Date Time & Place        01.10.12, Couch Area 1 o’ clockWho attended             Jenny Strand, Becky Doyle, Emily DavisWho...
Upcoming SlideShare
Loading in...5
×

Meeting plan 3

94

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
94
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Meeting plan 3

  1. 1. Date Time & Place 01.10.12, Couch Area 1 o’ clockWho attended Jenny Strand, Becky Doyle, Emily DavisWho didn’t attend Mark Smith (was doing work in class)Topics to be discussed When is the next filming day Equipment Other work for teachers Free time When people have their part time jobs and cant filmSummary of what was Our next filming date is going to be the 02.10.12, and we have changed our location to suit every member of the group. Thesaid locations are Monton, The Three Sisters and Winton Park. These are all local for us and so much easier than going to Bolton. We booked equipment out till the 04.10.12 in case we need to film in our break on Thursday but we are hoping to get quite a lot of it done tomorrow. The only real problem we have encountered is finding a replacement actor to play George. The person we wanted to use isn’t allowed out of lesson time so we have had to improvise and Becky is going to play this character. With Becky being a girl and the character being male. We’ve had to discuss costume in detail and plan it out what she is going to wear. Another problem is when the whole group is free to film as two of us have part time jobs. We’ll make a separate document on this stating when were free and work around it.
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×