Morgan Stanley
Winter MLP & Diversified
Natural Gas Bus Tour
January 27, 2015
1
Strong. Innovative. Growing.
Forward-Looking Statements
This presentation contains forward-looking statements within the meaning of the federal securities laws. Forward-looking
statements are not guarantees of performance. They involve risks, uncertainties and assumptions. The future results of
EnLink Midstream, LLC, EnLink Midstream Partners, LP and their respective affiliates (collectively known as “EnLink
Midstream”) may differ materially from those expressed in the forward-looking statements contained throughout this
presentation and in documents filed with the Securities and Exchange Commission (“SEC”). Many of the factors that will
determine these results are beyond EnLink Midstream’s ability to control or predict. These statements are necessarily based
upon various assumptions involving judgments with respect to the future, including, among others, drilling levels; the
dependence on Devon Energy Corporation for a substantial portion of the natural gas that EnLink Midstream gathers,
processes and transports; EnLink Midstream’s lack of asset diversification; EnLink Midstream’s vulnerability to having a
significant portion of its operations concentrated in the Barnett Shale; the amount of hydrocarbons transported in EnLink
Midstream’s gathering and transmission lines and the level of its processing and fractionation operations; fluctuations in oil,
natural gas and natural gas liquids (NGL) prices; construction risks in its major development projects; changes in EnLink
Midstream’s credit rating; its ability to consummate acquisitions, successfully integrate any acquired businesses, realize any
cost savings and other synergies from any acquisition; changes in the availability and cost of capital; competitive conditions in
EnLink Midstream’s industry and their impact on its ability to connect hydrocarbon supplies to its assets; operating hazards,
natural disasters, weather-related delays, casualty losses and other matters beyond its control; and the effects of existing
and future laws and governmental regulations, including environmental and climate change requirements and other
uncertainties and other factors discussed in EnLink Midstream’s Annual Reports on Form 10-K for the year ended December
31, 2013, and in EnLink Midstream’s other filings with the SEC. You are cautioned not to put undue reliance on any forward-
looking statement. EnLink Midstream has no obligation to publicly update or revise any forward-looking statement, whether as
a result of new information, future events or otherwise.
2
Non-GAAP Financial Information
This presentation contains non-generally accepted accounting principle financial measures that EnLink Midstream refers to
as adjusted EBITDA, gross operating margin and segment cash flows. Adjusted EBITDA is defined as net income plus interest
expense, provision for income taxes, depreciation and amortization expense, stock-based compensation, (gain) loss on
noncash derivatives, transaction costs, distribution of equity investment and non-controlling interest; and income (loss) on
equity investment. Gross operating margin is defined as revenue less the cost of purchased gas, NGLs, condensate and crude
oil. Segment cash flows is defined as revenue less the cost of purchased gas, NGLs, condensate, crude oil and operating and
maintenance expenditures. The amounts included in the calculation of these measures are computed in accordance with
generally accepted accounting principles (GAAP) with the exception of maintenance capital expenditures. Maintenance capital
expenditures are capital expenditures made to replace partially or fully depreciated assets in order to maintain the existing
operating capacity of the assets and to extend their useful lives.
EnLink Midstream believes these measures are useful to investors because they may provide users of this financial
information with meaningful comparisons between current results and prior-reported results and a meaningful measure of
EnLink Midstream’s cash flow after it has satisfied the capital and related requirements of its operations.
Adjusted EBITDA, gross operating margin and segment cash flows, as defined above, are not measures of financial
performance or liquidity under GAAP. They should not be considered in isolation or as an indicator of EnLink Midstream’s
performance. Furthermore, they should not be seen as measures of liquidity or a substitute for metrics prepared in
accordance with GAAP.
3
4
Our Strategy: Stability Plus Growth
A Stable Investment in the MLP Space
Stability of cash flows
 ~95% fee-based contracts
 ~50% of gross operating margin from long-term Devon contracts
Top tier midstream energy service for our customers
Leverage Devon Energy sponsorship for growth
 Potential additional adjusted EBITDA from dropdowns: ~$375 MM by 2017
 Serve Devon E&P portfolio in its growth areas
Strong organic growth
 South Louisiana, West Texas and Ohio River Valley (ORV) expansion projects
Top tier balance sheet
 Investment grade credit rating at ENLK since inception
 Strong liquidity
Note: Adjusted EBITDA and gross operating margin are non-GAAP financial measures and are explained on page 3.
The Vehicle for Sustainable Growth:
Strategically Located and Complementary Assets
Gathering and Transportation
 ~8,800 miles of gathering and
transmission lines
 11 Bcf of natural gas storage capacity
Gas Processing
 13 plants with 3.4 Bcf/d of total
net inlet capacity
 1 plant with 120 MMcf/d of net inlet
capacity under construction
NGL Transportation,
Fractionation and Storage
 ~570 miles of liquids transport line
 7 fractionation facilities with
252,000 Bbl/d of total net capacity
 3.1 MMBbl of underground NGL storage
Crude, Condensate and Brine Handling
 200 miles of crude oil pipeline
 Barge and rail terminals
 500,000 Bbl of above ground storage
 100 vehicle trucking fleet
 8 brine disposal wells
5
EnLink Midstream Partners, LP
Master Limited Partnership
NYSE: ENLK
(BBB / Baa3)
EnLink Midstream, LLC
General Partner
NYSE: ENLC
Public
Unitholders
~70% ~30%
~1% GP
~7% LP
EnLink Midstream Holdings
(formerly Devon Midstream Holdings)
~51%
LP
~41%
LP
Devon Energy
Corp.
NYSE: DVN
(BBB+ / Baa1)
GP + 50% LP
The Vehicle for Sustainable Growth:
MLP Structure with a Premier Sponsor
6
Dist./Q Split Level
< $0.2500 2% / 98%
< $0.3125 15% / 85%
< $0.3750 25% / 75%
> $0.3750 50% / 50%
Current
Position
ENLC owns 100% of IDRs
~50%
LP
Note: The ownership percentages shown above are as of the date of this presentation.
The Vehicle for Sustainable Growth:
Mitigating Risk with Fee-Based Cash Flows
 Devon is EnLink Midstream’s largest customer
(>50% of consolidated 2014E adjusted EBITDA*)
 EnLink Midstream’s growth projects focus on crude/NGL services and rich gas processing
 Strong emphasis on fee-based contracts
2014E EnLink Midstream Consolidated
Gross Operating Margin*
95%
5%
By Contract Type
Texas
57%
19%
Ohio
5%
Okla.
19%
By Region
56%
Devon
44%
Other
By Customer
Fee-Based
Commodity
Sensitive
* Gross operating margin and adjusted EBITDA percentage estimates are provided for illustrative purposes and reflect period following transaction closing (2Q-4Q 2014).
Note: Adjusted EBITDA and gross operating margin are non-GAAP financial measures and are explained on page 3.
Louisiana
7
8
Each of EnLink Midstream’s segments benefits from the stability provided by long-term, fee-based contracts
Segment / Key Contract
% of Q4 2014
Segment
Cash Flow *
Texas
Devon Bridgeport Contract - 10 years with 5 year MVC
85%
Devon East Johnson County Contract - 10 years with 5 year MVC
Existing FT Transmission & Gathering - Volume Commitments with remaining terms of 2-10 years
Apache Deadwood Plant - Dedicated interest with 8 years remaining on 10 year term
Bearkat Plant - Volume Commitment with 10 year term from initial flow
Oklahoma
Devon Cana Contract - 10 years with 5 year MVC 100%
Linn Northridge Contract ** - 10 years with 5 year MVC
Louisiana
North LIG Firm Transport - Reservation fee with avg remaining life of 4 years
70%Firm Treating & Processing - Remaining term minimum 2 years
Cajun-Sibon Phases I & II - 5 & 10 year agreements for supply and sale of key products
ORV
E2 Compression / Stabilization Contract - 7 years ~30%
% of Total Segment Cash Flow in Q4 2014 ~80%
* Based on Q4 2014 estimates.
** As previously disclosed, Devon assigned this contract to a subsidiary of Linn Energy, effective as of December 1, 2014
Note: Segment cash flow is a non-GAAP financial measure and is explained in greater detail on page 3.
The Vehicle for Sustainable Growth:
Cash Flow Stability from Long-Term Contracts
Sustainable
Growth
Substantial
Scale &
Scope
Diverse,
Fee-Based
Cash Flow
Strong B/S
& Credit
Profile
9
 Investment grade balance sheet at ENLK (BBB, Baa3)
 Debt / EBITDA of ~3.5x
 Strong liquidity
 ~ 95% fee-based margin
 Balanced cash flow (Devon ~50%)
 Projects focused on NGL/crude and rich gas processing
 Total consolidated enterprise value of ~$14 billion
 Projected 2014 Combined Adjusted EBITDA: ~$675 MM
 Geographically diverse assets
 Stable base cash flow supported by long-term contracts
 Organic growth opportunities through Devon’s upstream portfolio
 Potential additional adjusted EBITDA from drop downs: ~$375 MM
Louisiana
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
The Vehicle for Sustainable Growth:
Well Positioned with a Strong Balance Sheet
The Four Avenues for
Growth
10
11
Avenue 1:
Drop Downs
Organic Growth
Projects
The Four Avenues for Growth
Progress in last Six Months
Ohio River Valley: E2 drop down complete
 Avenue 2:
Growing With
Devon
West Texas: Ajax Plant & Martin County Expansion
announced
 Avenue 3:
Organic Growth
Projects
Ohio River Valley: condensate pipeline & stabilization /
gas compression stations announced
Louisiana: Marathon JV & NGL pipeline announced
 Avenue 4:
Mergers &
Acquisitions
Louisiana: Gulf Coast natural gas assets acquired
West Texas: LPC crude logistics business acquisition

~$200 MM
~$200 MM+
~$300 MM+
~$335 MM
In the last six months, EnLink completed construction on ~$1 billion of growth projects,
including the Cajun-Sibon and the Bearkat expansions. EnLink also announced the
projects above, which represent the next $1 billion in capital. 11
Capital
Commitment
Avenue 1: Drop Downs
Devon Sponsorship Creates Drop Down Opportunities
12
2014 2015 2016 2017
Devon Sponsorship Provides Potential for ~$375 MM of Adjusted EBITDA from Drop Downs
Other Potential Devon Drop Downs *
E2
Legacy Devon
Midstream Assets *
Access Pipeline *
Victoria
Express
Pipeline *
* Cautionary Note: The information regarding these potential drop downs is for illustrative purposes only. No agreements or understandings exist regarding the terms of these potential drop
downs, and Devon is not obligated to sell or contribute any of these assets to EnLink. The completion of any future drop down will be subject to a number of conditions. The capital and
acquisition cost information on this slide is based on management’s current estimates and current market information and is subject to change.
** Represents the value assigned to the General Partner’s ownership interest in Devon’s legacy midstream assets in the transaction that closed in March 2014.
*** Based on 2014 Guidance.
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained on page 3.
Drop Down Cost:
~$193 MM
Estimated Adjusted EBITDA:
~$20-25 MM
Estimated Capital Cost:
$1.0 B
Estimated Adjusted EBITDA:
~$150 MM
Transaction Valuation:
$2.4 B **
Estimated Adjusted EBITDA:
~$200 MM ***
Estimated Capital Cost:
$70 MM
Estimated Adjusted EBITDA:
~$12 MM

Avenue 1: Drop Downs
E2 Drop Down in Ohio River Valley
13
New Assets
 Three facilities operating, two under construction
 When completed, five facilities will have total
capacity of ~580 MMcf/d and ~19,000 Bbl/d
Strategic Benefits
 Key customer: Antero Resources
 100% fee-based contracts with minimum volume
commitments
 Drop down from ENLC to ENLK completed in
October 2014
 Approximately ~$193 MM acquisition cost
 Estimated annual adjusted EBITDA contribution
post-drop down: ~$20-25 MM
E2 Stations
*
*
*
* Assets are in development as of the date of this presentation.
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained on page 3.
Avenue 1: Future Drop Downs
Devon’s Access & Victoria Express Pipelines
14
 Three ~180 mile pipelines from Sturgeon
terminal to Devon’s thermal acreage
 ~30 miles of dual pipeline from Sturgeon
Terminal to Edmonton
 Capacity net to Devon:
- Blended bitumen: 170,000 Bbl/d
 Devon ownership: 50%
- ~$1B invested to date
 ~56 mile crude oil pipeline from Eagle Ford
core to Port Victoria terminal
 ~300,000 Bbl of storage available
 Capacity:
- 50,000 Bbl/d start-up capacity (expandable)
 Devon ownership: 100%
- ~$70 MM invested to date
Access Pipeline Victoria Express Pipeline
15
Avenue 2: Growing With Devon
Martin County Expansion in West Texas
under construction
Processing Plant
under construction
AJAX
New Assets Under Construction
 Ajax: ~120 MMcf/d cryogenic processing plant
 23-mile, 12” high pressure gathering pipeline
and low pressure gathering systems
 Acreage dedication from Devon in Martin
County
 Planned to be operational second half of 2015
Strategic Benefits
 Expanding in an active area of Midland Basin
rapidly developing Wolfcamp production
 Leverages Devon sponsorship
 Anchored by long-term, fee-based contracts
 Increased ability to compete in Martin, Howard
and Midland Counties
 Multiple plant locations allows for potential
system expansion to 400 MMcf/d
 Deploying over $200 MM in capital; doubles
EnLink’s investment in the Permian
Avenue 2: Growing With Devon
Significant Production Growth in Cana-Woodford
Devon Assets in the Cana-Woodford
 Devon Rigs in Cana
̶ Q3 ‘14: 1 rig
̶ Expected by Q1 2015: 10+ rigs
 Acreage: ~280,000 net acres
̶ Acquired 50,000 net acres in June ‘14
 Workover activity yielding excellent results
̶ Acid treatments performed on 200+ wells
̶ Avg. rates per well increased 1-2+ MMCFE/d
̶ Payback period <3 months
̶ Identified >100 additional future locations
 Significant undrilled well inventory
̶ Total Cana risked locations: >5,000
16
EnLink Assets in the Cana-Woodford
 Pipeline: 410 miles, 530 MMcf/d capacity
 Processing: one plant with 350 MMcf/d capacity
Avenue 3: Organic Growth Projects
Gulf Coast Market for Products & Services
is Strategic to Growth Plans
17Source: EIA/RBN Energy
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
Bcf/d
New Gas Pipelines to Gulf Coast
Source RBN Energy, January 2015
Avenue 3: Organic Growth Projects
Cajun-Sibon Expansion Complete
 258 miles of NGL pipeline from Mont Belvieu area to NGL fractionation assets in
south Louisiana (195 miles new, 63 miles re-purposed)
 140 MBbl/d south Louisiana fractionation expansion
 Phase I completed Q4 2013; Phase II completed in Q4 2014
 Expected run-rate adjusted EBITDA of ~$115 MM
18
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
19
New Assets in Development
 30-mile, 10” NGL pipeline from EnLink’s
Riverside fractionator to Marathon Petroleum’s
Garyville refinery
 Expected to be operational in first half of 2017
Strategic Benefits
 50/50 JV with Marathon Petroleum Corp.
 Marathon to support the project with 50% of
capital cost and long-term, fee-based
contracts for butane and natural gasoline
transportation, supply and optional storage
 EnLink to construct and operate the pipeline
 First bolt-on project to Cajun-Sibon expansion
Avenue 3: Organic Growth Projects
JV with Marathon to Build NGL Pipeline
in South LA
*
* Assets are in development as of the date of this presentation.
20
Avenue 3: Organic Growth Projects
Ohio River Valley Condensate Pipeline,
Stabilization & Compression System Expansion
New Assets In Development
 45-mile, 8” condensate pipeline with an expected
capacity of ~50,000 Bbl/d
 6 new condensate stabilization and natural gas
compression stations with combined capacities of
~41,500 Bbl/d and ~560 MMcf/d, respectively
 Expected to be in service by second half of 2015
 Once complete, EnLink’s assets in the
Utica/Marcellus will include:
 250 miles of pipeline
 11 natural gas compression and condensate
stabilization facilities with total capacity of ~1.2
Bcf/d and ~60,000 Bbl/d, respectively
 Over 110 trucks
 Eight brine disposal wells
 ~630,000 Bbl of above ground storage
Strategic Benefits
 Leverages and expands EnLink’s footprint of
midstream assets in the Utica/Marcellus
 Supported by long-term, fee-based contracts
 Deploying over $250 MM in capital; increases
EnLink’s investment in the ORV to over ~$700 MM
* Assets are in development as of the date of this presentation.
*
*
*
Avenue 4: Mergers & Acquisitions
Gulf Coast Natural Gas Assets
 Closed on ~$235 million acquisition from Chevron on November 1st
 Creates opportunities to optimize Louisiana assets and convert redundant natural gas
pipelines to other services
 ~1,400 miles of natural gas pipelines in three systems spanning from Port Arthur, TX to
the Mississippi River corridor
 ~11 Bcf of natural gas storage capacity in three south Louisiana caverns
 Ownership and management of title tracking services offered at Henry Hub
21
Avenue 4: Mergers & Acquisitions
LPC Crude Oil Logistics Business
 Announced plans to acquire LPC Crude Oil Marketing, LLC
(“LPC”) on January 12, 2015 for ~$100 MM
 LPC’s assets include:
 13 pipeline and refinery injection stations,
 ~67 miles of crude gathering systems
 43 tractor trailers
 Extensive crude oil first purchasing operation
 Acquisition Multiple: ~8x run rate adjusted EBITDA
 Expect to close on acquisition in Q1 2015
22
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
EnLink Midstream Today & Tomorrow
EnLink Midstream
Today
EnLink Midstream
Potential Future in 2017
23
South Louisiana Growth:
Cajun-Sibon, Marathon JV,
Gulf Coast Acquisition
West Texas Growth:
Bearkat, Martin County
expansion & LPC
acquisition
Victoria
Express
Drop Down
Complete
ORV Condensate
Pipeline and
Stabilizers
Complete
Other Potential Step Changes
Other
Growth
Factors
• Growth from Serving Devon
• Mergers & Acquisitions
Potential
for $375 MM
of Adjusted EBITDA
from drop downs
Heavy Oil
Access
Pipeline
Drop down
Complete
CANADIAN
OIL
SANDS
Midstream
Holdings
Drop Down
Complete
E2 Drop Down
Complete
Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
Significant
Organic Growth
Projects
Underway
24
Our Strategy: Stability Plus Growth
A Stable Investment in the MLP Space
Stability of cash flows
 ~95% fee-based contracts
 ~50% of gross operating margin from long-term Devon contracts
Top tier midstream energy service for our customers
Leverage Devon Energy sponsorship for growth
 Potential additional adjusted EBITDA from dropdowns: ~$375 MM by 2017
 Serve Devon E&P portfolio in its growth areas
Strong organic growth
 South Louisiana, West Texas and Ohio River Valley (ORV) expansion projects
Top tier balance sheet
 Investment grade credit rating at ENLK since inception
 Strong liquidity
Note: Adjusted EBITDA and gross operating margin are non-GAAP financial measures and are explained on page 3.

More Related Content

What's hot

Barclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalBarclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalEnLinkMidstreamLLC
 
Investor Presentation March 2014
Investor Presentation March 2014Investor Presentation March 2014
Investor Presentation March 2014EnLinkMidstreamLLC
 
Q3 2014 Growth Initiatives Update
Q3 2014 Growth Initiatives UpdateQ3 2014 Growth Initiatives Update
Q3 2014 Growth Initiatives UpdateEnLinkMidstreamLLC
 
Jp energy january 2016 ubs 1x1 conference
Jp energy january 2016 ubs 1x1 conferenceJp energy january 2016 ubs 1x1 conference
Jp energy january 2016 ubs 1x1 conferenceir_jpenergy
 
Jp energy january 2016 ubs 1x1 conference
Jp energy   january 2016 ubs 1x1 conferenceJp energy   january 2016 ubs 1x1 conference
Jp energy january 2016 ubs 1x1 conferenceir_jpenergy
 
Jp energy january 2016 ubs 1x1 conference1
Jp energy   january 2016 ubs 1x1 conference1Jp energy   january 2016 ubs 1x1 conference1
Jp energy january 2016 ubs 1x1 conference1ir_jpenergy
 
Mlpa crestwood investor presentation_june 2016
Mlpa crestwood investor presentation_june 2016Mlpa crestwood investor presentation_june 2016
Mlpa crestwood investor presentation_june 2016CrestwoodCorporate
 
Am website presentation (a) august 2016
Am website presentation (a)   august 2016Am website presentation (a)   august 2016
Am website presentation (a) august 2016anteromidstream
 
Investor presentation march 2016
Investor presentation march 2016Investor presentation march 2016
Investor presentation march 2016CrestwoodCorporate
 
Investor presentation march 2016 v final
Investor presentation march 2016 v finalInvestor presentation march 2016 v final
Investor presentation march 2016 v finalCrestwoodCorporate
 
Investor presentation november 2015 v rbc final
Investor presentation november 2015 v rbc finalInvestor presentation november 2015 v rbc final
Investor presentation november 2015 v rbc finalCrestwoodCorporate
 
Am website presentation (a) may 2016
Am website presentation (a)   may 2016Am website presentation (a)   may 2016
Am website presentation (a) may 2016anteromidstream
 
Trc q2 2014 earnings slides final
Trc q2 2014 earnings slides finalTrc q2 2014 earnings slides final
Trc q2 2014 earnings slides finaltrcsolutions
 
Q1 16 operations report - final
Q1 16 operations report - finalQ1 16 operations report - final
Q1 16 operations report - finalEnLinkMidstreamLLC
 
December Investor Presentation
December Investor Presentation December Investor Presentation
December Investor Presentation amereninvestors
 
UBS MLP One-on-One Conference
UBS MLP One-on-One ConferenceUBS MLP One-on-One Conference
UBS MLP One-on-One ConferenceSunocoLP
 
Edison International - Business Update November 2016
Edison International - Business Update November 2016Edison International - Business Update November 2016
Edison International - Business Update November 2016EdisonInternational
 
November Investor Presentation
November Investor PresentationNovember Investor Presentation
November Investor Presentationamereninvestors
 

What's hot (20)

Barclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalBarclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - final
 
Investor Presentation March 2014
Investor Presentation March 2014Investor Presentation March 2014
Investor Presentation March 2014
 
Goldman sachs presentation
Goldman sachs presentation Goldman sachs presentation
Goldman sachs presentation
 
Q3 2014 Growth Initiatives Update
Q3 2014 Growth Initiatives UpdateQ3 2014 Growth Initiatives Update
Q3 2014 Growth Initiatives Update
 
Jp energy january 2016 ubs 1x1 conference
Jp energy january 2016 ubs 1x1 conferenceJp energy january 2016 ubs 1x1 conference
Jp energy january 2016 ubs 1x1 conference
 
Jp energy january 2016 ubs 1x1 conference
Jp energy   january 2016 ubs 1x1 conferenceJp energy   january 2016 ubs 1x1 conference
Jp energy january 2016 ubs 1x1 conference
 
Jp energy january 2016 ubs 1x1 conference1
Jp energy   january 2016 ubs 1x1 conference1Jp energy   january 2016 ubs 1x1 conference1
Jp energy january 2016 ubs 1x1 conference1
 
Mlpa crestwood investor presentation_june 2016
Mlpa crestwood investor presentation_june 2016Mlpa crestwood investor presentation_june 2016
Mlpa crestwood investor presentation_june 2016
 
Am website presentation (a) august 2016
Am website presentation (a)   august 2016Am website presentation (a)   august 2016
Am website presentation (a) august 2016
 
Investor presentation march 2016
Investor presentation march 2016Investor presentation march 2016
Investor presentation march 2016
 
Investor presentation march 2016 v final
Investor presentation march 2016 v finalInvestor presentation march 2016 v final
Investor presentation march 2016 v final
 
Investor presentation november 2015 v rbc final
Investor presentation november 2015 v rbc finalInvestor presentation november 2015 v rbc final
Investor presentation november 2015 v rbc final
 
Am website presentation (a) may 2016
Am website presentation (a)   may 2016Am website presentation (a)   may 2016
Am website presentation (a) may 2016
 
Trc q2 2014 earnings slides final
Trc q2 2014 earnings slides finalTrc q2 2014 earnings slides final
Trc q2 2014 earnings slides final
 
Q1 16 operations report - final
Q1 16 operations report - finalQ1 16 operations report - final
Q1 16 operations report - final
 
December Investor Presentation
December Investor Presentation December Investor Presentation
December Investor Presentation
 
UBS MLP One-on-One Conference
UBS MLP One-on-One ConferenceUBS MLP One-on-One Conference
UBS MLP One-on-One Conference
 
Edison International - Business Update November 2016
Edison International - Business Update November 2016Edison International - Business Update November 2016
Edison International - Business Update November 2016
 
Awk red chip slides final without notes
Awk red chip slides final without notesAwk red chip slides final without notes
Awk red chip slides final without notes
 
November Investor Presentation
November Investor PresentationNovember Investor Presentation
November Investor Presentation
 

Viewers also liked

Acquisition of gulf coast natural gas assets final
Acquisition of gulf coast natural gas assets   finalAcquisition of gulf coast natural gas assets   final
Acquisition of gulf coast natural gas assets finalEnLinkMidstreamLLC
 
aCoronado acquisition-final-feb-2 v001-i2y1gg
aCoronado acquisition-final-feb-2 v001-i2y1ggaCoronado acquisition-final-feb-2 v001-i2y1gg
aCoronado acquisition-final-feb-2 v001-i2y1ggEnLinkMidstreamLLC
 
En link midstream jp morgan presentation
En link midstream jp morgan presentationEn link midstream jp morgan presentation
En link midstream jp morgan presentationEnLinkMidstreamLLC
 
2015 Jefferies Energy Conference
2015 Jefferies Energy Conference2015 Jefferies Energy Conference
2015 Jefferies Energy ConferenceEnLinkMidstreamLLC
 
2013 Wells Fargo Pipeline, MLP & Energy Symposium
2013 Wells Fargo Pipeline, MLP & Energy Symposium2013 Wells Fargo Pipeline, MLP & Energy Symposium
2013 Wells Fargo Pipeline, MLP & Energy SymposiumEnLinkMidstreamLLC
 
2015 analyst day presentation v12 for website (1)
2015 analyst day presentation   v12 for website (1)2015 analyst day presentation   v12 for website (1)
2015 analyst day presentation v12 for website (1)EnLinkMidstreamLLC
 
Mufg conference presentation final
Mufg conference presentation   finalMufg conference presentation   final
Mufg conference presentation finalEnLinkMidstreamLLC
 
2014 analyst day presentation final
2014 analyst day presentation final2014 analyst day presentation final
2014 analyst day presentation finalEnLinkMidstreamLLC
 
Rbc presentation final 11.18.13
Rbc presentation final   11.18.13Rbc presentation final   11.18.13
Rbc presentation final 11.18.13EnLinkMidstreamLLC
 

Viewers also liked (10)

Acquisition of gulf coast natural gas assets final
Acquisition of gulf coast natural gas assets   finalAcquisition of gulf coast natural gas assets   final
Acquisition of gulf coast natural gas assets final
 
aCoronado acquisition-final-feb-2 v001-i2y1gg
aCoronado acquisition-final-feb-2 v001-i2y1ggaCoronado acquisition-final-feb-2 v001-i2y1gg
aCoronado acquisition-final-feb-2 v001-i2y1gg
 
En link midstream jp morgan presentation
En link midstream jp morgan presentationEn link midstream jp morgan presentation
En link midstream jp morgan presentation
 
2015 Jefferies Energy Conference
2015 Jefferies Energy Conference2015 Jefferies Energy Conference
2015 Jefferies Energy Conference
 
2013 Wells Fargo Pipeline, MLP & Energy Symposium
2013 Wells Fargo Pipeline, MLP & Energy Symposium2013 Wells Fargo Pipeline, MLP & Energy Symposium
2013 Wells Fargo Pipeline, MLP & Energy Symposium
 
2015 analyst day presentation v12 for website (1)
2015 analyst day presentation   v12 for website (1)2015 analyst day presentation   v12 for website (1)
2015 analyst day presentation v12 for website (1)
 
Mufg conference presentation final
Mufg conference presentation   finalMufg conference presentation   final
Mufg conference presentation final
 
Naptp presentation final
Naptp presentation   finalNaptp presentation   final
Naptp presentation final
 
2014 analyst day presentation final
2014 analyst day presentation final2014 analyst day presentation final
2014 analyst day presentation final
 
Rbc presentation final 11.18.13
Rbc presentation final   11.18.13Rbc presentation final   11.18.13
Rbc presentation final 11.18.13
 

Similar to Morgan Stanley Winter MLP & Diversified Natural Gas Bus Tour

RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015EnLinkMidstreamLLC
 
Investor Presentation August 2015
Investor Presentation August 2015Investor Presentation August 2015
Investor Presentation August 2015EnLinkMidstreamLLC
 
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceGoldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceEnLinkMidstreamLLC
 
Citi MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceCiti MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceEnLinkMidstreamLLC
 
Citi conference presentation final - 8.20.14
Citi conference presentation   final - 8.20.14Citi conference presentation   final - 8.20.14
Citi conference presentation final - 8.20.14EnLinkMidstreamLLC
 
Credit suisse mlp conference presentation
Credit suisse mlp conference presentationCredit suisse mlp conference presentation
Credit suisse mlp conference presentationEnLinkMidstreamLLC
 
Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation EnLinkMidstreamLLC
 
Morgan stanley mlp bus tour jan. 26 - final
Morgan stanley mlp bus tour   jan. 26 - finalMorgan stanley mlp bus tour   jan. 26 - final
Morgan stanley mlp bus tour jan. 26 - finalEnLinkMidstreamLLC
 
Jp morgan okc bus tour may 16 16 - final
Jp morgan okc bus tour   may 16 16 - finalJp morgan okc bus tour   may 16 16 - final
Jp morgan okc bus tour may 16 16 - finalEnLinkMidstreamLLC
 
Q4 15 operations report final2
Q4 15 operations report   final2Q4 15 operations report   final2
Q4 15 operations report final2EnLinkMidstreamLLC
 
Enlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnLinkMidstreamLLC
 
Q2 2016 operations report final as published
Q2 2016   operations report final as publishedQ2 2016   operations report final as published
Q2 2016 operations report final as publishedEnLinkMidstreamLLC
 
Q2 2016 operations report final as published
Q2 2016   operations report final as publishedQ2 2016   operations report final as published
Q2 2016 operations report final as publishedEnLinkMidstreamLLC
 
2015 analyst day presentation v13 for website
2015 analyst day presentation   v13 for website2015 analyst day presentation   v13 for website
2015 analyst day presentation v13 for websiteEnLinkMidstreamLLC
 
Tph midstream ngl conf presentation final (1)
Tph midstream ngl conf presentation   final (1)Tph midstream ngl conf presentation   final (1)
Tph midstream ngl conf presentation final (1)EnLinkMidstreamLLC
 
ET April 2023 Investor Presentation_Final.pdf
ET April 2023 Investor Presentation_Final.pdfET April 2023 Investor Presentation_Final.pdf
ET April 2023 Investor Presentation_Final.pdfssuser6f254f1
 
Enlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations reportEnlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations reportEnLinkMidstreamLLC
 
En link midstream jefferies presentation nov 29 16
En link midstream jefferies presentation   nov 29 16En link midstream jefferies presentation   nov 29 16
En link midstream jefferies presentation nov 29 16EnLinkMidstreamLLC
 

Similar to Morgan Stanley Winter MLP & Diversified Natural Gas Bus Tour (18)

RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015RBC Capital Markets MLP Conference 2015
RBC Capital Markets MLP Conference 2015
 
Investor Presentation August 2015
Investor Presentation August 2015Investor Presentation August 2015
Investor Presentation August 2015
 
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceGoldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
 
Citi MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceCiti MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure Conference
 
Citi conference presentation final - 8.20.14
Citi conference presentation   final - 8.20.14Citi conference presentation   final - 8.20.14
Citi conference presentation final - 8.20.14
 
Credit suisse mlp conference presentation
Credit suisse mlp conference presentationCredit suisse mlp conference presentation
Credit suisse mlp conference presentation
 
Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation
 
Morgan stanley mlp bus tour jan. 26 - final
Morgan stanley mlp bus tour   jan. 26 - finalMorgan stanley mlp bus tour   jan. 26 - final
Morgan stanley mlp bus tour jan. 26 - final
 
Jp morgan okc bus tour may 16 16 - final
Jp morgan okc bus tour   may 16 16 - finalJp morgan okc bus tour   may 16 16 - final
Jp morgan okc bus tour may 16 16 - final
 
Q4 15 operations report final2
Q4 15 operations report   final2Q4 15 operations report   final2
Q4 15 operations report final2
 
Enlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations report
 
Q2 2016 operations report final as published
Q2 2016   operations report final as publishedQ2 2016   operations report final as published
Q2 2016 operations report final as published
 
Q2 2016 operations report final as published
Q2 2016   operations report final as publishedQ2 2016   operations report final as published
Q2 2016 operations report final as published
 
2015 analyst day presentation v13 for website
2015 analyst day presentation   v13 for website2015 analyst day presentation   v13 for website
2015 analyst day presentation v13 for website
 
Tph midstream ngl conf presentation final (1)
Tph midstream ngl conf presentation   final (1)Tph midstream ngl conf presentation   final (1)
Tph midstream ngl conf presentation final (1)
 
ET April 2023 Investor Presentation_Final.pdf
ET April 2023 Investor Presentation_Final.pdfET April 2023 Investor Presentation_Final.pdf
ET April 2023 Investor Presentation_Final.pdf
 
Enlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations reportEnlk and enlc second quarter 2017 operations report
Enlk and enlc second quarter 2017 operations report
 
En link midstream jefferies presentation nov 29 16
En link midstream jefferies presentation   nov 29 16En link midstream jefferies presentation   nov 29 16
En link midstream jefferies presentation nov 29 16
 

More from EnLinkMidstreamLLC

En link midstream announces avenger delaware crude gathering system final
En link midstream announces avenger delaware crude gathering system finalEn link midstream announces avenger delaware crude gathering system final
En link midstream announces avenger delaware crude gathering system finalEnLinkMidstreamLLC
 
En link midstream announces strategic partner update
En link midstream announces strategic partner updateEn link midstream announces strategic partner update
En link midstream announces strategic partner updateEnLinkMidstreamLLC
 
En link midstream 1q 2018 operations report final
En link midstream 1q 2018 operations report finalEn link midstream 1q 2018 operations report final
En link midstream 1q 2018 operations report finalEnLinkMidstreamLLC
 
En link midstream 1q 2018 operations report
En link midstream 1q 2018 operations reportEn link midstream 1q 2018 operations report
En link midstream 1q 2018 operations reportEnLinkMidstreamLLC
 
EnLink Midstream Q4 & Full-Year 2017 Operations Report
EnLink Midstream Q4 & Full-Year 2017 Operations ReportEnLink Midstream Q4 & Full-Year 2017 Operations Report
EnLink Midstream Q4 & Full-Year 2017 Operations ReportEnLinkMidstreamLLC
 
En link midstream 2018 guidance
En link midstream 2018 guidanceEn link midstream 2018 guidance
En link midstream 2018 guidanceEnLinkMidstreamLLC
 
Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017EnLinkMidstreamLLC
 
Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017EnLinkMidstreamLLC
 
February 2017 enlk and enlc operations report
February 2017 enlk and enlc operations reportFebruary 2017 enlk and enlc operations report
February 2017 enlk and enlc operations reportEnLinkMidstreamLLC
 
2017 en link midstream guidance
2017 en link midstream guidance2017 en link midstream guidance
2017 en link midstream guidanceEnLinkMidstreamLLC
 
En link midstream chickasaw presentation dec 7 16
En link midstream chickasaw presentation   dec 7 16En link midstream chickasaw presentation   dec 7 16
En link midstream chickasaw presentation dec 7 16EnLinkMidstreamLLC
 
En link midstream 3q 2016 operations report final
En link midstream 3q 2016 operations report finalEn link midstream 3q 2016 operations report final
En link midstream 3q 2016 operations report finalEnLinkMidstreamLLC
 
Greater Chickadee Crude Oil Gathering Project
Greater Chickadee Crude Oil Gathering ProjectGreater Chickadee Crude Oil Gathering Project
Greater Chickadee Crude Oil Gathering ProjectEnLinkMidstreamLLC
 
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLinkMidstreamLLC
 

More from EnLinkMidstreamLLC (14)

En link midstream announces avenger delaware crude gathering system final
En link midstream announces avenger delaware crude gathering system finalEn link midstream announces avenger delaware crude gathering system final
En link midstream announces avenger delaware crude gathering system final
 
En link midstream announces strategic partner update
En link midstream announces strategic partner updateEn link midstream announces strategic partner update
En link midstream announces strategic partner update
 
En link midstream 1q 2018 operations report final
En link midstream 1q 2018 operations report finalEn link midstream 1q 2018 operations report final
En link midstream 1q 2018 operations report final
 
En link midstream 1q 2018 operations report
En link midstream 1q 2018 operations reportEn link midstream 1q 2018 operations report
En link midstream 1q 2018 operations report
 
EnLink Midstream Q4 & Full-Year 2017 Operations Report
EnLink Midstream Q4 & Full-Year 2017 Operations ReportEnLink Midstream Q4 & Full-Year 2017 Operations Report
EnLink Midstream Q4 & Full-Year 2017 Operations Report
 
En link midstream 2018 guidance
En link midstream 2018 guidanceEn link midstream 2018 guidance
En link midstream 2018 guidance
 
Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017
 
Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017Enlk &amp; enlc operations report third quarter 2017
Enlk &amp; enlc operations report third quarter 2017
 
February 2017 enlk and enlc operations report
February 2017 enlk and enlc operations reportFebruary 2017 enlk and enlc operations report
February 2017 enlk and enlc operations report
 
2017 en link midstream guidance
2017 en link midstream guidance2017 en link midstream guidance
2017 en link midstream guidance
 
En link midstream chickasaw presentation dec 7 16
En link midstream chickasaw presentation   dec 7 16En link midstream chickasaw presentation   dec 7 16
En link midstream chickasaw presentation dec 7 16
 
En link midstream 3q 2016 operations report final
En link midstream 3q 2016 operations report finalEn link midstream 3q 2016 operations report final
En link midstream 3q 2016 operations report final
 
Greater Chickadee Crude Oil Gathering Project
Greater Chickadee Crude Oil Gathering ProjectGreater Chickadee Crude Oil Gathering Project
Greater Chickadee Crude Oil Gathering Project
 
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
 

Recently uploaded

OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书Fis s
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxHenryBriggs2
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...wyqazy
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 

Recently uploaded (20)

OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls ServicesPreet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptx
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 

Morgan Stanley Winter MLP & Diversified Natural Gas Bus Tour

  • 1. Morgan Stanley Winter MLP & Diversified Natural Gas Bus Tour January 27, 2015 1 Strong. Innovative. Growing.
  • 2. Forward-Looking Statements This presentation contains forward-looking statements within the meaning of the federal securities laws. Forward-looking statements are not guarantees of performance. They involve risks, uncertainties and assumptions. The future results of EnLink Midstream, LLC, EnLink Midstream Partners, LP and their respective affiliates (collectively known as “EnLink Midstream”) may differ materially from those expressed in the forward-looking statements contained throughout this presentation and in documents filed with the Securities and Exchange Commission (“SEC”). Many of the factors that will determine these results are beyond EnLink Midstream’s ability to control or predict. These statements are necessarily based upon various assumptions involving judgments with respect to the future, including, among others, drilling levels; the dependence on Devon Energy Corporation for a substantial portion of the natural gas that EnLink Midstream gathers, processes and transports; EnLink Midstream’s lack of asset diversification; EnLink Midstream’s vulnerability to having a significant portion of its operations concentrated in the Barnett Shale; the amount of hydrocarbons transported in EnLink Midstream’s gathering and transmission lines and the level of its processing and fractionation operations; fluctuations in oil, natural gas and natural gas liquids (NGL) prices; construction risks in its major development projects; changes in EnLink Midstream’s credit rating; its ability to consummate acquisitions, successfully integrate any acquired businesses, realize any cost savings and other synergies from any acquisition; changes in the availability and cost of capital; competitive conditions in EnLink Midstream’s industry and their impact on its ability to connect hydrocarbon supplies to its assets; operating hazards, natural disasters, weather-related delays, casualty losses and other matters beyond its control; and the effects of existing and future laws and governmental regulations, including environmental and climate change requirements and other uncertainties and other factors discussed in EnLink Midstream’s Annual Reports on Form 10-K for the year ended December 31, 2013, and in EnLink Midstream’s other filings with the SEC. You are cautioned not to put undue reliance on any forward- looking statement. EnLink Midstream has no obligation to publicly update or revise any forward-looking statement, whether as a result of new information, future events or otherwise. 2
  • 3. Non-GAAP Financial Information This presentation contains non-generally accepted accounting principle financial measures that EnLink Midstream refers to as adjusted EBITDA, gross operating margin and segment cash flows. Adjusted EBITDA is defined as net income plus interest expense, provision for income taxes, depreciation and amortization expense, stock-based compensation, (gain) loss on noncash derivatives, transaction costs, distribution of equity investment and non-controlling interest; and income (loss) on equity investment. Gross operating margin is defined as revenue less the cost of purchased gas, NGLs, condensate and crude oil. Segment cash flows is defined as revenue less the cost of purchased gas, NGLs, condensate, crude oil and operating and maintenance expenditures. The amounts included in the calculation of these measures are computed in accordance with generally accepted accounting principles (GAAP) with the exception of maintenance capital expenditures. Maintenance capital expenditures are capital expenditures made to replace partially or fully depreciated assets in order to maintain the existing operating capacity of the assets and to extend their useful lives. EnLink Midstream believes these measures are useful to investors because they may provide users of this financial information with meaningful comparisons between current results and prior-reported results and a meaningful measure of EnLink Midstream’s cash flow after it has satisfied the capital and related requirements of its operations. Adjusted EBITDA, gross operating margin and segment cash flows, as defined above, are not measures of financial performance or liquidity under GAAP. They should not be considered in isolation or as an indicator of EnLink Midstream’s performance. Furthermore, they should not be seen as measures of liquidity or a substitute for metrics prepared in accordance with GAAP. 3
  • 4. 4 Our Strategy: Stability Plus Growth A Stable Investment in the MLP Space Stability of cash flows  ~95% fee-based contracts  ~50% of gross operating margin from long-term Devon contracts Top tier midstream energy service for our customers Leverage Devon Energy sponsorship for growth  Potential additional adjusted EBITDA from dropdowns: ~$375 MM by 2017  Serve Devon E&P portfolio in its growth areas Strong organic growth  South Louisiana, West Texas and Ohio River Valley (ORV) expansion projects Top tier balance sheet  Investment grade credit rating at ENLK since inception  Strong liquidity Note: Adjusted EBITDA and gross operating margin are non-GAAP financial measures and are explained on page 3.
  • 5. The Vehicle for Sustainable Growth: Strategically Located and Complementary Assets Gathering and Transportation  ~8,800 miles of gathering and transmission lines  11 Bcf of natural gas storage capacity Gas Processing  13 plants with 3.4 Bcf/d of total net inlet capacity  1 plant with 120 MMcf/d of net inlet capacity under construction NGL Transportation, Fractionation and Storage  ~570 miles of liquids transport line  7 fractionation facilities with 252,000 Bbl/d of total net capacity  3.1 MMBbl of underground NGL storage Crude, Condensate and Brine Handling  200 miles of crude oil pipeline  Barge and rail terminals  500,000 Bbl of above ground storage  100 vehicle trucking fleet  8 brine disposal wells 5
  • 6. EnLink Midstream Partners, LP Master Limited Partnership NYSE: ENLK (BBB / Baa3) EnLink Midstream, LLC General Partner NYSE: ENLC Public Unitholders ~70% ~30% ~1% GP ~7% LP EnLink Midstream Holdings (formerly Devon Midstream Holdings) ~51% LP ~41% LP Devon Energy Corp. NYSE: DVN (BBB+ / Baa1) GP + 50% LP The Vehicle for Sustainable Growth: MLP Structure with a Premier Sponsor 6 Dist./Q Split Level < $0.2500 2% / 98% < $0.3125 15% / 85% < $0.3750 25% / 75% > $0.3750 50% / 50% Current Position ENLC owns 100% of IDRs ~50% LP Note: The ownership percentages shown above are as of the date of this presentation.
  • 7. The Vehicle for Sustainable Growth: Mitigating Risk with Fee-Based Cash Flows  Devon is EnLink Midstream’s largest customer (>50% of consolidated 2014E adjusted EBITDA*)  EnLink Midstream’s growth projects focus on crude/NGL services and rich gas processing  Strong emphasis on fee-based contracts 2014E EnLink Midstream Consolidated Gross Operating Margin* 95% 5% By Contract Type Texas 57% 19% Ohio 5% Okla. 19% By Region 56% Devon 44% Other By Customer Fee-Based Commodity Sensitive * Gross operating margin and adjusted EBITDA percentage estimates are provided for illustrative purposes and reflect period following transaction closing (2Q-4Q 2014). Note: Adjusted EBITDA and gross operating margin are non-GAAP financial measures and are explained on page 3. Louisiana 7
  • 8. 8 Each of EnLink Midstream’s segments benefits from the stability provided by long-term, fee-based contracts Segment / Key Contract % of Q4 2014 Segment Cash Flow * Texas Devon Bridgeport Contract - 10 years with 5 year MVC 85% Devon East Johnson County Contract - 10 years with 5 year MVC Existing FT Transmission & Gathering - Volume Commitments with remaining terms of 2-10 years Apache Deadwood Plant - Dedicated interest with 8 years remaining on 10 year term Bearkat Plant - Volume Commitment with 10 year term from initial flow Oklahoma Devon Cana Contract - 10 years with 5 year MVC 100% Linn Northridge Contract ** - 10 years with 5 year MVC Louisiana North LIG Firm Transport - Reservation fee with avg remaining life of 4 years 70%Firm Treating & Processing - Remaining term minimum 2 years Cajun-Sibon Phases I & II - 5 & 10 year agreements for supply and sale of key products ORV E2 Compression / Stabilization Contract - 7 years ~30% % of Total Segment Cash Flow in Q4 2014 ~80% * Based on Q4 2014 estimates. ** As previously disclosed, Devon assigned this contract to a subsidiary of Linn Energy, effective as of December 1, 2014 Note: Segment cash flow is a non-GAAP financial measure and is explained in greater detail on page 3. The Vehicle for Sustainable Growth: Cash Flow Stability from Long-Term Contracts
  • 9. Sustainable Growth Substantial Scale & Scope Diverse, Fee-Based Cash Flow Strong B/S & Credit Profile 9  Investment grade balance sheet at ENLK (BBB, Baa3)  Debt / EBITDA of ~3.5x  Strong liquidity  ~ 95% fee-based margin  Balanced cash flow (Devon ~50%)  Projects focused on NGL/crude and rich gas processing  Total consolidated enterprise value of ~$14 billion  Projected 2014 Combined Adjusted EBITDA: ~$675 MM  Geographically diverse assets  Stable base cash flow supported by long-term contracts  Organic growth opportunities through Devon’s upstream portfolio  Potential additional adjusted EBITDA from drop downs: ~$375 MM Louisiana Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3. The Vehicle for Sustainable Growth: Well Positioned with a Strong Balance Sheet
  • 10. The Four Avenues for Growth 10
  • 11. 11 Avenue 1: Drop Downs Organic Growth Projects The Four Avenues for Growth Progress in last Six Months Ohio River Valley: E2 drop down complete  Avenue 2: Growing With Devon West Texas: Ajax Plant & Martin County Expansion announced  Avenue 3: Organic Growth Projects Ohio River Valley: condensate pipeline & stabilization / gas compression stations announced Louisiana: Marathon JV & NGL pipeline announced  Avenue 4: Mergers & Acquisitions Louisiana: Gulf Coast natural gas assets acquired West Texas: LPC crude logistics business acquisition  ~$200 MM ~$200 MM+ ~$300 MM+ ~$335 MM In the last six months, EnLink completed construction on ~$1 billion of growth projects, including the Cajun-Sibon and the Bearkat expansions. EnLink also announced the projects above, which represent the next $1 billion in capital. 11 Capital Commitment
  • 12. Avenue 1: Drop Downs Devon Sponsorship Creates Drop Down Opportunities 12 2014 2015 2016 2017 Devon Sponsorship Provides Potential for ~$375 MM of Adjusted EBITDA from Drop Downs Other Potential Devon Drop Downs * E2 Legacy Devon Midstream Assets * Access Pipeline * Victoria Express Pipeline * * Cautionary Note: The information regarding these potential drop downs is for illustrative purposes only. No agreements or understandings exist regarding the terms of these potential drop downs, and Devon is not obligated to sell or contribute any of these assets to EnLink. The completion of any future drop down will be subject to a number of conditions. The capital and acquisition cost information on this slide is based on management’s current estimates and current market information and is subject to change. ** Represents the value assigned to the General Partner’s ownership interest in Devon’s legacy midstream assets in the transaction that closed in March 2014. *** Based on 2014 Guidance. Note: Adjusted EBITDA is a non-GAAP financial measure and is explained on page 3. Drop Down Cost: ~$193 MM Estimated Adjusted EBITDA: ~$20-25 MM Estimated Capital Cost: $1.0 B Estimated Adjusted EBITDA: ~$150 MM Transaction Valuation: $2.4 B ** Estimated Adjusted EBITDA: ~$200 MM *** Estimated Capital Cost: $70 MM Estimated Adjusted EBITDA: ~$12 MM 
  • 13. Avenue 1: Drop Downs E2 Drop Down in Ohio River Valley 13 New Assets  Three facilities operating, two under construction  When completed, five facilities will have total capacity of ~580 MMcf/d and ~19,000 Bbl/d Strategic Benefits  Key customer: Antero Resources  100% fee-based contracts with minimum volume commitments  Drop down from ENLC to ENLK completed in October 2014  Approximately ~$193 MM acquisition cost  Estimated annual adjusted EBITDA contribution post-drop down: ~$20-25 MM E2 Stations * * * * Assets are in development as of the date of this presentation. Note: Adjusted EBITDA is a non-GAAP financial measure and is explained on page 3.
  • 14. Avenue 1: Future Drop Downs Devon’s Access & Victoria Express Pipelines 14  Three ~180 mile pipelines from Sturgeon terminal to Devon’s thermal acreage  ~30 miles of dual pipeline from Sturgeon Terminal to Edmonton  Capacity net to Devon: - Blended bitumen: 170,000 Bbl/d  Devon ownership: 50% - ~$1B invested to date  ~56 mile crude oil pipeline from Eagle Ford core to Port Victoria terminal  ~300,000 Bbl of storage available  Capacity: - 50,000 Bbl/d start-up capacity (expandable)  Devon ownership: 100% - ~$70 MM invested to date Access Pipeline Victoria Express Pipeline
  • 15. 15 Avenue 2: Growing With Devon Martin County Expansion in West Texas under construction Processing Plant under construction AJAX New Assets Under Construction  Ajax: ~120 MMcf/d cryogenic processing plant  23-mile, 12” high pressure gathering pipeline and low pressure gathering systems  Acreage dedication from Devon in Martin County  Planned to be operational second half of 2015 Strategic Benefits  Expanding in an active area of Midland Basin rapidly developing Wolfcamp production  Leverages Devon sponsorship  Anchored by long-term, fee-based contracts  Increased ability to compete in Martin, Howard and Midland Counties  Multiple plant locations allows for potential system expansion to 400 MMcf/d  Deploying over $200 MM in capital; doubles EnLink’s investment in the Permian
  • 16. Avenue 2: Growing With Devon Significant Production Growth in Cana-Woodford Devon Assets in the Cana-Woodford  Devon Rigs in Cana ̶ Q3 ‘14: 1 rig ̶ Expected by Q1 2015: 10+ rigs  Acreage: ~280,000 net acres ̶ Acquired 50,000 net acres in June ‘14  Workover activity yielding excellent results ̶ Acid treatments performed on 200+ wells ̶ Avg. rates per well increased 1-2+ MMCFE/d ̶ Payback period <3 months ̶ Identified >100 additional future locations  Significant undrilled well inventory ̶ Total Cana risked locations: >5,000 16 EnLink Assets in the Cana-Woodford  Pipeline: 410 miles, 530 MMcf/d capacity  Processing: one plant with 350 MMcf/d capacity
  • 17. Avenue 3: Organic Growth Projects Gulf Coast Market for Products & Services is Strategic to Growth Plans 17Source: EIA/RBN Energy 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 Bcf/d New Gas Pipelines to Gulf Coast Source RBN Energy, January 2015
  • 18. Avenue 3: Organic Growth Projects Cajun-Sibon Expansion Complete  258 miles of NGL pipeline from Mont Belvieu area to NGL fractionation assets in south Louisiana (195 miles new, 63 miles re-purposed)  140 MBbl/d south Louisiana fractionation expansion  Phase I completed Q4 2013; Phase II completed in Q4 2014  Expected run-rate adjusted EBITDA of ~$115 MM 18 Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
  • 19. 19 New Assets in Development  30-mile, 10” NGL pipeline from EnLink’s Riverside fractionator to Marathon Petroleum’s Garyville refinery  Expected to be operational in first half of 2017 Strategic Benefits  50/50 JV with Marathon Petroleum Corp.  Marathon to support the project with 50% of capital cost and long-term, fee-based contracts for butane and natural gasoline transportation, supply and optional storage  EnLink to construct and operate the pipeline  First bolt-on project to Cajun-Sibon expansion Avenue 3: Organic Growth Projects JV with Marathon to Build NGL Pipeline in South LA * * Assets are in development as of the date of this presentation.
  • 20. 20 Avenue 3: Organic Growth Projects Ohio River Valley Condensate Pipeline, Stabilization & Compression System Expansion New Assets In Development  45-mile, 8” condensate pipeline with an expected capacity of ~50,000 Bbl/d  6 new condensate stabilization and natural gas compression stations with combined capacities of ~41,500 Bbl/d and ~560 MMcf/d, respectively  Expected to be in service by second half of 2015  Once complete, EnLink’s assets in the Utica/Marcellus will include:  250 miles of pipeline  11 natural gas compression and condensate stabilization facilities with total capacity of ~1.2 Bcf/d and ~60,000 Bbl/d, respectively  Over 110 trucks  Eight brine disposal wells  ~630,000 Bbl of above ground storage Strategic Benefits  Leverages and expands EnLink’s footprint of midstream assets in the Utica/Marcellus  Supported by long-term, fee-based contracts  Deploying over $250 MM in capital; increases EnLink’s investment in the ORV to over ~$700 MM * Assets are in development as of the date of this presentation. * * *
  • 21. Avenue 4: Mergers & Acquisitions Gulf Coast Natural Gas Assets  Closed on ~$235 million acquisition from Chevron on November 1st  Creates opportunities to optimize Louisiana assets and convert redundant natural gas pipelines to other services  ~1,400 miles of natural gas pipelines in three systems spanning from Port Arthur, TX to the Mississippi River corridor  ~11 Bcf of natural gas storage capacity in three south Louisiana caverns  Ownership and management of title tracking services offered at Henry Hub 21
  • 22. Avenue 4: Mergers & Acquisitions LPC Crude Oil Logistics Business  Announced plans to acquire LPC Crude Oil Marketing, LLC (“LPC”) on January 12, 2015 for ~$100 MM  LPC’s assets include:  13 pipeline and refinery injection stations,  ~67 miles of crude gathering systems  43 tractor trailers  Extensive crude oil first purchasing operation  Acquisition Multiple: ~8x run rate adjusted EBITDA  Expect to close on acquisition in Q1 2015 22 Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3.
  • 23. EnLink Midstream Today & Tomorrow EnLink Midstream Today EnLink Midstream Potential Future in 2017 23 South Louisiana Growth: Cajun-Sibon, Marathon JV, Gulf Coast Acquisition West Texas Growth: Bearkat, Martin County expansion & LPC acquisition Victoria Express Drop Down Complete ORV Condensate Pipeline and Stabilizers Complete Other Potential Step Changes Other Growth Factors • Growth from Serving Devon • Mergers & Acquisitions Potential for $375 MM of Adjusted EBITDA from drop downs Heavy Oil Access Pipeline Drop down Complete CANADIAN OIL SANDS Midstream Holdings Drop Down Complete E2 Drop Down Complete Note: Adjusted EBITDA is a non-GAAP financial measure and is explained in greater detail on page 3. Significant Organic Growth Projects Underway
  • 24. 24 Our Strategy: Stability Plus Growth A Stable Investment in the MLP Space Stability of cash flows  ~95% fee-based contracts  ~50% of gross operating margin from long-term Devon contracts Top tier midstream energy service for our customers Leverage Devon Energy sponsorship for growth  Potential additional adjusted EBITDA from dropdowns: ~$375 MM by 2017  Serve Devon E&P portfolio in its growth areas Strong organic growth  South Louisiana, West Texas and Ohio River Valley (ORV) expansion projects Top tier balance sheet  Investment grade credit rating at ENLK since inception  Strong liquidity Note: Adjusted EBITDA and gross operating margin are non-GAAP financial measures and are explained on page 3.