Strong. Innovative. Growing.
Forward-Looking Statements
This presentation contains forward-looking statements within the meaning of the federal securities laws. Although these statements
reflect the current views, assumptions and expectations of our management, the matters addressed herein involve certain risks and
uncertainties that could cause actual activities, performance, outcomes and results to differ materially than those indicated. Such
forward-looking statements include, but are not limited to, statements about future financial and operating results, guidance,
projected or forecasted financial results, objectives, project timing, expectations and intentions and other statements that are not
historical facts. Factors that could result in such differences or otherwise materially affect our financial condition, results of
operations and cash flows include, without limitation, (a) the dependence on Devon for a substantial portion of the natural gas that
we gather, process and transport, (b) our lack of asset diversification, (c) our vulnerability to having a significant portion of our
operations concentrated in the Barnett Shale, (d) the amount of hydrocarbons transported in our gathering and transmission lines
and the level of our processing and fractionation operations, (e) fluctuations in oil, natural gas and NGL prices, (f) construction risks
in our major development projects, (g) our ability to consummate future acquisitions, successfully integrate any acquired businesses,
realize any cost savings and other synergies from any acquisition, (h) changes in the availability and cost of capital, (i) competitive
conditions in our industry and their impact on our ability to connect hydrocarbon supplies to our assets, (j) operating hazards, natural
disasters, weather-related delays, casualty losses and other matters beyond our control, (k) a failure in our computing systems or a
cyber-attack on our systems, and (l) the effects of existing and future laws and governmental regulations, including environmental
and climate change requirements and other uncertainties. These and other applicable uncertainties, factors and risks are described
more fully in EnLink Midstream Partners, LP’s and EnLink Midstream, LLC’s filings with the Securities and Exchange Commission,
including EnLink Midstream Partners, LP’s and EnLink Midstream, LLC’s Annual Reports on Form 10-K, Quarterly Reports on
Form 10-Q and Current Reports on Form 8-K. Neither EnLink Midstream Partners, LP nor EnLink Midstream, LLC assumes any
obligation to update these forward-looking statements. The assumptions and estimates underlying the forecasted financial
information included in the guidance information in this press release are inherently uncertain and, though considered reasonable
by the EnLink Midstream management team as of the date of its preparation, are subject to a wide variety of significant business,
economic, and competitive risks and uncertainties that could cause actual results to differ materially from those contained in the
forecasted financial information. Accordingly, there can be no assurance that the forecasted results are indicative of EnLink
Midstream’s future performance or that actual results will not differ materially from those presented in the forecasted financial
information. Inclusion of the forecasted financial information in this press release should not be regarded as a representation by any
person that the results contained in the forecasted financial information will be achieved.
2
Non-GAAP Financial Information
This presentation contains non-generally accepted accounting principle financial measures that we refer to as adjusted
EBITDA, distributable cash flow, gross operating margin, growth capital expenditures, adjusted EBITDA of EnLink Midstream
Holdings (EMH) and maintenance capital expenditures. We define adjusted EBITDA as net income from continuing operations
plus interest expense, provision for income taxes, depreciation and amortization expense, impairment expense, stock-based
compensation, gain on noncash derivatives, transaction costs, distribution of equity investment and non-controlling interest
and income on equity investment. We define distributable cash flow as net cash provided by operating activities plus adjusted
EBITDA, net to EnLink Midstream Partners, LP less interest expense, litigation settlement adjustment, interest rate swap,
cash taxes and other, maintenance capital expenditures and Predecessor adjusted EBITDA. Gross operating margin is
defined as revenue minus the cost of purchased gas, NGL, condensate and crude oil. Growth capital expenditures are defined
as all construction-related direct labor and material costs, as well as indirect construction costs including general engineering
costs and the costs of funds used in construction. Adjusted EBITDA of EMH is defined as earnings plus depreciation,
provisions for income taxes and distribution of equity investment less income on equity investment.
The amounts included in the calculation of these measures are computed in accordance with generally accepted accounting
principles (GAAP) with the exception of maintenance capital expenditures. Maintenance capital expenditures are capital
expenditures made to replace partially or fully depreciated assets in order to maintain the existing operating capacity of the
assets and to extend their useful lives.
The Partnership and General Partner believe these measures are useful to investors because they may provide users of this
financial information with meaningful comparisons between current results and prior-reported results and a meaningful
measure of the Partnership’s and the General Partner's cash flow after it has satisfied the capital and related requirements
of its operations.
3
4
Our Strategy: Stability Plus Growth
A Stable Investment in the MLP Space
Stability of cash flows
 ~95% fee-based contracts
 ~50% of gross operating margin from long-term Devon contracts
Top tier midstream energy service for our customers
Leverage Devon Energy sponsorship for growth
 Expect significant growth from dropdowns
 Serve Devon E&P portfolio in its growth areas
Strong organic growth
 South Louisiana, West Texas and Ohio River Valley (ORV) expansion projects
Top tier balance sheet
 Investment grade credit rating at ENLK since inception
 Strong liquidity with a new $1.5 billion credit facility
Note: Adjusted EBITDA and gross operating margin are non-GAAP financial measures and are explained on page 3.
The Vehicle for Sustainable Growth:
Strategically Located and Complementary Assets
Gathering and Transportation
 ~8,800 miles of gathering and
transmission lines
 11 Bcf of natural gas storage capacity
Gas Processing
 13 plants with 3.4 Bcf/d of total
net inlet capacity
NGL Transportation,
Fractionation and Storage
 ~600 miles of liquids transport line
 7 fractionation facilities with
280,000 Bbl/d of total capacity
 3.2 MMBbl of underground NGL storage
Crude, Condensate and Brine Handling
 200 miles of crude oil pipeline
 Barge and rail terminals
 500,000 Bbl of above ground storage
 100 vehicle trucking fleet
 8 brine disposal wells
 6 condensate stabilization & gas
compression stations in service
5
EnLink Midstream Partners, LP
Master Limited Partnership
NYSE: ENLK
(BBB / Baa3)
EnLink Midstream, LLC
General Partner
NYSE: ENLC
Public
Unitholders
~70% ~30%
~1% GP
~18% LP
EnLink Midstream Holdings
(formerly Devon Midstream Holdings)
~44%
LP
~37%
LP
Devon Energy
Corp.
NYSE: DVN
(BBB+ / Baa1)
GP + 75% LP
The Vehicle for Sustainable Growth:
MLP Structure with a Premier Sponsor
6
Dist./Q Split Level
< $0.2500 2% / 98%
< $0.3125 15% / 85%
< $0.3750 25% / 75%
> $0.3750 50% / 50%
Current
Position
ENLC owns 100% of IDRs
~25%
LP
Note: The ownership percentages shown above are as of the date of this presentation.
Sustainable
Growth
Substantial
Scale &
Scope
Diverse,
Fee-Based
Cash Flow
Strong B/S
& Credit
Profile
7
 Investment grade balance sheet at ENLK (BBB, Baa3)
 Debt / EBITDA of ~3.3x
 Strong liquidity with new $1.5 billion credit facility
 ~ 95% fee-based margin
 Balanced cash flow (Devon ~50%)
 Projects focused on NGL/crude and rich gas processing
 Total consolidated enterprise value of ~$14 billion
 Projected 2015 Combined Adjusted EBITDA: ~$740 MM
 Geographically diverse assets with multi-commodity exposure
 Stable base cash flow supported by long-term contracts
 Organic growth opportunities through Devon’s upstream portfolio
 Expect significant growth from drop downs
Louisiana
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
The Vehicle for Sustainable Growth:
Well Positioned with a Strong Balance Sheet
8
EnLink Midstream Consolidated
2015
Guidance
Adjusted EBITDA $740 MM
% of Gross Operating Margin from fee-based contracts ~ 95%
EnLink Midstream Partners, LP (ENLK)
2015
Guidance
Adjusted EBITDA ~ $710 MM
Distributable Cash Flow ~ $570 MM
ENLK annual distributions per unit ~ $1.58
ENLK annual distribution growth rate from 2014 to 2015 ~ 7.5%
Announced acquisitions (not including drop downs) ~ $700 MM
Growth capital expenditures ~ $500 MM
Maintenance capital expenditures ~ $50 MM
EnLink Midstream, LLC (ENLC)
2015
Guidance
Cash Taxes ~ $20 MM
ENLC annual distributions per unit ~ $1.025
ENLC distribution growth from 2014 to 2015 ~18.5%
Note: Adjusted EBITDA, gross operating margin, distributable cash flow, growth capital expenditures and maintenance capital expenditures are non-GAAP financial
measures
2015 Guidance:
Stability Plus Growth
The Four Avenues for
Growth
9
10
Avenue 1:
Drop Downs
Organic Growth
Projects
The Four Avenues for Growth
Progress in Last Nine Months
Ohio River Valley: E2 drop down complete
EnLink Midstream Holdings (EMH): 25%
drop down complete
 Avenue 2:
Growing With
Devon
West Texas: Ajax Plant & Martin County Expansion
announced
 Avenue 3:
Organic Growth
Projects
Ohio River Valley: condensate pipeline & stabilization /
gas compression stations announced
Louisiana: Marathon JV & NGL pipeline announced
 Avenue 4:
Mergers &
Acquisitions
Louisiana: Gulf Coast natural gas assets acquired
West Texas: LPC crude logistics business acquired
West Texas: Coronado acquisition announced

~$1.1 Billion
~$200 MM+
~$300 MM+
~$935 MM
In the last nine months, EnLink announced $2.5 Billion of acquisitions and growth projects.
EnLink also completed construction on ~$1 billion of growth projects,
including the Cajun-Sibon and the Bearkat expansions. 10
Capital
Commitment
Avenue 1: Drop Downs
Devon Sponsorship Creates Drop Down Opportunities
11
2014 2015 2016 2017
Devon Sponsorship Provides Potential for ~$375 MM of Adjusted EBITDA from Drop Downs
Other Potential Devon Drop Downs *
E2 25% EMH **
Access Pipeline *
Victoria Express
Pipeline *
* Cautionary Note: The information regarding these potential drop downs is for illustrative purposes only. No agreements or understandings exist regarding the terms of these potential drop
downs, and Devon is not obligated to sell or contribute any of these assets to EnLink. The completion of any future drop down will be subject to a number of conditions. The capital cost
information on this slide is based on management’s current estimates and current market information and is subject to change.
** Based on 2015 Guidance and accounts for 25% of the total estimated adjusted EBITDA of EMH.
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained on page 3.
Drop Down Cost:
~$193 MM
Estimated Adjusted EBITDA:
~$20-25 MM
Estimated Capital Cost:
~$1.0 B
Estimated Adjusted EBITDA:
~$150 MM
Drop Down Cost for 25% Interest:
$925 MM
Estimated 2015 Adjusted EBITDA:
~$100 MM **
Estimated Capital Cost:
~$70 MM
Estimated Adjusted EBITDA:
~$12 MM

25%
EMH

Avenue 1: Drop Downs
E2 Drop Down in Ohio River Valley
12
New Assets
 Three facilities operating, two under construction
 When completed, five facilities will have total
capacity of ~580 MMcf/d and ~19,000 Bbl/d
Strategic Benefits
 Key customer: Antero Resources
 100% fee-based contracts with minimum volume
commitments
 Drop down from ENLC to ENLK completed in
October 2014
 Approximately $193 MM acquisition cost
 Estimated annual adjusted EBITDA contribution:
~$20-25 MM
E2 Stations
*
*
*
* Assets are in development as of the date of this presentation.
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained on page 3.
Avenue 1: Future Drop Downs
Devon’s Access & Victoria Express Pipelines
13
 Three ~180 mile pipelines from Sturgeon
terminal to Devon’s thermal acreage
 ~30 miles of dual pipeline from Sturgeon
Terminal to Edmonton
 Capacity net to Devon:
- Blended bitumen: 170,000 Bbl/d
 Devon ownership: 50%
- ~$1B invested to date
 ~56 mile crude oil pipeline from Eagle Ford
core to Port Victoria terminal
 ~300,000 Bbl of storage available
 Capacity:
- 50,000 Bbl/d start-up capacity (expandable)
 Devon ownership: 100%
- ~$70 MM invested to date
Access Pipeline Victoria Express Pipeline
14
Avenue 2: Growing With Devon
Martin County Expansion in West Texas
 Ajax: ~120 MMcf/d cryogenic processing plant
 Acreage dedication from Devon in Martin County
 Anchored by long-term, fee-based contract
 Expect to begin operations in 2016
Note: EnLink Midstream will own the Coronado assets upon the closing of the acquisition, but does not own them today.
Avenue 2: Growing With Devon
Significant Production Growth in Cana-Woodford
Devon Assets in the Cana-Woodford
 Devon Rigs in Cana
̶ End of 2014: 5 rigs
̶ Avg. in 2015: 8 rigs (including non-operated)
 Acreage: ~280,000 net acres
 Workover activity yielded excellent results
̶ Acid treatments performed on 200+ wells
̶ Avg. rates per well increased 1-2+ MMCFE/d
̶ Payback period <3 months
 Emerging opportunity in STACK oil window
̶ 35,000 net acres
 Significant undrilled well inventory
̶ Expected wells drilled in 2015: 95 total
̶ Expected wells in STACK oil window: 20
15
EnLink Assets in the Cana-Woodford
 Pipeline: 410 miles, 530 MMcf/d capacity
 Processing: one plant with 350 MMcf/d capacity
Avenue 3: Organic Growth Projects
Gulf Coast Market for Products & Services
is Strategic to Growth Plans
16Source: EIA/RBN Energy
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
Bcf/d
New Gas Pipelines to Gulf Coast
Source RBN Energy, January 2015
Avenue 3: Organic Growth Projects
Cajun-Sibon Expansion Complete
 258 miles of NGL pipeline from Mont Belvieu area to NGL fractionation assets in
south Louisiana (195 miles new, 63 miles re-purposed)
 140 MBbl/d south Louisiana fractionation expansion
 Phase I completed Q4 2013; Phase II completed in Q4 2014
 Expected run-rate adjusted EBITDA of ~$115 MM
17
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
18
New Assets in Development
 30-mile, 10” NGL pipeline from EnLink’s
Riverside fractionator to Marathon Petroleum’s
Garyville refinery
 Expected to be operational in first half of 2017
Strategic Benefits
 50/50 JV with Marathon Petroleum Corp.
 Marathon to support the project with 50% of
capital cost and long-term, fee-based
contracts for butane and natural gasoline
transportation, supply and optional storage
 EnLink to construct and operate the pipeline
 First bolt-on project to Cajun-Sibon expansion
Avenue 3: Organic Growth Projects
JV with Marathon to Build NGL Pipeline
in South LA
*
* Assets are in development as of the date of this presentation.
19
Avenue 3: Organic Growth Projects
Ohio River Valley Condensate Pipeline,
Stabilization & Compression System Expansion
New Assets In Development
 45-mile, 8” condensate pipeline with an expected
capacity of ~50,000 Bbl/d
 6 new condensate stabilization and natural gas
compression stations with combined capacities of
~41,500 Bbl/d and ~560 MMcf/d, respectively
 Once complete, EnLink’s assets in the
Utica/Marcellus will include:
 250 miles of pipeline
 11 natural gas compression and condensate
stabilization facilities with total capacity of ~1.2
Bcf/d and ~60,000 Bbl/d, respectively
 Over 110 trucks
 Eight brine disposal wells
 ~630,000 Bbl of above ground storage
Strategic Benefits
 Leverages and expands EnLink’s footprint of
midstream assets in the Utica/Marcellus
 Supported by long-term, fee-based contracts
 Deploying over $250 MM in capital; increases
EnLink’s investment in the ORV to over ~$700 MM
* Assets are in development as of the date of this presentation.
*
*
*
Avenue 4: Mergers & Acquisitions
Gulf Coast Natural Gas Assets
 Closed on ~$235 million acquisition from Chevron on November 1st
 Creates opportunities to optimize Louisiana assets and convert redundant natural gas
pipelines to other services
 ~1,400 miles of natural gas pipelines in three systems spanning from Port Arthur, TX to
the Mississippi River corridor
 ~11 Bcf of natural gas storage capacity in three south Louisiana caverns
 Ownership and management of title tracking services offered at Henry Hub
 Expected near-term acquisition multiple: ~10x adjusted EBITDA
20
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
Avenue 4: Mergers & Acquisitions
Coronado Midstream in Midland Basin
21
Note: EnLink Midstream will own the Coronado assets upon the closing of the acquisition, but does not own them today.
 Announced ~$600 million agreement to acquire Coronado Midstream Holdings LLC on Feb. 2, 2015
 Coronado’s assets include:
 ~175 MMcf/d of gas processing capacity
 ~270 miles of gas gathering pipelines with ~35,000 horsepower of compression
 Under construction: ~100 MMcf/d of processing capacity and gathering system expansions
 Underpinned by long-term contracts and production dedication from over 190,000 acres
 Key producers include Reliance Energy, Inc., Diamondback Energy, Inc. and RSP Permian, Inc.
 Expected long-term acquisition multiple: 7-8x adjusted EBITDA with $400-$600 of additional capital expenditures
Avenue 4: Mergers & Acquisitions
LPC Crude Oil Logistics Business
 Closed on acquisition of LPC Crude Oil Marketing, LLC
(“LPC”) on January 31, 2015 for ~$100 MM
 LPC’s assets include:
 13 pipeline and refinery injection stations,
 ~67 miles of crude gathering systems
 43 tractor trailers
 Extensive crude oil first purchasing operation
 Acquisition Multiple: ~8x run rate adjusted EBITDA
22
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
EnLink Midstream Today & Tomorrow
EnLink Midstream
Today
EnLink Midstream
Potential Future in 2017
23
West Texas Growth:
Bearkat, Ajax, Coronado
& LPC acquisitions
ORV Condensate
Pipeline and
Stabilizers
Complete
Drop
Downs
Access
Pipeline
Drop down
CompleteCANADIAN
OIL
SANDS
Midstream
Holdings
Drop Down
Complete
E2 Drop Down
Complete
South Louisiana
Growth: Cajun-Sibon,
Marathon JV, Gulf
Coast Acquisition
Victoria
Express
Drop Down
Complete
Growing
with Devon
Organic
Growth
M&A
Cana
Growth
24
Our Strategy: Stability Plus Growth
A Stable Investment in the MLP Space
Stability of cash flows
 ~95% fee-based contracts
 ~50% of gross operating margin from long-term Devon contracts
Top tier midstream energy service for our customers
Leverage Devon Energy sponsorship for growth
 Expect significant growth from dropdowns
 Serve Devon E&P portfolio in its growth areas
Strong organic growth
 South Louisiana, West Texas and Ohio River Valley (ORV) expansion projects
Top tier balance sheet
 Investment grade credit rating at ENLK since inception
 Strong liquidity with a new $1.5 billion credit facility
Note: Adjusted EBITDA and gross operating margin are non-GAAP financial measures and are explained on page 3.

More Related Content

What's hot

Permian summit presentation 4.1.14 final
Permian summit presentation 4.1.14   finalPermian summit presentation 4.1.14   final
Permian summit presentation 4.1.14 finalEnLinkMidstreamLLC
 
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLinkMidstreamLLC
 
Investor presentation december 2015 v final
Investor presentation december 2015 v finalInvestor presentation december 2015 v final
Investor presentation december 2015 v finalCrestwoodCorporate
 
Morgan stanley mlp bus tour jan. 26 - final
Morgan stanley mlp bus tour   jan. 26 - finalMorgan stanley mlp bus tour   jan. 26 - final
Morgan stanley mlp bus tour jan. 26 - finalEnLinkMidstreamLLC
 
02 24-16 fourth quarter &amp; fy 2015 financial review final
02 24-16 fourth quarter &amp; fy 2015 financial review final02 24-16 fourth quarter &amp; fy 2015 financial review final
02 24-16 fourth quarter &amp; fy 2015 financial review finalAES_BigSky
 
Project phoenix investor presentation 10232016_225pm_ct
Project phoenix investor presentation 10232016_225pm_ctProject phoenix investor presentation 10232016_225pm_ct
Project phoenix investor presentation 10232016_225pm_ctir_jpenergy
 
Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017EnLinkMidstreamLLC
 
Investor presentation march 2016
Investor presentation march 2016Investor presentation march 2016
Investor presentation march 2016CrestwoodCorporate
 
Jp energy january 2016 ubs 1x1 conference1
Jp energy   january 2016 ubs 1x1 conference1Jp energy   january 2016 ubs 1x1 conference1
Jp energy january 2016 ubs 1x1 conference1ir_jpenergy
 
May Investor Presentation
May Investor PresentationMay Investor Presentation
May Investor PresentationAES_BigSky
 
Mlpa crestwood investor presentation_june 2016
Mlpa crestwood investor presentation_june 2016Mlpa crestwood investor presentation_june 2016
Mlpa crestwood investor presentation_june 2016CrestwoodCorporate
 
Trc q1 2014 earnings slides final
Trc q1 2014 earnings slides finalTrc q1 2014 earnings slides final
Trc q1 2014 earnings slides finaltrcsolutions
 
Enlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations reportEnlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations reportEnLinkMidstreamLLC
 
Q1 fiscal 2016 slides final
Q1 fiscal 2016 slides finalQ1 fiscal 2016 slides final
Q1 fiscal 2016 slides finalRoyalGold
 
Investor presentation march 2016 v final
Investor presentation march 2016 v finalInvestor presentation march 2016 v final
Investor presentation march 2016 v finalCrestwoodCorporate
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - finalFirstQuantum
 
Enbridge Inc. Second Quarter 2014 Financial Results
Enbridge Inc. Second Quarter 2014 Financial ResultsEnbridge Inc. Second Quarter 2014 Financial Results
Enbridge Inc. Second Quarter 2014 Financial ResultsEnbridge Inc.
 
Investor presentation november 2015 v rbc final
Investor presentation november 2015 v rbc finalInvestor presentation november 2015 v rbc final
Investor presentation november 2015 v rbc finalCrestwoodCorporate
 

What's hot (20)

Permian summit presentation 4.1.14 final
Permian summit presentation 4.1.14   finalPermian summit presentation 4.1.14   final
Permian summit presentation 4.1.14 final
 
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
 
Investor presentation december 2015 v final
Investor presentation december 2015 v finalInvestor presentation december 2015 v final
Investor presentation december 2015 v final
 
Morgan stanley mlp bus tour jan. 26 - final
Morgan stanley mlp bus tour   jan. 26 - finalMorgan stanley mlp bus tour   jan. 26 - final
Morgan stanley mlp bus tour jan. 26 - final
 
02 24-16 fourth quarter &amp; fy 2015 financial review final
02 24-16 fourth quarter &amp; fy 2015 financial review final02 24-16 fourth quarter &amp; fy 2015 financial review final
02 24-16 fourth quarter &amp; fy 2015 financial review final
 
Project phoenix investor presentation 10232016_225pm_ct
Project phoenix investor presentation 10232016_225pm_ctProject phoenix investor presentation 10232016_225pm_ct
Project phoenix investor presentation 10232016_225pm_ct
 
Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017
 
Investor presentation march 2016
Investor presentation march 2016Investor presentation march 2016
Investor presentation march 2016
 
Jp energy january 2016 ubs 1x1 conference1
Jp energy   january 2016 ubs 1x1 conference1Jp energy   january 2016 ubs 1x1 conference1
Jp energy january 2016 ubs 1x1 conference1
 
May Investor Presentation
May Investor PresentationMay Investor Presentation
May Investor Presentation
 
Devon Sharpens Focus
Devon Sharpens FocusDevon Sharpens Focus
Devon Sharpens Focus
 
Mlpa crestwood investor presentation_june 2016
Mlpa crestwood investor presentation_june 2016Mlpa crestwood investor presentation_june 2016
Mlpa crestwood investor presentation_june 2016
 
Trc q1 2014 earnings slides final
Trc q1 2014 earnings slides finalTrc q1 2014 earnings slides final
Trc q1 2014 earnings slides final
 
Enlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations reportEnlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations report
 
Q1 fiscal 2016 slides final
Q1 fiscal 2016 slides finalQ1 fiscal 2016 slides final
Q1 fiscal 2016 slides final
 
Investor presentation march 2016 v final
Investor presentation march 2016 v finalInvestor presentation march 2016 v final
Investor presentation march 2016 v final
 
Presentation september - final
Presentation   september - finalPresentation   september - final
Presentation september - final
 
Enbridge Inc. Second Quarter 2014 Financial Results
Enbridge Inc. Second Quarter 2014 Financial ResultsEnbridge Inc. Second Quarter 2014 Financial Results
Enbridge Inc. Second Quarter 2014 Financial Results
 
Awk red chip slides final without notes
Awk red chip slides final without notesAwk red chip slides final without notes
Awk red chip slides final without notes
 
Investor presentation november 2015 v rbc final
Investor presentation november 2015 v rbc finalInvestor presentation november 2015 v rbc final
Investor presentation november 2015 v rbc final
 

Viewers also liked

RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015EnLinkMidstreamLLC
 
Jp morgan okc bus tour may 16 16 - final
Jp morgan okc bus tour   may 16 16 - finalJp morgan okc bus tour   may 16 16 - final
Jp morgan okc bus tour may 16 16 - finalEnLinkMidstreamLLC
 
Tph midstream ngl conf presentation final (1)
Tph midstream ngl conf presentation   final (1)Tph midstream ngl conf presentation   final (1)
Tph midstream ngl conf presentation final (1)EnLinkMidstreamLLC
 
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceGoldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceEnLinkMidstreamLLC
 
En link orv condensate pipeline project
En link orv condensate pipeline projectEn link orv condensate pipeline project
En link orv condensate pipeline projectEnLinkMidstreamLLC
 
Credit suisse mlp conference presentation
Credit suisse mlp conference presentationCredit suisse mlp conference presentation
Credit suisse mlp conference presentationEnLinkMidstreamLLC
 
Barclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalBarclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalEnLinkMidstreamLLC
 
Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation EnLinkMidstreamLLC
 
Citi conference presentation final - 8.20.14
Citi conference presentation   final - 8.20.14Citi conference presentation   final - 8.20.14
Citi conference presentation final - 8.20.14EnLinkMidstreamLLC
 
Q2 2016 operations report final as published
Q2 2016   operations report final as publishedQ2 2016   operations report final as published
Q2 2016 operations report final as publishedEnLinkMidstreamLLC
 
Greater Chickadee Crude Oil Gathering Project
Greater Chickadee Crude Oil Gathering ProjectGreater Chickadee Crude Oil Gathering Project
Greater Chickadee Crude Oil Gathering ProjectEnLinkMidstreamLLC
 
Q2 2016 operations report final as published
Q2 2016   operations report final as publishedQ2 2016   operations report final as published
Q2 2016 operations report final as publishedEnLinkMidstreamLLC
 
Citi MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceCiti MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceEnLinkMidstreamLLC
 
Q4 15 operations report final2
Q4 15 operations report   final2Q4 15 operations report   final2
Q4 15 operations report final2EnLinkMidstreamLLC
 

Viewers also liked (14)

RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015
 
Jp morgan okc bus tour may 16 16 - final
Jp morgan okc bus tour   may 16 16 - finalJp morgan okc bus tour   may 16 16 - final
Jp morgan okc bus tour may 16 16 - final
 
Tph midstream ngl conf presentation final (1)
Tph midstream ngl conf presentation   final (1)Tph midstream ngl conf presentation   final (1)
Tph midstream ngl conf presentation final (1)
 
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceGoldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
 
En link orv condensate pipeline project
En link orv condensate pipeline projectEn link orv condensate pipeline project
En link orv condensate pipeline project
 
Credit suisse mlp conference presentation
Credit suisse mlp conference presentationCredit suisse mlp conference presentation
Credit suisse mlp conference presentation
 
Barclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalBarclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - final
 
Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation
 
Citi conference presentation final - 8.20.14
Citi conference presentation   final - 8.20.14Citi conference presentation   final - 8.20.14
Citi conference presentation final - 8.20.14
 
Q2 2016 operations report final as published
Q2 2016   operations report final as publishedQ2 2016   operations report final as published
Q2 2016 operations report final as published
 
Greater Chickadee Crude Oil Gathering Project
Greater Chickadee Crude Oil Gathering ProjectGreater Chickadee Crude Oil Gathering Project
Greater Chickadee Crude Oil Gathering Project
 
Q2 2016 operations report final as published
Q2 2016   operations report final as publishedQ2 2016   operations report final as published
Q2 2016 operations report final as published
 
Citi MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceCiti MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure Conference
 
Q4 15 operations report final2
Q4 15 operations report   final2Q4 15 operations report   final2
Q4 15 operations report final2
 

Similar to Credit Suisse 20th Annual Energy Summit Presentation

2015 Jefferies Energy Conference
2015 Jefferies Energy Conference2015 Jefferies Energy Conference
2015 Jefferies Energy ConferenceEnLinkMidstreamLLC
 
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUMWELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUMEnLinkMidstreamLLC
 
Enlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnLinkMidstreamLLC
 
Investor Presentation March 2014
Investor Presentation March 2014Investor Presentation March 2014
Investor Presentation March 2014EnLinkMidstreamLLC
 
Q1 16 operations report - final
Q1 16 operations report - finalQ1 16 operations report - final
Q1 16 operations report - finalEnLinkMidstreamLLC
 
Mufg conference presentation final
Mufg conference presentation   finalMufg conference presentation   final
Mufg conference presentation finalEnLinkMidstreamLLC
 
2017 en link midstream guidance
2017 en link midstream guidance2017 en link midstream guidance
2017 en link midstream guidanceEnLinkMidstreamLLC
 
En link midstream jefferies presentation nov 29 16
En link midstream jefferies presentation   nov 29 16En link midstream jefferies presentation   nov 29 16
En link midstream jefferies presentation nov 29 16EnLinkMidstreamLLC
 
2015 Delta Investor Day Presentation
2015 Delta Investor Day Presentation2015 Delta Investor Day Presentation
2015 Delta Investor Day PresentationDelta_Airlines
 
En link midstream 3q 2016 operations report final
En link midstream 3q 2016 operations report finalEn link midstream 3q 2016 operations report final
En link midstream 3q 2016 operations report finalEnLinkMidstreamLLC
 
En link midstream chickasaw presentation dec 7 16
En link midstream chickasaw presentation   dec 7 16En link midstream chickasaw presentation   dec 7 16
En link midstream chickasaw presentation dec 7 16EnLinkMidstreamLLC
 
February 2017 enlk and enlc operations report
February 2017 enlk and enlc operations reportFebruary 2017 enlk and enlc operations report
February 2017 enlk and enlc operations reportEnLinkMidstreamLLC
 
Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017EnLinkMidstreamLLC
 

Similar to Credit Suisse 20th Annual Energy Summit Presentation (15)

2015 Jefferies Energy Conference
2015 Jefferies Energy Conference2015 Jefferies Energy Conference
2015 Jefferies Energy Conference
 
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUMWELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
WELLS FARGO SECURITIES RESEARCH, ECONOMICS AND STRATEGY 2014 ENERGY SYMPOSIUM
 
Enlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations report
 
Investor Presentation March 2014
Investor Presentation March 2014Investor Presentation March 2014
Investor Presentation March 2014
 
Q1 16 operations report - final
Q1 16 operations report - finalQ1 16 operations report - final
Q1 16 operations report - final
 
Mufg conference presentation final
Mufg conference presentation   finalMufg conference presentation   final
Mufg conference presentation final
 
Naptp presentation final
Naptp presentation   finalNaptp presentation   final
Naptp presentation final
 
2017 en link midstream guidance
2017 en link midstream guidance2017 en link midstream guidance
2017 en link midstream guidance
 
En link midstream jefferies presentation nov 29 16
En link midstream jefferies presentation   nov 29 16En link midstream jefferies presentation   nov 29 16
En link midstream jefferies presentation nov 29 16
 
2015 Delta Investor Day Presentation
2015 Delta Investor Day Presentation2015 Delta Investor Day Presentation
2015 Delta Investor Day Presentation
 
En link midstream 3q 2016 operations report final
En link midstream 3q 2016 operations report finalEn link midstream 3q 2016 operations report final
En link midstream 3q 2016 operations report final
 
En link midstream chickasaw presentation dec 7 16
En link midstream chickasaw presentation   dec 7 16En link midstream chickasaw presentation   dec 7 16
En link midstream chickasaw presentation dec 7 16
 
February 2017 enlk and enlc operations report
February 2017 enlk and enlc operations reportFebruary 2017 enlk and enlc operations report
February 2017 enlk and enlc operations report
 
Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017
 
Goldman sachs presentation
Goldman sachs presentation Goldman sachs presentation
Goldman sachs presentation
 

More from EnLinkMidstreamLLC

En link midstream announces avenger delaware crude gathering system final
En link midstream announces avenger delaware crude gathering system finalEn link midstream announces avenger delaware crude gathering system final
En link midstream announces avenger delaware crude gathering system finalEnLinkMidstreamLLC
 
En link midstream announces strategic partner update
En link midstream announces strategic partner updateEn link midstream announces strategic partner update
En link midstream announces strategic partner updateEnLinkMidstreamLLC
 
En link midstream 1q 2018 operations report final
En link midstream 1q 2018 operations report finalEn link midstream 1q 2018 operations report final
En link midstream 1q 2018 operations report finalEnLinkMidstreamLLC
 
En link midstream 1q 2018 operations report
En link midstream 1q 2018 operations reportEn link midstream 1q 2018 operations report
En link midstream 1q 2018 operations reportEnLinkMidstreamLLC
 
EnLink Midstream Q4 & Full-Year 2017 Operations Report
EnLink Midstream Q4 & Full-Year 2017 Operations ReportEnLink Midstream Q4 & Full-Year 2017 Operations Report
EnLink Midstream Q4 & Full-Year 2017 Operations ReportEnLinkMidstreamLLC
 
En link midstream 2018 guidance
En link midstream 2018 guidanceEn link midstream 2018 guidance
En link midstream 2018 guidanceEnLinkMidstreamLLC
 

More from EnLinkMidstreamLLC (6)

En link midstream announces avenger delaware crude gathering system final
En link midstream announces avenger delaware crude gathering system finalEn link midstream announces avenger delaware crude gathering system final
En link midstream announces avenger delaware crude gathering system final
 
En link midstream announces strategic partner update
En link midstream announces strategic partner updateEn link midstream announces strategic partner update
En link midstream announces strategic partner update
 
En link midstream 1q 2018 operations report final
En link midstream 1q 2018 operations report finalEn link midstream 1q 2018 operations report final
En link midstream 1q 2018 operations report final
 
En link midstream 1q 2018 operations report
En link midstream 1q 2018 operations reportEn link midstream 1q 2018 operations report
En link midstream 1q 2018 operations report
 
EnLink Midstream Q4 & Full-Year 2017 Operations Report
EnLink Midstream Q4 & Full-Year 2017 Operations ReportEnLink Midstream Q4 & Full-Year 2017 Operations Report
EnLink Midstream Q4 & Full-Year 2017 Operations Report
 
En link midstream 2018 guidance
En link midstream 2018 guidanceEn link midstream 2018 guidance
En link midstream 2018 guidance
 

Recently uploaded

如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfProbe Gold
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024nicola_mining
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdftaxlinkcpa
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...Kumaran637735
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 

Recently uploaded (20)

如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdf
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdf
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 

Credit Suisse 20th Annual Energy Summit Presentation

  • 1. Credit Suisse 20th Annual Energy Summit February 23 - 24, 2015 1 Strong. Innovative. Growing.
  • 2. Forward-Looking Statements This presentation contains forward-looking statements within the meaning of the federal securities laws. Although these statements reflect the current views, assumptions and expectations of our management, the matters addressed herein involve certain risks and uncertainties that could cause actual activities, performance, outcomes and results to differ materially than those indicated. Such forward-looking statements include, but are not limited to, statements about future financial and operating results, guidance, projected or forecasted financial results, objectives, project timing, expectations and intentions and other statements that are not historical facts. Factors that could result in such differences or otherwise materially affect our financial condition, results of operations and cash flows include, without limitation, (a) the dependence on Devon for a substantial portion of the natural gas that we gather, process and transport, (b) our lack of asset diversification, (c) our vulnerability to having a significant portion of our operations concentrated in the Barnett Shale, (d) the amount of hydrocarbons transported in our gathering and transmission lines and the level of our processing and fractionation operations, (e) fluctuations in oil, natural gas and NGL prices, (f) construction risks in our major development projects, (g) our ability to consummate future acquisitions, successfully integrate any acquired businesses, realize any cost savings and other synergies from any acquisition, (h) changes in the availability and cost of capital, (i) competitive conditions in our industry and their impact on our ability to connect hydrocarbon supplies to our assets, (j) operating hazards, natural disasters, weather-related delays, casualty losses and other matters beyond our control, (k) a failure in our computing systems or a cyber-attack on our systems, and (l) the effects of existing and future laws and governmental regulations, including environmental and climate change requirements and other uncertainties. These and other applicable uncertainties, factors and risks are described more fully in EnLink Midstream Partners, LP’s and EnLink Midstream, LLC’s filings with the Securities and Exchange Commission, including EnLink Midstream Partners, LP’s and EnLink Midstream, LLC’s Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q and Current Reports on Form 8-K. Neither EnLink Midstream Partners, LP nor EnLink Midstream, LLC assumes any obligation to update these forward-looking statements. The assumptions and estimates underlying the forecasted financial information included in the guidance information in this press release are inherently uncertain and, though considered reasonable by the EnLink Midstream management team as of the date of its preparation, are subject to a wide variety of significant business, economic, and competitive risks and uncertainties that could cause actual results to differ materially from those contained in the forecasted financial information. Accordingly, there can be no assurance that the forecasted results are indicative of EnLink Midstream’s future performance or that actual results will not differ materially from those presented in the forecasted financial information. Inclusion of the forecasted financial information in this press release should not be regarded as a representation by any person that the results contained in the forecasted financial information will be achieved. 2
  • 3. Non-GAAP Financial Information This presentation contains non-generally accepted accounting principle financial measures that we refer to as adjusted EBITDA, distributable cash flow, gross operating margin, growth capital expenditures, adjusted EBITDA of EnLink Midstream Holdings (EMH) and maintenance capital expenditures. We define adjusted EBITDA as net income from continuing operations plus interest expense, provision for income taxes, depreciation and amortization expense, impairment expense, stock-based compensation, gain on noncash derivatives, transaction costs, distribution of equity investment and non-controlling interest and income on equity investment. We define distributable cash flow as net cash provided by operating activities plus adjusted EBITDA, net to EnLink Midstream Partners, LP less interest expense, litigation settlement adjustment, interest rate swap, cash taxes and other, maintenance capital expenditures and Predecessor adjusted EBITDA. Gross operating margin is defined as revenue minus the cost of purchased gas, NGL, condensate and crude oil. Growth capital expenditures are defined as all construction-related direct labor and material costs, as well as indirect construction costs including general engineering costs and the costs of funds used in construction. Adjusted EBITDA of EMH is defined as earnings plus depreciation, provisions for income taxes and distribution of equity investment less income on equity investment. The amounts included in the calculation of these measures are computed in accordance with generally accepted accounting principles (GAAP) with the exception of maintenance capital expenditures. Maintenance capital expenditures are capital expenditures made to replace partially or fully depreciated assets in order to maintain the existing operating capacity of the assets and to extend their useful lives. The Partnership and General Partner believe these measures are useful to investors because they may provide users of this financial information with meaningful comparisons between current results and prior-reported results and a meaningful measure of the Partnership’s and the General Partner's cash flow after it has satisfied the capital and related requirements of its operations. 3
  • 4. 4 Our Strategy: Stability Plus Growth A Stable Investment in the MLP Space Stability of cash flows  ~95% fee-based contracts  ~50% of gross operating margin from long-term Devon contracts Top tier midstream energy service for our customers Leverage Devon Energy sponsorship for growth  Expect significant growth from dropdowns  Serve Devon E&P portfolio in its growth areas Strong organic growth  South Louisiana, West Texas and Ohio River Valley (ORV) expansion projects Top tier balance sheet  Investment grade credit rating at ENLK since inception  Strong liquidity with a new $1.5 billion credit facility Note: Adjusted EBITDA and gross operating margin are non-GAAP financial measures and are explained on page 3.
  • 5. The Vehicle for Sustainable Growth: Strategically Located and Complementary Assets Gathering and Transportation  ~8,800 miles of gathering and transmission lines  11 Bcf of natural gas storage capacity Gas Processing  13 plants with 3.4 Bcf/d of total net inlet capacity NGL Transportation, Fractionation and Storage  ~600 miles of liquids transport line  7 fractionation facilities with 280,000 Bbl/d of total capacity  3.2 MMBbl of underground NGL storage Crude, Condensate and Brine Handling  200 miles of crude oil pipeline  Barge and rail terminals  500,000 Bbl of above ground storage  100 vehicle trucking fleet  8 brine disposal wells  6 condensate stabilization & gas compression stations in service 5
  • 6. EnLink Midstream Partners, LP Master Limited Partnership NYSE: ENLK (BBB / Baa3) EnLink Midstream, LLC General Partner NYSE: ENLC Public Unitholders ~70% ~30% ~1% GP ~18% LP EnLink Midstream Holdings (formerly Devon Midstream Holdings) ~44% LP ~37% LP Devon Energy Corp. NYSE: DVN (BBB+ / Baa1) GP + 75% LP The Vehicle for Sustainable Growth: MLP Structure with a Premier Sponsor 6 Dist./Q Split Level < $0.2500 2% / 98% < $0.3125 15% / 85% < $0.3750 25% / 75% > $0.3750 50% / 50% Current Position ENLC owns 100% of IDRs ~25% LP Note: The ownership percentages shown above are as of the date of this presentation.
  • 7. Sustainable Growth Substantial Scale & Scope Diverse, Fee-Based Cash Flow Strong B/S & Credit Profile 7  Investment grade balance sheet at ENLK (BBB, Baa3)  Debt / EBITDA of ~3.3x  Strong liquidity with new $1.5 billion credit facility  ~ 95% fee-based margin  Balanced cash flow (Devon ~50%)  Projects focused on NGL/crude and rich gas processing  Total consolidated enterprise value of ~$14 billion  Projected 2015 Combined Adjusted EBITDA: ~$740 MM  Geographically diverse assets with multi-commodity exposure  Stable base cash flow supported by long-term contracts  Organic growth opportunities through Devon’s upstream portfolio  Expect significant growth from drop downs Louisiana Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3. The Vehicle for Sustainable Growth: Well Positioned with a Strong Balance Sheet
  • 8. 8 EnLink Midstream Consolidated 2015 Guidance Adjusted EBITDA $740 MM % of Gross Operating Margin from fee-based contracts ~ 95% EnLink Midstream Partners, LP (ENLK) 2015 Guidance Adjusted EBITDA ~ $710 MM Distributable Cash Flow ~ $570 MM ENLK annual distributions per unit ~ $1.58 ENLK annual distribution growth rate from 2014 to 2015 ~ 7.5% Announced acquisitions (not including drop downs) ~ $700 MM Growth capital expenditures ~ $500 MM Maintenance capital expenditures ~ $50 MM EnLink Midstream, LLC (ENLC) 2015 Guidance Cash Taxes ~ $20 MM ENLC annual distributions per unit ~ $1.025 ENLC distribution growth from 2014 to 2015 ~18.5% Note: Adjusted EBITDA, gross operating margin, distributable cash flow, growth capital expenditures and maintenance capital expenditures are non-GAAP financial measures 2015 Guidance: Stability Plus Growth
  • 9. The Four Avenues for Growth 9
  • 10. 10 Avenue 1: Drop Downs Organic Growth Projects The Four Avenues for Growth Progress in Last Nine Months Ohio River Valley: E2 drop down complete EnLink Midstream Holdings (EMH): 25% drop down complete  Avenue 2: Growing With Devon West Texas: Ajax Plant & Martin County Expansion announced  Avenue 3: Organic Growth Projects Ohio River Valley: condensate pipeline & stabilization / gas compression stations announced Louisiana: Marathon JV & NGL pipeline announced  Avenue 4: Mergers & Acquisitions Louisiana: Gulf Coast natural gas assets acquired West Texas: LPC crude logistics business acquired West Texas: Coronado acquisition announced  ~$1.1 Billion ~$200 MM+ ~$300 MM+ ~$935 MM In the last nine months, EnLink announced $2.5 Billion of acquisitions and growth projects. EnLink also completed construction on ~$1 billion of growth projects, including the Cajun-Sibon and the Bearkat expansions. 10 Capital Commitment
  • 11. Avenue 1: Drop Downs Devon Sponsorship Creates Drop Down Opportunities 11 2014 2015 2016 2017 Devon Sponsorship Provides Potential for ~$375 MM of Adjusted EBITDA from Drop Downs Other Potential Devon Drop Downs * E2 25% EMH ** Access Pipeline * Victoria Express Pipeline * * Cautionary Note: The information regarding these potential drop downs is for illustrative purposes only. No agreements or understandings exist regarding the terms of these potential drop downs, and Devon is not obligated to sell or contribute any of these assets to EnLink. The completion of any future drop down will be subject to a number of conditions. The capital cost information on this slide is based on management’s current estimates and current market information and is subject to change. ** Based on 2015 Guidance and accounts for 25% of the total estimated adjusted EBITDA of EMH. Note: Adjusted EBITDA is a non-GAAP financial measure and is explained on page 3. Drop Down Cost: ~$193 MM Estimated Adjusted EBITDA: ~$20-25 MM Estimated Capital Cost: ~$1.0 B Estimated Adjusted EBITDA: ~$150 MM Drop Down Cost for 25% Interest: $925 MM Estimated 2015 Adjusted EBITDA: ~$100 MM ** Estimated Capital Cost: ~$70 MM Estimated Adjusted EBITDA: ~$12 MM  25% EMH 
  • 12. Avenue 1: Drop Downs E2 Drop Down in Ohio River Valley 12 New Assets  Three facilities operating, two under construction  When completed, five facilities will have total capacity of ~580 MMcf/d and ~19,000 Bbl/d Strategic Benefits  Key customer: Antero Resources  100% fee-based contracts with minimum volume commitments  Drop down from ENLC to ENLK completed in October 2014  Approximately $193 MM acquisition cost  Estimated annual adjusted EBITDA contribution: ~$20-25 MM E2 Stations * * * * Assets are in development as of the date of this presentation. Note: Adjusted EBITDA is a non-GAAP financial measure and is explained on page 3.
  • 13. Avenue 1: Future Drop Downs Devon’s Access & Victoria Express Pipelines 13  Three ~180 mile pipelines from Sturgeon terminal to Devon’s thermal acreage  ~30 miles of dual pipeline from Sturgeon Terminal to Edmonton  Capacity net to Devon: - Blended bitumen: 170,000 Bbl/d  Devon ownership: 50% - ~$1B invested to date  ~56 mile crude oil pipeline from Eagle Ford core to Port Victoria terminal  ~300,000 Bbl of storage available  Capacity: - 50,000 Bbl/d start-up capacity (expandable)  Devon ownership: 100% - ~$70 MM invested to date Access Pipeline Victoria Express Pipeline
  • 14. 14 Avenue 2: Growing With Devon Martin County Expansion in West Texas  Ajax: ~120 MMcf/d cryogenic processing plant  Acreage dedication from Devon in Martin County  Anchored by long-term, fee-based contract  Expect to begin operations in 2016 Note: EnLink Midstream will own the Coronado assets upon the closing of the acquisition, but does not own them today.
  • 15. Avenue 2: Growing With Devon Significant Production Growth in Cana-Woodford Devon Assets in the Cana-Woodford  Devon Rigs in Cana ̶ End of 2014: 5 rigs ̶ Avg. in 2015: 8 rigs (including non-operated)  Acreage: ~280,000 net acres  Workover activity yielded excellent results ̶ Acid treatments performed on 200+ wells ̶ Avg. rates per well increased 1-2+ MMCFE/d ̶ Payback period <3 months  Emerging opportunity in STACK oil window ̶ 35,000 net acres  Significant undrilled well inventory ̶ Expected wells drilled in 2015: 95 total ̶ Expected wells in STACK oil window: 20 15 EnLink Assets in the Cana-Woodford  Pipeline: 410 miles, 530 MMcf/d capacity  Processing: one plant with 350 MMcf/d capacity
  • 16. Avenue 3: Organic Growth Projects Gulf Coast Market for Products & Services is Strategic to Growth Plans 16Source: EIA/RBN Energy 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Bcf/d New Gas Pipelines to Gulf Coast Source RBN Energy, January 2015
  • 17. Avenue 3: Organic Growth Projects Cajun-Sibon Expansion Complete  258 miles of NGL pipeline from Mont Belvieu area to NGL fractionation assets in south Louisiana (195 miles new, 63 miles re-purposed)  140 MBbl/d south Louisiana fractionation expansion  Phase I completed Q4 2013; Phase II completed in Q4 2014  Expected run-rate adjusted EBITDA of ~$115 MM 17 Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
  • 18. 18 New Assets in Development  30-mile, 10” NGL pipeline from EnLink’s Riverside fractionator to Marathon Petroleum’s Garyville refinery  Expected to be operational in first half of 2017 Strategic Benefits  50/50 JV with Marathon Petroleum Corp.  Marathon to support the project with 50% of capital cost and long-term, fee-based contracts for butane and natural gasoline transportation, supply and optional storage  EnLink to construct and operate the pipeline  First bolt-on project to Cajun-Sibon expansion Avenue 3: Organic Growth Projects JV with Marathon to Build NGL Pipeline in South LA * * Assets are in development as of the date of this presentation.
  • 19. 19 Avenue 3: Organic Growth Projects Ohio River Valley Condensate Pipeline, Stabilization & Compression System Expansion New Assets In Development  45-mile, 8” condensate pipeline with an expected capacity of ~50,000 Bbl/d  6 new condensate stabilization and natural gas compression stations with combined capacities of ~41,500 Bbl/d and ~560 MMcf/d, respectively  Once complete, EnLink’s assets in the Utica/Marcellus will include:  250 miles of pipeline  11 natural gas compression and condensate stabilization facilities with total capacity of ~1.2 Bcf/d and ~60,000 Bbl/d, respectively  Over 110 trucks  Eight brine disposal wells  ~630,000 Bbl of above ground storage Strategic Benefits  Leverages and expands EnLink’s footprint of midstream assets in the Utica/Marcellus  Supported by long-term, fee-based contracts  Deploying over $250 MM in capital; increases EnLink’s investment in the ORV to over ~$700 MM * Assets are in development as of the date of this presentation. * * *
  • 20. Avenue 4: Mergers & Acquisitions Gulf Coast Natural Gas Assets  Closed on ~$235 million acquisition from Chevron on November 1st  Creates opportunities to optimize Louisiana assets and convert redundant natural gas pipelines to other services  ~1,400 miles of natural gas pipelines in three systems spanning from Port Arthur, TX to the Mississippi River corridor  ~11 Bcf of natural gas storage capacity in three south Louisiana caverns  Ownership and management of title tracking services offered at Henry Hub  Expected near-term acquisition multiple: ~10x adjusted EBITDA 20 Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
  • 21. Avenue 4: Mergers & Acquisitions Coronado Midstream in Midland Basin 21 Note: EnLink Midstream will own the Coronado assets upon the closing of the acquisition, but does not own them today.  Announced ~$600 million agreement to acquire Coronado Midstream Holdings LLC on Feb. 2, 2015  Coronado’s assets include:  ~175 MMcf/d of gas processing capacity  ~270 miles of gas gathering pipelines with ~35,000 horsepower of compression  Under construction: ~100 MMcf/d of processing capacity and gathering system expansions  Underpinned by long-term contracts and production dedication from over 190,000 acres  Key producers include Reliance Energy, Inc., Diamondback Energy, Inc. and RSP Permian, Inc.  Expected long-term acquisition multiple: 7-8x adjusted EBITDA with $400-$600 of additional capital expenditures
  • 22. Avenue 4: Mergers & Acquisitions LPC Crude Oil Logistics Business  Closed on acquisition of LPC Crude Oil Marketing, LLC (“LPC”) on January 31, 2015 for ~$100 MM  LPC’s assets include:  13 pipeline and refinery injection stations,  ~67 miles of crude gathering systems  43 tractor trailers  Extensive crude oil first purchasing operation  Acquisition Multiple: ~8x run rate adjusted EBITDA 22 Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
  • 23. EnLink Midstream Today & Tomorrow EnLink Midstream Today EnLink Midstream Potential Future in 2017 23 West Texas Growth: Bearkat, Ajax, Coronado & LPC acquisitions ORV Condensate Pipeline and Stabilizers Complete Drop Downs Access Pipeline Drop down CompleteCANADIAN OIL SANDS Midstream Holdings Drop Down Complete E2 Drop Down Complete South Louisiana Growth: Cajun-Sibon, Marathon JV, Gulf Coast Acquisition Victoria Express Drop Down Complete Growing with Devon Organic Growth M&A Cana Growth
  • 24. 24 Our Strategy: Stability Plus Growth A Stable Investment in the MLP Space Stability of cash flows  ~95% fee-based contracts  ~50% of gross operating margin from long-term Devon contracts Top tier midstream energy service for our customers Leverage Devon Energy sponsorship for growth  Expect significant growth from dropdowns  Serve Devon E&P portfolio in its growth areas Strong organic growth  South Louisiana, West Texas and Ohio River Valley (ORV) expansion projects Top tier balance sheet  Investment grade credit rating at ENLK since inception  Strong liquidity with a new $1.5 billion credit facility Note: Adjusted EBITDA and gross operating margin are non-GAAP financial measures and are explained on page 3.