Zuellig Pharma
Corporation.
Distribution system increases customer service levels.
“The system features the Dexion RDS sortation
                                                                                                      control module which utilises information
                                                                                                 contained in the carton identification barcode.”




Challenge solved.                                designated, route-specific, despatch lines.
Zuellig Pharma Corporation constructed a         The system features the Dexion RDS (Real
20,000 square metre Distribution Centre          Time Distribution System) sortation control
to handle approximately 2,150 product            module which utilises information contained
lines, 12,000 order line items per day and       in the carton identification barcode.
over 40,000 orders a month.
The company wanted to reduce delivery
time for non-critical orders from five days to
within two days with “Life-saving” products
despatched within one to two hours.
The DC has a 22,000 pallet capacity.
There are four specific storage areas within
the Distribution Centre with the pallet bulk
store area featuring 8,000 square meters
of Dexion high rise pallet racking. The high
volume, small or loose order picking area
is equipped with carton live storage shelving
and serviced by a conveyor system for
order processing and replenishment.

Products and services used.
Dexion designed and installed an automated
9-lane, sortation conveyor system, which
takes completed order cartons from the
specialised picking zones to barcode




Dexion Case Study – Zuellig Pharma Corporation

More Related Content

Viewers also liked

Logistics & Supply Chain Issues in Pharmaceutical Company
Logistics & Supply Chain Issues in Pharmaceutical Company  Logistics & Supply Chain Issues in Pharmaceutical Company
Logistics & Supply Chain Issues in Pharmaceutical Company Manjunath Shivashankar
 
Supply chain issues in Pharma industry
Supply chain issues in Pharma industrySupply chain issues in Pharma industry
Supply chain issues in Pharma industryJaimeen Rana
 
Drug Discovery & Development Overview
Drug Discovery & Development OverviewDrug Discovery & Development Overview
Drug Discovery & Development OverviewMikeSumner
 
Case study o & m
Case study o & mCase study o & m
Case study o & mAnil Shrestha
 
MBA case study presentation template
MBA case study presentation templateMBA case study presentation template
MBA case study presentation templategorvis
 
Case study of Uttarakhand Flood Disaster 2013 - by Narendra Yadav
Case study of Uttarakhand Flood Disaster 2013 - by Narendra YadavCase study of Uttarakhand Flood Disaster 2013 - by Narendra Yadav
Case study of Uttarakhand Flood Disaster 2013 - by Narendra YadavNarendra Yadav
 
Drug Development Life Cycle
Drug Development Life CycleDrug Development Life Cycle
Drug Development Life CycleRajendra Sadare
 
Drug discovery and development
Drug discovery and developmentDrug discovery and development
Drug discovery and developmentrahul_pharma
 

Viewers also liked (10)

Logistics & Supply Chain Issues in Pharmaceutical Company
Logistics & Supply Chain Issues in Pharmaceutical Company  Logistics & Supply Chain Issues in Pharmaceutical Company
Logistics & Supply Chain Issues in Pharmaceutical Company
 
Supply chain issues in Pharma industry
Supply chain issues in Pharma industrySupply chain issues in Pharma industry
Supply chain issues in Pharma industry
 
Case study Research
Case study Research Case study Research
Case study Research
 
Drug Discovery & Development Overview
Drug Discovery & Development OverviewDrug Discovery & Development Overview
Drug Discovery & Development Overview
 
Case study o & m
Case study o & mCase study o & m
Case study o & m
 
Case Study Method
Case Study MethodCase Study Method
Case Study Method
 
MBA case study presentation template
MBA case study presentation templateMBA case study presentation template
MBA case study presentation template
 
Case study of Uttarakhand Flood Disaster 2013 - by Narendra Yadav
Case study of Uttarakhand Flood Disaster 2013 - by Narendra YadavCase study of Uttarakhand Flood Disaster 2013 - by Narendra Yadav
Case study of Uttarakhand Flood Disaster 2013 - by Narendra Yadav
 
Drug Development Life Cycle
Drug Development Life CycleDrug Development Life Cycle
Drug Development Life Cycle
 
Drug discovery and development
Drug discovery and developmentDrug discovery and development
Drug discovery and development
 

More from JoeyDorrington

Western sydney records case study
Western sydney records case studyWestern sydney records case study
Western sydney records case studyJoeyDorrington
 
Toll logistics & footlocker case study
Toll logistics & footlocker case studyToll logistics & footlocker case study
Toll logistics & footlocker case studyJoeyDorrington
 
The warehouse case study
The warehouse case studyThe warehouse case study
The warehouse case studyJoeyDorrington
 
Supercheap auto case study
Supercheap auto case studySupercheap auto case study
Supercheap auto case studyJoeyDorrington
 
St microelectronics case study
St microelectronics case studySt microelectronics case study
St microelectronics case studyJoeyDorrington
 
Retail adventures case study
Retail adventures case studyRetail adventures case study
Retail adventures case studyJoeyDorrington
 
Quicksilver case study
Quicksilver case studyQuicksilver case study
Quicksilver case studyJoeyDorrington
 
New zealand case study
New zealand case studyNew zealand case study
New zealand case studyJoeyDorrington
 
National library case study
National library case studyNational library case study
National library case studyJoeyDorrington
 
Nab docklands case study
Nab docklands case studyNab docklands case study
Nab docklands case studyJoeyDorrington
 

More from JoeyDorrington (20)

Westpac case study
Westpac case studyWestpac case study
Westpac case study
 
Western sydney records case study
Western sydney records case studyWestern sydney records case study
Western sydney records case study
 
Universal case study
Universal case studyUniversal case study
Universal case study
 
Toyota case study
Toyota case studyToyota case study
Toyota case study
 
Toll logistics & footlocker case study
Toll logistics & footlocker case studyToll logistics & footlocker case study
Toll logistics & footlocker case study
 
Toll ipec case study
Toll ipec case studyToll ipec case study
Toll ipec case study
 
The warehouse case study
The warehouse case studyThe warehouse case study
The warehouse case study
 
Supercheap auto case study
Supercheap auto case studySupercheap auto case study
Supercheap auto case study
 
St microelectronics case study
St microelectronics case studySt microelectronics case study
St microelectronics case study
 
Stihl case study
Stihl case studyStihl case study
Stihl case study
 
Retail adventures case study
Retail adventures case studyRetail adventures case study
Retail adventures case study
 
Res med case study
Res med case studyRes med case study
Res med case study
 
Recall case study
Recall case studyRecall case study
Recall case study
 
Quicksilver case study
Quicksilver case studyQuicksilver case study
Quicksilver case study
 
Pearson case study
Pearson case studyPearson case study
Pearson case study
 
P&o case study
P&o case studyP&o case study
P&o case study
 
Nick scali case study
Nick scali case studyNick scali case study
Nick scali case study
 
New zealand case study
New zealand case studyNew zealand case study
New zealand case study
 
National library case study
National library case studyNational library case study
National library case study
 
Nab docklands case study
Nab docklands case studyNab docklands case study
Nab docklands case study
 

Zuelig pharma corporation case study

  • 1. Zuellig Pharma Corporation. Distribution system increases customer service levels.
  • 2. “The system features the Dexion RDS sortation control module which utilises information contained in the carton identification barcode.” Challenge solved. designated, route-specific, despatch lines. Zuellig Pharma Corporation constructed a The system features the Dexion RDS (Real 20,000 square metre Distribution Centre Time Distribution System) sortation control to handle approximately 2,150 product module which utilises information contained lines, 12,000 order line items per day and in the carton identification barcode. over 40,000 orders a month. The company wanted to reduce delivery time for non-critical orders from five days to within two days with “Life-saving” products despatched within one to two hours. The DC has a 22,000 pallet capacity. There are four specific storage areas within the Distribution Centre with the pallet bulk store area featuring 8,000 square meters of Dexion high rise pallet racking. The high volume, small or loose order picking area is equipped with carton live storage shelving and serviced by a conveyor system for order processing and replenishment. Products and services used. Dexion designed and installed an automated 9-lane, sortation conveyor system, which takes completed order cartons from the specialised picking zones to barcode Dexion Case Study – Zuellig Pharma Corporation