge in development is that the component and assembly variations will occur throughout the production life of the productWe probably do not know the how wide these variations might be and how they will affect our producthopefully occur in a small percentage of the population – 1 to 3%The probability of seeing these failures with 10 – 20 samples is very LOW We can help see these potential reliability risks when we use thermal stress to skew the silicon
  7. The challenge in development is that the component and assembly variations will occur throughout the production life of the productWe probably do not know the how wide these variations might be and how they will affect our producthopefully occur in a small percentage of the population – 1 to 3%The probability of seeing these failures with 10 – 20 samples is very LOW We can help see these potential reliability risks when we use thermal stress to skew the silicon