1. Date Time & Place 24.09.12 1pm Couch Area
Who attended Mark Smith, Emily Davis, Jenny Strand and Becky Doyle
Who didn’t attend Jenny was sent home ill after 10 minutes.
Topics to be discussed What day we are filming
Meeting times
Meeting places
Breaks and dinner
Discuss when all members of the group are free
Costume and props (actors need to remember their costume)
Actors
Summary of what was Our next possible filming day is Sunday 30th September. We will meet in the morning, possibly about 11am to 11.30am and will
said film into the late afternoon. Our meeting place will be Monton as it is accessible for all of us, and then we will get the bus to
Bolton to meet Mark there. Our plan is reshoot Scene 1 Shot 1 in Bolton and try a different area to see if we get a better effect
while filming. We also want to film Shot 2 and the rest of the Scene 1. It’s important to get as much done as possible as Bolton
is a 45 minute bus ride from where 3 members of the group live, and we have to think of how much transport is going to cost as
some of the group depend on EMA to fund transport which isn’t a lot.
We need to film enough shots for scene 1 to work with and make a really good sequence when it comes to post production. If
we are successful in doing this we want to start filming Scene 2.
We have also replaced one of our actors to a more reliable person, and will strongly add potential to our film.